CN209443316U - A kind of permeable tile work pavement structure that closely knit asphalt macadam concrete layer is set - Google Patents

A kind of permeable tile work pavement structure that closely knit asphalt macadam concrete layer is set Download PDF

Info

Publication number
CN209443316U
CN209443316U CN201821608858.6U CN201821608858U CN209443316U CN 209443316 U CN209443316 U CN 209443316U CN 201821608858 U CN201821608858 U CN 201821608858U CN 209443316 U CN209443316 U CN 209443316U
Authority
CN
China
Prior art keywords
closely knit
layer
asphalt macadam
concrete layer
tile work
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821608858.6U
Other languages
Chinese (zh)
Inventor
李辉
李昊臻
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tongji University
Original Assignee
Tongji University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tongji University filed Critical Tongji University
Priority to CN201821608858.6U priority Critical patent/CN209443316U/en
Application granted granted Critical
Publication of CN209443316U publication Critical patent/CN209443316U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a kind of permeable tile work pavement structures that closely knit asphalt macadam concrete layer is arranged, it from top to bottom successively include permeable tile work surface layer, coarse sand screed-coat, closely knit asphalt macadam concrete layer and graded broken stone layer, the graded broken stone layer is laid on soil matrix, and the drilling being evenly arranged is equipped in the closely knit asphalt macadam concrete layer.Compared with prior art, the utility model is designed reasonably, structure is simple, and by being arranged closely knit asphalt macadam concrete layer, when construction can be used as temporary construction work surface, guarantees that the water permeability of the permeable tile work layer of surface layer is unaffected;Through hole can also be bored when surface construction, to infiltrate rainwater infiltration;Overall structure takes into account intensity, the permeable requirement with construction technology.

