CN209397566U - The roadbed erosion control ruggedized construction that gabion wall and groynes group close - Google Patents
The roadbed erosion control ruggedized construction that gabion wall and groynes group close Download PDFInfo
- Publication number
- CN209397566U CN209397566U CN201822136328.2U CN201822136328U CN209397566U CN 209397566 U CN209397566 U CN 209397566U CN 201822136328 U CN201822136328 U CN 201822136328U CN 209397566 U CN209397566 U CN 209397566U
- Authority
- CN
- China
- Prior art keywords
- groynes
- meters
- gabion
- gabion wall
- dam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Revetment (AREA)
Abstract
This application involves the roadbed erosion control ruggedized constructions that a kind of roadbed erosion control ruggedized construction more particularly to a kind of gabion wall and groynes group close;It includes groynes, road shoulder barricade and gabion wall;Road shoulder barricade is located at river side and multiple groynes being spaced apart is distributed with, and dam root end and the road shoulder barricade of groynes are fixedly linked, and the abutment end of groynes is inclined to stretch to river.Due to implementing above-mentioned technical proposal, groynes group is arranged in the application on the outside of the road shoulder barricade of highway, and by gabion wall that the connection of adjacent groynes is integral, and gabion wall, groynes group and road shoulder barricade are carried out build-in combination, form firm water injury protection structure;Reduce current scour directly washing away and to the collateral damage of slope of highway, reduce Highway risk, ensure the safe and smooth of highway to safeguard structure;It can guarantee that long provoking flow spur dam itself from damage by water, is primarily adapted for use in the longer provoking flow spur dam group of groynes dam body and the stronger section of water flow impact pressure simultaneously.
Description
Technical field
The roadbed closed this application involves a kind of roadbed erosion control ruggedized construction more particularly to a kind of gabion wall and groynes group is anti-
Rush ruggedized construction.
Background technique
Groynes is a kind of with the embankment protection structure for well choosing stream effect, and especially long provoking flow spur dam is being close to mountain along the river
It plays a significant role during the erosion protection of highway.Due to the top punching and naughty erosion effect of water flow, easily to groyne head and basis
Cause greatly to destroy, single groynes by water flow continuous erosion and cause part and whole destroy;Groynes group can be certain
Gradually weaken the eroding velocity of water flow in degree, and strengthens the protective performance of single groynes, but due to groynes group Zhong Ba and dam
Between lack firm connection combination, the decline of dam group's protective performance and the local failure of head dam are easily caused under washing away for a long time;It washes away brokenly
Bad groynes and groynes group, lateral erosion and naughty erosion water damage to highway subgrade.
Summary of the invention
The purpose of the application is to propose that a kind of roadbed erosion control that the gabion wall for eliminating drawbacks described above is closed with groynes group adds
Fixing structure.
The application is achieved in that gabion wall and the roadbed erosion control ruggedized construction that groynes group closes comprising groynes, road
Shoulder barricade and gabion wall;Road shoulder barricade is located at river side and multiple groynes being spaced apart, the road dam root Duan Yu of groynes is distributed with
Shoulder barricade is fixedly linked, and the abutment end of groynes is inclined to stretch to river;Gabion wall is connected in the middle part of two adjacent groynes.
Further, adjacent groynes, corresponding gabion wall and road shoulder barricade surround filling region, filling in filling region
There are building stones, the gap between building stones is filled with mud.
Further, the upper layer of building stones is equipped with mud, and the total height of building stones is consistent with the total height of gabion wall.
Further, what multiple groynes were equidistant is distributed in road shoulder barricade side;The tie point position of gabion wall and groynes position
At 1/3 dam length of dam root to 1/2 dam length position away from groynes.
Further, groynes includes the lower dam bottom at section trapezoidal upper dam bottom and rectangular in cross-section, and upper dam bottom matches seat
In lower dam bottom upper surface;Mortar flag stone layer is covered on upper dam bottom, mortar flag stone layer two sides of the bottom, which are connected separately with, to be coated on down
The vertical cofferdam of dam bottom two sides.
Further, gabion wall is made of two layers of gabion, and lower layer number is two, and upper layer number is one;Or gabion wall
It is made of three layers of gabion, lower layer number is three, and middle layer number is two, and upper layer number is one.
Further, road shoulder barricade includes straight wall and the pedestal that is fixed below straight wall.
Further, the width of mortar flag stone layer is 2 meters to 2.5 meters, the gradient of mortar flag stone layer upstream face be 1:1.4 extremely
The gradient of 1:1.5, mortar flag stone layer back side are 1:1 to 1:1.5, and mortar flag stone layer grouts piece with a thickness of 0.4 meter to 0.6 meter
Rock layers upper surface to vertical cofferdam lower end surface is a height of 4 meters to 5.5 meters total, and wherein groynes height located underground is 3.5 meters to 4 meters;
Vertical cofferdam with a thickness of 0.7 meter to 1 meter, the height in vertical cofferdam is 0.5 meter to 0.7 meter;The dam root of groynes is to the dam of groynes
The gradient of head is 1% to 2%;Angle between groynes and road shoulder barricade is 100 ° to 135 °.
Further, gabion wall is made of two layers of gabion, and gabion wall total height is 1.5 meters to 1.8 meters, and bottom layer width is
1.8 meters to 2.2 meters;Gabion wall is made of three layers of gabion, and gabion wall total height is 2.1 meters to 2.7 meters, and bottom layer width is 2.5 meters
To 3.5 meters.
Further, the total height of road shoulder barricade is 7 meters to 10 meters;Straight wall width is 0.8 meter to 1 meter;Base width is 2
For rice to 2.5 meters, base height is 1 meter to 1.5 meters, and it is 0.4 meter to 0.8 meter that two sides of base, which grows straight wall length,.
Due to implementing above-mentioned technical proposal, groynes group is arranged in the application on the outside of the road shoulder barricade of highway, and passes through gabion
Wall is integral by the connection of adjacent groynes, and gabion wall, groynes group and road shoulder barricade are carried out build-in combination, it is anti-to form firm damaged or destroyed by flood
Protection structure;It due to the permeability flexible performance of gabion wall, can gradually deposit, and then expand between road shoulder barricade and gabion wall
Subgrade protection width, it is final to reduce current scour directly washing away and to the collateral damage of slope of highway, reduce to safeguard structure
Highway risk ensures the safe and smooth of highway;It can guarantee that long provoking flow spur dam itself from damage by water, is mainly fitted simultaneously
For the longer provoking flow spur dam group of groynes dam body and the stronger section of water flow impact pressure.
Detailed description of the invention
The specific structure of the application is provided by drawings and examples below:
Fig. 1 is the positive structure diagram of the application;
Fig. 2 is the overlooking structure diagram of the application;
Fig. 3 is the schematic cross-sectional view of the application;
Fig. 4 is groynes the schematic diagram of the section structure;
Fig. 5 is gabion wall the schematic diagram of the section structure;
Fig. 6 is road shoulder barricade the schematic diagram of the section structure.
Legend: 1. road shoulder barricades, 101. straight walls, 102. pedestals, 2. gabion walls, 3. building stones, 4. muds, on 5. dam bottom,
6. lower dam bottom, 7. mortar flag stone layers, 8. vertical cofferdam, 9. riverbeds, the width of B. mortar flag stone layer, P1. mortar flag stone layer meet water
The gradient in face, the gradient of P2. mortar flag stone layer back side, b1. mortar flag stone thickness degree, the mortar flag stone layer upper surface H. is to vertical
Cofferdam lower end surface is always high, H1. groynes height located underground, the thickness in the vertical cofferdam b2., the height in the vertical cofferdam h1., α groynes
With the angle between road shoulder barricade, h2. gabion wall total height, b3. bottom layer width, the total height of h3. road shoulder barricade, b4. straight wall is wide
Degree, b5. base width, h4. base height, the spacing of the adjacent groynes of S..
Specific embodiment
The application is not limited by following embodiments, can be determined according to the technical solution of the application and actual conditions specific
Embodiment.
As shown in Figures 1 to 6, the roadbed erosion control ruggedized construction that gabion wall 2 and groynes group close includes groynes, road shoulder barricade 1
With gabion wall 2;Road shoulder barricade 1 is located at river side and multiple groynes being spaced apart is distributed with, and the dam root end of groynes and road shoulder are kept off
Wall 1 is fixedly linked, and the abutment end of groynes is inclined to stretch to river;Gabion wall 2 is connected in the middle part of two adjacent groynes.
Groynes group is set on the outside of the road shoulder barricade 1 of highway, and by gabion wall 2 that the connection of adjacent groynes is integral, it will
Gabion wall 2, groynes group and road shoulder barricade 1 carry out build-in combination, form an enclosed region between composite structure, form firm water
Ruin safeguard structure;Due to the permeability flexible performance of gabion wall 2, can gradually deposit between road shoulder barricade 1 and gabion wall 2,
And then expand subgrade protection width, it is final to reduce current scour directly washing away and to the indirect broken of slope of highway to safeguard structure
It is bad, Highway risk is reduced, ensures the safe and smooth of highway.
The application embodies the advantage of three kinds of safeguard structures, has both accomplished the stable prevention and treatment composite structure of formation,
It protects water flow from washing away roadbed side slope well, avoids a series of harm of repetition damaged or destroyed by flood bring;The application protection against erosion
Significant effect is not easily susceptible to erosion damage, and has evaded and repeated the serious harm of damaged or destroyed by flood bring, while having also promoted river channel ecology
The balance and sustainable development of environment, ultimate guarantee highway transportation it is unimpeded and safe;It can guarantee long provoking flow spur dam certainly simultaneously
Body is from damage by water.The application is suitable for the longer provoking flow spur dam group of groynes dam body and the stronger section of water flow impact pressure, fits
It is flung for strong water flow bend, the situations such as big drop landform lateral erosion.
As shown in Figures 1 to 6, adjacent groynes, corresponding gabion wall 2 and road shoulder barricade 1 surround filling region, filling region
Interior to be filled with building stones 3, the gap between building stones 3 is filled with mud.Stone, building stones filling can be carried out in filling region, work as the application
When work, mud constantly can be sent into filling region through gabion wall 2 by water flow, and after a period of time, mud can fill full stone
Gap between material 3, so that more firm protection combination is formed, by flow cavitation result except the range far from roadbed side slope.
As shown in Figures 1 to 6, the upper layer of building stones 3 is equipped with mud 4, the total height of building stones 3 and the total height of gabion wall 2
Unanimously.
It can be implanted into vegetation on closed mud 4 in this way, pass through the fixed filler further expansion subgrade protection of root system
Stability.Mud can continual supplement, looked after without artificial, highway side can build up vegetation band, promote river channel ecology
The balance and sustainable development of environment, and by flow cavitation result in the range far from roadbed side slope.
As shown in Figures 1 to 3, what multiple groynes were equidistant is distributed in 1 side of road shoulder barricade;The tie point of gabion wall 2 and groynes
Position is located at 1/3 dam length of dam root to 1/2 dam length position away from groynes.If the tie point of gabion wall 2 and groynes is away from groynes
Dam root is excessively close, can reduce the stability of combination protection;The tie point of gabion wall 2 and groynes if the dam root away from groynes too far if can
It results in waste of resources.
As shown in Figures 1 to 4, groynes includes the lower dam bottom 6 at section trapezoidal upper dam bottom 5 and rectangular in cross-section, upper dam bottom 5
Seat is matched in lower 6 upper surface of dam bottom;Mortar flag stone layer 7 is covered on upper dam bottom 5,7 two sides of the bottom of mortar flag stone layer are separately connected
There is the vertical cofferdam 8 for being coated on lower 6 two sides of dam bottom.
As shown in Fig. 1,2,3,5, gabion wall 2 is made of two layers of gabion, and lower layer number is two, and upper layer number is one;
Or gabion wall 2 is made of three layers of gabion, lower layer number is three, and middle layer number is two, and upper layer number is one.
As shown in Fig. 1,2,3,6, road shoulder barricade 1 includes straight wall 101 and the pedestal 102 for being fixed on 101 lower section of straight wall.
As shown in figure 4, the width B of mortar flag stone layer is 2 meters to 2.5 meters, the gradient P1 of mortar flag stone layer upstream face is 1:
1.4 to 1:1.5, the gradient P2 of mortar flag stone layer back side are 1:1 to 1:1.5, and mortar flag stone thickness degree b1 is 0.4 meter to 0.6
Rice, always high H is 4 meters to 5.5 meters for mortar flag stone layer upper surface to vertical cofferdam lower end surface, and wherein groynes height H1 located underground is
3.5 meters to 4 meters;The thickness b2 in vertical cofferdam is 0.7 meter to 1 meter, and the height h1 in vertical cofferdam is 0.5 meter to 0.7 meter;Groynes
Dam root to groynes abutment gradient be 1% to 2%;Angle α between groynes and road shoulder barricade is 100 ° to 135 °.Groynes is located at ground
Under be partially buried under riverbed 9.
As shown in figure 5, gabion wall 2 is made of two layers of gabion, gabion wall total height h2 is 1.5 meters to 1.8 meters, bottom layer width
B3 is 1.8 meters to 2.2 meters;Gabion wall 2 is made of three layers of gabion, and gabion wall total height h2 is 2.1 meters to 2.7 meters, bottom layer width
B3 is 2.5 meters to 3.5 meters.
As shown in fig. 6, the total height h3 of road shoulder barricade is 7 meters to 10 meters;Straight wall width b4 is 0.8 meter to 1 meter;Pedestal is wide
Spend b5 be 2 meters to 2.5 meters, base height h4 be 1 meter to 1.5 meters, 102 two sides of pedestal grow 101 length of straight wall be 0.4 meter extremely
0.8 meter.
Embodiment 1 is close to mountain subgrade river side for river valley basin, and highway subgrade side is by bend concave bank current top-lashed action, water
It flows that rapid, water level is deeper, it is strong to take husky ability.Height of water level preliminary survey discovery is greater than 2.0 meters, and water velocity is 3.2 meters/s.Exploration hair
Existing, the groynes group built before at this is destroyed by strong current scour, abutment and dam root repeatedly.For the above data, make
With the application to being combined protection at the work point.
Former destroyed barricade is removed, carries out creating high road shoulder barricade 1, rear addition 2 structure of gabion wall and groynes are closely solid
It is fixed.Size design is as follows: the total height h3 of road shoulder barricade is 7.5 meters, and straight wall width b4 is 1 meter, and base width b5 is 2.5 meters,
Base height h4 is 1 meter, and it is 0.75 meter that 102 two sides of pedestal, which grow 101 length of straight wall,.Gabion wall 2 takes three layer heaps to put, gabion
2 top layer width of wall is 1 meter, and bottom layer width b3 is 3 meters, and gabion wall total height h2 is 2.4 meters.The width of the mortar flag stone layer of groynes
B is 2.5 meters, and the gradient P1 of mortar flag stone layer upstream face is 1:1.5, and the gradient P2 of mortar flag stone layer back side is 1:1.5, is grouted
Ragstone layer thickness b1 is 0.6 meter;Always high H is 5.5 meters for mortar flag stone layer upper surface to vertical cofferdam lower end surface, and wherein groynes is located at
Underground height H1 is 3.5 meters;The thickness b2 in vertical cofferdam is 1 meter, and the height h1 in vertical cofferdam is 0.6 meter, and the dam root of groynes is extremely
The gradient of the abutment of groynes is 1.5%;Angle between groynes and road shoulder is 120 °;The dam length of groynes is 50 meters, between adjacent groynes
It is 60 meters away from S.
Embodiment 2, highway side are at momentum model, and in the exposed water of roadbed side slope, the flow of water is smaller, but seasonal bright
Aobvious, spring and summer has compared with mass-flow, and dry season water level is lower.Work point scene is mostly forms group dam by groynes, protected under regular situation compared with
It is good, but go to pot repeatly when experience nodositas flood, therefore duplicate damaged or destroyed by flood.For the above data, using the application to the work point
Place is combined protection.
On the basis of current groynes group, 2 structure of gabion wall is added, repairs dam way of escape epaulement, forms novel protective combination
Structure.Size design is as follows: the total height h3 of road shoulder barricade is 7 meters, and straight wall width b4 is 1 meter, and base width b5 is 2.5 meters,
Base height h4 is 1 meter, and it is 0.75 meter that 102 two sides of pedestal, which grow 101 length of straight wall,.Gabion wall 2 takes three layer heaps to put, gabion
2 top layer width of wall is 1 meter, and bottom layer width b3 is 3 meters, and gabion wall total height h2 is 2.4 meters.The width of the mortar flag stone layer of groynes
B is 2.5 meters, and the gradient P1 of mortar flag stone layer upstream face is 1:1.5, and the gradient P2 of mortar flag stone layer back side is 1:1.5, is grouted
Ragstone layer thickness b1 is 0.6 meter;Always high H is 5.5 meters for mortar flag stone layer upper surface to vertical cofferdam lower end surface, and wherein groynes is located at
Underground height H1 is 3.5 meters;The thickness b2 in vertical cofferdam is 1 meter, and the height h1 in vertical cofferdam is 0.6 meter, and the dam root of groynes is extremely
The gradient of the abutment of groynes is 1.5%;Angle between groynes and road shoulder is 115 °;The dam length of groynes is 30 meters, between adjacent groynes
It is 40 meters away from S.
The above technical characteristic constitutes embodiments herein, can basis with stronger adaptability and implementation result
Actual needs increases and decreases inessential technical characteristic, to meet the needs of different situations.
Claims (10)
1. the roadbed erosion control ruggedized construction that a kind of gabion wall and groynes group close, it is characterised in that: including groynes, road shoulder barricade and
Gabion wall;Road shoulder barricade is located at river side and multiple groynes being spaced apart is distributed with, and the dam root end of groynes and road shoulder barricade are solid
Fixed to be connected, the abutment end of groynes is inclined to stretch to river;Gabion wall is connected in the middle part of two adjacent groynes.
2. the roadbed erosion control ruggedized construction that gabion wall according to claim 1 and groynes group close, it is characterised in that: adjacent
Groynes, corresponding gabion wall and road shoulder barricade surround filling region, building stones are filled in filling region, the gap between building stones is filled out
Filled with mud.
3. the roadbed erosion control ruggedized construction that gabion wall according to claim 2 and groynes group close, it is characterised in that: building stones
Upper layer be equipped with mud, the total height of building stones is consistent with the total height of gabion wall.
4. the roadbed erosion control ruggedized construction that gabion wall according to claim 1 or 2 or 3 and groynes group close, feature exist
In: multiple groynes it is equidistant be distributed in road shoulder barricade side;The tie point position of gabion wall and groynes is located at the dam root away from groynes
At 1/3 dam length to 1/2 dam length position.
5. the roadbed erosion control ruggedized construction that gabion wall according to claim 1 or 2 or 3 and groynes group close, feature exist
In: groynes includes the lower dam bottom at section trapezoidal upper dam bottom and rectangular in cross-section, and upper dam bottom matching seat is in lower dam bottom upper surface;
Mortar flag stone layer is covered on upper dam bottom, mortar flag stone layer two sides of the bottom, which are connected separately with, is coated on enclosing vertically for lower dam bottom two sides
Weir.
6. the roadbed erosion control ruggedized construction that gabion wall according to claim 1 or 2 or 3 and groynes group close, feature exist
In: gabion wall is made of two layers of gabion, and lower layer number is two, and upper layer number is one;Or gabion wall is made of three layers of gabion,
Lower layer number is three, and middle layer number is two, and upper layer number is one.
7. the roadbed erosion control ruggedized construction that gabion wall according to claim 1 or 2 or 3 and groynes group close, feature exist
In the pedestal that: road shoulder barricade includes straight wall and is fixed below straight wall.
8. the roadbed erosion control ruggedized construction that gabion wall according to claim 5 and groynes group close, it is characterised in that: grout
The width of ragstone layer is 2 meters to 2.5 meters, and the gradient of mortar flag stone layer upstream face is 1:1.4 to 1:1.5, mortar flag stone layer backwater
The gradient in face is 1:1 to 1:1.5, and mortar flag stone layer is with a thickness of 0.4 meter to 0.6 meter, mortar flag stone layer upper surface to vertical cofferdam
Lower end surface is a height of 4 meters to 5.5 meters total, and wherein groynes height located underground is 3.5 meters to 4 meters;Vertical cofferdam with a thickness of 0.7 meter
To 1 meter, the height in vertical cofferdam is 0.5 meter to 0.7 meter;The dam root of groynes to groynes abutment gradient be 1% to 2%;Groynes
Angle between road shoulder barricade is 100 ° to 135 °.
9. the roadbed erosion control ruggedized construction that gabion wall according to claim 6 and groynes group close, it is characterised in that: gabion
Wall is made of two layers of gabion, and gabion wall total height is 1.5 meters to 1.8 meters, and bottom layer width is 1.8 meters to 2.2 meters;Gabion wall is by three
Layer gabion is constituted, and gabion wall total height is 2.1 meters to 2.7 meters, and bottom layer width is 2.5 meters to 3.5 meters.
10. the roadbed erosion control ruggedized construction that gabion wall according to claim 7 and groynes group close, it is characterised in that: road
The total height of shoulder barricade is 7 meters to 10 meters;Straight wall width is 0.8 meter to 1 meter;Base width is 2 meters to 2.5 meters, base height
It is 1 meter to 1.5 meters, it is 0.4 meter to 0.8 meter that two sides of base, which grows straight wall length,.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822136328.2U CN209397566U (en) | 2018-12-19 | 2018-12-19 | The roadbed erosion control ruggedized construction that gabion wall and groynes group close |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822136328.2U CN209397566U (en) | 2018-12-19 | 2018-12-19 | The roadbed erosion control ruggedized construction that gabion wall and groynes group close |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209397566U true CN209397566U (en) | 2019-09-17 |
Family
ID=67895198
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822136328.2U Active CN209397566U (en) | 2018-12-19 | 2018-12-19 | The roadbed erosion control ruggedized construction that gabion wall and groynes group close |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209397566U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109487751A (en) * | 2018-12-19 | 2019-03-19 | 新疆维吾尔自治区交通规划勘察设计研究院 | The roadbed erosion control ruggedized construction that gabion wall and groynes group close |
-
2018
- 2018-12-19 CN CN201822136328.2U patent/CN209397566U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109487751A (en) * | 2018-12-19 | 2019-03-19 | 新疆维吾尔自治区交通规划勘察设计研究院 | The roadbed erosion control ruggedized construction that gabion wall and groynes group close |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105735208B (en) | Dykes and dams super standard flood flood diversion siphon pipe band group | |
CN106759066B (en) | A kind of method of mountain area side slope water conservancy diversion energy dissipating prevention and control geological disaster | |
CN102191759B (en) | Novel breakwater and design method thereof | |
CN212533968U (en) | Drop ecological landscape dam | |
CN109487751A (en) | The roadbed erosion control ruggedized construction that gabion wall and groynes group close | |
CN108978578A (en) | A kind of control method of Highway in front of the mountains and training dyke based on shunting beam flow theory | |
CN107100130A (en) | Subgrade protection system and implementation in a kind of debris flow gully | |
CN209397566U (en) | The roadbed erosion control ruggedized construction that gabion wall and groynes group close | |
CN209873714U (en) | River bank protection structure for urban mountain area | |
CN111270698A (en) | Protective structure for exposed diseases of bridge pile foundation in sand-mining river channel in mountainous area and construction method of protective structure | |
CN213805270U (en) | Prevent that river course from cutting step energy dissipation second grade dam that permeates water of many curved arches that destroys under | |
CN1793516A (en) | Mould bag line curtain and method for preventing falldown of river bank | |
CN212426957U (en) | Bank protection engineering hydraulic structure | |
CN206428602U (en) | Prevent mud from blocking the roadbed both sides shallow seated groundwater connectivity structure with soil erosion | |
CN101824809A (en) | Large-gradient gravel river bank protective structure and river washout-resistant controlling method thereof | |
CN206916686U (en) | A kind of subgrade protection system in debris flow gully | |
CN209397565U (en) | The novel groynes safeguard structure reinforced for peripheral basic erosion control | |
KR101062728B1 (en) | Beach nourishment using the filter layer and the swell control structure and it's construction technique | |
CN105603942B (en) | Dykes and dams super standard flood flood diversion siphon pipe band | |
CN216379405U (en) | Flood control structure of river course | |
Komar et al. | Changes due to jetties at Tillamook Bay, Oregon | |
JP2903386B2 (en) | Surface water intake method in rapid rivers | |
CN201627138U (en) | Bridge abutment protecting structure | |
TW201016930A (en) | Regulation method for river with the function of protecting bridge pier and dike, and with the function of forming sand and stone collecting specific area | |
CN106368169A (en) | Ecological protection slope for river protection |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: 830006 No. 189, cangfanggou North Road, shayibak District, Urumqi City, Xinjiang Uygur Autonomous Region Patentee after: Xinjiang transportation planning, survey, design and Research Institute Co.,Ltd. Address before: 830000 cangfanggou Road, Shaqu District, Urumqi City, Xinjiang Uygur Autonomous Region Patentee before: XINJIANG TRANSPORTATION PLANNING SURVEYING AND DESIGN INSTITUTE |
|
CP03 | Change of name, title or address |