CN209412974U - A kind of prefabricated docking balcony slab - Google Patents

A kind of prefabricated docking balcony slab Download PDF

Info

Publication number
CN209412974U
CN209412974U CN201920045513.2U CN201920045513U CN209412974U CN 209412974 U CN209412974 U CN 209412974U CN 201920045513 U CN201920045513 U CN 201920045513U CN 209412974 U CN209412974 U CN 209412974U
Authority
CN
China
Prior art keywords
balcony slab
docking
balcony
slab
prefabricated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920045513.2U
Other languages
Chinese (zh)
Inventor
王艳艳
王美月
卢思铮
闫磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Construction New Building Material Polytron Technologies Inc
Original Assignee
Beijing Construction New Building Material Polytron Technologies Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Construction New Building Material Polytron Technologies Inc filed Critical Beijing Construction New Building Material Polytron Technologies Inc
Priority to CN201920045513.2U priority Critical patent/CN209412974U/en
Application granted granted Critical
Publication of CN209412974U publication Critical patent/CN209412974U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Steps, Ramps, And Handrails (AREA)

Abstract

The utility model discloses a kind of prefabricated docking balcony slab, is related to the technical field of balcony slab comprising the left balcony slab and right balcony slab of mirror symmetry, the left balcony slab and the right balcony slab or so are docking integrally;Several reinforcing bars one are extended with one end that the right balcony slab docks house positioned at the left balcony slab, the reinforcing bar one is respectively positioned in same level, and the left balcony slab and the right balcony slab are further fixed on several hanging rings.The utility model has the effect of reducing the single installation quality in installation process.