Description

A kind of permeable tile work pavement structure that closely knit asphalt macadam concrete layer is set
Technical field
The utility model relates to pavement structure technical fields, and in particular to a kind of that closely knit asphalt macadam concrete layer is arranged Permeable tile work pavement structure.
Background technique
With popularizing for sponge city, people are more and more stronger for the consciousness of porous pavement.Permeable tile work road surface is as one The effective sponge facility of kind, is chiefly used in pavement, walking street, garden path etc. without motor vehicle load road, and have light-duty The regions such as road, square, the parking lot of load requirement.Traditional permeable tile work pavement structure is mostly surface layer, (screed-coat), rubble Base, original state soil matrix layer structure, wherein surface layer function be infiltration rainwater, crushed rock base course function be water storage, original state soil matrix is just In draining;Although meeting the demand of pervious function, due in road structure graded broken stone base it is weak and less in Heavy-load road is applied.Few certain applications are excessively paid attention to mechanics and are held in the permeable tile work road surface in middle heavily loaded region, Chang Yinwei The promotion of loading capability, leads to the reduction of itself water permeability, once there is rainstorm weather, it is easy to there is ponding, influences pedestrian With traffic.In addition, permeable pavement construction technology is simple and crude at this stage, surface layer is often blocked by rubble dust in work progress, thoroughly Aqueous to can significantly reduce, these problems affect the application of the technology to a certain extent.
Utility model content
The purpose of this utility model is exactly to overcome the problems of the above-mentioned prior art and to provide a kind of intensity good, saturating The permeable tile work pavement structure of the aqueous good closely knit asphalt macadam concrete layer of setting.
The purpose of this utility model can be achieved through the following technical solutions: a kind of closely knit asphalt macadam concrete of setting The permeable tile work pavement structure of layer, the pavement structure successively include permeable tile work surface layer, coarse sand screed-coat, closely knit drip from top to bottom Green crushed stone concrete layer and graded broken stone layer, the graded broken stone layer are laid on soil matrix, the closely knit asphalt macadam coagulation The drilling being evenly arranged is equipped in soil layer.
The utility model patent by the way that closely knit asphalt macadam concrete layer is arranged, on the one hand due to self-strength and modulus compared with Height can effectively share more load, reduce rubble weak floor carrying load and corresponding deformation, and asphalt macadam coagulation Soil layer rigidity is relatively low, can to avoid by it is lower and on there is the case where reflection crack, influence pavement usage;It on the other hand is upper Layer structure provides more smooth plane, convenient for construction.In addition, the permeable tile work pavement structure is also that dense bitumen road surface changes Permeable pavement road surface provides a kind of practical and low in cost, construction is simple modification scheme.
Preferably, the closely knit asphalt macadam concrete layer is dense-graded asphalt concrete, and when construction selects as needed AC or ATB, nominal maximum aggregate size are less than 20mm, and dustability is poor when partial size is excessive;It is current that construction period can be used as road vehicle Temporary pavement material layer, utmostly to prevent Construction traffic and road cement from blocking the permeable of permeable pavement structure surface " channel ", the traffic total amount of thickness foundation construction period is within the scope of 15 to 20cm;It can bore and pass through in this layer when surface construction So as to permeable, aperture, since pitch flexbile base deforms relatively large feature, should not be added broken pinking 2 to 3cm in hole Stone, and aperture is larger will affect this layer of bearing capacity;The spacing of wells and the distance at hole spacing edge are not less than 3 times of apertures, It can be specifically designed according to local condition of raining, spacing is smaller to generate the damage such as through crack.
Preferably, the thickness of the graded broken stone layer within the scope of 20 to 40cm, porosity be 35~50%, partial size is 2 To 5cm.
Preferably, the soil matrix is the native compacted lift of element, and the soil compaction degree of the native compacted lift of element is on 90%~95% left side It is right.
Preferably, the screed-coat is coarse sands layer, and the thickness of the coarse sands layer is within the scope of 2 to 3cm and ballast grain sizes exist Within the scope of 0.5 to 1cm.
Preferably, brick road face includes the muti-piece high intensity tile work mutually spliced, adjacent two blocks of high-intensitive tile works it Between have 1 to 2cm permeable gap, the compression strength of the high intensity tile work is greater than or equal to 50MPa and flexural strength is not less than 5Mpa。
Preferably, the mutual composed pattern of tile work can be divided into three classes according to structural behaviour difference, herringbone pattern, parquets pattern With running bond pattern, more preferably herringbone pattern.
Compared with prior art, the beneficial effects of the utility model are embodied in: the permeable tile work pavement structure, and design is closed Reason, structure are simple.By the way that closely knit asphalt macadam concrete layer is arranged, the bearing capacity on road surface is significantly improved, while as construction The current temporary pavement material layer of period road vehicle, utmostly to prevent Construction traffic and road cement from blocking porous pavement Permeable " channel " of body structure surface;And when last paved surface layer of material, it can punch on it, the rainwater of infiltration is allowed to continue Lower infiltration, guarantees enough rain penetration abilities, road surface not ponding, below smooth discharge to road surface and in surrounding greenery patches.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the graph of pore diameter distribution of the closely knit asphalt macadam concrete layer of the utility model;
Fig. 3 is that permeable tile work surface layer is mated formation form schematic diagram in embodiment 1;
Fig. 4 is the form schematic diagram of mating formation of parquets pattern;
Fig. 5 is the form schematic diagram of mating formation of running bond pattern.
Wherein, 1 is permeable tile work surface layer, and 2 be coarse sand screed-coat, and 3 be closely knit asphalt macadam concrete layer;4 is broken for gradation Rock layers, 5 be anti-filter geotextiles, and 6 be soil matrix, and 7 be drilling, and 8 be high-intensitive floor tile, and 9 be permeable gap.
Specific embodiment
It elaborates below to the embodiments of the present invention, the present embodiment before being with technical solutions of the utility model It puts and is implemented, the detailed implementation method and specific operation process are given, but the protection scope of the utility model is unlimited In following embodiments.
Embodiment 1
A kind of permeable tile work pavement structure that closely knit asphalt macadam concrete layer is set, as shown in Figure 1, including soil matrix 6, grade With metalling 4, closely knit asphalt macadam concrete layer 3 and permeable tile work surface layer 1, it is equipped between soil matrix 6 and graded broken stone layer 4 anti- Geotextiles 5 are filtered, coarse sand screed-coat 2, permeable tile work surface layer are equipped between permeable tile work surface layer and closely knit asphalt macadam concrete layer 3 1 is layed on coarse sand screed-coat 2.
Specifically, closely knit asphalt macadam concrete layer 3 is layed on graded broken stone layer 4.Tile work road surface 1 includes mutually splicing Muti-piece high intensity tile work, have between adjacent two blocks of high-intensitive tile works 1 to 2cm permeable gap 9, the pressure resistance of high-intensitive tile work Degree is greater than or equal to 50MPa and flexural strength is not less than 5Mpa, as shown in figure 3, the high-intensitive mutually splicing of floor tile 8 in the present embodiment Pattern be herringbone pattern;As needed, the pattern that high-intensitive floor tile 8 mutually splices can also be parquets pattern (such as Fig. 4 institute Show) and running bond pattern (as shown in Figure 5).
Closely knit asphalt macadam concrete layer 3 is dense-graded asphalt concrete, and when construction selects AC or ATB as needed, most Big nominal particle diameter is less than 20mm, and the traffic total amount of thickness foundation construction period is within the scope of 12 to 20cm.Graded broken stone layer 4 Thickness within the scope of 20 to 40cm, porosity 40%, partial size be 2 to 5cm.Soil matrix 6 is the native compacted lift of element, element soil compacted lift 6 Soil matrix be pressed in 93% or so.The thickness of coarse sand screed-coat 2 is within the scope of 2 to 3cm and ballast grain sizes are within the scope of 0.5 to 1cm.
As shown in Fig. 2, drilling 7 can be arranged on closely knit asphalt macadam concrete layer 3, drilling 7 is through entire close when construction Real asphalt macadam concrete layer 3, drill 7 aperture 2 to 3cm, the spacing of wells is not less than 3 times of apertures with apart from roadside.

