CN209413248U - A kind of support scaffolding for building - Google Patents

A kind of support scaffolding for building Download PDF

Info

Publication number
CN209413248U
CN209413248U CN201920068267.2U CN201920068267U CN209413248U CN 209413248 U CN209413248 U CN 209413248U CN 201920068267 U CN201920068267 U CN 201920068267U CN 209413248 U CN209413248 U CN 209413248U
Authority
CN
China
Prior art keywords
telescopic sleeving
sleeving rod
rod
terminal pad
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920068267.2U
Other languages
Chinese (zh)
Inventor
于成见
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong National Construction Engineering Group Co Ltd
Shandong Guojian Engineering Group Co Ltd
Original Assignee
Shandong National Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong National Construction Engineering Group Co Ltd filed Critical Shandong National Construction Engineering Group Co Ltd
Priority to CN201920068267.2U priority Critical patent/CN209413248U/en
Application granted granted Critical
Publication of CN209413248U publication Critical patent/CN209413248U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ladders (AREA)

Abstract

The utility model discloses a kind of support scaffoldings for building, including first connecting rod, location hole, first telescopic sleeving rod, second telescopic sleeving rod, terminal pad and the second card slot, it is characterized by: the both ends on the bottom bar top are vertically-mounted the first telescopic sleeving rod, Anti-slip cover is installed on the outside of first telescopic sleeving rod, the top of first telescopic sleeving rod is equipped with bolt, one end inside first telescopic sleeving rod through the first telescopic sleeving rod is equipped with the second telescopic sleeving rod, location hole is offered on the side wall of second telescopic sleeving rod bottom end, and it cooperates between location hole and bolt, second telescopic sleeving rod, the upper end of second telescopic sleeving rod is equipped with caging bolt.The utility model can make scaffold guarantee the stability of scaffold installation during the installation process, improve the installation quality of scaffold by using level meter and terminal pad, hidden danger caused by reducing because of mistake installation.

