CN112332347A - Temporary power utilization cable support for construction site of power transmission and transformation project - Google Patents

Temporary power utilization cable support for construction site of power transmission and transformation project Download PDF

Info

Publication number
CN112332347A
CN112332347A CN202011280321.3A CN202011280321A CN112332347A CN 112332347 A CN112332347 A CN 112332347A CN 202011280321 A CN202011280321 A CN 202011280321A CN 112332347 A CN112332347 A CN 112332347A
Authority
CN
China
Prior art keywords
support
cable
support frame
rod
sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011280321.3A
Other languages
Chinese (zh)
Inventor
刘群
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Yushang Power Construction Co ltd
Original Assignee
Hunan Yushang Power Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Yushang Power Construction Co ltd filed Critical Hunan Yushang Power Construction Co ltd
Priority to CN202011280321.3A priority Critical patent/CN112332347A/en
Publication of CN112332347A publication Critical patent/CN112332347A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G7/00Overhead installations of electric lines or cables
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G7/00Overhead installations of electric lines or cables
    • H02G7/05Suspension arrangements or devices for electric cables or lines

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The invention discloses a temporary power utilization cable support for a power transmission and transformation engineering construction site in the field of cable protection, which comprises a support sleeve, wherein a telescopic support rod is inserted into the support sleeve, two sides of the top of the telescopic support rod are fixedly connected with annular clamps, and two sides of the support sleeve are provided with support frame accommodating grooves; according to the invention, through the arrangement of the telescopic supporting rod and the supporting sleeve, a worker can accommodate the telescopic supporting rod into the supporting sleeve, after the locking bolt is screwed out, one side of the cable supporting frame can be accommodated into the supporting frame accommodating groove by taking the supporting frame connecting shaft as an axis, after the fastening bolt is screwed out, the cable supporting frame can slide into the accommodating support by pushing the limiting inclined plate, then the bottom supporting plate is lifted and placed into the accommodating support, the whole operation flow is simple and convenient, time and labor are saved, the worker can quickly build or accommodate the cable supporting frame when needed, a large amount of use area is not required after the accommodating is completed, and the practicability of the device is greatly improved.

Description

Temporary power utilization cable support for construction site of power transmission and transformation project
Technical Field
The invention relates to the field of cable protection, in particular to a temporary power utilization cable support for a construction site of a power transmission and transformation project.
Background
The transmission and transformation project is a general name of transmission line construction and transformer installation project. The higher the voltage grade of power transmission and transformation engineering is, the larger the transmitted power is, and the longer the transmission distance is. The power transmission and transformation project with voltage over 33 ten thousand volts is called ultra-high voltage power transmission and transformation. The highest voltage grades of the ultrahigh voltage transmission and transformation lines put into operation in China are +/-1100 kV direct current transmission lines and 1000kV alternating current transmission lines, and the transmission projects generally referred to in the standards printed by HJ24-2014 of the environmental protection department can be divided into alternating current transmission and transformation projects and direct current transmission projects, wherein the alternating current transmission and transformation projects comprise transmission lines and transformer stations (or switch stations and series compensation stations), and the direct current transmission projects comprise transmission lines, converter stations and grounding electrode systems. The transmission of current often leads to because of the circuit generates heat and causes the loss, so all through the transformer step-up voltage, let the electric current diminish in order to reduce the loss that generates heat when carrying. High voltage electricity has a high risk, and the target electric appliance does not need such high voltage, which requires reduction of voltage by transformation. Since a plurality of times of power transformation is required in the current transmission process, the transmission of current is referred to as power transmission and transformation. The temporary power utilization cable on the construction site of the power transmission and transformation project needs to be buried in the ground or laid overhead.
At present, when built on stilts cabling, often need build cable support temporarily, but current temporary support is not only not convenient for the staff and builds fast because the structure is more when building, and area occupied is great, and the staff of not being convenient for transports it, very big improvement use cost.
Disclosure of Invention
The invention aims to provide a temporary power utilization cable support for a construction site of a power transmission and transformation project, which aims to solve the problems in the background technology.
In order to achieve the purpose, the invention provides the following technical scheme:
a temporary power utilization cable support for a power transmission and transformation project construction site comprises a support sleeve, a telescopic support rod is inserted into the support sleeve, annular clamps are fixedly connected to two sides of the top of the telescopic support rod, support frame accommodating grooves are formed in two sides of the support sleeve, a support frame connecting shaft is movably connected to the inside of each support frame accommodating groove, a cable support frame is sleeved on the outer surface of each support frame connecting shaft, locking bolts are inserted into two sides of each annular clamp, one end of each locking bolt is in threaded connection with the cable support frame, an accommodating support is fixedly connected to the bottom of the support sleeve, a limiting inclined plate adjusting shaft is inserted into the top end of the inside of each accommodating support, a limiting inclined plate is sleeved on the outer surface of each limiting inclined plate adjusting shaft, one side of each limiting inclined plate extends into a strip-shaped limiting groove, and the strip-shaped limiting grooves are formed in, one side of bottom sprag board is pegged graft and is had fastening bolt, fastening bolt's one end extend to the inside of bar spacing groove and with spacing swash plate threaded connection, through flexible bracing piece and the setting of backup sleeve, the staff can accomodate into backup sleeve's inside with flexible bracing piece, back is twisted out with locking bolt, can accomodate into the support frame and accomodate the inslot with one side of cable support frame as the axle center with the support frame connecting axle, back is twisted out with fastening bolt, through promoting spacing swash plate, can slide in accomodating the support, lift bottom sprag board again, and put into and accomodate the support, not only whole operation flow is simple convenient, time saving and labor saving, the staff can build or accomodate it fast when needs, and accomodate and need not occupy a large amount of usable floor area after accomplishing, very big improvement the device's practicality.
As a further scheme of the invention: the firm base of support sleeve's bottom fixedly connected with, the bottom swing joint that the inslot was accomodate to the support frame has folding bracing piece, and the staff pulls out the back with cable support frame, can drive folding bracing piece and pull out from its inside simultaneously, makes folding bracing piece can make cable support frame keep firm through locking.
As a still further scheme of the invention: the other end and the cable support frame swing joint of folding bracing piece, the spacing lantern ring of lift has been cup jointed to the surface of flexible bracing piece, makes the spacing lantern ring of lift fix behind the bottom of folding bracing piece, can play spacing effect to it, improves the steadiness of folding bracing piece.
As a still further scheme of the invention: the front of the spacing lantern ring that goes up and down is pegged graft and is had locking screw, locking screw's one end extends to the inside in locking hole, twist locking screw in the inside of the spacing lantern ring that goes up and down and can make it fixed, through the spacing lantern ring that goes up and down, the setting of spacing swash plate regulating spindle and spacing swash plate, after pulling the opposite side in bar spacing groove with one side of spacing swash plate, can mutually support with the bottom sprag, carry out triangular support to the support sleeve, make the spacing lantern ring that goes up and down fix behind the bottom of folding bracing piece, can play spacing effect to it, the overall structure is simple compact, joint strength is high, the staff of not only being convenient for operates, and the steadiness is stronger.
As a still further scheme of the invention: the front of the supporting sleeve is provided with a fastening screw rod, one end of the fastening screw rod penetrates through the inside of the threaded hole and is in threaded connection with the telescopic supporting rod, and after the telescopic supporting rod is lifted to a specified height, the fastening screw rod is inserted into the threaded hole corresponding to the fastening screw rod, so that the fastening screw rod can be fixed.
As a still further scheme of the invention: the bar recess has been seted up to cable support frame's inside, the inside fixedly connected with direction threaded rod of bar recess, but the cable overlap joint is on cable support frame, through cable support frame and cable splint's setting, with the cable overlap joint back on cable support frame, make the translation slider carry out the translation along the bar recess, the staff can be according to the size of cable, carry out nimble regulation to the interval between the adjacent cable splint to carry out the centre gripping to it, not only improved the steadiness of cable, and be applicable to the not cable of equidimension, good practicality has.
As a still further scheme of the invention: the inside sliding connection of bar recess has the translation slider, the top fixedly connected with cable splint of translation slider, the translation slider can carry out the translation along the bar recess, and the staff can carry out nimble regulation to the interval between the adjacent cable splint according to the size of cable to carry out the centre gripping to it, not only improved the steadiness of cable, and be applicable to the not cable of equidimension, have good practicality.
As a still further scheme of the invention: the both sides of translation slider all are provided with the screw thread locking lantern ring, one side and the top of cable splint and cable support frame all are provided with the wearing layer, twist the screw thread locking lantern ring and can carry on spacingly to it behind the both sides of translation slider, avoid translation slider to carry out the translation.
Compared with the prior art, the invention has the beneficial effects that:
1. according to the invention, through the arrangement of the telescopic supporting rod and the supporting sleeve, a worker can accommodate the telescopic supporting rod into the supporting sleeve, after the locking bolt is screwed out, one side of the cable supporting frame can be accommodated into the supporting frame accommodating groove by taking the supporting frame connecting shaft as an axis, after the fastening bolt is screwed out, the cable supporting frame can slide into the accommodating bracket by pushing the limiting inclined plate, then the bottom supporting plate is lifted and placed into the accommodating bracket, the whole operation flow is simple and convenient, time and labor are saved, the worker can quickly build or accommodate the cable supporting frame when needed, a large amount of use area is not required after the accommodating is completed, and the practicability of the device is greatly improved.
2. According to the invention, through the arrangement of the lifting limiting sleeve ring, the limiting inclined plate adjusting shaft and the limiting inclined plate, one side of the limiting inclined plate is pulled to the other side of the strip-shaped limiting groove and can be matched with the bottom supporting plate to support the supporting sleeve in a triangular mode, so that the lifting limiting sleeve ring can play a limiting role after being fixed at the bottom of the folding supporting rod, the integral structure is simple and compact, the connection strength is high, the operation of workers is facilitated, and the stability is strong.
3. According to the cable clamping device, the cable is lapped on the cable supporting frame through the arrangement of the cable supporting frame and the cable clamping plates, the translation sliding block is enabled to translate along the strip-shaped groove, and a worker can flexibly adjust the distance between the adjacent cable clamping plates according to the size of the cable, so that the cable is clamped, the stability of the cable is improved, the cable clamping device is suitable for cables of different sizes, and the cable clamping device has good practicability.
Drawings
FIG. 1 is a schematic front view of the structure of the present invention;
FIG. 2 is a schematic top view of the telescopic supporting rod according to the present invention;
FIG. 3 is a schematic top view of the support sleeve of the present invention;
FIG. 4 is a perspective view of the cable support of the present invention;
FIG. 5 is an enlarged view of the structure at A in FIG. 1 according to the present invention;
fig. 6 is an enlarged view of the structure at B in fig. 1 of the present invention.
In the figure: 1. a support sleeve; 2. a telescopic support rod; 3. an annular clip; 4. a support frame receiving groove; 5. a support frame connecting shaft; 6. a cable support frame; 7. locking the bolt; 8. a storage rack; 9. a limiting inclined plate adjusting shaft; 10. a limit sloping plate; 11. a strip-shaped limiting groove; 12. a bottom support plate; 13. fastening a bolt; 14. a stable base; 15. folding the support rod; 16. a lifting limit lantern ring; 17. locking the screw rod; 18. a locking hole; 19. fastening a screw rod; 20. a threaded hole; 21. a strip-shaped groove; 22. guiding a threaded rod; 23. a translation slide block; 24. a cable clamp plate; 25. the lines lock the lantern ring.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1 to 6, in an embodiment of the present invention, a temporary power cable support for a power transmission and transformation engineering construction site includes a support sleeve 1, a telescopic support rod 2 is inserted into the support sleeve 1, two sides of the top of the telescopic support rod 2 are both fixedly connected with an annular clip 3, two sides of the support sleeve 1 are both provided with support frame receiving grooves 4, the support frame receiving grooves 4 are internally and movably connected with a support frame connecting shaft 5, the outer surface of the support frame connecting shaft 5 is sleeved with a cable support frame 6, two sides of the annular clip 3 are both inserted with locking bolts 7, one end of each locking bolt 7 is in threaded connection with the cable support frame 6, the bottom of the support sleeve 1 is fixedly connected with a receiving support 8, the top end of the inside of the receiving support 8 is inserted with a limit inclined plate adjusting shaft 9, the outer surface of the limit inclined plate adjusting shaft 9 is sleeved with a limit inclined plate 10, the strip-shaped limiting groove 11 is arranged inside the bottom supporting plate 12, a fastening bolt 13 is inserted into one side of the bottom supporting plate 12, one end of the fastening bolt 13 extends into the strip-shaped limiting groove 11 and is in threaded connection with the limiting inclined plate 10, through the arrangement of the telescopic supporting rod 2 and the supporting sleeve 1, a worker can store the telescopic supporting rod 2 into the supporting sleeve 1, after screwing out the locking bolt 7, one side of the cable supporting frame 6 can be stored into the supporting frame storing groove 4 by taking the supporting frame connecting shaft 5 as an axis, after screwing out the fastening bolt 13, the cable supporting frame can slide into the storing bracket 8 by pushing the limiting inclined plate 10, then the bottom supporting plate 12 is lifted and put into the storing bracket 8, the whole operation flow is simple and convenient, time and labor are saved, the worker can quickly build or store the cable supporting frame when needed, and a large using area is not needed after the storing is completed, the practicability of the device is greatly improved.
Wherein, the bottom end of the supporting sleeve 1 is fixedly connected with a stable base 14, the bottom end of the supporting frame accommodating groove 4 is movably connected with a folding supporting rod 15, after the cable supporting frame 6 is pulled out by a worker, the folding supporting rod 15 can be driven to be pulled out from the interior of the supporting frame accommodating groove, the folding supporting rod 15 can keep stable through locking, the other end of the folding supporting rod 15 is movably connected with the cable supporting frame 6, the outer surface of the telescopic supporting rod 2 is sleeved with a lifting limiting lantern ring 16, the lifting limiting lantern ring 16 is fixed at the bottom of the folding supporting rod 15 and can play a limiting role, the stability of the folding supporting rod 15 is improved, the front side of the lifting limiting lantern ring 16 is inserted with a locking screw rod 17, one end of the locking screw rod 17 extends to the inside of a locking hole 18, the locking screw rod 17 is screwed into the inside of the lifting limiting lantern ring 16 to fix the locking screw rod, one end of the fastening screw 19 penetrates through the inside of the threaded hole 20 and is in threaded connection with the telescopic support rod 2, and after the telescopic support rod 2 is lifted to a specified height, the fastening screw 19 is inserted into the corresponding threaded hole 20 to be fixed.
The inside of the cable support frame 6 is provided with a bar-shaped groove 21, the inside of the bar-shaped groove 21 is fixedly connected with a guide threaded rod 22, a cable can be lapped on the cable support frame 6, the inside of the bar-shaped groove 21 is connected with a translation sliding block 23 in a sliding way, the top of the translation sliding block 23 is fixedly connected with a cable clamp plate 24, the translation sliding block 23 can translate along the bar-shaped groove 21, a worker can flexibly adjust the distance between the adjacent cable clamp plates 24 according to the size of the cable so as to clamp the cable, the stability of the cable is improved, the cable support frame is suitable for cables with different sizes, the cable support frame has good practicability, both sides of the translation sliding block 23 are provided with thread locking lantern rings 25, the cable clamp plate 24 and one side and the top of the cable support frame 6 are provided with wear-resistant layers, and the thread locking, the translation slider 23 is prevented from translating.
The working principle of the invention is as follows: through the arrangement of the telescopic supporting rod 2 and the supporting sleeve 1, a worker can store the telescopic supporting rod 2 into the supporting sleeve 1, after the locking bolt 7 is screwed out, one side of the cable supporting frame 6 can be stored into the supporting frame storing groove 4 by taking the supporting frame connecting shaft 5 as an axis, after the fastening bolt 13 is screwed out, the cable supporting frame can slide into the storing bracket 8 by pushing the limiting inclined plate 10, then the bottom supporting plate 12 is lifted and placed into the storing bracket 8, the whole operation process is simple and convenient, time and labor are saved, the worker can quickly build or store the cable supporting frame when needed, and does not need to occupy a large using area after the storage is finished, the practicability of the device is greatly improved, through the arrangement of the lifting limiting lantern ring 16, the limiting inclined plate adjusting shaft 9 and the limiting inclined plate 10, one side of the limiting inclined plate 10 is pulled to the other side of the strip-shaped limiting groove 11, can mutually support with bottom sprag board 12, carry out the triangular supports to support sleeve 1, make the spacing lantern ring 16 of lift fix behind the bottom of folding bracing piece 15, can play spacing effect to it, the overall structure is simple compact, not only be convenient for the staff operates, and the steadiness is stronger, setting through cable support frame 6 and cable clamp plate 24, with cable overlap joint back on cable support frame 6, make translation slider 23 carry out the translation along bar groove 21, the staff can be according to the size of cable, adjust in a flexible way the interval between the adjacent cable clamp plate 24, thereby carry out the centre gripping to it, the steadiness of cable has not only been improved, and be applicable to the cable of equidimension not, and good practicality is had.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and the technical solutions and the inventive concepts thereof according to the present invention should be equivalent or changed within the scope of the present invention.

Claims (8)

1. The utility model provides a power transmission and transformation engineering job site is electric cable support temporarily, includes supporting sleeve (1), its characterized in that: the cable support is characterized in that a telescopic support rod (2) is inserted into the support sleeve (1), annular clamps (3) are fixedly connected to two sides of the top of the telescopic support rod (2), support frame accommodating grooves (4) are formed in two sides of the support sleeve (1), a support frame connecting shaft (5) is movably connected into each support frame accommodating groove (4), a cable support frame (6) is sleeved on the outer surface of each support frame connecting shaft (5), locking bolts (7) are inserted into two sides of each annular clamp (3), one end of each locking bolt (7) is in threaded connection with the cable support frame (6), an accommodating support (8) is fixedly connected to the bottom of the support sleeve (1), a limiting inclined plate adjusting shaft (9) is inserted into the top end of the accommodating support (8), and a limiting inclined plate (10) is sleeved on the outer surface of the limiting inclined plate adjusting shaft (9), one side of the limiting inclined plate (10) extends into the strip-shaped limiting groove (11), the strip-shaped limiting groove (11) is formed in the bottom supporting plate (12), a fastening bolt (13) is inserted into one side of the bottom supporting plate (12), and one end of the fastening bolt (13) extends into the strip-shaped limiting groove (11) and is in threaded connection with the limiting inclined plate (10).
2. The temporary power utilization cable support for the construction site of the power transmission and transformation project, according to claim 1, is characterized in that: the bottom fixedly connected with of support sleeve (1) stabilizes base (14), the bottom swing joint that the groove (4) was accomodate to the support frame has folding bracing piece (15).
3. The temporary power utilization cable support for the construction site of the power transmission and transformation project, according to claim 2, is characterized in that: the other end of the folding support rod (15) is movably connected with the cable support frame (6), and the outer surface of the telescopic support rod (2) is sleeved with a lifting limiting lantern ring (16).
4. The temporary power utilization cable support for the construction site of the power transmission and transformation project, according to claim 3, is characterized in that: the front surface of the lifting limiting lantern ring (16) is inserted with a locking screw rod (17), and one end of the locking screw rod (17) extends into the locking hole (18).
5. The temporary power utilization cable support for the construction site of the power transmission and transformation project, according to claim 1, is characterized in that: the front surface of the supporting sleeve (1) is provided with a fastening screw rod (19), and one end of the fastening screw rod (19) penetrates through the inside of the threaded hole (20) and is in threaded connection with the telescopic supporting rod (2).
6. The temporary power utilization cable support for the construction site of the power transmission and transformation project, according to claim 1, is characterized in that: a strip-shaped groove (21) is formed in the cable support frame (6), and a guide threaded rod (22) is fixedly connected to the inside of the strip-shaped groove (21).
7. The temporary power utilization cable support for the construction site of the power transmission and transformation project, according to claim 6, is characterized in that: the inside sliding connection of bar recess (21) has translation slider (23), the top fixedly connected with cable clamp plate (24) of translation slider (23).
8. The temporary power cable bracket for the construction site of the power transmission and transformation project, according to claim 7, is characterized in that: both sides of translation slider (23) all are provided with screw thread locking lantern ring (25), one side and the top of cable splint (24) and cable support frame (6) all are provided with the wearing layer.
CN202011280321.3A 2020-11-16 2020-11-16 Temporary power utilization cable support for construction site of power transmission and transformation project Pending CN112332347A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011280321.3A CN112332347A (en) 2020-11-16 2020-11-16 Temporary power utilization cable support for construction site of power transmission and transformation project

