CN209372993U - A kind of Europe superscript charging pile test macro - Google Patents

A kind of Europe superscript charging pile test macro Download PDF

Info

Publication number
CN209372993U
CN209372993U CN201821981176.XU CN201821981176U CN209372993U CN 209372993 U CN209372993 U CN 209372993U CN 201821981176 U CN201821981176 U CN 201821981176U CN 209372993 U CN209372993 U CN 209372993U
Authority
CN
China
Prior art keywords
module
europe superscript
charging pile
bms
test macro
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821981176.XU
Other languages
Chinese (zh)
Inventor
郑曹凯
潘文武
彭朝辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Times Energy Technology Co., Ltd
Original Assignee
Shenzhen Gurivat Energy Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Gurivat Energy Technology Co Ltd filed Critical Shenzhen Gurivat Energy Technology Co Ltd
Priority to CN201821981176.XU priority Critical patent/CN209372993U/en
Application granted granted Critical
Publication of CN209372993U publication Critical patent/CN209372993U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model belongs to electric vehicle engineering field, and in particular to a kind of Europe superscript charging pile test macro, including BMS module, protocol conversion module, charge parameter obtain module and host computer;Protocol conversion module is connect with Europe superscript charging pile and the BMS module respectively by CAN bus, for the communication Protocol Conversion between Europe superscript and national standard;Charge parameter obtains module and connect with the output circuit of Europe superscript charging pile, and for obtaining the charge parameter of output, charge parameter acquisition module also passes through RS485 bus and connect with BMS module;Host computer and BMS module communicate to connect, for issuing control signal to BMS module.The system obtains the communication data packet between BMS module and Europe superscript charging pile by host computer and is parsed, and analyzes the speed and stability communicated between BMS module and Europe superscript charging pile.

Description

A kind of Europe superscript charging pile test macro
Technical field
The application belongs to electric vehicle engineering field, and in particular to a kind of Europe superscript charging pile test macro.
Background technique
As global electric car industry is greatly developed, electric car is more and more.Charging equipment of electric automobile quantity It sharply rises, major producer starts to research and develop charging equipment in succession.However each producer understands different and big function to rechargeable standard Rate equipment test shortcoming opposite with aging.Existing some test macros are only merely to test communication protocol, and be substantially state Mapping test system.Europe superscript direct current rush-harvesting and rush-planting test macro is national mainly for Europe superscript agreement is used, and lacks be directed in the prior art The test macro of Europe superscript charging pile, can not performance to the charging pile of Europe superscript and communication protocol test.
Utility model content
In order to solve the technical issues of can not testing in the prior art the charging pile of Europe superscript, the application provides one kind Europe superscript charging pile test macro.
A kind of Europe superscript charging pile test macro, include: BMS module, protocol conversion module, charge parameter obtain module and on Position machine;
The protocol conversion module is connect with Europe superscript charging pile and the BMS module respectively by CAN bus, is used for Europe superscript Communication Protocol Conversion between national standard;
The charge parameter obtains module and connect with the output circuit of the Europe superscript charging pile, for obtaining the charging of output Parameter, the charge parameter acquisition module also pass through RS485 bus and connect with the BMS module;
The host computer and the BMS module communicate to connect, for issuing control signal to the BMS module.
It further, further include display module, the display module and the BMS module communicate to connect, for described Charge parameter obtains the charge parameter that module obtains and is shown.
It further, further include contactor and inverter, the output circuit of the Europe superscript charging pile passes through the contactor It is electrically connected with the inverter;
The BMS module is also electrically connected with the contactor, for control the output circuit of the Europe superscript charging pile with it is inverse Become the on-off of device.
Wherein, the host computer is used to issue control signal to the BMS module, is arranged when the BMS module works Voltage parameter, current parameters, temperature parameter.
Wherein, the display module, which includes one, can input touch screen, when for showing and be arranged BMS module work Voltage parameter, current parameters, temperature parameter.
Wherein, the host computer is also used to obtain the communication data packet between the BMS module and the Europe superscript charging pile It is parsed.
Wherein, the display module is also used to be shown the parsing result of the communication data packet.
Preferably, it is DC meter that the charge parameter, which obtains module,.
According to the Europe superscript charging pile test macro of above-described embodiment, pass through filling for PC control BMS module simulation battery Electric management module, and the communication Protocol Conversion between Europe superscript charging pile and BMS module is completed by protocol conversion module, it realizes Communication between BMS module and Europe superscript charging pile, while the communication between BMS module and Europe superscript charging pile is obtained by host computer Data packet is parsed, and parsing result is come out by display module real-time display, analyze BMS module and Europe superscript charging pile it Between the speed and stability that communicate, while charge parameter obtains the charging ginseng that module also obtains the output of Europe superscript charging pile in real time Number, and real-time display is carried out to charge parameter when charging by display module.
Detailed description of the invention
Fig. 1 is a kind of test macro block diagram that embodiment provides of the application;
Fig. 2 is the test macro block diagram that the application another kind embodiment provides.
Specific embodiment
The utility model is described in further detail below by specific embodiment combination attached drawing.It is wherein different to implement Similar component uses associated similar element numbers in mode.In the following embodiments, many datail descriptions are In order to enable the application can be better understood.However, those skilled in the art can recognize without lifting an eyebrow, it is part of Feature is dispensed in varied situations, or can be substituted by other elements, material, method.In some cases, The relevant some operations of the application are there is no display in the description or describe, this is the core in order to avoid the application It is flooded by excessive description, and to those skilled in the art, these relevant operations, which are described in detail, not to be necessary, They can completely understand relevant operation according to the general technology knowledge of description and this field in specification.
It is formed respectively in addition, feature described in this description, operation or feature can combine in any suitable way Kind embodiment.Meanwhile each step in method description or movement can also can be aobvious and easy according to those skilled in the art institute The mode carry out sequence exchange or adjustment seen.Therefore, the various sequences in the description and the appended drawings are intended merely to clearly describe a certain A embodiment is not meant to be necessary sequence, and wherein some sequentially must comply with unless otherwise indicated.
The application provides a kind of Europe superscript charging pile test macro, such as Fig. 1, which includes: BMS module 4, protocol conversion mould Block 2, charge parameter obtain module 3 and host computer 5;
Wherein, protocol conversion module 2 is connect with Europe superscript charging pile 1 and BMS module 4 respectively by CAN bus, is used for Europe superscript Communication is established in protocol conversion when communicating between charging pile 1 and BMS module 4, when charging, Europe superscript charging pile 1 and BMS module 4 Protocol conversion module 2 is for converting Europe superscript communication protocol and national standard communication protocol when agreement, so that 1 He of Europe superscript charging pile Communication is completed between BMS module 4.
Wherein, charge parameter obtains module 3 and connect with the output circuit of Europe superscript charging pile 1, for charging in system The charge parameter that Europe superscript charging pile 1 exports is obtained when test, which includes charging voltage, electric current and charging time Deng, while charge parameter obtains module 3 and also connect the charging for being communicated, and being will acquire with BMS module 4 by RS485 bus Parameter is sent to BMS module.
Wherein, host computer 5 is connect with BMS module 4 by the communications cable, and host computer 5 is used to issue to BMS module 4 and control Signal is configured the running parameter of BMS module 4, such as charge when minimum/high monomer voltage and current, work when most Operating temperature low/high, the voltage and current parameter of demand when charging can also be arranged such as use filling when constant pressure or constant-current charge Piezoelectric voltage and charging current etc..
Further, which further includes display module 6, which is connect with BMS module 4 by cable, packet The touch display screen that can be inputted is included, carries out real-time display for obtaining the charge parameter that module 3 obtains to charge parameter, such as Real-time display, while the important parameter that BMS module 4 can also be arranged are carried out to current voltage, electric current and runing time It is shown, such as setting carries out real-time display in monomer voltage, current voltage, Current Temperatures and SOC, facilitates tester Member checks and analyzes the stability of the system, the real-time of communication and anti-interference ability.
Further, which further includes contactor 7 and inverter 8, and the output circuit of Europe superscript charging pile 1 passes through contactor 7 are electrically connected with inverter 8, while BMS module 4 is also connect with the signal input part of contactor 7, logical for issuing to contactor 7 The on-off of the output circuit and inverter 8 of disconnected control signal and then control Europe superscript charging pile 1, inverter 8 are defeated by Europe superscript charging pile 1 DC inversion out is at three-phase alternating current and sends back in national grid, in this way consumption of the system to electric energy during the test The consumption and thermal energy consumption of only each module, reduce the loss of electric energy.
Wherein, it can also change or be arranged when BMS module 4 works by the touch display screen that inputs of display module 6 Information of voltage, current information and temperature information, such as change or setting monomer voltage, current voltage, Current Temperatures parameter.
Further, the communication data packet that host computer 5 is also used to obtain between BMS module 4 and Europe superscript charging pile 1 is solved Analysis such as parses charge mode control signal and charging that BMS module 4 is sent to Europe superscript charging pile 1 from communication data packet The result of parameter etc., parsing carries out real-time display by display module 6, analyzes the BMS4 module for staff and fills with Europe superscript The stability and real-time communicated between electric stake 1.
It is described in detail below in conjunction with test macro workflow of the specific embodiment to the application.
The present embodiment provides a kind of Europe superscript charging pile test macro, the system of the present embodiment is used for Europe superscript rush-harvesting and rush-planting charging pile It is tested, such as Fig. 2, including two Europe superscript charging piles, wherein using test macro control panel, specifically uses STM32F207 core Piece simulates above-mentioned BMS module 4, and the protocol conversion of Europe superscript and national standard is carried out using PLC module, realizes that BMS module 4 and Europe superscript are filled Protocol communication between electric stake, two Europe superscript PLC modules pass through CAN bus and test macro control panel communicates to connect, and lead to CP agreement line and the communication connection of Europe superscript charging pile are crossed, wherein PC host computer controls board communications by USB connecting line and test macro Connection, wherein test macro control panel also passes through the connection of two-way serial ports there are two 7 cun of LCD displays, and two display screens are used respectively In to the relevant parameter and information progress real-time exhibition in two Europe superscript charging pile test process.Two are wherein used in the present embodiment A DC meter obtains the information such as output voltage, electric current and the operating time in Europe superscript charging pile test process respectively, and should The information of acquisition is sent to test macro control panel and is further intuitively shown by display screen, facilitates tester to survey Test result is analyzed.
Wherein, PC host computer is used to send control signal to test macro control panel, is arranged by the PC host computer and is charged When minimum/high monomer voltage and current, work when minimum/elevated operating temperature, test macro control panel can also be set and filled The voltage and current parameter of demand when electric, such as use constant pressure or constant-current charge when charging voltage and charging current, test system Above- mentioned information are converted into the identifiable control signal of Europe superscript charging pile by Europe superscript PLC module by system control panel, control its correspondence Operating mode, output electric current, output voltage etc..The also real-time collecting test system control panel of PC host computer simultaneously and Europe superscript charge Stake 1 between communication data packet and the data packet is parsed, such as parse include in data packet test macro control Plate is sent to control information of Europe superscript charging pile etc., which includes the operating mode for controlling Europe superscript charging pile, work electricity Stream and voltage etc., and the result of parsing is shown in real time by LCD display, facilitate tester's comparative analysis test macro Real-time and stability for being communicated between control panel and Europe superscript charging pile 1 etc..
Further, the output circuit of Europe superscript charging pile is input in inverter by direct contactor, and inverter is by Europe The DC inversion of mark charging pile output at three-phase alternating current and sends back in national grid, in this way system pair during the test The consumption of electric energy only has the consumption and thermal energy consumption of each module, reduces the loss of electric energy.
Core control is test macro control panel in the present embodiment, is communicated by USB with PC host computer, by test data reality When be sent to PC upper computer end, while PC host computer is got parms by control instruction, parameter and switching on and shutting down instruction control is arranged System etc..LCD and control panel serial communication show real-time voltage, electric current, electric energy, operation using 7 cun of serial ports resistance colored touch screens The data such as time, LCD can also be configured BMS parameter such as monomer voltage, current voltage, current SOC etc., to Protection parameters Setting etc..Test macro control panel by 485 access two-way DC meters to Europe superscript charging pile output voltage, electric current, electric energy into Row in real time acquisition, input current, voltage are monitored, test macro control panel also by control D.C. contactor on-off come The on-off between inverter and Europe superscript charging pile output circuit is controlled, the function of protection system is reached with this.Test macro control Plate is communicated by two-way CAN bus and Europe superscript PLC module, then passes through CCS2 jack interface and Europe superscript by Europe superscript PLC module Charging pile is communicated.
The entire test macro workflow of the present embodiment is as follows: tester clicks the automatic test of beginning on LCD, then Europe superscript charging pile is waited to plug in rifle, Europe superscript charging pile starts Europe superscript charging pile, test macro control panel etc. after plugging in rifle to CCS2 interface To the starting communication message of Europe superscript PLC module, start entire charging after detecting the communication message that Europe superscript PLC module is sent Communication protocol flow.After communication passes through and enters the charging stage, the transmission of test macro control panel has been delayed demand voltage and has been led to It crosses ammeter and collects Europe superscript charging pile in real time and export after slow starting voltage has reached requirement objective value and be closed D.C. contactor, collect After busbar voltage, by CAN3 communication control inverter in the booting work of DC bus target voltage.It is simultaneously emitted by electric current request, Charging pile starts to be output to target current, and inverter at three-phase alternating current and sends back to DC inversion in power grid.
Use above specific case is illustrated the utility model, is merely used to help understand the utility model, and Not to limit the utility model.Think of for those skilled in the art of the present invention, according to the utility model Think, several simple deductions, deformation or replacement can also be made.

Claims (8)

1. a kind of Europe superscript charging pile test macro characterized by comprising BMS module, protocol conversion module, charge parameter obtain Modulus block and host computer;
The protocol conversion module is connect with Europe superscript charging pile and the BMS module respectively by CAN bus, is used for Europe superscript and state Communication Protocol Conversion between mark;
The charge parameter obtains module and connect with the output circuit of the Europe superscript charging pile, for obtaining the charging ginseng of output Number, the charge parameter acquisition module also pass through RS485 bus and connect with the BMS module;
The host computer and the BMS module communicate to connect, for issuing control signal to the BMS module.
2. test macro as described in claim 1, which is characterized in that further include display module, the display module with it is described The communication connection of BMS module is shown for obtaining the charge parameter that module obtains to the charge parameter.
3. test macro as claimed in claim 2, which is characterized in that further include contactor and inverter, the Europe superscript charging The output circuit of stake is electrically connected by the contactor with the inverter;
The BMS module is also electrically connected with the contactor, for controlling the output circuit and inverter of the Europe superscript charging pile On-off.
4. test macro as claimed in claim 3, which is characterized in that the host computer is used to issue to the BMS module and control Voltage parameter, current parameters, temperature parameter when BMS module work are arranged in signal processed.
5. test macro as claimed in claim 4, which is characterized in that the display module, which includes one, can input touch screen, For showing and being arranged voltage parameter, current parameters, temperature parameter when the BMS module works.
6. test macro as claimed in claim 5, which is characterized in that the host computer be also used to obtain the BMS module with Communication data packet between the Europe superscript charging pile is parsed.
7. test macro as claimed in claim 6, which is characterized in that the display module is also used to the communication data packet Parsing result be shown.
8. test macro as claimed in claim 2, which is characterized in that it is DC meter that the charge parameter, which obtains module,.
CN201821981176.XU 2018-11-28 2018-11-28 A kind of Europe superscript charging pile test macro Active CN209372993U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821981176.XU CN209372993U (en) 2018-11-28 2018-11-28 A kind of Europe superscript charging pile test macro

