CN209413304U - High slope lattice girder formwork-strengthening system - Google Patents
High slope lattice girder formwork-strengthening system Download PDFInfo
- Publication number
- CN209413304U CN209413304U CN201822228789.2U CN201822228789U CN209413304U CN 209413304 U CN209413304 U CN 209413304U CN 201822228789 U CN201822228789 U CN 201822228789U CN 209413304 U CN209413304 U CN 209413304U
- Authority
- CN
- China
- Prior art keywords
- soil nailing
- lattice girder
- lattice
- soil
- pull rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model relates to a kind of high slope lattice girder formwork-strengthening systems, the first soil nailing and the second soil nailing including being implanted into side slope, first soil nailing, and arranged for interval is in a row implanted into side slope middle, and the first soil nailing front end is fixedly connected with the inner end to pull rod;Preformed hole on lattice beam side is passed through to the outer end of pull rod, for tensing and supporting lattice beam side;Second soil nailing, arranged for interval are in a row implanted into side slope bottom, and the second soil nailing extends to its front support in lattice beam side bottom.The utility model not only increases the overall stability of side slope using the first soil nailing and to pull rod, while can also reinforce the template of lattice girder, the sectional dimension of lattice girder and position.Second soil nailing is used to support lattice beam forms bottom, further increases the overall stability of form stable and side slope.
Description
Technical field
The utility model relates to the supports of template, hardened system, specifically, being a kind of high slope lattice beam die plate reinforcing
System.
Background technique
With the rapid development of construction industry, have many roads and building periphery natural feature height difference larger, need into
Row slope retaining, in molded height about in 24 meters or so of tall and big side slope, and the gradient is already shaped into irregular shape,
When carrying out supporting with lattice girder in this side slope, scaffold can not be fixed, and lattice beam forms can not be fixed, the section ruler of lattice girder
Very little and position is difficult to control, and is easy to happen swollen mould and spillage, and in construction, there are many insecurity factors.
Summary of the invention
The technical problem to be solved by the present invention is to provide a kind of high slope lattice girder formwork-strengthening systems, to reach control
Make the purpose of molded tall and big side slope lattice beam section size.
In order to solve the above technical problems, the technical solution adopted in the utility model is:
A kind of high slope lattice girder formwork-strengthening system, the first soil nailing and the second soil nailing including being implanted into side slope,
First soil nailing, arranged for interval are in a row implanted into side slope middle, and the first soil nailing front end is fixedly connected to pull rod
Inner end;Preformed hole on lattice beam side is passed through to the outer end of pull rod, for tensing and supporting lattice beam side;
Second soil nailing, arranged for interval are in a row implanted into side slope bottom, and the second soil nailing extends to its front support in lattice
Structure beam side bottom.
Further, the first soil nailing front end is concordant with side slope face, the lattice to rod length to be passed through to pull rod
Structure beam section width+200mm.
Further, the first soil nailing and the second soil nailing are obliquely installed, and tilt angle is 20-30 degree.
Further, the middle part circumferential surface of the first soil nailing middle part and/or the second soil nailing is provided with soil nailing protective layer
Support rod, soil nailing protective layer support rod include annular base plate, convex to form arc surface in the middle part of annular base plate.
Further, the corresponding lattice girder cross-sectional width of the first soil nailing is greater than 300mm and sets less than 500mm by spacing 500mm
It sets to pull rod;It is arranged by spacing 100mm to pull rod when the corresponding lattice girder cross-sectional width of the first soil nailing is less than 300mm.
The utility model is connected using the first soil nailing and carries out lattice beam die plate reinforcing to pull rod, in advance in installation to railing
The formwork sides of position punch, and are reinforced with to pull rod to template.First soil nailing and the whole of side slope is not only increased to pull rod
Body stability, while the template of lattice girder can also be reinforced, the sectional dimension of lattice girder and position.Second soil nailing is used to support lattice
Structure beam forms bottom, further increases the overall stability of form stable and side slope.
Detailed description of the invention
Fig. 1 is high slope lattice girder formwork-strengthening system sectional view described in the utility model.
Fig. 2 is the first soil nailing processing sectional view described in the utility model.
In figure, the first soil nailing of 1-, the second soil nailing of 2-, 3- side slope, 4- is to pull rod, 5- lattice side template, the protection of 6- soil nailing
Layer support rod, 7- lattice girder.
