CN209413341U - A kind of permanent ruggedized construction of excessive fire building - Google Patents

A kind of permanent ruggedized construction of excessive fire building Download PDF

Info

Publication number
CN209413341U
CN209413341U CN201821979288.1U CN201821979288U CN209413341U CN 209413341 U CN209413341 U CN 209413341U CN 201821979288 U CN201821979288 U CN 201821979288U CN 209413341 U CN209413341 U CN 209413341U
Authority
CN
China
Prior art keywords
steel structure
structure column
permanent
excessive fire
crossbeam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821979288.1U
Other languages
Chinese (zh)
Inventor
苏潘
潘付平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Zhonggu Construction Group Co ltd
Original Assignee
Shenzhen Zhonggu Building Reinforcement Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Zhonggu Building Reinforcement Technology Co Ltd filed Critical Shenzhen Zhonggu Building Reinforcement Technology Co Ltd
Priority to CN201821979288.1U priority Critical patent/CN209413341U/en
Application granted granted Critical
Publication of CN209413341U publication Critical patent/CN209413341U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model relates to build the technical field of reparation, more particularly, to a kind of permanent ruggedized construction of excessive fire building, it includes the steel structure column being mounted on construction wall, the steel structure crossbeam perpendicular to steel structure column is slidably connected on steel structure column, steel structure column is outward extended with the mounting plate perpendicular to steel structure column, and driving steel structure crossbeam is equipped on mounting plate and slides the jack being connected on spandrel girder.The utility model can effectively reduce a possibility that spandrel girder that excessive fire is built is collapsed because of load-bearing capacity decline, substantially increase the safety of excessive fire building by providing a kind of permanent ruggedized construction of excessive fire building.