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821981176.XU CN209372993U (en) 2018-11-28 2018-11-28 A kind of Europe superscript charging pile test macro

Publications (1)

Publication Number Publication Date
CN209372993U true CN209372993U (en) 2019-09-10

Family

ID=67834144

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821981176.XU Active CN209372993U (en) 2018-11-28 2018-11-28 A kind of Europe superscript charging pile test macro

Country Status (1)

Country Link
CN (1) CN209372993U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112977143A (en) * 2019-12-02 2021-06-18 北京新能源汽车股份有限公司 Switching control box and charging parameter confirmation method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112977143A (en) * 2019-12-02 2021-06-18 北京新能源汽车股份有限公司 Switching control box and charging parameter confirmation method
CN112977143B (en) * 2019-12-02 2022-08-30 北京新能源汽车股份有限公司 Switching control box and charging parameter confirmation method

Similar Documents

Publication Publication Date Title
CN207198262U (en) A kind of charging pile test system with feedback function
CN106019002B (en) A kind of validation test platform and its test method for battery management system
CN203689120U (en) New energy vehicle battery management system master and slave control board hardware-in-the-loop test system
CN101908657A (en) Battery simulating system
CN102004199B (en) Alternating current charging post in-situ test device and method
CN105068022B (en) For the simulated failure intelligent electric meter of three phase mains and electrical test simulator
CN102096043A (en) Platform and method for testing life of motors
CN201348654Y (en) Lithium battery protective circuit board tester
CN103019902A (en) Automatic testing device and automatic testing method of ARINC 429 bus signal performance parameters
CN104142446B (en) System and method for testing charging control response time of electric vehicle charger
CN103268697A (en) Intelligent meter reading centralized control system for PMI power system and teaching experiment platform based on centralized control system
CN205015449U (en) Be shaded and adjust test system
CN203616466U (en) Comprehensive tester and test equipment of battery management system
CN109471033A (en) A kind of synthesis working condition measurement system, method and the battery test system of power battery
CN209372993U (en) A kind of Europe superscript charging pile test macro
CN102043105B (en) Full-function test device and test method of AC (alternating current) charging pile
CN102004200B (en) Vehicle-mounted filed test device and method of alternating current charging pile
CN107942241A (en) A kind of hookup for high voltage DC breaker submodule
CN203117358U (en) Intelligent tester for secondary polarity of four-star-shaped voltage transformer
CN102393497A (en) Portable polarity calibrator for electronic mutual inductor
CN213689799U (en) Alternating current-direct current fills electric pile integration testing platform
CN109164292A (en) A kind of electric automobile charging pile electric parameter analysis system and method
CN206440787U (en) A kind of electric automobile high-voltage integration module test system
CN203689146U (en) New energy vehicle battery management system master and slave control board hardware-in-the-loop test system
CN204882853U (en) Electric energy meter pressure resistance test installation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 518000 floor 3, building 9, Henglong Industrial Park, Shuitian community, Shiyan street, Bao'an District, Shenzhen City, Guangdong Province

Patentee after: Shenzhen Times Energy Technology Co., Ltd

Address before: 518000 Room 203, 2nd Floor, Five Buildings, Jiayu Industrial Park, No. 28 Guangming, Shangwu Village, Shiyan Street, Baoan District, Shenzhen City, Guangdong Province

Patentee before: Shenzhen Gurivat Energy Technology Co., Ltd.