Description

A kind of support scaffolding for building
Technical field
The utility model relates to technical field of buildings, specially a kind of support scaffolding for building.
Background technique
Scaffold is the generic term of construction, refer to built on construction site for convenience of construction personnel up and down work or Ensure that the facility of site operation safety, scaffold mainly have the characteristics that bearing capacity is larger, be convenient to mount and dismount, be economical and practical.
Existing scaffold is mostly that connector is directly attached, and the bonding strength of junction not can guarantee, Yi Fasheng The situation that connection is loose or connection is not in place be easy to cause security risk, and traditional scaffold is that construction personnel installs by hand, right Installation experience it is more demanding, new hand during installation due to experience deficiency easily by scaffold installation position tilt, there are safety Hidden danger, existing scaffold is mostly integrated design, and integral strength is enough, but is needing to require bearing height In space, scaffold is not able to satisfy specific height dimension requirement, impacts to the actual use of scaffold.
Utility model content
The purpose of this utility model is to provide a kind of support scaffoldings for building, to solve to propose in above-mentioned background technique The problem of.
To achieve the above object, the utility model provides the following technical solutions: a kind of support scaffolding for building, including the One connecting rod, location hole, the first telescopic sleeving rod, the second telescopic sleeving rod, terminal pad and the second card slot, the both ends on the bottom bar top It is vertically-mounted to have the first telescopic sleeving rod, Anti-slip cover, first telescopic sleeving rod are installed on the outside of first telescopic sleeving rod Top bolt is installed, one end inside first telescopic sleeving rod through the first telescopic sleeving rod is equipped with the second telescopic Bar offers location hole on the side wall of second telescopic sleeving rod bottom end, and cooperates between location hole and bolt, and described Two telescopic sleeving rods, the upper end of second telescopic sleeving rod are equipped with caging bolt, the outside peace on second telescopic sleeving rod top Bottom end equipped with first connecting rod, and inside first connecting rod offers the first card slot, the first connection at first card slot Terminal pad is installed on the outside of bar, the bottom of the terminal pad is uniformly provided with mounting hole, the middle position of the terminal pad side wall Place is equipped with level meter, and there are four horizontal connecting holes for the top setting on the outside of the terminal pad, and the inside of horizontal connecting hole is opened Equipped with the second card slot, the inside of second card slot is equipped with the second connecting rod through horizontal connecting hole one end, the level Protective case is installed, second connecting rod on the outside of terminal pad one end far from being equipped on the outside of the second connecting rod of connection hole Connector sleeve.
Preferably, the both ends of the bottom bar bottom end are mounted on support base, and support base is welding one between bottom bar Body structure.
Preferably, there are two the quantity settings of the bolt, and the distance between two bolts are equal to two neighboring positioning The distance between hole.
Preferably, first telescopic sleeving rod passes through between bolt and the second telescopic sleeving rod and the second connecting rod and connector sleeve Between constitute telescoping mechanism, and the center line of the center line of the first telescopic sleeving rod and the second telescopic sleeving rod is in same vertical line On.
Preferably, there are four the quantity settings of the horizontal connecting hole, and about terminal pad between four horizontal connecting holes Symmetrically distribution.
Preferably, the length of the Anti-slip cover is the half of the first telescopic sleeving rod length, and the material of Anti-slip cover is chlorination Rubber.
Compared with prior art, the utility model has the beneficial effects that the support scaffolding for building, by using level Instrument and terminal pad can make scaffold guarantee the stability of scaffold installation during the installation process, improve the installation of scaffold Quality, hidden danger caused by reducing because of mistake installation, when junction occurs due to unexpected etc. in use for scaffold When falling off, the terminal pad below horizontal connecting hole can protect the whereabouts that scaffold prevents scaffold, ensure making for scaffold With safety, by using connector sleeve and the second connecting rod, by rotating the second connecting rod of connector sleeve and connector sleeve one end, so that The distance between two second connecting rods inside connector sleeve change, and the distance tune in scaffold horizontal direction may be implemented Section, by using the first telescopic sleeving rod, the second telescopic sleeving rod, bolt and location hole, first back-outs bolt outward, then by the Two telescopic sleeving rods are extracted out outward, and when being retracted to suitable height, bolt is screwed into location hole, and scaffold height may be implemented It is adjustable, while can be more stable with the connection between the first telescopic sleeving rod and the second telescopic sleeving rod using two bolts, lead to It crosses using caging bolt, can preventing terminal pad, the effect of compression power is threadingly subjected to displacement in direction in use, is increased The safety that scaffold uses can prevent first connecting rod link position in horizontal connecting hole from sending out by using protective case Raw sliding, while keeping the connection between first connecting rod and horizontal connecting hole more firm.
Detailed description of the invention
Fig. 1 is the positive structure diagram of the utility model.
