CN209429183U - A kind of measurement pile bottom sediment tool - Google Patents

A kind of measurement pile bottom sediment tool Download PDF

Info

Publication number
CN209429183U
CN209429183U CN201822253915.XU CN201822253915U CN209429183U CN 209429183 U CN209429183 U CN 209429183U CN 201822253915 U CN201822253915 U CN 201822253915U CN 209429183 U CN209429183 U CN 209429183U
Authority
CN
China
Prior art keywords
iron pan
reinforcing bar
iron
fixed
pile bottom
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201822253915.XU
Other languages
Chinese (zh)
Inventor
黄川�
罗宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fourth Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
Fourth Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fourth Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical Fourth Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN201822253915.XU priority Critical patent/CN209429183U/en
Application granted granted Critical
Publication of CN209429183U publication Critical patent/CN209429183U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of measurement pile bottom sediment tools to measure pile bottom sediment tool, including the first iron pan, hex nut is fixedly connected at the top and bottom of first iron pan, the second iron pan is fixedly connected at the top of first iron pan, second iron pan is equipped with impenetrating mouth corresponding with hex nut, the lateral wall of first iron pan is fixedly connected with iron hoop, and first iron pan connects reinforcing bar by multiple fixed mechanisms.In the utility model, pass through the mating reaction of rope, reinforcing bar, the first iron pan, the second iron pan, iron hoop, the first fixed screw, hex nut and movable rubber band, achieve the effect that loosening rope reinforcing bar down injects in sediment layer, realizes the function of measuring heavy thickness of slag layer;It by the mating reaction of fixed block, third fixed screw and reinforcing bar, reaches and twists off the effect that third fixed screw dismantles reinforcing bar from the bottom of the first iron pan, realize the function of being easily installed slot disassembly reinforcing bar.