Description

A kind of prefabricated docking balcony slab
Technical field
The utility model relates to the technical fields of prefabricated balcony plate, more particularly, to a kind of prefabricated docking balcony.
Background technique
As the improvement of people's living standards, the floor space that people live is increasing.Meanwhile the size of balcony also with Day all increasings.One big and broad balcony is that people loosens body and mind, the preferable place to enjoy life.
But after the size of balcony increases, the weight of balcony is also increased, and generates the problem that lifting quality It is excessive, and worker's also inconvenient operation when slinging, at the same the support frame for being used to support balcony be also required to bigger size and Bigger bearing capacity;The balcony intensity to be met also accordingly increases.
Utility model content
The purpose of the utility model is to provide a kind of prefabricated docking balcony slab, there is the single peace reduced in installation process The effect of packing quality.
The above-mentioned purpose of the utility model has the technical scheme that
A kind of prefabricated docking balcony slab, left balcony slab and right balcony slab including mirror symmetry, the left balcony slab with Described right balcony slab or so is docking integrally;It is extended with positioned at the left balcony slab with one end that the right balcony slab docks house Several reinforcing bars one, the reinforcing bar one are respectively positioned in same level, and the left balcony slab and the right balcony slab are also fixed There are several hanging rings.
By using above-mentioned technical proposal, balcony is divided into two, is installed separately, by left balcony slab and right balcony slab or so It is docked jointly with house after docking, reduces the installation quality of single, also make docking is more accurate to be easy.
The utility model is further arranged to: the adjacent face of the left balcony slab and the right balcony slab opens up respectively There is the accommodating chamber being open in opposite directions, and the left balcony slab and the right balcony slab are extended in opposite directions extend into opposite appearance respectively The upper surface of the reinforcing bar two received in chamber, the left balcony slab and the right balcony slab offers receiving described in several connection The pouring hole of chamber.
By using above-mentioned technical proposal, after left balcony slab is docked with right balcony slab, the reinforcing bar two of two sides reaches respectively In opposite accommodating chamber.Left balcony slab and right balcony slab are fixed by pouring hole casting concrete, improve the steady of balcony entirety It is qualitative.
The utility model is further arranged to: opening up that there are two pour respectively positioned at the left balcony slab and the right balcony slab Hole, accommodating chamber described in the pouring hole connection are built, connection is distributed in certainly in two pouring holes of the same accommodating chamber On side far from house to the direction close to the side in house.
By using above-mentioned technical proposal, only when pouring hole casting concrete from one, concrete is likely difficult to reach Far from the position of pouring hole in accommodating chamber, so that fixed effect can not be played.But two pouring holes set up separately, can be to accommodating chamber In multiple positions pour, Concrete Filled can be made to expire accommodating chamber as far as possible.
The utility model is further arranged to: offer concave station on the left balcony slab and the right balcony slab, two One end of left balcony slab described in the concave station difference connection and the right balcony slab docking house;When the left balcony slab and institute When stating right balcony slab or so docking, two concave stations are connected.
By using above-mentioned technical proposal, the casting concrete in the ground in concave station and house improves house and balcony The firmness of connection.
The utility model is further arranged to: towards being extended in the side wall surface of house side in the concave station Several longitudinal bars being located in the same horizontal plane, the free end of the longitudinal bar than the reinforcing bar one free end farther away from The left balcony slab or the right balcony slab at place.
By using above-mentioned technical proposal, longitudinal bar can be extend on the ground in house, the meeting after casting concrete The firmness that enhancing balcony is connect with house.
The utility model is further arranged to: the free end of the longitudinal bar bends downward to form bending part.
By using above-mentioned technical proposal, anchor hole can be opened up on the ground in house, bending part extend into anchoring In hole and casting concrete anchors, and further increases the firmness of house connection balcony.
The utility model is further arranged to: being extended with several in opposite directions respectively on the opposite side wall surface of two concave stations The cross reinforcement being located in the same horizontal plane.
By using above-mentioned technical proposal, after in concreting to two concave stations, left balcony is can be improved in cross reinforcement Firmness between plate and right balcony slab.
The utility model is further arranged to: when the left balcony slab is docked with the right balcony slab, two sides it is described The free end of cross reinforcement reaches the top of opposite left balcony slab and right balcony slab respectively.
By using above-mentioned technical proposal, the active force of cross reinforcement can be generated directly from another piece of balcony slab, into one Step improves the firmness between left balcony slab and right balcony slab.
The utility model is further arranged to: the upper surface of the left balcony slab and the right balcony slab is respectively arranged with L-shaped fin one and fin two, when the left balcony slab and the right balcony slab offset, the fin one with it is described Fin two is collectively formed a " U "-shaped fin structure, the U-shaped mouth direction of the fin structure towards house side, The upper surface of the fin one and the fin two is plugged with several reverse U-shaped joint bars.
