CN209369846U - A kind of blender - Google Patents

A kind of blender Download PDF

Info

Publication number
CN209369846U
CN209369846U CN201821160461.5U CN201821160461U CN209369846U CN 209369846 U CN209369846 U CN 209369846U CN 201821160461 U CN201821160461 U CN 201821160461U CN 209369846 U CN209369846 U CN 209369846U
Authority
CN
China
Prior art keywords
fork arm
hole
cantilever
thorn
orientation line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821160461.5U
Other languages
Chinese (zh)
Inventor
李学彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
North China Institute of Science and Technology
Original Assignee
North China Institute of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by North China Institute of Science and Technology filed Critical North China Institute of Science and Technology
Priority to CN201821160461.5U priority Critical patent/CN209369846U/en
Application granted granted Critical
Publication of CN209369846U publication Critical patent/CN209369846U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model embodiment discloses a kind of blender, is related to underground engineering support field, is easy to implement and uses hole section hole sealing agent stirring near anchor pole in support engineering or anchor cable hole aperture.It include: connector, connecting rod and U-shaped fork arm, the connecting rod first end is equipped with the connector, the connecting rod second end is equipped with the U-shaped fork arm, the U-shaped fork arm includes the first fork arm, the second fork arm, the first cantilever and the second cantilever, first cantilever and the difference horizontal connection of second cantilever one end are in the connecting rod second end, the first cantilever other end is vertically installed with first fork arm, the second cantilever other end is vertically installed with second fork arm, and first cantilever and the second cantilevered axle are symmetrically disposed on the connecting rod two sides.The utility model is suitable for the construction of the underground engineering supports such as mine laneway, tunnel or Metro Thoroughfare.