Fig. 2 is structural schematic diagram at the A of Fig. 1 of the utility model.
Fig. 3 is the side structure schematic view of the first connecting rod of the utility model.
Fig. 4 is the protective case, terminal pad and the second notch schematic diagram of the utility model.
In figure: 1, first connecting rod;2, the second connecting rod;3, connector sleeve;4, level meter;5, bolt;6, location hole;7, bottom Bar;8, support base;9, the first telescopic sleeving rod;10, Anti-slip cover;11, the second telescopic sleeving rod;12, protective case;13, terminal pad;14, Caging bolt;15, mounting hole;16, horizontal connecting hole;17, the first card slot;18, the second card slot.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-4 is please referred to, a kind of embodiment provided by the utility model: a kind of support scaffolding for building, including first Connecting rod 1, location hole 6, the first telescopic sleeving rod 9, the second telescopic sleeving rod 11, terminal pad 13 and the second card slot 18,7 top of bottom bar Both ends are vertically-mounted the first telescopic sleeving rod 9, and the both ends of 7 bottom end of bottom bar are mounted on support base 8, and support base 8 with bottom It is weldedization structure between bar 7, device can be made firmer using weldedization structure, safety is protected, The outside of first telescopic sleeving rod 9 is equipped with Anti-slip cover 10, and the length of Anti-slip cover 10 is the half of 9 length of the first telescopic sleeving rod, and The material of Anti-slip cover 10 is chlorinated rubber, is equipped with protective jacket 10 first and can protect the first telescopic sleeving rod, secondly can be reduced Installation difficulty, the top of the first telescopic sleeving rod 9 are equipped with bolt 5, and there are two the quantity settings of bolt 5, and between two bolts 5 Distance be equal to the distance between two neighboring location hole 6, be used cooperatively using bolt 5 and location hole 6, first can be fixed The distance between telescopic sleeving rod 9 and the second telescopic sleeving rod 11 run through one end of the first telescopic sleeving rod 9 inside first telescopic sleeving rod 9 Second telescopic sleeving rod 11 is installed, location hole 6, and location hole 6 and bolt 5 are offered on the side wall of 11 bottom end of the second telescopic sleeving rod Between cooperate, the second telescopic sleeving rod 11, the upper end of the second telescopic sleeving rod 11 is equipped with caging bolt 14, the second telescopic sleeving rod First connecting rod 1 is installed, and the bottom end inside first connecting rod 1 offers the first card slot 17, the first card on the outside of 11 tops Terminal pad 13 is installed, the bottom of terminal pad 13 is uniformly provided with mounting hole 15, terminal pad on the outside of the first connecting rod 1 at slot 17 The middle position of 13 side walls is equipped with level meter 4, and there are four horizontal connecting holes 16 for the top setting in 13 outside of terminal pad, horizontal There are four the quantity settings of connecting hole 16, and is symmetrically distributed between four horizontal connecting holes 16 about terminal pad 13, uses Multiple horizontal connecting holes 16 can be such that device is used together with other devices, and device practicability improves, and horizontal connecting hole 16 Inside offers the second card slot 18, and the inside of the second card slot 18 is equipped with the second connecting rod 2 through 16 one end of horizontal connecting hole, First telescopic sleeving rod 9, which passes through to constitute between the second connecting rod 2 and connector sleeve 3 between bolt 5 and the second telescopic sleeving rod 11, to be stretched Contracting mechanism, and the center line of the center line of the first telescopic sleeving rod 9 and the second telescopic sleeving rod 11 is on same vertical line, using flexible Mechanism can make device sized when in use, more practical, be equipped on the outside of the second connecting rod 2 at horizontal connecting hole 16 Protective case 12, the second connecting rod 2 is far from being equipped with connector sleeve 3 on the outside of 13 one end of terminal pad.
Working principle: when using the scaffold, be installed to the scaffold needs place to be used first, in installation process In, when the use distance between scaffold needs to adjust, by the second connecting rod for rotating connector sleeve 3 and 3 one end of connector sleeve 2, so that the distance between two the second connecting rods 2 inside connector sleeve 3 change, may be implemented in scaffold horizontal direction Distance adjust, can by observe level meter 4 reading so that the installation of scaffold is more stable, to guarantee scaffold Installation quality when using highly needing to adjust, bolt 5 is back-outed outward first when scaffold is installed, then by Two extractions outward of telescopic sleeving rod 11, when being retracted to suitable height, bolt 5 are screwed into location hole 6, scaffold may be implemented Height is adjusted, while can be with the connection between the first telescopic sleeving rod 9 and the second telescopic sleeving rod 11 more using two bolts 5 Stablize, when due to unexpected etc. junction, which occurs, for scaffold in use falls off, the company of 16 lower section of horizontal connecting hole Connect disk 13 can protect scaffold prevent scaffold whereabouts, ensured scaffold using safe.
It is obvious to a person skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and And without departing substantially from the spirit or essential attributes of the utility model, it can realize that this is practical new in other specific forms Type.Therefore, in all respects, the present embodiments are to be considered as illustrative and not restrictive, this is practical new The range of type is indicated by the appended claims rather than the foregoing description, it is intended that containing for the equivalent requirements of the claims will be fallen in All changes in justice and range are embraced therein.It should not treat any reference in the claims as limiting Related claim.

Claims (6)

1. a kind of support scaffolding for building, including first connecting rod (1), location hole (6), bottom bar (7), the first telescopic sleeving rod (9), the second telescopic sleeving rod (11), terminal pad (13) and the second card slot (18), it is characterised in that: the two of bottom bar (7) top End is vertically-mounted to be had the first telescopic sleeving rod (9), is equipped with Anti-slip cover (10) on the outside of first telescopic sleeving rod (9), described The top of first telescopic sleeving rod (9) is equipped with bolt (5), runs through the first telescopic sleeving rod (9) inside first telescopic sleeving rod (9) One end be equipped with the second telescopic sleeving rod (11), offer location hole (6) on the side wall of the second telescopic sleeving rod (11) bottom end, And cooperate between location hole (6) and bolt (5), second telescopic sleeving rod (11), second telescopic sleeving rod (11) Upper end is equipped with caging bolt (14), is equipped with first connecting rod (1) on the outside of the second telescopic sleeving rod (11) top, and the The internal bottom end of one connecting rod (1) offers the first card slot (17), on the outside of the first connecting rod (1) at first card slot (17) It is equipped with terminal pad (13), the bottom of the terminal pad (13) is uniformly provided with mounting hole (15), terminal pad (13) side wall Middle position be equipped with level meter (4), the setting of top on the outside of the terminal pad (13) there are four horizontal connecting hole (16), And the inside of horizontal connecting hole (16) offers the second card slot (18), the inside of second card slot (18) is equipped with through level Second connecting rod (2) of connecting hole (16) one end is equipped with guarantor on the outside of the second connecting rod (2) at the horizontal connecting hole (16) Sheath (12), second connecting rod (2) are equipped with connector sleeve (3) on the outside of separate terminal pad (13) one end.
2. a kind of support scaffolding for building according to claim 1, it is characterised in that: the two of bottom bar (7) bottom end End is mounted on support base (8), and support base (8) is weldedization structure between bottom bar (7).
3. a kind of support scaffolding for building according to claim 1, it is characterised in that: the quantity of the bolt (5) is set There are two setting, and the distance between two bolts (5) are equal to the distance between two neighboring location hole (6).
4. a kind of support scaffolding for building according to claim 1, it is characterised in that: first telescopic sleeving rod (9) By constituting telescopic machine between the second connecting rod (2) and connector sleeve (3) between bolt (5) and the second telescopic sleeving rod (11) Structure, and the center line of the center line of the first telescopic sleeving rod (9) and the second telescopic sleeving rod (11) is on same vertical line.
5. a kind of support scaffolding for building according to claim 1, it is characterised in that: the horizontal connecting hole (16) There are four quantity settings, and is symmetrically distributed between four horizontal connecting holes (16) about terminal pad (13).
6. a kind of support scaffolding for building according to claim 1, it is characterised in that: the length of the Anti-slip cover (10) For the half of the first telescopic sleeving rod (9) length, and the material of Anti-slip cover (10) is chlorinated rubber.
CN201920068267.2U 2019-01-15 2019-01-15 A kind of support scaffolding for building Expired - Fee Related CN209413248U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920068267.2U CN209413248U (en) 2019-01-15 2019-01-15 A kind of support scaffolding for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920068267.2U CN209413248U (en) 2019-01-15 2019-01-15 A kind of support scaffolding for building

Publications (1)

Publication Number Publication Date
CN209413248U true CN209413248U (en) 2019-09-20

Family

ID=67943683

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920068267.2U Expired - Fee Related CN209413248U (en) 2019-01-15 2019-01-15 A kind of support scaffolding for building

Country Status (1)

Country Link
CN (1) CN209413248U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113775172A (en) * 2021-10-19 2021-12-10 安徽中嘉环保建材科技有限公司 Aluminum template supporting structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113775172A (en) * 2021-10-19 2021-12-10 安徽中嘉环保建材科技有限公司 Aluminum template supporting structure

Similar Documents

Publication Publication Date Title
CN107829551B (en) Multifunctional hand foot prop for tunnel maintenance
CN209413248U (en) A kind of support scaffolding for building
CN112909742A (en) Lightning protection device for high-rise building
CN211046420U (en) Scalable lightning protection fixing device is used to light steel villa
CN209538643U (en) A kind of lifting platform
CN209509655U (en) A kind of project installation protection fence
CN107975292A (en) A kind of antitheft protecting fence component of communication equipment cabinet
CN108252207A (en) A kind of bridge rubber bearing being easily installed
CN210048455U (en) Movable lifting platform for house building
CN206419453U (en) A kind of rig high-altitude fixed pulley structure
CN205421892U (en) Even wall scaffold for building
CN208918239U (en) Safeguard hanger
CN208339952U (en) A kind of gardens fire plant that stability is good
CN207749848U (en) A kind of fall arrest construction holder
CN207715069U (en) A kind of portable ladder of electric power overhaul
CN213094195U (en) Communication all-in-one machine based on Beidou system
CN215254397U (en) Scaffold for building engineering
CN219795143U (en) Insulating ladder for power transmission and transformation construction
CN214935402U (en) Portal frame structure with entrance to a cave safeguard function
CN212561191U (en) Hanging flower basket device for bridge construction
CN216664939U (en) Scaffold frame protector is used in construction
CN205447177U (en) Equipment for power transmission and distribution rack
KR102652873B1 (en) pole support
CN221073405U (en) Anti-tilting scaffold
CN215711279U (en) Safety protection device for people on tower crane

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190920

Termination date: 20210115

CF01 Termination of patent right due to non-payment of annual fee