CN209397482U - A kind of novel railway lifting bridge pier - Google Patents

A kind of novel railway lifting bridge pier Download PDF

Info

Publication number
CN209397482U
CN209397482U CN201920087561.8U CN201920087561U CN209397482U CN 209397482 U CN209397482 U CN 209397482U CN 201920087561 U CN201920087561 U CN 201920087561U CN 209397482 U CN209397482 U CN 209397482U
Authority
CN
China
Prior art keywords
pier
bolt group
bracket
bridge
improvement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920087561.8U
Other languages
Chinese (zh)
Inventor
霍艳忠
武振锋
张璐
杨震宇
蔡国华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lanzhou Jiaotong University
Original Assignee
Lanzhou Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lanzhou Jiaotong University filed Critical Lanzhou Jiaotong University
Priority to CN201920087561.8U priority Critical patent/CN209397482U/en
Application granted granted Critical
Publication of CN209397482U publication Critical patent/CN209397482U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to bridge structure technical fields, and in particular to a kind of novel railway lifting bridge pier.It includes improvement top cap, lifting body, transmission mechanism, improvement pier body, bolt group one, bolt group two, bolt group three and bolt group four;The improvement pier body is set immediately below the transmission mechanism;The lifting body is set right above the transmission mechanism;The improvement top cap is set right above the lifting body, and the improvement top cap is connected with the lifting body by the bolt group one, the bolt group two, the bolt group three and the bolt group four.The utility model is designed reasonably, good reliability, it is easy to operate, railway bridge can be efficiently solved under the influence of various factors, longitudinal irregularity problem between each bridge floor, between railway bridge inlet and bridge floor occurs caused by sedimentation or protrusion for bridge floor, to guarantee that train is safe, steady, high speed by railway bridge, have a good application prospect.

Description

A kind of novel railway lifting bridge pier
Technical field
The utility model relates to bridge structure technical fields, and in particular to a kind of novel railway lifting bridge pier.
Background technique
Bridge pier is to support bridge span structure and object is built in the permanent Asia for reaching ground with vehicle active load of cutting.Pass through railway bridge in train When, it may appear that two kinds of situations: first is that due to heavy haul train and the common gravity of bridge, bridge pier sedimentation can be caused, caused each Longitudinal irregularity between bridge floor;Second is that in the inlet of railway bridge, since for a long time, the heavy haul train of more train numbers passes through, can draw The sedimentation for sending out embankment, causes longitudinal irregularity between railway bridge inlet and bridge floor.Above-mentioned two situations are in the area of weak soil matter It is easier to occur, this can cause train and jump vehicle, cannot such as eliminate the height between each bridge floor, between railway bridge inlet and bridge floor in time It is poor to spend, and passenger and cargo that can be contained to train cause great security risk.And existing Railway Bridges And Piers are mostly integrated steel Tendon concrete structure, no elevating function, when above-mentioned two situations occurs in railway bridge, maintenance difficulty is big, at high cost, and effect is not yet It is ideal.
Utility model content
The purpose of the utility model is to provide a kind of novel railways to go up and down bridge pier, and solve railway bridge influences in various factors Under, longitudinal irregularity problem between each bridge floor, between railway bridge inlet and bridge floor occurs caused by sedimentation or protrusion for bridge floor, To guarantee train safety, steady, high speed pass through railway bridge.
The technical solution adopted in the utility model is:
A kind of novel railway goes up and down bridge pier, including improvement top cap, lifting body, transmission mechanism, improvement pier body, bolt group one, Bolt group two, bolt group three and bolt group four;The improvement pier body is set immediately below the transmission mechanism;The transmission mechanism is just The lifting body is arranged in top;The improvement top cap, the improvement top cap and the lifting body are set right above the lifting body It is connected by the bolt group one, the bolt group two, the bolt group three with the bolt group four.
Preferably, there are circular counter bore and rectangle counterbore in the improvement top cap downside.
Preferably, there are the tapped through hole and rectangular channel of perforation upper and lower side on the lifting body.
Preferably, the improvement pier body includes column rail one, column rail two, pier shaft, circular cone cushion cap, safety door, foot ladder and prevents Guardrail;The pier shaft is set on the upside of the circular cone cushion cap;The foot ladder is arranged along the vertical middle line of the pier shaft leading flank;Institute It states protective fence and is set to pier shaft upper side edge;There are circular counter bore, the column rail one, institute at pier shaft upper side center State the circular counter bore two sides that column rail two is set in turn in the pier shaft along the middle line of the pier shaft upper side left and right directions, the column There is graduation mark on rail one;The safety door is set to immediately ahead of foot ladder lower part.
Preferably, the transmission mechanism includes controller, bracket one, worm screw, bracket two, shaft coupling one, retarder, shaft coupling Device two, motor and rotary body;The bracket one is set on the right side of the controller;The bracket is set on the right side of the bracket one Two;The worm screw is set between the bracket one and the bracket two, has one end of rectangular head to be located on the worm screw described Two right side of bracket;The retarder is set on the right side of the bracket two;There are low speed output end and high speed input terminal on the retarder; The shaft coupling one is set between the bracket two and the retarder, and the low speed as the worm screw and the retarder is defeated The connector of outlet;The motor is set on the right side of the retarder;The shaft coupling two is set to the retarder and described Between motor, as the high speed input terminal of the retarder and the connector of the motor;There is cylinder on the rotary body Portion, worm gear part and threaded shank, the cylindrical portion of the rotary body are set in the circular counter bore of the pier shaft, the snail of the rotary body Wheel portion is meshed with the worm screw, and it is vertical be set on rear side of the worm screw, the screw parts of the rotary body are in the worm screw Upside;There are lock case, rising button and declines button on the controller, the lock case, the rising button and the decline are pressed Button is set gradually from left to right above the controller leading flank, and the controller is connected by bundle conductor with the motor It connects.
The advantageous effects of the utility model are: rationally, good reliability is easy to operate, can efficiently solve for design Under the influence of various factors, bridge floor occurs caused by sedimentation or protrusion between each bridge floor railway bridge, railway bridge inlet and bridge Longitudinal irregularity problem between face is had a good application prospect with guaranteeing that train is safe, steady, high speed by railway bridge.
Detailed description of the invention
Fig. 1 is the structural schematic diagram that the novel railway that utility model embodiment provides goes up and down bridge pier;
Fig. 2 is the right side view that the novel railway that utility model embodiment provides goes up and down bridge pier;
Fig. 3 is the A-A schematic cross-sectional view that the novel railway that utility model embodiment provides goes up and down bridge pier;
Fig. 4 is the schematic rear view that the novel railway that utility model embodiment provides goes up and down bridge pier;
Fig. 5 is the B-B schematic cross-sectional view that the novel railway that utility model embodiment provides goes up and down bridge pier;
Fig. 6 is the decomposition diagram that the novel railway that utility model embodiment provides goes up and down bridge pier;
Fig. 7 is the improvement pier body structural schematic diagram that the novel railway that utility model embodiment provides goes up and down bridge pier.
Fig. 8 is the schematic elevation view for the transmission mechanism that the novel railway that utility model embodiment provides goes up and down bridge pier;
Fig. 9 is the decomposition diagram for the transmission mechanism that the novel railway that utility model embodiment provides goes up and down bridge pier.
In figure: 1- improves top cap;2- lifting body;3- transmission mechanism;4- improves pier body;5- controller;6- bracket one;7- snail Bar;8- bracket two;9- shaft coupling one;10- retarder;11- shaft coupling two;12- motor;13- rotary body;14- column rail one; 15- column rail two;16- pier shaft;17- circular cone cushion cap;18- safety door;19- foot ladder;20- protective fence;21- bolt group one;22- spiral shell Bolt group two;23- bolt group three;24- bolt group four;25- lock case;26- rising button;27- declines button.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe.
1. structure is installed
As shown in figures 1 to 6, a kind of novel railway goes up and down bridge pier, including improvement top cap 1, lifting body 2, transmission mechanism 3, improvement Pier body 4, bolt group 1, bolt group 2 22, bolt group 3 23 and bolt group 4 24;Institute is set immediately below the transmission mechanism 3 State improvement pier body 4;The lifting body 2 is set right above the transmission mechanism 3;The improvement is set right above the lifting body 2 Top cap 1, the improvement top cap 1 pass through the bolt group 1, the bolt group 2 22, the bolt group with the lifting body 2 3 23 are connected with the bolt group 4 24;
There are circular counter bore and rectangle counterbore in 1 downside of improvement top cap;The rectangle counterbore and the column rail 1 and The column rail 2 15 matches;The circular counter bore and the threaded shank of the rotary body 13 match;The design of this structure can make The lifting body 2 and the connector of the improvement top cap 1 move up and down.
There are the tapped through hole and rectangular channel of perforation upper and lower side on the lifting body 2;The rectangular channel and the column Rail 1 and the column rail 2 15 match;The tapped through hole can be meshed with the threaded shank of the rotary body 13, so that The lifting body 2 is moved up and down with the positive and negative rotation of the rotary body 13 along the column rail 1 and the column rail 2 15.
As shown in fig. 7, the improvement pier body 4 includes column rail 1, column rail 2 15, pier shaft 16, circular cone cushion cap 17, safety door 18, foot ladder 19 and protective fence 20;The pier shaft 16 is set on the upside of the circular cone cushion cap 17;The foot ladder 19 is along the pier shaft The vertical middle line of 16 leading flanks is arranged;The protective fence 20 is set to the 16 upper side edge of pier shaft;16 upside of pier shaft Have circular counter bore at the center of face, the column rail 1, the column rail 2 15 along the 16 upper side left and right directions of pier shaft middle line The circular counter bore two sides of the pier shaft 16 are set in turn in, have graduation mark on the column rail one;The safety door 18 is set to institute It states immediately ahead of 19 lower part of foot ladder.
As Figure 8-9, the transmission mechanism 3 include controller 5, bracket 1, worm screw 7, bracket 28, shaft coupling 1, Retarder 10, shaft coupling 2 11, motor 12 and rotary body 13;The bracket 1 is set on the right side of the controller 5;The branch The bracket 28 is arranged in one 6 right side of frame;The worm screw 7 is set between the bracket 1 and the bracket 28, the worm screw There is one end of rectangular head to be located at 28 right side of bracket on 7;The retarder 10 is arranged in 28 right side of bracket;The deceleration There are low speed output end and high speed input terminal on device 10;The shaft coupling 1 be set to the bracket 28 and the retarder 10 it Between, the connector as the worm screw 7 and the low speed output end of the retarder 10;The electricity is set on the right side of the retarder 10 Motivation 12;The shaft coupling 2 11 is set between the retarder 10 and the motor 12, as the retarder 10 The connector of high speed input terminal and the motor 12;There are cylindrical portion, worm gear part and threaded shank, the rotation on the rotary body 13 The cylindrical portion of swivel 13 is set in the circular counter bore of the pier shaft 16, the worm gear part of the rotary body 13 and 7 phase of worm screw Engagement, and it is vertical be set to 7 rear side of the worm screw, the screw parts of the rotary body 13 are in 7 upside of worm screw;The control There are lock case 25, rising button 26 and declines button 27, the lock case 25, the rising button 26 and the declines button on device 5 27 set gradually from left to right above 5 leading flank of controller, and the controller 5 passes through bundle conductor and the motor 12 It is connected.
2. working principle
In the specific use process, the voltage that it is 220V that the controller 5, which first has to after accessing decompression from railway contact line, Then a staff opens the lock case 25 with key, closes lock, adjusts iron according to the fault type that railway bridge is occurred Road and bridge height.As illustrated in figures 1 and 8, if it is the irregularity between each bridge floor, then the rising button 26, the electricity are pressed Motivation 12, which is powered, to be rotated forward, and is successively passed through the shaft coupling 2 11, the retarder 10, the shaft coupling 1, the worm screw 7, is driven It moves the rotary body 13 to rotate forward, another staff observes the graduation mark on the bracket 1, when the lifting body 2 Appropriate location is risen to along the column rail 1 and the column rail 2 15 with the connector of the improvement top cap 1, is unclamped on described Button 26 is risen, the motor 12 stops rotating forward;If it is the irregularity between railway bridge inlet and bridge floor, then press described Declines button 27, the motor 12, which is powered, to be inverted, and successively passes through the shaft coupling 2 11, the retarder 10, the shaft coupling Device 1, the worm screw 7 drive the rotary body 13 to invert, and another staff observes the graduation mark on the bracket 1, When the connector of the lifting body 2 and the improvement top cap 1 drops to appropriate position along the column rail 1 and the column rail 2 15 It sets, unclamps the declines button 27, the motor 12 stops reversion.If not regulating railway bridge height, Ke Yijin once Row repeatedly above two operation finally pulls open lock, locks the lock case 25 until adjusting railway bridge height.
As shown in fig. 7, the column rail 1 and the column rail 2 15 are for the lifting body 2 and the improvement top cap 1 Connector plays the guiding role of rise and fall;The pier shaft 16 is whole to play a supportive role;The circular cone cushion cap 17 is more typical Rectangular cushion cap can increase the earthing volume on cushion cap surface, improve the stability of the improvement pier body 4, and then increase Novel iron The reliability of road lifting bridge pier;The safety door 18 can prevent non-working person from climbing novel railway lifting bridge pier;The foot Ladder 19 helps maintenance personal to rise to 16 upper side of pier shaft;The protective fence 20 can prevent maintenance personal from surprisingly falling It falls.
As Figure 8-9, bracket 1 and bracket 28, which play the worm screw 7, supports and fixes;The retarder 10 can reduce the input speed of the motor 12, can make the motor 12 that the rotary body 13 be driven to carry out indirectly low The positive and negative rotation movement of fast heavy duty;The structure design that the worm gear part of the rotary body 13 is meshed with the worm screw 7, can make institute It states rotary body 13 and realizes self-locking, i.e., the described rotary body 13 will not be under the external force of other (other than the motor 12) It rotates.
In conclusion the utility model the utility model is designed reasonably, good reliability is easy to operate, can effectively solve Certainly railway bridge is under the influence of various factors, bridge floor occurs between each bridge floor caused by sedimentation or protrusion, railway bridge inlet with Longitudinal irregularity problem between bridge floor, to guarantee that train is safe, steady, high speed by railway bridge, before there is good application Scape.
Although the application is described above by referring to specific embodiment, one of ordinary skill in the art are answered Work as understanding, in principle disclosed in the present application and range, many modifications can be made for configuration disclosed in the present application and details. The protection scope of the application is determined by the attached claims, and claim is intended to technical characteristic in claim Equivalent literal meaning or range whole modifications for being included.

Claims (5)

1. a kind of novel railway goes up and down bridge pier, it is characterised in that: including improvement top cap (1), lifting body (2), transmission mechanism (3), Improve pier body (4), bolt group one (21), bolt group two (22), bolt group three (23) and bolt group four (24);The transmission mechanism (3) the improvement pier body (4) is set immediately below;The lifting body (2) is set right above the transmission mechanism (3);The lifting The improvement top cap (1) is set right above body (2), and the improvement top cap (1) and the lifting body (2) pass through the bolt group one (21), the bolt group two (22), the bolt group three (23) are connected with the bolt group four (24).
2. novel railway according to claim 1 goes up and down bridge pier, it is characterised in that: improvement top cap (1) downside has Circular counter bore and rectangle counterbore.
3. novel railway according to claim 1 goes up and down bridge pier, it is characterised in that: have in perforation on the lifting body (2) The tapped through hole and rectangular channel of downside.
4. novel railway according to claim 1 goes up and down bridge pier, it is characterised in that: the improvement pier body (4) includes column rail One (14), column rail two (15), pier shaft (16), circular cone cushion cap (17), safety door (18), foot ladder (19) and protective fence (20);Institute It states and the pier shaft (16) is set on the upside of circular cone cushion cap (17);The foot ladder (19) along the pier shaft (16) leading flank it is vertical in Line setting;The protective fence (20) is set to the pier shaft (16) upper side edge;Have at pier shaft (16) the upper side center Circular counter bore, the column rail one (14), the column rail two (15) along the pier shaft (16) upper side left and right directions middle line successively The circular counter bore two sides of the pier shaft (16) are set to, have graduation mark on the column rail one;The safety door (18) is set to institute It states immediately ahead of foot ladder (19) lower part.
5. novel railway according to claim 4 goes up and down bridge pier, it is characterised in that: the transmission mechanism (3) includes control Device (5), bracket one (6), worm screw (7), bracket two (8), shaft coupling one (9), retarder (10), shaft coupling two (11), motor (12) and rotary body (13);The bracket one (6) is set on the right side of the controller (5);On the right side of the bracket one (6) described in setting Bracket two (8);The worm screw (7) is set between the bracket one (6) and the bracket two (8), has square on the worm screw (7) One end of forming head is located on the right side of the bracket two (8);The retarder (10) is set on the right side of the bracket two (8);The deceleration Device has low speed output end and high speed input terminal on (10);The shaft coupling one (9) is set to the bracket two (8) and the deceleration Connector between device (10), as the worm screw (7) and the low speed output end of the retarder (10);The retarder (10) The motor (12) is arranged in right side;The shaft coupling two (11) be set to the retarder (10) and the motor (12) it Between, as the high speed input terminal of the retarder (10) and the connector of the motor (12);Have on the rotary body (13) The cylindrical portion of cylindrical portion, worm gear part and threaded shank, the rotary body (13) is set in the circular counter bore of the pier shaft (16), institute The worm gear part for stating rotary body (13) is meshed with the worm screw (7), and it is vertical be set on rear side of the worm screw (7), the rotation The screw parts of body (13) are on the upside of the worm screw (7);Have on the controller (5) lock case (25), rising button (26) and under It drops button (27), the lock case (25), the rising button (26) and the declines button (27) are on front side of the controller (5) It is set gradually from left to right above face, the controller (5) is connected by bundle conductor with the motor (12).
CN201920087561.8U 2019-01-20 2019-01-20 A kind of novel railway lifting bridge pier Expired - Fee Related CN209397482U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920087561.8U CN209397482U (en) 2019-01-20 2019-01-20 A kind of novel railway lifting bridge pier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920087561.8U CN209397482U (en) 2019-01-20 2019-01-20 A kind of novel railway lifting bridge pier

Publications (1)

Publication Number Publication Date
CN209397482U true CN209397482U (en) 2019-09-17

Family

ID=67898548

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920087561.8U Expired - Fee Related CN209397482U (en) 2019-01-20 2019-01-20 A kind of novel railway lifting bridge pier

Country Status (1)

Country Link
CN (1) CN209397482U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111893899A (en) * 2020-08-06 2020-11-06 华东交通大学 Lifting type bridge turning system
CN114508044A (en) * 2022-04-02 2022-05-17 济南金衢公路勘察设计研究有限公司 Highway bridge pier anti-settlement device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111893899A (en) * 2020-08-06 2020-11-06 华东交通大学 Lifting type bridge turning system
CN114508044A (en) * 2022-04-02 2022-05-17 济南金衢公路勘察设计研究有限公司 Highway bridge pier anti-settlement device

Similar Documents

Publication Publication Date Title
CN209397482U (en) A kind of novel railway lifting bridge pier
CN201080715Y (en) Lead-screw drive safe load parking platform
CN201534962U (en) Self-traveling type bridge detection and maintenance trolley special for high-speed railways
CN209602961U (en) A kind of supporting bracket of bridge construction
CN106744145A (en) Jacking equipment electromagnetic lever rack-and-pinion safety catch
CN107054403A (en) A kind of rolling stock anti-skid device
CN201376867Y (en) Single-crystal silicon rod lifter
CN204342282U (en) For the multi-functional vertical shift actuating device of Bridge Erector
CN104533117B (en) Inclined parking device
CN205832587U (en) A kind of rail break roller-coaster upset platform car locking mechanism
CN104512802A (en) Multifunctional longitudinal movement driving device for bridge girder erection machine
CN106629303A (en) Horizontal electromagnetic lever safety brake device for gear and rack lifting equipment
CN204475926U (en) A kind of tilting lugs
CN202946633U (en) Safety driving nut
CN200999180Y (en) Track hoisting equipment emergency windbreak apparatus
CN101670671B (en) Combined framework type glass fiber product hydraulic press without pull rod
CN207863556U (en) A kind of cantilevered intelligent parking garage
CN206901637U (en) A kind of elevator hand barring device
CN202672945U (en) Switch locking mechanism of track traffic train door
CN206016367U (en) Simple lifting multi-storied garage with chain detection apparatus
CN202429909U (en) Folding guardrail and crane
CN201666072U (en) Portal crane mechanism of subway safety door
CN201296721Y (en) Vertical lifting turnover dumping machine for sludge sterilization system
CN211759399U (en) Welding device for processing bridge structure
CN206826674U (en) Rolling stock anti-skid device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190917

Termination date: 20210120

CF01 Termination of patent right due to non-payment of annual fee