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011280321.3A CN112332347A (en) 2020-11-16 2020-11-16 Temporary power utilization cable support for construction site of power transmission and transformation project

Publications (1)

Publication Number Publication Date
CN112332347A true CN112332347A (en) 2021-02-05

Family

ID=74318750

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011280321.3A Pending CN112332347A (en) 2020-11-16 2020-11-16 Temporary power utilization cable support for construction site of power transmission and transformation project

Country Status (1)

Country Link
CN (1) CN112332347A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113113870A (en) * 2021-02-27 2021-07-13 高彩红 Interim overhead line device of electric power transmission
CN113612182A (en) * 2021-08-25 2021-11-05 中国一冶集团有限公司 Quick assembly folding telescopic temporary electric wire overhead device
CN114123020A (en) * 2021-11-04 2022-03-01 深圳供电局有限公司 Electric wire support
CN114123062A (en) * 2021-11-13 2022-03-01 广西电网有限责任公司南宁供电局 Cable support
CN115104598A (en) * 2022-06-24 2022-09-27 国网湖南省电力有限公司 Bird-proof foot standing device

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN209443811U (en) * 2018-09-26 2019-09-27 深圳市鹏升建设有限公司 A kind of house construction engineering support device
CN209592794U (en) * 2019-05-10 2019-11-05 国网河南省电力公司新乡供电公司 A kind of power transmission cable temporary support auxiliary device
CN209657522U (en) * 2019-02-14 2019-11-19 李孝彦 A kind of education is with explaining and publicising device
CN110726091A (en) * 2019-10-17 2020-01-24 北京金河水务建设集团有限公司 Interim illumination support is used in tunnel construction
CN210041252U (en) * 2019-05-05 2020-02-07 安徽慕凡电子科技有限公司 Cable support for communication engineering
CN110994467A (en) * 2019-12-11 2020-04-10 王启栋 Cable support frame for electric power construction
CN210608469U (en) * 2019-09-11 2020-05-22 支静静 Overhead connection frame for electric wire
CN210770986U (en) * 2019-10-28 2020-06-16 南京华享环境科技有限公司 Be used for prosthetic strutting arrangement of drainage pipe
CN111509646A (en) * 2020-05-18 2020-08-07 丁西彦 Electric power transmission device capable of adjusting supporting direction and angle and implementation method thereof