Claims (9)

1. a kind of permeable tile work pavement structure that closely knit asphalt macadam concrete layer is arranged, which is characterized in that the pavement structure from On down successively include permeable tile work surface layer, coarse sand screed-coat, closely knit asphalt macadam concrete layer and graded broken stone layer, it is described Graded broken stone layer is laid on soil matrix, and the drilling being evenly arranged is equipped in the closely knit asphalt macadam concrete layer.
2. a kind of permeable tile work pavement structure that closely knit asphalt macadam concrete layer is arranged according to claim 1, special Sign is that the material of the closely knit asphalt macadam concrete layer is dense-graded asphalt concrete, and the closely knit asphalt macadam is mixed Solidifying the thickness of the layer is 12~20cm.
3. a kind of permeable tile work pavement structure that closely knit asphalt macadam concrete layer is set according to claim 1 or 2, It is characterized in that, the aperture of the drilling is 2~3cm, and the hole heart of two neighboring drilling is away from not less than 3 times of boring apertures.
4. a kind of permeable tile work pavement structure that closely knit asphalt macadam concrete layer is arranged according to claim 1, special Sign is that the permeable tile work surface layer is spliced by the high-intensitive floor tile of muti-piece rectangle, adjacent two pieces of high-intensitive floor tiles it Between be equipped with 1~2cm permeable gap.
5. a kind of permeable tile work pavement structure that closely knit asphalt macadam concrete layer is arranged according to claim 4, special Sign is that the laying shape of the high intensity floor tile is in herringbone pattern, parquets pattern or running bond pattern.
6. a kind of permeable tile work pavement structure that closely knit asphalt macadam concrete layer is arranged according to claim 1, special Sign is that the coarse sand screed-coat uses partial size for the rubble of 0.5~1cm, the coarse sand screed-coat with a thickness of 2~3cm.
7. a kind of permeable tile work pavement structure that closely knit asphalt macadam concrete layer is arranged according to claim 1, special Sign is that the graded broken stone layer uses partial size for the rubble of 2~5cm, the porosity of the graded broken stone layer is 35%~ 50%, the graded broken stone layer with a thickness of 20~40cm.
8. a kind of permeable tile work pavement structure that closely knit asphalt macadam concrete layer is arranged according to claim 1, special Sign is, anti-filter geotextiles are equipped between the graded broken stone layer and soil matrix.
9. a kind of permeable tile work pavement structure that closely knit asphalt macadam concrete layer is arranged according to claim 1, special Sign is that the soil compaction degree is 90%~95%.
CN201821608858.6U 2018-09-30 2018-09-30 A kind of permeable tile work pavement structure that closely knit asphalt macadam concrete layer is set Active CN209443316U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821608858.6U CN209443316U (en) 2018-09-30 2018-09-30 A kind of permeable tile work pavement structure that closely knit asphalt macadam concrete layer is set