Description

A kind of permanent ruggedized construction of excessive fire building
Technical field
The utility model relates to build the technical field of reparation, the permanent reinforcing more particularly, to a kind of excessive fire building is tied Structure.
Background technique
It is some building after fire occurs, since burnt area is big, will cause construction wall crack, reinforced steel it is strong Degree such as dies down at the bad phenomenons, declines so as to cause the load-bearing capacity of spandrel girder, makes to build in the hole.
A kind of permanent ruggedized construction of excessive fire building of existing Publication No. CN205172033U, including it is set to excessive fire The stiffening frame of building interior, the attachment members being fixedly connected with stiffening frame, the attachment members are attached at the load-bearing of building Beam side, the spandrel girder of the building are connected with pulling force rib, and the pulling force rib is fixedly connected with attachment members.
Prior art among the above has the following deficiencies: that the ruggedized construction in documents is attached at the load-bearing of building Beam side becomes load suffered by construction wall uniformly, but has no too big side for the load-bearing capacity for promoting spandrel girder It helps, spandrel girder remains unchanged in the presence of the possibility collapsed by load-bearing capacity decline, and the safety for the building that over-fires still is unable to get Good guarantee.
Utility model content
The purpose of the utility model is to provide a kind of permanent ruggedized constructions of excessive fire building, can effectively reduce excessive fire and build A possibility that spandrel girder built is collapsed because of load-bearing capacity decline, substantially increases the safety of excessive fire building.
The above-mentioned purpose of utility model of the utility model has the technical scheme that
A kind of permanent ruggedized construction of excessive fire building, including the steel structure column being mounted on construction wall, steel structure column On slidably connect steel structure crossbeam perpendicular to steel structure column, steel structure column is outward extended with the installation perpendicular to steel structure column Plate is equipped with driving steel structure crossbeam on mounting plate and slides the jack being connected on spandrel girder.
By using above-mentioned technical proposal, steel structure column is installed on construction wall, and steel is installed on steel structure column Structure crossbeam effectively supports spandrel girder, substantially increases the load-bearing capacity of excessive fire building bearing beam, effectively reduces excessive fire and build A possibility that spandrel girder built is collapsed because of load-bearing capacity decline, substantially increases the safety of excessive fire building.Passing through will Steel structure crossbeam is slidably connected on steel structure column, and when the height of steel structure column is less than the terrain clearance of spandrel girder, use is very heavy Top jacks up steel structure crossbeam towards spandrel girder direction, slides steel structure crossbeam upwards up to being connected on spandrel girder along steel structure column, Substantially increase the applicability of steel structure column.
The utility model is further arranged to: the jack is screw jack, including installing bottom on a mounting board , being fitted into pedestal has jacking sleeve, and one end that jacking sleeve stretches out pedestal is equipped with the support that steel structure crossbeam is connected to by sliding Seat.
By using above-mentioned technical proposal, screw jack has light-weight, easy to carry, maintenance simply and using peace The advantages that complete reliable.And screw jack supports weight by screw thread self-locking effect, simple structure is suitable for long-term Zhi Chichong Object.
The utility model is further arranged to: the groove for being fitted into pedestal is offered on mounting plate.
By using above-mentioned technical proposal, groove, which is arranged, makes mounting plate play a kind of positioning action to screw jack, just In rapidly and accurately disposing screw jack on a mounting board, the assembly efficiency of steel structure column is improved.
The utility model is further arranged to: being equipped between steel structure crossbeam and mounting plate and is used on steel structure column The fixed ring of firm banking.
By using above-mentioned technical proposal, a possibility that screw jack is fallen from mounting plate is effectively reduced, is increased The stationarity that screw jack is placed.
The utility model is further arranged to: being equipped with and is connected on steel structure column relative to the side of jack in mounting plate Stiffener plate.
By using above-mentioned technical proposal, the bearing capacity of mounting plate is substantially increased, effectively reduces mounting plate because of carrying Scarce capacity and a possibility that bend, be positioned to screw jack more steady.
The utility model is further arranged to: being covered with rubber layer on the surface that bracket is in contact with steel structure crossbeam.
By using above-mentioned technical proposal, greatly reduces bracket and frictionally damage is touched to steel structure crossbeam, simultaneously as Rubber layer is per se with elasticity, to have certain effectiveness in vibration suppression.
The utility model is further arranged to: the steel structure column is H profile steel, including the first wing plate for being parallel to each other and the Two wing plates, are connected with web between the first wing plate and the second wing plate, and steel structure crossbeam is equipped in the end close to steel structure column and supports It is connected to the end plate of the second wing plate, is extended with the deck of the second wing plate of cladding in the two sides of end plate.
By using above-mentioned technical proposal, deck is set, steel structure crossbeam is temporarily fixed on steel structure column, have It is slowly adjusted conducive to jack pair steel structure crossbeam, until steel structure crossbeam is jacked up to the position for fitting in spandrel girder, effectively Reduce a possibility that steel structure crossbeam is fallen from steel structure column during the adjustment of jack, ensures construction safety.
The utility model is further arranged to: being offered mounting groove on the second wing plate, is equipped on end plate across peace Tankage simultaneously makes steel structure crossbeam and the relatively-stationary fastener of steel structure column.
By using above-mentioned technical proposal, mounting groove is set, make the steel structure crossbeam slid along steel structure column more easily by It is relatively fixed between fastener realization and steel structure column, the time that fastener looks for hole and alignment hole to pass through is saved, favorably In raising installation effectiveness.Meanwhile after jack is by steel structure crossbeam top to the position of fitting spandrel girder, keep steel structure horizontal with fastener Liang Yugang structure column keeps relatively fixed, is conducive to the burden for mitigating jack.