By using above-mentioned technical proposal, convenient for installing balcony fence after balcony installs.
In conclusion the advantageous effects of the utility model are as follows:
1. balcony is divided into two pieces, reduces the installation quality of single by the way that left balcony slab and right balcony slab is arranged;
2. improving the bonding strength between left balcony slab and right balcony slab by setting accommodating chamber and reinforcing bar two;
3. improving the bonding strength of balcony and house by setting longitudinal bar.
Detailed description of the invention
Fig. 1 is a kind of isometric view of prefabricated docking balcony;
Fig. 2 is the partial sectional view of Section A-A in Fig. 1;
Fig. 3 is a kind of perspective view of the explosion 1 of prefabricated docking balcony;
Fig. 4 is a kind of perspective view of the explosion 2 of prefabricated docking balcony;
Fig. 5 is the supplementary structure schematic diagram of right balcony slab;
Fig. 6 is a kind of use schematic diagram of prefabricated docking balcony.
In figure, 1, left balcony slab;2, right balcony slab;3, reinforcing bar one;41, accommodating chamber;42, reinforcing bar two;43, pouring hole;5, Concave station;61, longitudinal bar;611, bending part;62, cross reinforcement;71, fin;72, joint bar;8, hanging ring.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
Referring to Fig. 1, a kind of prefabricated docking balcony slab disclosed by the utility model, including two mirror symmetries in rectangle Left balcony slab 1 and right balcony slab 2.Left balcony slab 1 be located in the same horizontal plane with right balcony slab 2 it is horizontally disposed, and left and right Relatively.House side when arrow in Fig. 1 is oriented to docking house, one end adjacent to the side are left balcony slab 1 and the right side The one end in the docking of balcony slab 2 house.Several steel are extended on the opposite that left balcony slab 1 docks house with right balcony slab 2 Muscle 1, several reinforcing bars 1 are evenly arranged in same level.
Offer the accommodating chamber for the rectangle being open in opposite directions respectively on the adjacent face of left balcony slab 1 and right balcony slab 2 41, meanwhile, left balcony slab 1 and right balcony slab 2 are extended with reinforcing bar 2 42 in opposite directions.Reinforcing bar 2 42 is stretched out and is stretched from accommodating chamber 41 Enter into another opposite accommodating chamber 41.Connection there are two being opened up respectively in the upper surface of left balcony slab 1 and right balcony slab 2 The pouring hole 43 of accommodating chamber 41.Connection in two pouring holes 43 of the same accommodating chamber 41 be distributed in from far from house a side to On the direction of the side in house.It offsets when left balcony slab 1 is docked with right balcony slab 2 or so, two accommodating chambers 41 of two sides It is opposite to form enclosure space.By pouring hole 43 into accommodating chamber 41 casting concrete, left balcony slab 1 and right balcony can be improved Bonding strength between plate 2.
Concave station 5 is offered in the upper surface of left balcony slab 1 and right balcony slab 2.Two concave stations 5 distinguish the left balcony of connection Plate 1 and right balcony slab 2 dock the end face in house.Simultaneously when left balcony slab 1 is docked with right balcony slab 2 or so, two concave stations 5 It is connected.
In concave station 5, towards the side wall surface of house side on to house side be extended with several longitudinal bars 61, several longitudinal bars 61 are located in the same horizontal plane.The free end of longitudinal bar 61 on left balcony slab 1 and right balcony slab 2 Compared with the free end of reinforcing bar 1 farther away from left balcony slab 1 and right balcony slab 2.The free end of longitudinal bar 61 is turned under simultaneously Folding forms bending part 611.When in use, anchor hole is opened up on the ground in house, bending part 611 extend into anchor hole and pours Cement is built, so as to improve the bonding strength of balcony and house.
It is extended with several cross reinforcements being located in the same horizontal plane 62 in two concave stations 5 in opposite side wall surface in opposite directions. The free end of the cross reinforcement 62 of two sides is respectively protruding into the top of opposite left balcony slab 1 and right balcony slab 2.In cross reinforcement 62 The position intersected with longitudinal bar 61 is welded and fixed.
Casting concrete in concave station 5 and on the ground in house, can be further by the bonding strength of balcony and house And the bonding strength between left balcony slab 1 and right balcony slab 2.
It is respectively arranged with and left balcony slab 1 and right balcony slab 2 one in the upper surface of left balcony slab 1 and right balcony slab 2 Body formed fin 71.Fin 71 is L-shaped, and is located at the outside of concave station 5.When left balcony slab 1 and right balcony slab 2 dock Later, two fins 71 collectively constitute 71 structure of fin of " u "-shaped, where the U-shaped mouth direction towards house of 71 structure of fin Side.The joint bar 72 of several inverted " u "-shapeds is respectively fixed on the top of two fins 71.Fin 71 and joint bar 72 are just The setting of balcony fence is carried out after balcony is fixed.
Two sides are away from each other in two pieces of fins 71, and in left balcony slab 1 and have the upper surface of balcony slab to be respectively fixed with Two hanging rings 8.
The embodiment of present embodiment is the preferred embodiment of the utility model, and not limitation is originally practical new according to this The protection scope of type, therefore: the equivalence changes that all structures, shape, principle according to the utility model are done should all be covered by practical Within novel protection scope.

Claims (9)

1. a kind of prefabricated docking balcony slab, it is characterised in that: left balcony slab (1) and right balcony slab (2) including mirror symmetry, The left balcony slab (1) is docking integrally with right balcony slab (2) left and right;Positioned at the left balcony slab (1) and the right sun The one end in platen (2) docking house is extended with several reinforcing bars one (3), and the reinforcing bar one (3) is respectively positioned in same level, institute It states left balcony slab (1) and the right balcony slab (2) is further fixed on several hanging rings (8).
2. a kind of prefabricated docking balcony slab according to claim 1, it is characterised in that: the left balcony slab (1) and institute The adjacent face for stating right balcony slab (2) offers the accommodating chamber (41) being open in opposite directions, and the left balcony slab (1) and institute respectively It states right balcony slab (2) and is extended with the reinforcing bar two (42) extending into opposite accommodating chamber (41), the left balcony slab in opposite directions respectively (1) and the upper surface of the right balcony slab (2) offers the pouring holes (43) of accommodating chamber described in several connection (41).
3. a kind of prefabricated docking balcony slab according to claim 2, it is characterised in that: be located at the left balcony slab (1) with The right balcony slab (2) is opened up respectively there are two pouring hole (43), accommodating chamber (41) described in pouring hole (43) connection, connection It is distributed in two pouring holes (43) of the same accommodating chamber (41) from the side far from house to close to house On the direction of side.
4. a kind of prefabricated docking balcony slab according to claim 1, it is characterised in that: the left balcony slab (1) with it is described It is offered concave station (5) on right balcony slab (2), left balcony slab (1) and the right side described in two concave stations (5) difference connection The one end in balcony slab (2) docking house;When the left balcony slab (1) is docked with right balcony slab (2) left and right, described in two Concave station (5) is connected.
5. a kind of prefabricated docking balcony slab according to claim 4, it is characterised in that: be located at the concave station (5) interior direction Several longitudinal bars being located in the same horizontal plane (61), the longitudinal bar (61) are extended in the side wall surface of house side Free end than the free end of the reinforcing bar one (3) farther away from the left balcony slab (1) at place or the right balcony slab (2)。
6. a kind of prefabricated docking balcony slab according to claim 5, it is characterised in that: the free end of the longitudinal bar (61) It bends downward to form bending part (611).
7. a kind of prefabricated docking balcony slab according to claim 4, it is characterised in that: two concave stations (5) it is opposite It is extended with several cross reinforcements being located in the same horizontal plane (62) in side wall surface in opposite directions respectively.
8. a kind of prefabricated docking balcony slab according to claim 7, it is characterised in that: when the left balcony slab (1) and institute When stating right balcony slab (2) docking, the free end of the cross reinforcement (62) of two sides reaches opposite left balcony slab (1) and the right side respectively The top of balcony slab (2).
9. a kind of prefabricated docking balcony slab according to claim 4, it is characterised in that: the left balcony slab (1) and institute The upper surface for stating right balcony slab (2) is respectively arranged with L-shaped fin (71) one and fin (71) two, when the left balcony When plate (1) and the right balcony slab (2) offset, the fin (71) one is collectively formed one in " U " with the fin (71) two Fin (71) structure of shape, the U-shaped mouth direction of fin (71) structure towards house side, the fin (71) one with The upper surface of the fin (71) two is plugged with several reverse U-shaped joint bars (72).
CN201920045513.2U 2019-01-10 2019-01-10 A kind of prefabricated docking balcony slab Active CN209412974U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920045513.2U CN209412974U (en) 2019-01-10 2019-01-10 A kind of prefabricated docking balcony slab

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920045513.2U CN209412974U (en) 2019-01-10 2019-01-10 A kind of prefabricated docking balcony slab

Publications (1)

Publication Number Publication Date
CN209412974U true CN209412974U (en) 2019-09-20

Family

ID=67943366

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920045513.2U Active CN209412974U (en) 2019-01-10 2019-01-10 A kind of prefabricated docking balcony slab

Country Status (1)

Country Link
CN (1) CN209412974U (en)

Similar Documents

Publication Publication Date Title
CN105926766B (en) Fabricated shear wall Alveolus type attachment structure assembly engineering method
CN110093977A (en) Prefabricated component mounting structure and its installation method
CN209412974U (en) A kind of prefabricated docking balcony slab
CN208792900U (en) A kind of enclosure upright post segment component and its enclosure upright post structure
CN106437146A (en) Template used for casting floor beam and construction method of floor beam
CN210238761U (en) Prefabricated balcony slab of assembled with stable connection structure
KR101013148B1 (en) Revolving Support of Table Form
CN108643405A (en) Assembled mould plate and its construction method for shear wall corner sleeper region
CN208650656U (en) Enclosure upright post panel piece and its prefabricated component and its enclosure upright post
CN106320589A (en) Roof assembling method
CN207228464U (en) A kind of assembled non-load bearing wall gypsum hollow block
CN215168464U (en) Prefabricated toilet
KR100906113B1 (en) Breakwater using wave dissipating block
CN210917854U (en) Prevent cavity centre form wall structure of fracture
JP2004204579A (en) Construction method for hybrid structural box body
KR200267053Y1 (en) A Steel Cage for Reinforced of Head in a Steel Pipe Pile
CN218758686U (en) Sizing template upper opening anti-overflow device
CN216587698U (en) Detachable circular arc chamfer hangs mould device
CN212052576U (en) Prefabricated panel for wharf
CN218522673U (en) Roadway concrete supporting mold
CN209868930U (en) Novel wall body pouring mold
JPS5931320A (en) Connecting structure of pile and pillar steel skeleton
KR200231222Y1 (en) Reinforcing bar space maintain unit for deck plate
CN210622477U (en) Prefabricated enclosure of integral type
CN208749103U (en) Architectural engineering vertical formwork support frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant