CN209384078U - Highway maintenance crack filling equipment - Google Patents

Highway maintenance crack filling equipment Download PDF

Info

Publication number
CN209384078U
CN209384078U CN201920054553.3U CN201920054553U CN209384078U CN 209384078 U CN209384078 U CN 209384078U CN 201920054553 U CN201920054553 U CN 201920054553U CN 209384078 U CN209384078 U CN 209384078U
Authority
CN
China
Prior art keywords
sliding shoe
steel pipe
filling equipment
highway maintenance
crack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920054553.3U
Other languages
Chinese (zh)
Inventor
张丽梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201920054553.3U priority Critical patent/CN209384078U/en
Application granted granted Critical
Publication of CN209384078U publication Critical patent/CN209384078U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

Highway maintenance crack filling equipment.Since the width in crack can change at any time, material spouting velocity be it is identical, will cause small crack material in this way and spray and excessive generate waste.Highway maintenance crack filling equipment, its composition includes: the branch cylinder (3) covered in discharge nozzle (1) outside, branch cylinder bottom is fixed with chassis (21), pressing plate (17) and deashing device are provided on chassis, branch cylinder is internally provided with steel pipe (12), steel pipe is connect with discharge nozzle by connector (5), it is connect with conehead (6) by fixed plate (7) in steel pipe, it is slidably connected in steel pipe with pushing block (8), pushing block lower part is fixedly connected with sliding shoe (10), pushing block center setting jet pipe (9) passes through sliding shoe and extends to sliding shoe lower part, sliding shoe and the sliding bar (11) of steel pipe two sides are slidably connected, sliding shoe two sides are respectively arranged with rod assembly (24).The utility model is applied to the filling of highway crack.

Description

Highway maintenance crack filling equipment
Technical field
The utility model relates to technical field of highway maintenance technology, and in particular to a kind of highway maintenance crack filling equipment.
Background technique
Currently, bituminous pavement rolling due to construction quality or overloaded vehicle, part location is just after a period of use Have bulge, crackle and it is loose phenomena such as, if repaired not in time, it will further destroy road, the cementation of fissures is to satisfy the need A kind of mode of the preventive maintenance of face disease, that there are impurity is more in the crack that general road occurs, as dust, leaf and its It is easy to be deposited in the impurity in gap, is only generally by bituminous pavement when road pavement crack carries out cementation of fissures processing Crack treatment it is more obvious, without clear up gap in impurity, the effect of the cementation of fissures will be so influenced, after leading to the cementation of fissures Pavement roughness it is shaky, connecting is poor, influence repairing quality, since the width in crack can change at any time, material spray Speed is identical out, will cause small crack material in this way and sprays excessive generation waste.
Summary of the invention
The purpose of the utility model is to provide a kind of highway maintenance crack filling equipments.
Above-mentioned purpose is realized by following technical scheme:
A kind of highway maintenance crack filling equipment, composition includes: the branch cylinder covered outside discharge nozzle, the branch cylinder bottom Portion is fixed with chassis, is provided with pressing plate and deashing device on the chassis;
The branch cylinder is internally provided with steel pipe, and the steel pipe is connect with the discharge nozzle by connector, described It is connect with conehead by fixed plate in steel pipe, is slidably connected in the steel pipe with pushing block, the pushing block lower part and sliding shoe It is fixedly connected, the pushing block center setting jet pipe passes through the sliding shoe and extends to the sliding shoe lower part, described Sliding shoe and the sliding bar of the steel pipe two sides are slidably connected, and the sliding shoe two sides are respectively arranged with rod assembly.
Highway maintenance crack filling equipment, the deashing device include dust-absorbing tube, in the dust-absorbing tube Gas blow pipe, the gas blow pipe and air blower is arranged by connection hose connection in the heart, and the dust-absorbing tube and dust absorption fan are logical Cross piping connection.
Highway maintenance crack filling equipment, the angle between the side and horizontal plane of the conehead is 60- 70°。
Highway maintenance crack filling equipment, the chassis two sides are provided with support wheel.
Highway maintenance crack filling equipment, the rod assembly include connecting rod, the connecting rod Lower part and the sliding shoe are hinged, and the top of the connecting rod is fixed with holding frame.
Highway maintenance crack filling equipment, the holding frame includes bottom plate, the bottom plate two sides with stretch Contracting bar is fixedly connected, and is fixed with ring tube in the middle part of the bottom plate.
The utility model beneficial effect achieved is:
1. the utility model can be by portable rod assembly, so that sliding shoe drives pushing block sliding, another conehead and sliding block The gap of side generates variation, so that the amount that material sprays changes, does not need the spouting velocity for adjusting machine again, can To be manually adjusted at any time according to fracture width.
2. the utility model be arranged gas blow pipe, can before spraying into material by crack dust or rubbish blowout, It is cased with dust-absorbing tube on gas blow pipe, dust suction can be made thorough much sooner, guarantees in crack without sundries.
Detailed description of the invention
Attached drawing is used to provide a further understanding of the present invention, and constitutes part of specification, practical with this Novel embodiment is used to explain the utility model together, does not constitute limitations of the present invention.In the accompanying drawings:
Attached drawing 1 is the main view of the utility model;
Attached drawing 2 is the side view of the utility model;
In figure: 1, discharge nozzle;2, hand push frame;3, branch cylinder;4, connecting rod;5, connector;6, conehead;7, fixed plate;8, pushing block; 9, jet pipe;10, sliding shoe;11, sliding bar;12, steel pipe;13, connection frame;14, ring tube;15, telescopic rod;16, bottom plate;17, Pressing plate;18, support wheel;19, gas blow pipe;20, dust-absorbing tube;21, chassis;22, hose is connected;23, supporting block;21, rod assembly.
Specific embodiment
It is illustrated below in conjunction with preferred embodiment of the attached drawing to the utility model, it should be understood that described herein excellent It selects embodiment to be only used for describing and explaining the present invention, is not used to limit the utility model.
Embodiment 1:
A kind of highway maintenance crack filling equipment, composition includes: the branch cylinder 3 covered outside discharge nozzle 1, the branch cylinder Bottom is fixed with chassis 21, and pressing plate 17 and deashing device are provided on the chassis, and the left side of jet pipe, deashing is arranged in pressing plate The right side of jet pipe is arranged in device, and equipment moving direction is from left to right, it is ensured that cleaning sundries is first carried out, then in ejecta Material, finally flattens again;
The branch cylinder is internally provided with steel pipe 12, and the steel pipe is connect with the discharge nozzle by connector 5, described Steel pipe in connect with conehead 6 by fixed plate 7, supporting block 23, supporting block and branch cylinder internal whorl company are fixed with outside steel pipe It connects realization to fix, be slidably connected in the steel pipe with pushing block 8, pushing block upper end is taper, and taper is identical as cone block, be may be implemented With the sliding of pushing block, the gap size bored between block and conehead changes, and the pushing block lower part is fixedly connected with sliding shoe 10, The described pushing block center setting jet pipe 9 passes through the sliding shoe and extends to the sliding shoe lower part, the sliding shoe with The sliding bar 11 of the steel pipe two sides is slidably connected, and the sliding shoe two sides are respectively arranged with rod assembly 24, all It is fixedly connected with the form all for welding.
Embodiment 2:
According to highway maintenance described in embodiment 1 crack filling equipment, the deashing device includes dust-absorbing tube 20, is inhaled Dirt barrel is the form of annulus cylinder, it is ensured that dust suction quickly and thoroughly, prevents sundries from dropping into crack again, described Dust-absorbing tube center is arranged gas blow pipe 19, the gas blow pipe and air blower and is connected by connection hose 22, the dust-absorbing tube With dust absorption fan by piping connection, air blower and dust absorption fan are all disposed on master machine, and object is additionally provided on master machine Barrel is provided with blender and heater in material barrel, eventually by the ejection for spraying motor and realizing material.
Embodiment 3:
The crack filling equipment of the highway maintenance according to embodiment 1 or 2, the side of the conehead and horizontal plane it Between angle be 60-70 °, pile-up of the material on conehead can be prevented.
Embodiment 4:
According to the crack filling equipment of highway maintenance described in embodiment 1 or 2 or 3, the chassis two sides are provided with branch Support wheel 18.
Embodiment 5:
According to highway maintenance crack filling equipment described in embodiment 1 or 2 or 3 or 4, the rod assembly includes connecting Extension bar 4, the lower part of the connecting rod and the sliding shoe are hinged, and the top of the connecting rod, which is fixed with, holds frame 2.
Embodiment 6:
According to highway maintenance crack filling equipment described in embodiment 1 or 2 or 3 or 4 or 5, the holding frame includes Bottom plate 16, the bottom plate two sides are fixedly connected with telescopic rod 15, are fixed with ring tube 14 in the middle part of the bottom plate.It is being split When seam filling, gas blow pipe and jet pipe are all placed in crack, then start air blower and dust absorption fan, then hand holds branch cylinder On 13 pushing meanss of connection frame movement, move 1-2s after starting spray motor, material by jet pipe ejection, pass through pressure after ejection Plate flattens, and pressing plate top setting screw rod is threadedly coupled with chassis, and the adjustment of pulling plate pressure may be implemented, enter to encounter crack and become smaller, The ring tube on rod assembly is held with finger to move upwards, so that sliding shoe upward sliding, so that between pushing block and conehead Gap becomes smaller, and the quantitative change for spraying material is few, prevents material ejection from excessively causing to waste, enters crack and become larger to unclamp again ring tube i.e. It can.