Specific embodiment
A kind of high slope lattice girder formwork-strengthening system that typical embodiment provides of the utility model, including implantation side
First soil nailing 1 and the second soil nailing 2 on slope;First soil nailing 1, arranged for interval are in a row implanted into 3 middle part of side slope, the first soil nailing 1
Front end is fixedly connected with the inner end to pull rod 4;Preformed hole on lattice beam side 5 is passed through to the outer end of pull rod 4, for tensing and propping up
Support lattice beam side 5;Second soil nailing 2, arranged for interval are in a row implanted into 3 bottom of side slope, and the second soil nailing 2 extends to its front end
It is supported in 5 bottom of lattice beam side.
First soil nailing 1 is referred to as short brad, according to embodiment of above, using the connection of the first soil nailing 1 to pull rod 4 into
Row lattice beam die plate reinforcing is punched in formwork sides of the installation to railing position in advance, is reinforced with to pull rod 4 to template.
This short brad and the overall stability that side slope is not only increased to pull rod 4, while the template of lattice girder 7 can also be reinforced, guarantee
The sectional dimension of lattice girder 7 and position.The first soil nailing 1 can also be used as the pull rod of scaffold simultaneously.Second soil nailing 2 is for branch
Lattice beam forms bottom is supportted, form stable is further increased and becomes the overall stability on slope.
Using the reinforcing engineering method, the problem of more than 20 meters or more of irregular tall and big slope retaining difficulty can solve.With biography
The slope retaining of system is compared, and the supporting when excavating, side slope preferable for soil property or the larger tall and big original side slope of height difference are not needed,
It needs supporting that can use and first excavates or first repair slope, then carry out slope retaining.The method can accelerate construction progress, and safety
Reliably.
In a preferred embodiment, the middle part circumferential surface of 1 middle part of the first soil nailing and/or the second soil nailing 2
It is provided with soil nailing protective layer support rod 6, soil nailing protective layer support rod 6 includes annular base plate, convexes to form circle in the middle part of annular base plate
Cambered surface, the soil nailing protective layer support rod 6 are conducive to improve the mechanical property of the first soil nailing 1 and the second soil nailing 2 in soil structures,
Guarantee that above-mentioned soil nailing still keeps stable and higher support strength in the state of bearing die plate pressure.
It is done below with reference to the technical solution that a specific embodiment protects the requires of the utility model further clear, complete
Explanation.
Embodiment
In molded irregular tall and big side slope (24 meters of height or more), slope retaining is carried out with lattice girder, can be adopted
With the method for installing short brad when setting up scaffold.Then it is welded in advance in short brad end and formwork reinforcement is carried out to pull rod 4,
7 sectional dimension of lattice girder can be effectively controlled, while this short brad can also be used as the pull rod of scaffold.First in the first soil
Nail 1, i.e., above-described short brad end weld one to pull rod 4 in advance, and weld length 10d is to drawing to 4 length of pull rod
7 cross-sectional width+the 200mm of lattice girder that bar 4 is passed through.Then it is installed respectively in the centre of the corresponding side slope 3 of lattice girder and bottom
One, which arranges the first soil nailing 1 and one, arranges the 2nd soil nailing 2, and soil nailing angle is punched downwards 25 degree of horizontal sextant angle or so of position, the first soil
It follows closely 1 corresponding 7 cross-sectional width of lattice girder and is less than 500mm by spacing 500mm setting to pull rod greater than 300mm;When the first soil nailing 1 is right
7 cross-sectional width of lattice girder answered is arranged by spacing 100mm to pull rod when being less than 300mm.Soil nailing injecting paste material uses 42.5, water ash
Than for 0.5-0.55, the slip casting of original soil area is 20kg/m, earthen fill zone slip casting is 30kg/m, and injecting cement paste intensity is not less than 20Mpa.
Claims (5)
1. a kind of high slope lattice girder formwork-strengthening system, it is characterised in that: the first soil nailing and the second soil including being implanted into side slope
Nail,
First soil nailing, arranged for interval are in a row implanted into side slope middle, and the first soil nailing front end is fixedly connected with the inner end to pull rod;
Preformed hole on lattice beam side is passed through to the outer end of pull rod, for tensing and supporting lattice beam side;
Second soil nailing, arranged for interval are in a row implanted into side slope bottom, and the second soil nailing extends to its front support in lattice girder
Side form bottom.
2. high slope lattice girder formwork-strengthening system according to claim 1, it is characterised in that: the first soil nailing front end and side
Slope surface is concordant, the lattice girder cross-sectional width+200mm to rod length to be passed through to pull rod.
3. high slope lattice girder formwork-strengthening system according to claim 2, it is characterised in that: the first soil nailing and the second soil
Nail is obliquely installed, and tilt angle is 20-30 degree.
4. high slope lattice girder formwork-strengthening system according to claim 1,2 or 3, it is characterised in that: first soil
The middle part circumferential surface of nail middle part and/or the second soil nailing is provided with soil nailing protective layer support rod, and soil nailing protective layer support rod includes
Annular base plate, annular base plate middle part convex to form arc surface.
5. high slope lattice girder formwork-strengthening system according to claim 4, it is characterised in that: the corresponding lattice of the first soil nailing
Structure beam section width is greater than 300mm and is less than 500mm by spacing 500mm setting to pull rod;When the corresponding lattice girder of the first soil nailing is cut
Face width is arranged by spacing 100mm to pull rod when being less than 300mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822228789.2U CN209413304U (en) | 2018-12-28 | 2018-12-28 | High slope lattice girder formwork-strengthening system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822228789.2U CN209413304U (en) | 2018-12-28 | 2018-12-28 | High slope lattice girder formwork-strengthening system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209413304U true CN209413304U (en) | 2019-09-20 |
Family
ID=67941243
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822228789.2U Active CN209413304U (en) | 2018-12-28 | 2018-12-28 | High slope lattice girder formwork-strengthening system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209413304U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115492376A (en) * | 2022-08-31 | 2022-12-20 | 上海宝冶集团有限公司 | Template supporting method for lattice beams and lattice columns of ultra-large slope broken stone slope |
-
2018
- 2018-12-28 CN CN201822228789.2U patent/CN209413304U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115492376A (en) * | 2022-08-31 | 2022-12-20 | 上海宝冶集团有限公司 | Template supporting method for lattice beams and lattice columns of ultra-large slope broken stone slope |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207406349U (en) | Tunnel Base reinforcing construction | |
CN101864959A (en) | Method for tunneling construction of main structure of underground station | |
CN207616844U (en) | Foundation platform precast concrete side form and molding machine | |
CN106014446B (en) | A kind of reinforcement means of enhancing high ground stress soft rock stress tunnel inverted arch structural stability | |
CN102587924A (en) | Construction method for shallow-buried high-water-content clayed soil tunnel | |
CN106522236B (en) | The structure and construction method of pattern foundation pit supporting structure | |
CN203429641U (en) | Single-side supporting formwork reinforcing structure system for building construction | |
CN104947681A (en) | Super large super deep basement ground pit construction method | |
CN209413304U (en) | High slope lattice girder formwork-strengthening system | |
CN105064401A (en) | Method for excavating and constructing large-area basement | |
KR100989946B1 (en) | Construction method for under-ground structure construction using t-shaped guider with lagged flanges | |
CN204590122U (en) | A kind of groover hydraulic grab with correction push pedal | |
CN104328788B (en) | Double rows slip casting stake with draw shotcrete layer combined supporting construction method | |
CN210317344U (en) | Tunnel steel pipe encircles preliminary bracing structure | |
CN211113683U (en) | High slope dismounting-free light steel mould net self-compacting concrete frame slope protection structure | |
CN210106749U (en) | Counter-force structure of soft soil foundation super large section push pipe jacking operation | |
CN204173804U (en) | A kind of inside-climbing tower crane of structural beams bearing-type is installed and climbing structure | |
CN102493436A (en) | Novel manual tunneling construction method of rectangular anti-slide pile | |
CN102926403B (en) | Roof construction method by cover-excavation method | |
CN109707054A (en) | A kind of steel sections package concrete column and steel beam joint structure and construction method | |
CN205369919U (en) | Purlin is enclosed to multi -functional bracket appearance frame template | |
CN214301583U (en) | Ship-leaning component capable of recycling measure materials | |
CN205605215U (en) | Big section loess tunnel is grooving method construction structures in advance | |
CN204059367U (en) | Double rows slip casting stake with draw shotcrete layer combined retaining structure | |
CN210597642U (en) | Anchor bar invisible structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |