CN209429385U CN201822001236.3U CN201822001236U CN209429385U CN 209429385 U CN209429385 U CN 209429385U CN 201822001236 U CN201822001236 U CN 201822001236U CN 209429385 U CN209429385 U CN 209429385U
Authority
CN
China
Prior art keywords
steel pipe
reinforcing bar
hole
secondary reinforcing
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201822001236.3U
Other languages
Chinese (zh)
Inventor
葛鸿鹏
周鹏
贺震
徐金俊
侯文龙
王玮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Northwest Architecture Design and Research Institute Co Ltd
Original Assignee
China Northwest Architecture Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Northwest Architecture Design and Research Institute Co Ltd filed Critical China Northwest Architecture Design and Research Institute Co Ltd
Priority to CN201822001236.3U priority Critical patent/CN209429385U/en
Application granted granted Critical
Publication of CN209429385U publication Critical patent/CN209429385U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of steel pipe concrete profiled piles, including outer layer, concrete main body and the first secondary reinforcing bar, the outer layer is internally provided with concrete main body, and concrete main body is internally provided with the first steel pipe, the outer surface of first steel pipe offers link slot, and the right end of link slot and the second steel pipe is connected with each other, the right end of second steel pipe offers first through hole, and first through hole and main reinforcement are connected with each other, the second through-hole is offered on second steel pipe, and second through-hole be located at the left of first through hole, described first secondary reinforcing bar and the second through-hole are connected with each other, and first secondary reinforcing bar through the second steel pipe and the second secondary reinforcing bar interconnection.The steel pipe concrete profiled pile, for staff in the work welded to the second steel pipe, the second steel pipe carries out the restriction work of position by link slot, effectively reduces staff's probability that the second steel pipe is displaced when welding.

