CN209384724U - Automate Tools treasury - Google Patents
Automate Tools treasury Download PDFInfo
- Publication number
- CN209384724U CN209384724U CN201920074148.8U CN201920074148U CN209384724U CN 209384724 U CN209384724 U CN 209384724U CN 201920074148 U CN201920074148 U CN 201920074148U CN 209384724 U CN209384724 U CN 209384724U
- Authority
- CN
- China
- Prior art keywords
- plate
- frame
- pair
- hose
- sleeve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Landscapes
- Warehouses Or Storage Devices (AREA)
Abstract
Tools treasury is automated, the utility model relates to for electrical domain, more particularly to automation Tools treasury.It is simple to provide a kind of structure, it is rationally distributed, improve the automation Tools treasury of working efficiency.Control cabinet and management cabinet are equipped in the buffer area, Work tool is got for staff in the interactive areas, the miscellaneous function area include detection platform, cleaning, drying platform, AGV fork truck, AGV charging berth position and wind leaching channel, wind leaching channel is located at the centre of detection platform and cleaning, drying platform, and the AGV fork truck is located at AGV charging and berths on position;The storage area includes general all switch cabinets and deploys week switch cabinet for placing several week switch cabinets, the week switch cabinet.The detection platform includes base frame one, and the base frame one is equipped with along X to the munnion one moved, and the top of the munnion one is equipped with insulating megger, and the munnion one is equipped with the crossbearer one moved along Z-direction, and the utility model facilitates operation, saves the time.
Description
Technical field
The utility model relates to for electrical domain, more particularly to automation Tools treasury.
Background technique
In China's power industry, insulating tool is widely used and carries out hot line job and operation, insulating tool is to storage ring
There are strict requirements in border.If not being able to satisfy prescribed requirement under the conditions of storage environment, it is easy to cause the safety such as performance decline hidden
Suffer from, will seriously jeopardize the statement safety of inspection operation personnel.National quality technical supervision general bureau also specifies to insulation operative employee
Tool, the supporting management of live line tool and insulating protection tool, use, provide strict requirements, and put into effect accordingly
GB/T 18037-2000 " live line tool technical requirements and Guidance Rule " and power department have put into effect DL/T 974-
The directive documents such as 2005 " live-wire work tool storehouses ".Therefore, reinforce safe live working tools storage requirement and pipe
Reason, provide one it is relatively stable, take convenient subenvironment, to achieve the effect that insulating tool loss prevention, dust-proof, it is ensured that insulating tape
Electric operation Work tool using safe particularly important.Existing storehouse in use, arrange it is unreasonable, manually to Work tool into
Row is placed, is handled, and inconvenient for use, working efficiency is low.
Utility model content
The utility model is rationally distributed in view of the above problems, to provide a kind of structure simple, improves the automatic of working efficiency
Change Tools treasury.
The technical solution of the utility model is: described successively including buffer area, interactive areas, miscellaneous function area and storage area
Control cabinet and management cabinet are equipped in buffer area, Work tool, the miscellaneous function area packet are got for staff in the interactive areas
Include detection platform, cleaning, drying platform, AGV fork truck, AGV charging are berthed position and wind leaching channel, wind leaching channel is located at detection
The centre of platform and cleaning, drying platform, the AGV fork truck are located at AGV charging and berth on position;If the storage area is for placing
Dry all switch cabinets, the week switch cabinet include general all switch cabinets and deploy week switch cabinet.
The detection platform includes base frame one, and the base frame one is equipped with along X to the munnion one moved, the munnion one
Top is equipped with insulating megger, and the munnion one is equipped with the crossbearer one moved along Z-direction, and the crossbearer one is equipped with and moves along Y-direction
Arm one, the arm one includes pedestal one and sleeve one, and one end of the sleeve one is equipped with substrate one, and the substrate one is logical
It crosses and is bolted pedestal one;
The other end of the sleeve one is equipped with the metal probe connected by insulating barrier, and the metal probe passes through conducting wire
Insulating megger is connected, the conducting wire is located in sleeve one.
Spring is equipped between the insulating barrier and sleeve one.
The cleaning, drying platform includes base frame two, and the base frame two is equipped with along X to the munnion two moved, the munnion
Two are equipped with the crossbearer two moved along Z-direction, and the crossbearer two is equipped with the arm two moved along Y-direction, and the arm includes pedestal
Two and sleeve two, one end of the sleeve two is equipped with substrate two, and pedestal two is bolted in the substrate two;
The other end of the sleeve two is equipped with T shape mounting rack, and the horizontal ends of the mounting rack are equipped with cleaning solution spray head, originally
Sprinkler head and wind spray head, and the cleaning solution spray head connects water pump one by hose one, and the water pump one is connected to clear by pipeline
Washing lotion storage bin, the tap water spray head connect water pump two, the water pump two-way piping connection tap water storage by hose two
Case is deposited, the wind sprays head and connects air compressor machine by hose three.
The hose one, hose two and hose three are respectively provided in sleeve two, and the vertical end of the mounting rack, which is equipped with, to be used for
Place the perforation of hose one, hose two and hose three.
The all switch cabinets of the allotment include upper ledge and lower frame disposed in parallel, and the upper ledge is located at the top of lower frame, it is described on
Frame and lower frame are rectangle frame, and cross is equipped in the upper ledge, is equipped with waffle slab, the upper ledge and lower frame in the lower frame
Quadrangle end be respectively equipped with upright bar, lower frame is stretched out in the upright bar, so that upper ledge and lower frame form framework;
The left and right both ends intermediate symmetry of the framework is equipped with the vertical bar one for being parallel to upright bar, and the vertical bar one is located at upper ledge
Between lower frame, framework is separated into front frame and after-frame by a pair of of one place plane of vertical bar, and the left and right both ends of the front frame are symmetrically set
There are several cross bars one, the cross bar one is connected between vertical bar one and upright bar, and the inside of the cross bar one is set there are two supporting block,
Supporting block is used to support platen on the cross bar being oppositely arranged;
Vertical bar two is equipped among the left end of the after-frame, the vertical bar two is parallel to vertical bar one, and the right end of after-frame is equipped with extremely
Few two cross bars two, the cross bar two are connected between vertical bar one and upright bar, and the cross bar two is equipped with a pair of of buckle, a pair of card
Button is respectively used to connection strut, and a pair of of strut articulated connection, the articulated section of a pair of of strut is detachably connected on vertical bar two.
General all switch cabinets include cabinet body and several support plates, and the cabinet body, which includes that top plate and bottom plate is parallel with a pair, to be set
The vertical plate set, the top plate and bottom plate are connected between a pair of of vertical plate, and the top plate is located at the top of vertical plate, and bottom plate is located at
The middle and lower part of vertical plate;
Several support plates are connected between top plate and bottom plate by sliding equipment, and the sliding equipment includes that a pair is set in parallel
The guide rail set, a pair of guide rails are located at the both ends of top plate, and the guide rail is between top plate and bottom plate, the both ends point of the support plate
Not She You C-shaped sliding block, the guide rail is located in sliding block;
The outside of several support plates is connected by scissor-type component, and the scissor-type component includes several hinge groups, the hinge
Group connects one to one support plate, and the hinge group includes a pair of of connecting plate, and the infall of a pair of of connecting plate is hingedly on the supporting plate, adjacent
It is hinged between the connecting plate of hinge group.
It further include electric pushrod, the electric pushrod is vertically located in cabinet body, and one end of the electric pushrod is connected to top
The bottom surface of plate, the other end connect one end of any support plate.
Storehouse in the utility model successively includes buffer area, interactive areas, miscellaneous function area and storage area, wherein buffering
It is equipped with control cabinet and management cabinet in area, is easy to implement by control cabinet and storehouse is integrally controlled, management cabinet is standby for placing spare unit
Part;Work tool is got for staff in interactive areas;Detection to Work tool is gathered, cleaning, has dried and remove in miscellaneous function area
Function is transported, it is convenient and practical;Storage area is convenient for carrying out classification storage to Work tool, improves convenience.
General week switch cabinet stores the generally conventional Work tool that can all use, and deploying all switch cabinets is the difference according to work order, into
Goods is matched in row allotment.
The utility model facilitates operation, saves the time.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model,
Fig. 2 is the structural schematic diagram of detection platform,
Fig. 3 is the structural schematic diagram of arm one,
Fig. 4 is the structural schematic diagram of cleaning, drying platform,
Fig. 5 is the structural schematic diagram of arm two,
Fig. 6 is the structural schematic diagram of general all switch cabinets,
Fig. 7 is the right view of Fig. 6,
Fig. 8 is the schematic perspective view of general all switch cabinets,
Fig. 9 is the structural schematic diagram of scissor-type component,
Figure 10 is the partial enlarged view in Fig. 8 at M,
Figure 11 is the structural schematic diagram for deploying all switch cabinets,
Figure 12 is the top view of Figure 11,
Figure 13 is the left view of Figure 11,
Figure 14 is the schematic perspective view for deploying all switch cabinets;
1 is buffer area in figure, and 11 be control cabinet, and 12 be management cabinet,
2 be interactive areas,
3 be miscellaneous function area,
31 be detection platform,
311 be base frame one, and 312 be munnion one, and 313 be crossbearer one,
314 be arm one, and 3141 be pedestal one, and 3142 be sleeve one, and 3143 be substrate one,
315 be insulating megger, and 316 be insulating barrier, and 317 be metal probe, and 318 be spring,
32 be cleaning, drying platform,
321 be base frame two, and 322 be munnion two, and 323 be crossbearer two,
324 be arm two, and 3241 be pedestal two, and 3242 be sleeve two, and 3243 be substrate two, and 3244 be mounting rack, 32441
It is horizontal ends, 32442 be vertical end, and 324420 be perforation,
325 be cleaning solution spray head, and 326 be tap water spray head, and 327 be that wind sprays head,
33 be that AGV charging is berthed position, and 34 be wind leaching channel,
4 be storage area,
41 be general all switch cabinets,
411 be cabinet body, and 4111 be top plate, and 4112 be bottom plate, and 4113 be vertical plate,
412 be support plate,
413 be guide rail, and 414 be sliding block, and 415 be hinge group, and 4150 be connecting rod, and 416 be electric pushrod,
42 be to deploy all switch cabinets,
421 be upper ledge, and 422 be lower frame, and 423 be cross, and 424 be waffle slab, and 425 be upright bar, and 426 be vertical bar one, 427
It is front frame, 428 be after-frame, and 429 be cross bar one, and 4210 be supporting block, and 4211 be platen, and 4212 be vertical bar two, and 4213 be cross bar
Two, 4214 be buckle, and 4215 be strut;
XYZ represents coordinate system in figure.
Specific embodiment
The utility model as represented in figures 1 through 14, successively include buffer area 1, interactive areas 2, miscellaneous function area 3 and storage area 4,
Control cabinet 11 and management cabinet 12 are equipped in the buffer area, Work tool, the auxiliary are got for staff in the interactive areas
Functional areas include detection platform 31, cleaning, drying platform 32, AGV fork truck, AGV charging berth position 33 and wind leaching channel 34, it is described
Wind leaching channel is located at the centre of detection platform and cleaning, drying platform, and the AGV fork truck is located at AGV charging and berths on position;It is described
Storage area includes general all switch cabinets 41 and deploys week switch cabinet 42 for placing several week switch cabinets, the week switch cabinet.
Storehouse in the utility model successively includes buffer area, interactive areas, miscellaneous function area and storage area, wherein buffering
It is equipped with control cabinet and management cabinet in area, is easy to implement by control cabinet and storehouse is integrally controlled, management cabinet is standby for placing spare unit
Part;Work tool is got for staff in interactive areas;Detection to Work tool is gathered, cleaning, has dried and remove in miscellaneous function area
Function is transported, it is convenient and practical;Storage area is convenient for carrying out classification storage to Work tool, improves convenience.
General week switch cabinet stores the generally conventional Work tool that can all use, and deploying all switch cabinets is the difference according to work order, into
Goods is matched in row allotment.
Interactive areas is equipped with intake channel, enters convenient for staff, and detection, cleaning, drying are stored and taken and pass through AGV
Fork truck is completed, and high degree facilitates staff and get Work tool.Work tool can automatic detection damage for scrapping
Bad tool can in time feed back staff in time.Work tool can automate cleaning, and storage can all clean every time, make
Storage area reaches dustfree environment.
As Figure 2-3, the detection platform includes base frame 1, and the base frame one is equipped with along X to the munnion moved
One 312, the top of the munnion one is equipped with insulating megger 315, and the munnion one is equipped with the crossbearer 1 moved along Z-direction, institute
It states crossbearer one and is equipped with the arm 1 moved along Y-direction, the arm one includes pedestal 1 and sleeve 1, described
One end of sleeve one is equipped with substrate 1, and pedestal one is bolted in the substrate one;
The other end of the sleeve 1 is equipped with the metal probe 317 connected by insulating barrier 316, and the metal is visited
Head connects insulating megger by conducting wire, and the conducting wire is located in sleeve one.
By the way that the arm one moved along the direction XYZ is arranged, metal probe is mounted on one front end of arm, due to metal probe
Insulating megger is connected by conducting wire, different Work tools can be detected;Since arm can be moved along the direction XYZ, just
It is detected in adjusting to different positions, improves adaptability and working efficiency.
Spring 318 is equipped between the insulating barrier and sleeve one.
Elasticity is provided when metal probe and Work tool contact, avoids damage Work tool.
As illustrated in figures 4-5, the cleaning, drying platform includes base frame 2 321, and the base frame two is equipped with along X to moving
Munnion 2 322, the munnion two are equipped with the crossbearer 2 323 moved along Z-direction, and the crossbearer two is equipped with the hand moved along Y-direction
Arm 2 324, the arm include pedestal 2 3241 and sleeve 2 3241, and one end of the sleeve two is equipped with substrate 2 3243, institute
It states substrate two and pedestal two is bolted;
The other end of the sleeve two is equipped with T shape mounting rack 3244, and the horizontal ends 32441 of the mounting rack are equipped with cleaning solution
Spray head 325, tap water spray head 326 and wind spray first 327, and the cleaning solution spray head connects water pump one, the water by hose one
Pump one is connected to cleaning liquid storage tank by pipeline, and the tap water spray head connects water pump two, the water pump two-way by hose two
Originally water storage bin, the wind spray head and connect air compressor machine by hose three for piping connection.
By the way that the arm two moved along the direction XYZ is arranged, cleaning solution spray head, tap water spray head and wind are sprayed into head and set respectively
It sets on the mounting rack of arm front end, different types of cleaning action can be carried out to Work tool, such as extract cleaning solution and cleaned,
Extraction tap water is cleaned and wind leaching (can dry up), and three can be used in combination or be used alone, and improves adaptability.This reality
It is conventional equipment with new water pump one, water pump two and air compressor machine, is not shown in figure.Tap water spray head can extract purified water or
Deionized water.
The hose one, hose two and hose three are respectively provided in sleeve two, and the vertical end 32442 of the mounting rack is equipped with
For placing the perforation 324420 of hose one, hose two and hose three.
During installation, spacing is reserved between substrate two and pedestal two, convenient for placing hose one, hose two and hose three;Root
Factually border need of work selects corresponding hose to work.
As illustrated in figs. 11-14, all switch cabinets of the allotment include upper ledge 421 and lower frame 422 disposed in parallel, the upper ledge position
In the top of lower frame, the upper ledge and lower frame are rectangle frame, and cross 423 is equipped in the upper ledge, is equipped in the lower frame
Waffle slab 424(waffle slab can be used for placing adaptedly Work tool), the quadrangle end of the upper ledge and lower frame is respectively equipped with upright bar
425, lower frame is stretched out in the upright bar, so that upper ledge and lower frame form framework;
The left and right both ends intermediate symmetry of the framework is equipped with the vertical bar 1 for being parallel to upright bar, and the vertical bar one is located at upper
Between frame and lower frame, framework is separated into front frame 427 and after-frame 428 by a pair of of one place plane of vertical bar, and left and right the two of the front frame
End is symmetrically arranged with several cross bars 1, and the cross bar one is connected between vertical bar one and upright bar, and the inside of the cross bar one is equipped with
Two supporting blocks 4210, supporting block is used to support platen 4211 on the cross bar being oppositely arranged;
Vertical bar 2 4212 is equipped among the left end of the after-frame, the vertical bar two is parallel to vertical bar one, and the right end of after-frame is set
There are at least two cross bars 2 4213, the cross bar two is connected between vertical bar one and upright bar, and the cross bar two is equipped with a pair of of card
Button 4214, a pair of buckle are respectively used to connection strut 4215, and a pair of of strut is articulated and connected, and the articulated section 16 of a pair of of strut is detachable
It is connected on vertical bar two.
It is convenient for by the cabinet body (i.e. framework) that upper ledge, lower frame and four upright bars form monoblock type since lower frame is stretched out in upright bar
Framework is lifted by fork truck and is transported through movement;Vertical bar one is set at the left and right end of framework, framework is separated into front frame with after
Frame, the interior several opposite cross bars of setting of front frame, the supporting block of a pair of of inside of cross bar is used to support platen, convenient for placing different works
Utensil;Meanwhile can be different according to Work tool size, corresponding platen is placed in selection, guarantees the reliability that Work tool is placed;After-frame
At least two cross bars two of interior setting, in this way, at least two pairs of hinged struts can be placed, convenient for lifting to Work tool;It is a pair of
The articulated section of strut is detachably connected on vertical bar two, easy to disassemble, adjusts the accommodating space of Work tool.
As illustrated in figures 6-10, general all switch cabinets include cabinet body 411 and several support plates 412, and the cabinet body includes top
Plate 4111, bottom plate 4112 and a pair of vertical plate 4113 disposed in parallel, the top plate and bottom plate are connected between a pair of of vertical plate,
The top plate is located at the top of vertical plate, and bottom plate is located at the middle and lower part of vertical plate;
Several support plates are connected between top plate and bottom plate by sliding equipment, and the sliding equipment includes that a pair is set in parallel
The guide rail 413 set, a pair of guide rails are located at the both ends of top plate, and the guide rail is between top plate and bottom plate, and the two of the support plate
End is respectively equipped with C-shaped sliding block 414, and the guide rail is located in sliding block;
The outside of several support plates is connected by scissor-type component, and the scissor-type component includes several hinge groups 415, described
Hinge group connects one to one support plate, and the hinge group includes a pair of of connecting plate 4150, and the infall of a pair of of connecting plate is hinged on support plate
On, it is hinged between the connecting plate of adjacent hinge group.
By the way that cabinet body is arranged, common Work tool can be placed in cabinet body, convenient for storage;It is several due to being arranged in cabinet body
Support plate, convenient for being separated to Work tool;Sliding block is arranged in the both ends of support plate, can slide on guide rail, plate easy to support
Lifting action can place the Work tool of different size;Several support plates are connected by scissor-type component, convenient for forming linkage, only
Other support plates need to can be driven, it is made to keep balance, convenient for operation by driving any support plate.
It further include electric pushrod 416, the electric pushrod is vertically located in cabinet body, and one end of the electric pushrod is connected to
The bottom surface of top plate, the other end connect one end of any support plate.
By the way that electric pushrod is arranged, convenient for reliably pushing several support plates to act, lifting is reliable.
Claims (8)
1. automating Tools treasury, which is characterized in that successively include buffer area, interactive areas, miscellaneous function area and storage area, institute
It states and is equipped with control cabinet and management cabinet in buffer area, Work tool, the miscellaneous function area are got for staff in the interactive areas
It berths position and wind leaching channel including detection platform, cleaning, drying platform, AGV fork truck, AGV charging, wind leaching channel is located at inspection
The centre of platform and cleaning, drying platform is surveyed, the AGV fork truck is located at AGV charging and berths on position;The storage area is for placing
Several week switch cabinets, the week switch cabinet include general all switch cabinets and all switch cabinets of allotment.
2. automation Tools treasury according to claim 1, which is characterized in that the detection platform includes base frame one,
The base frame one is equipped with along X to the munnion one moved, and the top of the munnion one is equipped with insulating megger, sets on the munnion one
There is the crossbearer one moved along Z-direction, the crossbearer one is equipped with the arm one moved along Y-direction, and the arm one includes one He of pedestal
One end of sleeve one, the sleeve one is equipped with substrate one, and pedestal one is bolted in the substrate one;
The other end of the sleeve one is equipped with the metal probe connected by insulating barrier, and the metal probe is connected by conducting wire
Insulating megger, the conducting wire are located in sleeve one.
3. automation Tools treasury according to claim 2, which is characterized in that between the insulating barrier and sleeve one
Equipped with spring.
4. automation Tools treasury according to claim 1, which is characterized in that the cleaning, drying platform includes base frame
Two, the base frame two is equipped with along X to the munnion two moved, and the munnion two is equipped with the crossbearer two moved along Z-direction, the cross
Frame two is equipped with the arm two moved along Y-direction, and the arm includes pedestal two and sleeve two, and one end of the sleeve two is equipped with base
Pedestal two is bolted in plate two, the substrate two;
The other end of the sleeve two is equipped with T shape mounting rack, and the horizontal ends of the mounting rack are equipped with cleaning solution spray head, tap water sprays
Head and wind spray head, and the cleaning solution spray head connects water pump one by hose one, and the water pump one is connected to cleaning solution by pipeline
Storage bin, the tap water spray head connect water pump two by hose two, and the water pump two-way piping is connected to originally water storage bin,
The wind sprays head and connects air compressor machine by hose three.
5. automation Tools treasury according to claim 4, which is characterized in that the hose one, hose two and hose
Three are respectively provided in sleeve two, and the vertical end of the mounting rack is equipped with the perforation for placing hose one, hose two and hose three.
6. automation Tools treasury according to claim 1, which is characterized in that all switch cabinets of the allotment include setting in parallel
The upper ledge and lower frame set, the upper ledge are located at the top of lower frame, and the upper ledge and lower frame are rectangle frame, are equipped in the upper ledge
Cross, is equipped with waffle slab in the lower frame, and the quadrangle end of the upper ledge and lower frame is respectively equipped with upright bar, and the upright bar is stretched out
Lower frame, so that upper ledge and lower frame form framework;
The left and right both ends intermediate symmetry of the framework is equipped with the vertical bar one for being parallel to upright bar, and the vertical bar one is located at upper ledge under
Between frame, framework is separated into front frame and after-frame by a pair of of one place plane of vertical bar, if the left and right both ends of the front frame are symmetrically arranged with
Dry cross bar one, the cross bar one are connected between vertical bar one and upright bar, and the inside of the cross bar one is set there are two supporting block, relatively
Supporting block is used to support platen on the cross bar of setting;
Vertical bar two is equipped among the left end of the after-frame, the vertical bar two is parallel to vertical bar one, and the right end of after-frame is equipped at least two
A cross bar two, the cross bar two are connected between vertical bar one and upright bar, and the cross bar two is equipped with a pair of of buckle, a pair of buckle point
Strut Yong Yu not be connected, a pair of of strut articulated connection, the articulated section of a pair of of strut is detachably connected on vertical bar two.
7. automation Tools treasury according to claim 1, which is characterized in that general all switch cabinets include cabinet body and
Several support plates, the cabinet body include top plate and bottom plate and a pair of vertical plate disposed in parallel, and the top plate and bottom plate are connected to
Between a pair of of vertical plate, the top plate is located at the top of vertical plate, and bottom plate is located at the middle and lower part of vertical plate;
Several support plates are connected between top plate and bottom plate by sliding equipment, and the sliding equipment includes a pair of disposed in parallel
Guide rail, a pair of guide rails are located at the both ends of top plate, and between top plate and bottom plate, the both ends of the support plate are set the guide rail respectively
There is C-shaped sliding block, the guide rail is located in sliding block;
The outside of several support plates is connected by scissor-type component, and the scissor-type component includes several hinge groups, the hinge group one
One is correspondingly connected with support plate, and the hinge group includes a pair of of connecting plate, the infall of a pair of of connecting plate hingedly on the supporting plate, adjacent hinge group
Connecting plate between be hinged.
8. automation Tools treasury according to claim 7, which is characterized in that it further include electric pushrod, it is described electronic
Push rod is vertically located in cabinet body, and one end of the electric pushrod is connected to the bottom surface of top plate, and the other end connects any support plate
One end.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920074148.8U CN209384724U (en) | 2019-01-16 | 2019-01-16 | Automate Tools treasury |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920074148.8U CN209384724U (en) | 2019-01-16 | 2019-01-16 | Automate Tools treasury |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209384724U true CN209384724U (en) | 2019-09-13 |
Family
ID=67853606
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920074148.8U Withdrawn - After Issue CN209384724U (en) | 2019-01-16 | 2019-01-16 | Automate Tools treasury |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209384724U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110664139A (en) * | 2019-10-16 | 2020-01-10 | 国网江苏省电力有限公司扬州供电分公司 | Centralized storage equipment of multiplexer utensil storehouse |
-
2019
- 2019-01-16 CN CN201920074148.8U patent/CN209384724U/en not_active Withdrawn - After Issue
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110664139A (en) * | 2019-10-16 | 2020-01-10 | 国网江苏省电力有限公司扬州供电分公司 | Centralized storage equipment of multiplexer utensil storehouse |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102590741B (en) | Alternating current contactor automation test equipment | |
CN209384724U (en) | Automate Tools treasury | |
CN208716263U (en) | A kind of handkerchief box automatic arraying conveying device | |
CN103625924B (en) | A kind of automatic placement board-like material enters the device of framework | |
CN103543402A (en) | Automatic testing device | |
CN105442030B (en) | One kind cleaning electric plating machine | |
CN106624831B (en) | A kind of air-conditioning production line | |
CN109692829A (en) | A kind of polaroid surface cleaning apparatus | |
CN207202172U (en) | A kind of clothes intelligence hangar system | |
CN101862733A (en) | Automatic separation device | |
CN109484865A (en) | Reversible cannibalized equipment and reversible cargo destacking apparatus | |
CN109519010A (en) | A kind of automation Tools treasury | |
CN208507094U (en) | A kind of quick logistic label seat of replacement | |
CN208097152U (en) | Middle-placed switch cabinet hanging rack for safety belt | |
CN202062058U (en) | Monitoring protection device for overturning heat preserving furnace aluminum liquid level control | |
CN210418106U (en) | Automatic clothing sorting and conveying device | |
CN214553733U (en) | Corrosion-resistant multifunctional experiment table | |
CN203127746U (en) | Automatic discharging device | |
CN205474087U (en) | Wash and electroplate all -in -one | |
CN109911500A (en) | A kind of article-storage device with tally function goods and materials nameplate | |
CN209065000U (en) | A kind of board of glasses cleaning machine | |
CN208388530U (en) | A kind of commercial glass door cleaning machine equipment | |
CN209550005U (en) | A kind of detection device | |
CN208261496U (en) | A kind of LCD cleaning material basket | |
CN112170381A (en) | Network server rack cleaning device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20190913 Effective date of abandoning: 20230922 |
|
AV01 | Patent right actively abandoned |
Granted publication date: 20190913 Effective date of abandoning: 20230922 |
|
AV01 | Patent right actively abandoned | ||
AV01 | Patent right actively abandoned |