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821608858.6U CN209443316U (en) 2018-09-30 2018-09-30 A kind of permeable tile work pavement structure that closely knit asphalt macadam concrete layer is set

Publications (1)

Publication Number Publication Date
CN209443316U true CN209443316U (en) 2019-09-27

Family

ID=68009387

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821608858.6U Active CN209443316U (en) 2018-09-30 2018-09-30 A kind of permeable tile work pavement structure that closely knit asphalt macadam concrete layer is set

Country Status (1)

Country Link
CN (1) CN209443316U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110904946B (en) * 2019-12-11 2021-11-16 安徽三联学院 Foundation reinforcing method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110904946B (en) * 2019-12-11 2021-11-16 安徽三联学院 Foundation reinforcing method

Similar Documents

Publication Publication Date Title
CN104878678A (en) Construction method for water-permeable and water-retaining water-permeable pavement structure
CN209227320U (en) A kind of permeable tile work pavement structure that solid cement concrete layer is set
CN104452510B (en) Immediate construction method of rural road
CN109958018A (en) A kind of heavy rainfall urban road water-permeable pavement structure and its construction method
CN205368926U (en) Garden way supercrust structure that water permeability is strong
CN109944125B (en) Asphalt concrete pavement structure and paving process thereof
CN108086087A (en) A kind of construction method of porous pavement
CN209443316U (en) A kind of permeable tile work pavement structure that closely knit asphalt macadam concrete layer is set
CN207244389U (en) A kind of shallow-layer water storage road surface water-permeable brick
CN207484193U (en) Permeable road structure
CN207130558U (en) A kind of roadbed filling structure
CN106087639A (en) A kind of highway, Irish bridge structure and Irish bridge construction method
CN205741814U (en) A kind of asphalt pavement structure
CN207987662U (en) A kind of permeable pavement structure suitable for high frequency heavy duty road conditions
CN209211198U (en) A kind of urban environmental protection road surface
CN208362832U (en) A kind of spongeization road structure of cracking resistance
CN111549603A (en) Pavement considering water load coupling and construction method thereof
CN207391983U (en) A kind of sponge-type parking system
CN105803888A (en) Sponge type road paving structure
CN106676995B (en) A kind of deep formula asphalt pavement structure design method of Bayer process red mud roadbed
CN205399118U (en) Polyurethane rubble is resistant to pass through level ground anti -skidding colored road surface of permeating water
CN208136656U (en) A kind of whole-permeable asphalt pavement structure
CN113718580A (en) Anti-crack pavement structure and construction method
CN208472497U (en) A kind of municipal road pavement
CN208486146U (en) A kind of novel filter infiltration garden road step and sunk type square laying structure