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN209443811U (en) * 2018-09-26 2019-09-27 深圳市鹏升建设有限公司 A kind of house construction engineering support device
CN209657522U (en) * 2019-02-14 2019-11-19 李孝彦 A kind of education is with explaining and publicising device
CN210041252U (en) * 2019-05-05 2020-02-07 安徽慕凡电子科技有限公司 Cable support for communication engineering
CN209592794U (en) * 2019-05-10 2019-11-05 国网河南省电力公司新乡供电公司 A kind of power transmission cable temporary support auxiliary device
CN210608469U (en) * 2019-09-11 2020-05-22 支静静 Overhead connection frame for electric wire
CN110726091A (en) * 2019-10-17 2020-01-24 北京金河水务建设集团有限公司 Interim illumination support is used in tunnel construction
CN210770986U (en) * 2019-10-28 2020-06-16 南京华享环境科技有限公司 Be used for prosthetic strutting arrangement of drainage pipe
CN110994467A (en) * 2019-12-11 2020-04-10 王启栋 Cable support frame for electric power construction
CN111509646A (en) * 2020-05-18 2020-08-07 丁西彦 Electric power transmission device capable of adjusting supporting direction and angle and implementation method thereof

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113113870A (en) * 2021-02-27 2021-07-13 高彩红 Interim overhead line device of electric power transmission
CN113113870B (en) * 2021-02-27 2022-09-09 广东电网有限责任公司佛山供电局 Interim overhead line device of electric power transmission
CN113612182A (en) * 2021-08-25 2021-11-05 中国一冶集团有限公司 Quick assembly folding telescopic temporary electric wire overhead device
CN114123020A (en) * 2021-11-04 2022-03-01 深圳供电局有限公司 Electric wire support
CN114123062A (en) * 2021-11-13 2022-03-01 广西电网有限责任公司南宁供电局 Cable support
CN114123062B (en) * 2021-11-13 2024-06-18 广西电网有限责任公司南宁供电局 Cable support
CN115104598A (en) * 2022-06-24 2022-09-27 国网湖南省电力有限公司 Bird-proof foot standing device
CN115104598B (en) * 2022-06-24 2023-09-05 国网湖南省电力有限公司 Bird-preventing foothold device

Similar Documents

Publication Publication Date Title
CN112332347A (en) Temporary power utilization cable support for construction site of power transmission and transformation project
CN215580275U (en) Novel distribution network frame wiring structure
CN103166135A (en) Multifunctional operational tool
CN202363777U (en) Multifunctional operating tool
CN215528427U (en) Temporary power utilization cable support for construction site of power transmission and transformation project
CN213425607U (en) Cable classification supporting device for electric power engineering construction
CN211151200U (en) Outdoor portable on-spot power dispatching case
CN210398169U (en) Transformer substation operation state monitoring box convenient to install
CN212169403U (en) High-efficient iron tower fixed-position welding device
CN210485060U (en) Mounting bracket for UPS power supply
CN203895861U (en) Portable multifunctional power source cable support
CN215498187U (en) Line structure planning device of rural power grid
CN219329462U (en) Electric power wiring device
CN205237904U (en) Mounting fixture with adjustable transformer substation storage cell is exclusively used in
CN202564813U (en) Improved type multifunctional operation tool
CN220022118U (en) Weak current engineering wiring device
CN205944835U (en) Wire insulation support instrument
CN221057912U (en) Block terminal of convenient removal use
CN221211555U (en) Portable electrified fastener
CN214124633U (en) Cable pulling device for cable erection
CN214124501U (en) Electric box connecting frame for building
CN221126695U (en) Box transformer substation base with strong ground grabbing force
CN211907740U (en) Short circuit grounding clamping wire clamp for power line construction
CN214674010U (en) Cable fixing frame for protecting 10kV single-core cable
CN213484001U (en) Portable earth bar for power line

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20210205