Description

A kind of steel pipe concrete profiled pile
Technical field
The utility model relates to Special-Shaped Column technical field, specially a kind of steel pipe concrete profiled pile.
Background technique
Special-Shaped Column can effectively avoid common frame column from occurring the problem of protrusion indoors, and effective increase house is whole The usable floor area of body, while convenient for mitigating the self weight of building.
Peace generally is fixed using reinforcing bar and reinforcing bar during being assembled in common Special-Shaped Column currently on the market The work of dress, or when being assembled using steel pipe, stability when being welded between steel pipe and reinforcing bar is inadequate, steel pipe and steel The phenomenon that dislocation is easy to happen between muscle, in view of the above-mentioned problems, carrying out innovative design on the basis of original Special-Shaped Column.
Summary of the invention
The purpose of this utility model is to provide a kind of steel pipe concrete profiled piles, to solve to propose in above-mentioned background technique Special-Shaped Column common currently on the market, the work of installation is generally fixed using reinforcing bar and reinforcing bar during being assembled When making, or being assembled using steel pipe, stability when being welded between steel pipe and reinforcing bar is inadequate, between steel pipe and reinforcing bar The problem of the phenomenon that being easy to happen dislocation.
To achieve the above object, the utility model provides the following technical solutions: a kind of steel pipe concrete profiled pile, including outer The secondary reinforcing bar of layer, concrete main body and first, the outer layer is internally provided with concrete main body, and the inside of concrete main body is set It is equipped with the first steel pipe, the outer surface of first steel pipe offers link slot, and the right end of link slot and the second steel pipe mutually interconnects It connects, the right end of second steel pipe offers first through hole, and first through hole and main reinforcement are connected with each other, and main reinforcement runs through Second steel pipe offers the second through-hole on second steel pipe, and the second through-hole is located at the left of first through hole, and described first is secondary Reinforcing bar and the second through-hole are connected with each other, and the first secondary reinforcing bar is connected with each other through the second steel pipe and the second secondary reinforcing bar, and second Secondary reinforcing bar and main reinforcement are connected with each other.
Preferably, second steel pipe be by link slot and the first steel pipe be connected together, and the left end of the second steel pipe and Link slot is arcuate structure.
Preferably, the number of second steel pipe is provided with 4, and 4 the second steel pipes angularly divide on the first steel pipe Cloth.
Preferably, the number of the main reinforcement is provided with 2, and longitudinal centre line of 2 main reinforcements about the first steel pipe It is symmetrical, and main reinforcement constitutes slide construction by first through hole and the second steel pipe.
Preferably, the described first secondary reinforcing bar constitutes slide construction, and the first secondary reinforcing bar by the second through-hole and the second steel pipe The equidistantly distributed on the second steel pipe.
Preferably, the described second secondary reinforcing bar and the first secondary reinforcing bar are to be welded to connect, and the second secondary reinforcing bar and main reinforcement are weldering It connects in succession.
Compared with prior art, the utility model has the beneficial effects that the steel pipe concrete profiled pile,
1, for staff in the work welded to the second steel pipe, the second steel pipe carries out the limit of position by link slot Fixed work, effectively reduces staff's probability that the second steel pipe is displaced when welding;
2, the entire length of main reinforcement is greater than the first secondary reinforcing bar, consequently facilitating the first secondary reinforcing bar and main reinforcement carry out welding company It connects, while increasing stability of the Special-Shaped Column after having poured concrete;
3, main reinforcement and the first secondary reinforcing bar are installed on the second steel pipe by first through hole and the second through-hole, to make first Secondary reinforcing bar is distributed at equal intervals on the second steel pipe, while facilitating staff to the position of main reinforcement and the first secondary reinforcing bar It carries out smoothly adjusting work.
Detailed description of the invention
Fig. 1 is that the utility model integrally faces the schematic diagram of the section structure;
Fig. 2 is enlarged structure schematic diagram at A in the utility model Fig. 1;
Fig. 3 is the utility model entirety positive structure diagram.
In figure: 1, outer layer;2, concrete main body;3, the first steel pipe;4, link slot;5, the second steel pipe;6, first through hole;7, Main reinforcement;8, the second through-hole;9, the first secondary reinforcing bar;10, the second secondary reinforcing bar.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-3 is please referred to, the utility model provides a kind of technical solution: a kind of steel pipe concrete profiled pile, including outer layer 1, concrete main body 2 and the first secondary reinforcing bar 9, outer layer 1 is internally provided with concrete main body 2, and the inside of concrete main body 2 is set It is equipped with the first steel pipe 3, the outer surface of the first steel pipe 3 offers link slot 4, and link slot 4 and the right end of the second steel pipe 5 mutually interconnect It connects, the right end of the second steel pipe 5 offers first through hole 6, and first through hole 6 and main reinforcement 7 are connected with each other, and main reinforcement 7 passes through The second steel pipe 5 is worn, the second through-hole 8 is offered on the second steel pipe 5, and the second through-hole 8 is located at the left of first through hole 6, first is secondary Reinforcing bar 9 and the second through-hole 8 are connected with each other, and the first secondary reinforcing bar 9 is connected with each other through the second steel pipe 5 and the second secondary reinforcing bar 10, and And second secondary reinforcing bar 10 be connected with each other with main reinforcement 7;
Second steel pipe 5 is connected together by link slot 4 with the first steel pipe 3, and the left end of the second steel pipe 5 and link slot 4 It is arcuate structure, the effective stability for improving the second steel pipe 5 when being welded reduces what shifting occurred in the second steel pipe 5 Phenomenon;
The number of second steel pipe 5 is provided with 4, and 4 the second steel pipes 5 are in 3 spaced at equal angles around of the first steel pipe, effectively The overall stability of the Special-Shaped Column is increased, while convenient for the installation to main reinforcement 7 and the first secondary reinforcing bar 9;
The number of main reinforcement 7 is provided with 2, and 2 main reinforcements 7 are symmetrical about the longitudinal centre line of the first steel pipe 3, And main reinforcement 7 constitutes slide construction by first through hole 6 and the second steel pipe 5, convenient for making staff by main reinforcement 7 and second Steel pipe 5 is attached, while the adjustment convenient for setting main reinforcement 7 in the enterprising line position of the second steel pipe 5;
First secondary reinforcing bar 9 constitutes slide construction by the second through-hole 8 and the second steel pipe 5, and the first secondary reinforcing bar 9 is in the second steel Equidistantly distributed on pipe 5 is conducive to staff and is attached the first secondary reinforcing bar 9 with the second steel pipe 5, while facilitating first The adjustment that secondary reinforcing bar 9 is set in the enterprising line position of the second steel pipe 5;
Second secondary reinforcing bar 10 and the first secondary reinforcing bar 9 are to be welded to connect, and the second secondary reinforcing bar 10 is that welding connects with main reinforcement 7 It connects, the further connectivity increased between the first pair reinforcing bar 9, while the first secondary reinforcing bar 9 being made to pass through the second secondary reinforcing bar 10 and master Reinforcing bar 7 is attached.
Working principle: according to Fig. 1-2, the second steel pipe 5 is engaged on the first steel pipe 3 manually by link slot 4 first, is made Second steel pipe 5 keeps stablizing in the first steel pipe 3, to make staff that the second steel pipe 5 are welded to the first steel by electric welding machine On pipe 3, then remaining second steel pipe 5 is in turn mounted on the first steel pipe 3 according to above-mentioned principle;
According to Fig. 1-2, then main reinforcement 7 is slidably mounted on the second steel pipe 5 by first through hole 6, then by main steel Muscle 7 slides into suitable position on the second steel pipe 5, main reinforcement 7 is welded on the second steel pipe 5 by electric welding machine, then hand It is dynamic to be slidably mounted to the first secondary reinforcing bar 9 on second steel pipe 5 by the second through-hole 8, then by the first secondary reinforcing bar 9 in the second steel pipe Suitable position is slided on 5, the first secondary reinforcing bar 9 is welded on the second steel pipe 5 by electric welding machine, then manually by the second pair Reinforcing bar 10 is welded on the first secondary reinforcing bar 9 and main reinforcement 7 by electric welding machine, then according to above-mentioned principle, successively by remaining master The secondary reinforcing bar 9 of reinforcing bar 7, first and the second secondary reinforcing bar 10 carry out welding installation;
According to Fig. 1 and Fig. 3, the outside of the secondary reinforcing bar 9 of main reinforcement 7, first and the second secondary reinforcing bar 10 is then installed into outer layer 1 Afterwards, concrete main body 2 is filled into the inside of outer layer 1 by watering appliance, to make concrete main body 2 to main reinforcement 7, first Secondary reinforcing bar 9 and the second secondary reinforcing bar 10 are covered, and can complete the operating of the steel pipe concrete profiled pile in this way, such a Steel pipe concrete profiled pile is convenient for people to use.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of steel pipe concrete profiled pile, including the secondary reinforcing bar (9) of outer layer (1), concrete main body (2) and first, feature exists In: the outer layer (1) is internally provided with concrete main body (2), and concrete main body (2) is internally provided with the first steel pipe (3), the outer surface of first steel pipe (3) offers link slot (4), and link slot (4) and the right end of the second steel pipe (5) are mutual Connection, the right end of second steel pipe (5) offer first through hole (6), and first through hole (6) and main reinforcement (7) are connected with each other, And main reinforcement (7) runs through the second steel pipe (5), offers the second through-hole (8) on second steel pipe (5), and the second through-hole (8) Positioned at the left of first through hole (6), the described first secondary reinforcing bar (9) and the second through-hole (8) are connected with each other, and the first secondary reinforcing bar (9) It is connected with each other through the second steel pipe (5) and the second secondary reinforcing bar (10), and the second secondary reinforcing bar (10) mutually interconnects with main reinforcement (7) It connects.
2. a kind of steel pipe concrete profiled pile according to claim 1, it is characterised in that: second steel pipe (5) passes through Link slot (4) is to be connected together, and the left end of the second steel pipe (5) and link slot (4) are arcuate structure with the first steel pipe (3).
3. a kind of steel pipe concrete profiled pile according to claim 1, it is characterised in that: of second steel pipe (5) Number is provided with 4, and 4 the second steel pipes (5) are in the first steel pipe (3) spaced at equal angles around.
4. a kind of steel pipe concrete profiled pile according to claim 1, it is characterised in that: the number of the main reinforcement (7) 2 are provided with, and 2 main reinforcements (7) are symmetrical about the longitudinal centre line of the first steel pipe (3), and main reinforcement (7) passes through First through hole (6) and the second steel pipe (5) constitute slide construction.
5. a kind of steel pipe concrete profiled pile according to claim 1, it is characterised in that: the described first secondary reinforcing bar (9) is logical It crosses the second through-hole (8) and the second steel pipe (5) and constitutes slide construction, and the first secondary reinforcing bar (9) is equidistantly divided on the second steel pipe (5) Cloth.
6. a kind of steel pipe concrete profiled pile according to claim 1, it is characterised in that: the second secondary reinforcing bar (10) with First secondary reinforcing bar (9) is to be welded to connect, and the second secondary reinforcing bar (10) and main reinforcement (7) are to be welded to connect.
CN201822001236.3U 2018-11-30 2018-11-30 A kind of steel pipe concrete profiled pile Expired - Fee Related CN209429385U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822001236.3U CN209429385U (en) 2018-11-30 2018-11-30 A kind of steel pipe concrete profiled pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822001236.3U CN209429385U (en) 2018-11-30 2018-11-30 A kind of steel pipe concrete profiled pile

Publications (1)

Publication Number Publication Date
CN209429385U true CN209429385U (en) 2019-09-24

Family

ID=67970301

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822001236.3U Expired - Fee Related CN209429385U (en) 2018-11-30 2018-11-30 A kind of steel pipe concrete profiled pile

Country Status (1)

Country Link
CN (1) CN209429385U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112681613A (en) * 2021-01-11 2021-04-20 胡兵 Assembled steel construction concrete building body

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112681613A (en) * 2021-01-11 2021-04-20 胡兵 Assembled steel construction concrete building body

Similar Documents

Publication Publication Date Title
CN202831233U (en) Connected node of protracting inner diaphragm steel girder and concrete-filled steel-tubular columns inscribed a pipe coat
CN209429385U (en) A kind of steel pipe concrete profiled pile
CN106332825A (en) Improved main frame of offshore net cage
CN206752698U (en) A kind of steel construction single-layer latticed shell rice font node
CN208089308U (en) A kind of sharp radius curve shield duct piece water sealing structure
CN109339818A (en) A kind of compound tunnel segment structure of Mechanical Method service channel portal fringing
CN207609427U (en) A kind of simple multispan formula tunnel inverted arch trestle structure
CN215104349U (en) Prevent enhancement road bed road surface structure of ponding
CN206054469U (en) A kind of service tee
CN211371551U (en) Anti-leakage pipeline control assembly
CN208251085U (en) A kind of building engineering construction prestress pulling resistant pilework
CN208934700U (en) A kind of track engineering shield tunnel pipe of concrete slice mounting structure
CN208309868U (en) A kind of buckling restrained brace device
CN206554938U (en) A kind of simple and practical shield machine articulated mounting
CN206245290U (en) A kind of Flood discharge safety dyke-dam
CN216379572U (en) Slope support anti-collapse device
CN205935194U (en) Many steel structural framework for high -rise building
CN215891535U (en) Stainless steel elbow
CN111173196A (en) Giant circular steel tube concrete column for super high-rise building structure
CN205576765U (en) Tip additional strengthening suitable for bevel corrugated steel pipe
CN211113652U (en) A soil body shunt for piping lane foundation ditch symmetry is backfilled
CN214695492U (en) Irrigation diverging device of water economy resource
CN218050913U (en) Water and electricity installation steel pipe fast weld interfacing apparatus
CN207814690U (en) A kind of nozzle hair side flat mouth pipe outstanding
CN215483142U (en) Stagnant water steel sheet with prevent scraping wearability

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190924

Termination date: 20201130

CF01 Termination of patent right due to non-payment of annual fee