In conclusion the advantageous effects of the utility model are as follows:
1. installing steel structure column on construction wall, and steel structure crossbeam is installed on steel structure column, spandrel girder is carried out Effectively support substantially increases the load-bearing capacity of excessive fire building bearing beam, effectively reduces the spandrel girder of excessive fire building because of load-bearing energy A possibility that power declines and collapses substantially increases the safety of excessive fire building.
2. when the height of steel structure column is less than the terrain clearance of spandrel girder, using jack by steel structure crossbeam towards spandrel girder Direction jacks up, and slides steel structure crossbeam upwards along steel structure column until being connected on spandrel girder, substantially increases steel structure column Applicability.
3. setting deck is temporarily fixed to steel structure crossbeam on steel structure column, be conducive to jack pair steel structure crossbeam It is slowly adjusted, until jacking up steel structure crossbeam to the position for fitting in spandrel girder, effectively reduces steel structure crossbeam very heavy A possibility that falling from steel structure column during the adjustment on top, has ensured construction safety.
Detailed description of the invention
Fig. 1 is a kind of mounting structure schematic diagram of the permanent ruggedized construction of excessive fire building of the utility model.
Fig. 2 is the attachment structure schematic diagram of steel structure column and steel structure crossbeam in the utility model.
In figure, 1, steel structure column;11, the first wing plate;12, the second wing plate;121, mounting groove;13, web;14, mounting plate; 141, groove;142, stiffener plate;15, jack;151, pedestal;152, rocking handle;153, jacking sleeve;154, bracket;16, solid Determine ring;161, the first semi-ring;162, the second semi-ring;17, construction wall;
2, steel structure crossbeam;21, end plate;22, deck;23, spandrel girder.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
Referring to Fig.1, it is a kind of permanent ruggedized construction of excessive fire building disclosed by the utility model, including is mounted on building Steel structure column 1 on wall 17.In the present embodiment, steel structure column 1 is arranged perpendicular to ground.Steel structure column 1 is H profile steel, packet The first wing plate 11 and the second wing plate 12 being parallel to each other are included, is connected between the first wing plate 11 and the second wing plate 12 perpendicular to The web 13 of one wing plate 11.First wing plate 11 fits in construction wall 17 by swell fixture realization and fixes.
Referring to Fig.1 with Fig. 2, the second wing plate 12 is outward extended with the mounting plate 14 perpendicular to 1 extending direction of steel structure column.? In the present embodiment, fluted 141 are opened up on mounting plate 14, the axis of groove 141 is perpendicular to ground, and the opening side of groove 141 It supports or opposes to the ground.The stiffener plate 142 being connected on the second wing plate 12 is equipped with backwards to the side of groove 141 in mounting plate 14.
Referring to Fig.1, jack 15 is placed in groove 141.In the present embodiment, jack 15 is screw jack 15, including the pedestal 151 being entrenched in groove 141, pedestal 151 is externally provided with rocking handle 152, and being fitted into pedestal 151 has jacking sleeve 153, one end that jacking sleeve 153 stretches out pedestal 151 is equipped with bracket 154.Rubber layer is covered on the outer surface of bracket 154.
Referring to Fig.1, fixed ring 16 is equipped on the second wing plate 12.In the present embodiment, fixed ring 16 includes the first semi-ring 161 and the second semi-ring 162 for being fixed on the second wing plate 12, the both ends of the first semi-ring 161 and the second semi-ring 162 pass through respectively It is bolted together, forms fixed ring 16.The axis of fixed ring 16 is arranged perpendicular to ground.
Referring to Fig.1, steel structure column 1 slides up and down the steel structure being connected with below spandrel girder 23 in one end far from ground Crossbeam 2.In the present embodiment, steel structure crossbeam 2 is arranged perpendicular to steel structure column 1.Steel structure crossbeam 2 is similarly H profile steel, steel structure crossbeam 2 are equipped with the end plate 21 being connected on the second wing plate 12 in the end close to steel structure column 1, are extended with packet in the two sides of end plate 21 Cover the deck 22 of the second wing plate 12.
Referring to Fig.1, the second wing plate 12 offers the mounting groove 121 being in U-shape in the two sides of the end far from ground, installs The notch of slot 121 is arranged vertically upwards.Running through on end plate 21 has across mounting groove 121 and makes steel structure crossbeam 2 and steel structure column 1 Relatively-stationary fastener.In the present embodiment, fastener can be the combination of bolts and nuts.
The working principle of the present embodiment are as follows: the pedestal 151 of jack 15 is placed in the groove 141 on mounting plate 14, Meanwhile it is entrenched in pedestal 151 in the cavity of second semi-ring 162, the first semi-ring 161 is then mounted on the second semi-ring with bolt To realize fixation of the fixed ring 16 to 15 pedestal 151 of jack on 162.It is horizontal that second wing plate 12 of steel structure column 1 is passed through into steel structure Deck 22 on beam 2 realizes steel structure column 1 temporarily with steel structure crossbeam 2 relatively fixed.With swell fixture by steel structure column 1 The fitting of first wing plate 11 is fixed on construction wall 17.
If the height of steel structure column 1 is less than the terrain clearance of spandrel girder 23, the rocking handle on 15 pedestal 151 of jack is shaken 152, eject jacking sleeve 153 to outside pedestal 151.Bracket 154 is connected to steel structure crossbeam 2 with the ejection of jacking sleeve 153 On, and steel structure crossbeam 2 is jacked up vertically towards 23 direction of spandrel girder, slide steel structure crossbeam 2 upwards until completely along steel structure column 1 It is connected on spandrel girder 23.
Stop shaking rocking handle 152, use nut check after bolt is passed through mounting groove 121 and end plate 21, make steel structure crossbeam 2 with Steel structure column 1 is realized relatively fixed.
The present embodiment is by the installation steel structure column 1 on construction wall 17, and steel structure crossbeam is installed on steel structure column 1 2, spandrel girder 23 is effectively supported, the load-bearing capacity of excessive fire building bearing beam 23 is substantially increased, effectively reduces excessive fire and build A possibility that spandrel girder 23 built is collapsed because of load-bearing capacity decline, substantially increases the safety of excessive fire building.
The embodiment of present embodiment is the preferred embodiment of the utility model, and not limitation is originally practical new according to this The protection scope of type, therefore: the equivalence changes that all structures, shape, principle according to the utility model are done should all be covered by practical Within novel protection scope.