Description

A kind of measurement pile bottom sediment tool
Technical field
The utility model relates to Architectural Equipment technical field more particularly to a kind of measurement pile bottom sediment tools.
Background technique
High-speed rail or highway need to keep road surface face on a horizontal interface during construction, due to original Landforms can have the case where being uneven, some relatively high places can be spread by cutting out the soil horizon on surface Pad, some topographies it is more low-lying place just need drive piles to support road surface, keep road surface on a horizontal interface, over the ground Face drill after carry out survey pile bottom sediment layer thickness, see whether compound standard.
Sediment thickness is to lack more professional simple accurate measurement sediment thickness an important factor for influencing pile foundation pile quality Tool, many construction teams, which also rely on, at present feels to cause many support stakes quality problems occur to feel sediment thickness value.
For this purpose, it is proposed that a kind of measurement pile bottom sediment tool solves the above problems.
Utility model content
Purpose of the utility model is to solve exist in the prior art construction team also rely on feel feel sediment thickness Angle value, is unable to measure the problem of pile bottom sediment thickness is spent, and a kind of measurement pile bottom sediment tool proposed.
To achieve the goals above, the utility model adopts the technical scheme that
A kind of measurement pile bottom sediment tool, including the first iron pan are fixedly connected at the top and bottom of first iron pan There is hex nut, the second iron pan is fixedly connected at the top of first iron pan, second iron pan is equipped with and hex nut Corresponding impenetrating mouth, the lateral wall of first iron pan are fixedly connected with iron hoop, and first iron pan passes through multiple fixed mechanisms Reinforcing bar is connected, the reinforcing bar is inclined to set, one of them described hex nut is connected with rope by lock, the rope Lateral wall fixing sleeve is connected to multiple movable rubber bands.
Preferably, first iron pan is connect by multiple first fixed screws with the second iron pan.
Preferably, first iron pan is connect by multiple second fixed screws with iron hoop.
Preferably, the fixed mechanism includes the multiple camber fixed blocks being fixedly connected at the top of reinforcing bar, and the camber is solid Determine block to connect by two third fixed screws with the first iron pan, the bottom of the iron hoop is equipped with corresponding with third fixed screw Multiple screw holes, multiple screw holes are the center of circle around setting using the axle center of the first iron pan.
Preferably, the length of the reinforcing bar is 10 centimetres, and the diameter of the reinforcing bar is 22 millimeters.
Preferably, the angle between the reinforcing bar and the first iron pan is 120 °.
The technical solution that the embodiments of the present invention provide can include the following benefits:
1, pass through rope, reinforcing bar, the first iron pan, the second iron pan, iron hoop, the first fixed screw, hex nut and movable skin The mating reaction of muscle has achieved the effect that loosening rope reinforcing bar down injects in sediment layer, realizes and measures heavy thickness of slag layer Function;
2, it by the mating reaction of fixed block, third fixed screw and reinforcing bar, reaches and twists off third fixed screw for steel The effect that muscle is dismantled from the bottom of the first iron pan realizes the function of being easily installed slot disassembly reinforcing bar, the measurement stake easy to carry Bottom sediment tool.
Detailed description of the invention
Fig. 1 be the utility model proposes a kind of measurement pile bottom sediment tool structural schematic diagram;
Fig. 2 be the utility model proposes a kind of measurement pile bottom sediment tool in the connection structure of iron hoop and screw hole signal Figure.
In figure: 1 first iron pan, 2 hex nuts, 3 locks, 4 ropes, 5 movable rubber bands, 6 second iron pans, 7 first fixed spiral shells Silk, 8 second fixed screws, 9 iron hoops, 10 camber fixed blocks, 11 third fixed screws, 12 reinforcing bars, 13 screw holes, 14 impenetrating mouths.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.
Referring to Fig.1-2, a kind of measurement pile bottom sediment tool, including the first iron pan 1, the top and bottom of the first iron pan 1 are equal It is fixedly connected with hex nut 2, the effect of hex nut 2 is easy for lock 3 and is buckled in hex nut 2, will tie up to the rope on lock 3 Rope 4 is secured together with the first iron pan 1, and two hex nuts 2 are the top and bottom for being fixedly welded on the first iron pan 1 respectively , guarantee during use, the stability of the fixation between hex nut 2 and the first iron pan 1, during preventing use Hex nut 2 is disconnected with the first iron pan 1, and the first iron pan 1 is the iron pan than relatively lightweight, guarantees that lightweight iron pan can be swum in The surface of sediment layer, during measurement, can only reinforcing bar 12 be inserted into the inside of sediment layer.
Wherein, the top of the first iron pan 1 is fixedly connected with the second iron pan 6, and the second iron pan 6 is equipped with right with hex nut 2 The impenetrating mouth 14 answered, the lateral wall of the first iron pan 1 are fixedly connected with iron hoop 9, and the first iron pan 1 passes through multiple first fixed screws 7 It is connect with the second iron pan 6, the first iron pan 1 is connect by multiple second fixed screws 8 with iron hoop 9, convenient for according to the floating of sediment layer The thickness and area of iron pan required for power calculates are increased by the way that the second iron pan 6 to be fixed to the top of the first iron pan 1 Thickness of first iron pan 1 together with the second iron pan 6 increases by first by the way that iron hoop 9 to be fixed to the lateral wall of the first iron pan 1 The area of iron pan 1 prevents the area of the first iron pan 1 or the too small result for influencing measurement of thickness.
Wherein, the first iron pan 1 connects reinforcing bar 12 by multiple fixed mechanisms, and fixed mechanism includes being fixedly connected on reinforcing bar 12 Multiple camber fixed blocks 10 at top, camber fixed block 10 are connect by two third fixed screws 11 with the first iron pan 1, iron hoop 9 bottom is equipped with multiple screw holes 13 corresponding with third fixed screw 11, and multiple screw holes 13 are with the axle center of the first iron pan 1 Around setting, the length of reinforcing bar 12 is 10 centimetres in the center of circle, and the diameter of reinforcing bar 12 is 22 millimeters, reinforcing bar 12 and the first iron pan 1 it Between angle be 120 °, by twisting off third fixed screw 11, camber fixed block 10 may be implemented and the first iron pan 1 is detached from and connects It connecing, reinforcing bar 12 is fixedly welded on camber fixed block 10, and the angle between camber fixed block 10 and reinforcing bar 12 is 120 °, The inside of pile bottom sediment layer can be inserted into convenient for reinforcing bar 12, the length of reinforcing bar 12 is 10 centimetres, and diameter is 22 millimeters.
Wherein, one of hex nut 2 is connected with rope 4 by lock 3, and the lateral wall fixing sleeve of rope 4 is connected to more A activity rubber band 5 when measuring ties up to rope 4 on lock 3, it should be noted that the use technology of lock 3 and lock 3 is equal For the prior art, do not do excessive narration herein, be fixed to by lock 3 on the hex nuts 2 at the top of the first iron pan 1, then into Row measures for the first time, after measurement, lock 3 is dismantled from the hex nut 2 at 1 top of the first iron pan, is installed to the first iron It on the hex nut 2 of 1 bottom of disk, carries out second and measures, measurement result is compared it can be concluded that pile bottom sediment layer twice Thickness.
In the utility model, high-speed rail or highway need to keep road surface face on a horizontal boundary during construction On face, since original landforms can have the case where being uneven, some relatively high places can be by cutting out surface Soil horizon carry out place mat, some topographies it is more low-lying place just need drive piles to support road surface, keep road surface in a water On planar interface, to surface drilling after carry out survey pile bottom sediment layer thickness, see whether compound standard, when measuring, According to sediment buoyancy calculations iron pan area and thickness, increases on the first iron pan 1 and need the second iron pan 6 of specification with multiple first Fixed screw 7 is fixed, and increases the thickness of the first iron pan 1, and iron hoop 9 is then fixed on first by the second fixed screw 8 On the lateral wall of iron pan 1, increase the area of the first iron pan 1, rope 4 is tied up on lock 3, lock 3 is fixed to the first iron pan 1 On the hex nut 2 at top, then reinforcing bar 12 is fixed to the bottom of the first iron pan 1 or iron hoop 9, which is extend into stake Bottom carries out the measurement of first time pile bottom sediment layer, and measuring for the first time is that reinforcing bar 12 is downward, is put into a bottom, utilizes movable rubber band 5 Lock 3 is anchored to 1 bottom of the first iron pan and is located at record by position of the rope 4 at the top of casing after measurement proposes for the first time at this time On the hex nut 2 of 12 side of reinforcing bar, the device is put into a bottom again, is recorded second using another activity rubber band 5 4 scale of rope, two sides Measurement scales are analyzed;
As scale a=b twice, it was demonstrated that reinforcing bar 12 fails to touch sediment bottom after being inserted into, it was demonstrated that sediment thickness is greater than 10 lis Rice, is unable to satisfy the requirement of specification 5cm, when scale a ﹤ b twice, sediment depth=10-(b-a), it, can not as scale a ﹥ b twice Can, lock difference sediment instrument is devised convenient for promoting, in terms of measurement result reliable three from easy to operate, cheap.Binding reinforcement 12 go deep into sediment, lightweight iron pan floats on the principle of sediment surface layer, and reinforcing bar 12 is acquired difference in conjunction with iron pan, learn sediment thickness Degree, while increasing lock 3 using 4 end of rope and being engaged with the hex nut 2 welded on iron pan, inspection can be completed in same tool It surveys.
The preferable specific embodiment of the above, only the utility model, but the protection scope of the utility model is not It is confined to this, anyone skilled in the art is within the technical scope disclosed by the utility model, practical according to this Novel technical solution and its utility model design are subject to equivalent substitution or change, should all cover the protection model in the utility model Within enclosing.

Claims (6)

1. a kind of measurement pile bottom sediment tool, including the first iron pan (1), which is characterized in that the top of first iron pan (1) and Bottom is fixedly connected to hex nut (2), is fixedly connected with the second iron pan (6) at the top of first iron pan (1), and described Two iron pans (6) are equipped with impenetrating mouth (14) corresponding with hex nut (2), and the lateral wall of first iron pan (1) is fixedly connected Having iron hoop (9), first iron pan (1) is inclined to set by multiple fixed mechanisms connection reinforcing bar (12), the reinforcing bar (12), One of them described hex nut (2) is connected with rope (4) by latching (3), and the lateral wall fixing sleeve of the rope (4) is connected to Multiple activity rubber bands (5).
2. a kind of measurement pile bottom sediment tool according to claim 1, which is characterized in that first iron pan (1) passes through Multiple first fixed screws (7) connect with the second iron pan (6).
3. a kind of measurement pile bottom sediment tool according to claim 1, which is characterized in that first iron pan (1) passes through Multiple second fixed screws (8) connect with iron hoop (9).
4. a kind of measurement pile bottom sediment tool according to claim 1, which is characterized in that the fixed mechanism includes fixing The multiple camber fixed blocks (10) being connected at the top of reinforcing bar (12), the camber fixed block (10) pass through two third fixed screws (11) it is connect with the first iron pan (1), the bottom of the iron hoop (9) is equipped with multiple screw holes corresponding with third fixed screw (11) (13), multiple screw holes (13) are the center of circle around setting using the axle center of the first iron pan (1).
5. a kind of measurement pile bottom sediment tool according to claim 1, which is characterized in that the length of the reinforcing bar (12) is 10 centimetres, and the diameter of the reinforcing bar (12) is 22 millimeters.
6. a kind of measurement pile bottom sediment tool according to claim 1, which is characterized in that the reinforcing bar (12) and the first iron Angle between disk (1) is 120 °.
CN201822253915.XU 2018-12-29 2018-12-29 A kind of measurement pile bottom sediment tool Expired - Fee Related CN209429183U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822253915.XU CN209429183U (en) 2018-12-29 2018-12-29 A kind of measurement pile bottom sediment tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822253915.XU CN209429183U (en) 2018-12-29 2018-12-29 A kind of measurement pile bottom sediment tool

Publications (1)

Publication Number Publication Date
CN209429183U true CN209429183U (en) 2019-09-24

Family

ID=67974786

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822253915.XU Expired - Fee Related CN209429183U (en) 2018-12-29 2018-12-29 A kind of measurement pile bottom sediment tool

Country Status (1)

Country Link
CN (1) CN209429183U (en)

Similar Documents

Publication Publication Date Title
CN108005129A (en) A kind of safeguard structure system and method for controlling tunnel vertical deformation
CN106703000A (en) Field earth pressure cell burying device and method thereof
CN209429183U (en) A kind of measurement pile bottom sediment tool
CN206052472U (en) Compound tube railway empty well structure
GB1493054A (en) Methods and apparatus for measuring the rate of penetration in well drilling from floating platforms
CN109056756B (en) A kind of suspension device and its construction method of High water cut side slope
CN206916735U (en) Stake is built in a kind of damping
CN207314338U (en) It is portable quickly to determine stake device
KR101184001B1 (en) Equipment and method compaction surface
CN209538128U (en) A kind of dam structure promoted for reservoir landscape
CN207714357U (en) A kind of mountainous region reinforcement type iron tower foundation
CN209339175U (en) A kind of aquatic measurement platform of aquatic measurement platform multilayer damping stake and damping
CN108360579A (en) Steel-pipe pile hole subsoil plug top surface flatness and sediment thickness measuring device and method
CN205676918U (en) A kind of underlying structure of tower crane steel Platform pipe column foundation
CN213508397U (en) Foundation reinforcing device for building construction
CN209128981U (en) A kind of light-duty cone penetrometer
CN208815587U (en) A kind of shallow foundation rectifying of leaned building ruggedized construction
CN206034509U (en) Jointly survey bored concrete pile pile bolck and stake end displacement's test device
CN208363125U (en) A kind of mounting structure of centrifuge ground
CN203096686U (en) Novel composite structure combining long piled wharf and shore-connecting structure
CN210946318U (en) Digging device for railway roadbed
CN206772309U (en) Measure sign protection sleeve
CN206052797U (en) Dynamometry pile cover
CN215761680U (en) Construction reinforcing device for shield to penetrate shallow soft clay
CN206591506U (en) The monitoring device of reclaimation area deep sedimentation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190924