Claims (6)

1. a kind of highway maintenance crack filling equipment, composition includes: the branch cylinder covered outside discharge nozzle, it is characterized in that: described Branch cylinder bottom be fixed with chassis, be provided with pressing plate and deashing device on the chassis;
The branch cylinder is internally provided with steel pipe, and the steel pipe is connect with the discharge nozzle by connector, the steel pipe It is interior to be connect with conehead by fixed plate, it is slidably connected in the steel pipe with pushing block, the pushing block lower part is fixed with sliding shoe Connection, the pushing block center setting jet pipe pass through the sliding shoe and extend to the sliding shoe lower part, the sliding Block and the sliding bar of the steel pipe two sides are slidably connected, and the sliding shoe two sides are respectively arranged with rod assembly.
2. highway maintenance according to claim 1 crack filling equipment, it is characterized in that: the deashing device includes inhaling Dirt barrel, the dust-absorbing tube center is arranged gas blow pipe, the gas blow pipe and air blower and is connected by connection hose, described Dust-absorbing tube and dust absorption fan pass through piping connection.
3. highway maintenance according to claim 1 crack filling equipment, it is characterized in that: the side of the conehead and water Angle between plane is 60-70 °.
4. highway maintenance according to claim 1 crack filling equipment, it is characterized in that: the chassis two sides are provided with Support wheel.
5. highway maintenance according to claim 1 crack filling equipment, it is characterized in that: the rod assembly includes connecting Extension bar, the lower part of the connecting rod and the sliding shoe are hinged, and the top of the connecting rod is fixed with holding frame.
6. highway maintenance according to claim 5 crack filling equipment, it is characterized in that: the holding frame includes bottom Plate, the bottom plate two sides are fixedly connected with telescopic rod, are fixed with ring tube in the middle part of the bottom plate.
CN201920054553.3U 2019-01-14 2019-01-14 Highway maintenance crack filling equipment Expired - Fee Related CN209384078U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920054553.3U CN209384078U (en) 2019-01-14 2019-01-14 Highway maintenance crack filling equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920054553.3U CN209384078U (en) 2019-01-14 2019-01-14 Highway maintenance crack filling equipment

Publications (1)

Publication Number Publication Date
CN209384078U true CN209384078U (en) 2019-09-13

Family

ID=67853262

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920054553.3U Expired - Fee Related CN209384078U (en) 2019-01-14 2019-01-14 Highway maintenance crack filling equipment

Country Status (1)

Country Link
CN (1) CN209384078U (en)

Similar Documents

Publication Publication Date Title
CN209576130U (en) A kind of efficient device for reducing dust in construction site
CN205347950U (en) Novel bituminous paving pouring machine
CN109550657A (en) A kind of ceramic tile U.S. seam uses glue gun
CN104192474A (en) Aluminum sheet dedusting and conveying roller
CN209384078U (en) Highway maintenance crack filling equipment
CN108487605A (en) A kind of spray equipment for building decoration
EP3739126A1 (en) Self-propelled sweeper
CN208661251U (en) A kind of construction site garbage pulverator
CN212505778U (en) Road surface patching device is used in road construction
CN109837827A (en) A kind of all-purpose road maintenance cart
CN109441076A (en) A kind of ceramic tile U.S. seam is robbed with gluing
CN107824368A (en) A kind of automatically cleaning spray room system
CN207839473U (en) A kind of clean and reuse device for impactor
CN212091457U (en) Former feed pile canopy spraying dust device
CN109538249A (en) A kind of pressure-air multitube concrete injection device
CN209510339U (en) Pressure-air multitube concrete injection device
CN211194348U (en) Mobile aerated concrete block purging device
CN210207951U (en) Concrete pump pipe cleaning device
CN205587371U (en) Hole device is blown in building engineering bar planting
CN208541242U (en) A kind of fast disassembly type suction pipe assembly
CN217759843U (en) Beautiful seam of ceramic tile and cleaning device for interior decoration
CN113430976A (en) Leveling device for repairing roads and facilitating waste cleaning
CN209430138U (en) One kind being used for dust removal device for drilling orifice of coal mine tunnel
CN205728263U (en) Gunite concrete Special safety head protector
CN208729531U (en) One kind being convenient for clean sand-blasting machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190913

Termination date: 20210114

CF01 Termination of patent right due to non-payment of annual fee