Claims (8)

1. a kind of permanent ruggedized construction of excessive fire building, special including the steel structure column (1) being mounted on construction wall (17) Sign is: the steel structure crossbeam (2) perpendicular to steel structure column (1) is slidably connected on steel structure column (1), steel structure column (1) is outside It is extended with the mounting plate (14) perpendicular to steel structure column (1), driving steel structure crossbeam (2) sliding is installed on mounting plate (14) and is abutted In the jack (15) on spandrel girder (23).
2. a kind of permanent ruggedized construction of excessive fire building according to claim 1, it is characterised in that: the jack It (15) is screw jack (15), including the pedestal (151) being mounted on mounting plate (14), being fitted into pedestal (151) has lifting Sleeve (153), one end that jacking sleeve (153) stretches out pedestal (151) are equipped with the bracket that steel structure crossbeam (2) is connected to by sliding (154)。
3. a kind of permanent ruggedized construction of excessive fire building according to claim 2, it is characterised in that: on mounting plate (14) Offer the groove (141) for being fitted into pedestal (151).
4. a kind of permanent ruggedized construction of excessive fire building according to claim 3, it is characterised in that: in steel structure column (1) it is equipped between steel structure crossbeam (2) and mounting plate (14) and is used for the fixed ring (16) of firm banking (151).
5. a kind of permanent ruggedized construction of excessive fire building according to claim 4, it is characterised in that: in mounting plate (14) Side relative to jack (15) is equipped with the stiffener plate (142) being connected on steel structure column (1).
6. a kind of permanent ruggedized construction of excessive fire building according to claim 5, it is characterised in that: in bracket (154) Rubber layer is covered on the surface being in contact with steel structure crossbeam (2).
7. a kind of permanent ruggedized construction of excessive fire building according to claim 1, it is characterised in that: the steel structure column It (1) is H profile steel, including the first wing plate (11) being parallel to each other and the second wing plate (12), in the first wing plate (11) and the second wing plate (12) it is connected between web (13), steel structure crossbeam (2) is equipped in the end close to steel structure column (1) and is connected to the second wing plate (12) end plate (21) is extended with the deck (22) of cladding the second wing plate (12) in the two sides of end plate (21).
8. a kind of permanent ruggedized construction of excessive fire building according to claim 7, it is characterised in that: in the second wing plate (12) mounting groove (121) are offered on, are equipped on end plate (21) across mounting groove (121) and make steel structure crossbeam (2) and steel Structure column (1) relatively-stationary fastener.
CN201821979288.1U 2018-11-28 2018-11-28 A kind of permanent ruggedized construction of excessive fire building Active CN209413341U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821979288.1U CN209413341U (en) 2018-11-28 2018-11-28 A kind of permanent ruggedized construction of excessive fire building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821979288.1U CN209413341U (en) 2018-11-28 2018-11-28 A kind of permanent ruggedized construction of excessive fire building

Publications (1)

Publication Number Publication Date
CN209413341U true CN209413341U (en) 2019-09-20

Family

ID=67935667

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821979288.1U Active CN209413341U (en) 2018-11-28 2018-11-28 A kind of permanent ruggedized construction of excessive fire building

Country Status (1)

Country Link
CN (1) CN209413341U (en)

Similar Documents

Publication Publication Date Title
CN104234723B (en) A kind of open trench tunnel square-section self-propelled mobile falsework chassis
KR101300073B1 (en) Lifting device for girder
CN109680968B (en) Steel construction support post is smoothed and is just put up
CN211772901U (en) Space abnormal shape steel case arch rib installation device
CN109296192B (en) Lifting frame for assembled building
CN209413341U (en) A kind of permanent ruggedized construction of excessive fire building
CN213297191U (en) Building engineering assembled support
CN107902523B (en) Sheet-shaped old building additional elevator
CN210597630U (en) Net rack integral lifting structure
CN112878774A (en) Effectual building stand structure of shock attenuation
CN216664529U (en) Bearing assembly for assembly type building
CN207645573U (en) Piece-shape type aging blocks install elevator additional
CN212428009U (en) Heavy bearing structure of super high-rise outer protective frame
CN103601081A (en) Tower crane internal-climbing support system
CN208249618U (en) A kind of reinforced steel structure spandrel girder with damping effect
CN209942035U (en) Fixing device of assembled side fascia
CN201778823U (en) Enclosure pile section steel support walking arch crown internal mold lining trolley
CN220036702U (en) Tunnel supporting device with auxiliary support
CN214939238U (en) Bridge expansion joint structure
CN219887646U (en) Building beam reinforced structure
CN211228137U (en) Bridge support column
CN214575124U (en) Assembled truss with adjustable span
CN221004590U (en) Bearing support for construction engineering equipment
CN216195419U (en) Building steel structure framework with stronger compressive capacity
CN215052128U (en) Platform in tower column shaft

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 518000 zhuoyuhui b1810, excellence Meilin Central Plaza (South District), No. 126, Zhongkang Road, Meidu community, Meilin street, Futian District, Shenzhen, Guangdong Province

Patentee after: Shenzhen Zhonggu Construction Group Co.,Ltd.

Address before: 518000 808, block a, Haoming Fortune Plaza, Shennan Avenue, Futian District, Shenzhen, Guangdong

Patentee before: SHENZHEN ZHONGGU BUILDING REINFORCING TECHNOLOGY Co.,Ltd.