Description

A kind of blender
Technical field
The utility model relates to the underground engineering supports such as mine, tunnel and Metro Thoroughfare technical field more particularly to one Kind blender.
Background technique
Anchor cable and anchor pole are opened as support reinforcements modes such as a kind of effective tunnel and side slopes in geotechnical engineering and mine Adopt, subway tunnel build etc. related fieldss be widely used.When anchor cable or suspension roof support are constructed, drill, By anchor cable or anchor rod anchored in drilling, and at present it is usually that Anchor Agent is set in anchor cable or anchor pole bottom, is arranged in exposed junction Anchor cable or anchor pole are fixed on brill in the air with fastener by pallet.
Due to anchor pole or the cable bolting requirement in some areas, need one kind that can be convenient for anchor cable or armature boring superficial part extremely The sealing of hole blender in aperture (referring to drilling orifice hole section nearby), is particularly suitable for water zone support anchor rod or anchor The sealing of hole in rope hole is used.
Utility model content
In view of this, the utility model embodiment provides a kind of blender, it is easy to implement to anchor pole in support engineering or anchor The hole section sealing of hole stirring nearby of rope hole aperture is used, and is especially adapted for use in and is stirred sealing of hole to water zone support anchor rod or anchor cable hole, with Keep the stabilization of country rock and anchor pole or anchor cable.
In order to achieve the above objectives, the utility model adopts the following technical solution:
A kind of blender of the utility model embodiment, comprising: connector, connecting rod and U-shaped fork arm, the connecting rod first End is equipped with the connector, and the connecting rod second end is equipped with the U-shaped fork arm, and the U-shaped fork arm includes the first fork arm, second Fork arm, the first cantilever and the second cantilever, first cantilever and the difference horizontal connection of second cantilever one end are in the connecting rod the Two ends, the first cantilever other end are vertically installed with first fork arm, and the second cantilever other end is vertically arranged The second fork arm is stated, first cantilever and the second cantilevered axle are symmetrically disposed on the connecting rod two sides;
First fork arm is equipped with the first orientation line and the second orientation line, and the first orientation line and the second orientation line close It is symmetrical arranged in the midpoint of fork arm length, the first orientation line is set on the fork arm, is outstanding with first positioned at the midpoint Between arm, the first orientation line and the second orientation line direction of rotation are on the contrary, in the circle for being equipped with the first fork arm that first orients line Circumferential surface is equipped with the first thorn and hooks, and first thorn hooks upward, is equipped on the periphery of the first fork arm for being equipped with the second orientation line Second thorn hooks, and second thorn hooks downward, and first thorn is hooked to hook with the second thorn and is symmetrical arranged about the midpoint;
Second fork arm is equipped with the first orientation line and the second orientation line, is being equipped with the of the first orientation line The periphery of two fork arms is equipped with first thorn and hooks, and first thorn hooks upward, in the second fork arm for being equipped with the second orientation line Periphery be equipped with it is described second thorn hook, it is described second thorn hook downward, on the second fork arm it is described first thorn hook with second thorn It hooks and is symmetrical arranged about the midpoint.
Preferably, the blender further includes conical hopper shape location hole, and the conical hopper shape location hole is set to described Connecting rod and U-shaped fork arm junction, the conical hopper shape location hole include hollow cone structure and are set to the vertebra The tubular column structure of body structure floor, the cone of the conical hopper shape location hole are connected to the connecting rod, the conical hopper The U-shaped fork arm is connected at the top of the tubular column structure of shape location hole;
Also it is cased with hole sealing pad on the conical hopper location hole, the hole sealing pad is equipped with for across the first fork arm and the The first through hole of two fork arms, the first through hole are used to position the hole sealing pad, and the hole sealing pad is additionally provided with central through hole, institute Hole sealing pad is stated by the center by covering on the conical hopper location hole, the anchor pole or anchor cable exposed junction are across described Central through hole is connect with conical hopper location hole.
A kind of blender of the utility model embodiment, comprising: connector, connecting rod and U-shaped fork arm, the connecting rod first End is equipped with the connector, and the connecting rod second end is equipped with the U-shaped fork arm, and the U-shaped fork arm includes the first fork arm, second Fork arm, the first cantilever and the second cantilever, first cantilever and the difference horizontal connection of second cantilever one end are in the connecting rod the Two ends, the first cantilever other end are vertically installed with first fork arm, and the second cantilever other end is vertically arranged The second fork arm is stated, first cantilever and the second cantilevered axle are symmetrically disposed on the connecting rod two sides;It is set on first fork arm There are the first orientation line and the second orientation line, the first orientation line is set with the second orientation line about the middle point symmetry of fork arm length Set, it is described first orientation line is set on the fork arm, positioned at the midpoint and the first cantilever between, it is described first orientation line and Second orientation line direction of rotation hooks on the contrary, being equipped with the first thorn on the periphery of the first fork arm for being equipped with the first orientation line, described First thorn hooks upward, is equipped with the second thorn on the periphery of the first fork arm for being equipped with the second orientation line and hooks, second thorn hooks court Under, first thorn is hooked to hook with the second thorn and is symmetrical arranged about the midpoint;Second fork arm is equipped with first orientation Line and the second orientation line are equipped with first thorn on the periphery of the second fork arm for being equipped with the first orientation line and hook, described First thorn hooks upward, is equipped with second thorn on the periphery of the second fork arm for being equipped with the second orientation line and hooks, second thorn It hooks downward, first thorn on the second fork arm hooks to hook with the second thorn to be symmetrical arranged about the midpoint.It is easy to implement to supporting Anchor pole or the hole section sealing of hole stirring nearby of anchor cable hole aperture are used in engineering, are especially adapted for use in water zone support anchor rod or anchor cable Sealing of hole is stirred in hole, to keep the stabilization of country rock and anchor pole or anchor cable.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only It is some embodiments of the utility model, for those of ordinary skill in the art, in the premise not made the creative labor Under, it can also be obtained according to these attached drawings other attached drawings.
Fig. 1 is a kind of water zone anchor cable of the utility model embodiment or bolthole method for sealing flow diagram;
Fig. 2 is one example structure schematic diagram of blender in Fig. 1;
Fig. 3 is another example structure schematic diagram of blender in Fig. 1;
Fig. 4 is schematic enlarged-scale view at D in Fig. 2 or Fig. 3;
Fig. 5 is schematic enlarged-scale view at E in Fig. 2 or Fig. 3;
Fig. 6 is one embodiment enlarged section of connector in Fig. 2 or Fig. 3;
Fig. 7 is one embodiment main view of hole sealing pad in Fig. 3;
Fig. 8 is tubing string shape hole sealing agent structural front view described in Fig. 1;
Fig. 9 is tubing string shape hole sealing agent structure top view in Fig. 8;
Figure 10 is the structural schematic diagram after anchor cable or bolthole sealing of hole in country rock.
Specific embodiment
The utility model embodiment is described in detail with reference to the accompanying drawing.
It will be appreciated that the described embodiments are only a part of the embodiments of the utility model, rather than whole implementation Example.Based on the embodiments of the present invention, those of ordinary skill in the art are obtained without creative efforts The all other embodiment obtained, fall within the protection scope of the utility model.
Embodiment one
Referring to shown in Fig. 1 to Fig. 3 and Figure 10, the utility model embodiment provides a kind of water zone anchor cable or bolthole envelope Hole method is mainly used in the underground engineerings water zone anchor cable such as mine laneway, tunnel or Metro Thoroughfare or suspension roof support, right The drilling for being provided with anchor pole or anchor cable carries out sealing of hole.Be mainly used for comprising steps of
101, prefabricated tubing string shape hole sealing agent is covered on anchor cable or anchor pole are appeared, is pushed into anchor pole or anchor cable drilling;
In the present embodiment, the tubing string shape hole sealing agent includes: the sack of moccasin material production, and the sack is tubing string shape, Be filled at least two gel sealing of hole medicaments in the sack, different gel sealing of hole medicaments is mutually isolated be filled in it is described In sack.
102, anchor pole is directed at the U-shaped fork arm hollow space of blender again or anchor cable is positioned, push ahead U-shaped fork arm It is inserted into hole sealing agent, until U-shaped fork arm bottom is appeared with anchor pole or anchor cable contacts stopping, i.e., U-shaped fork arm bottom stops at country rock wall;
In the present embodiment, the blender includes U-shaped fork arm 1, and the hollow region that the U-shaped fork arm defines is using When, it can be positioned by alignment anchor pole or anchor cable, by pushing ahead U-shaped fork arm to U-shaped fork arm hollow region bottom It touches anchor pole or anchor cable is appeared, can play the role of positioning blender, only blender position deviation is put in whipping process Drill center line is too many.
103, the blender is rotated, is punctured the crust of the hole sealing agent by the U-shaped fork arm 1, and to the envelope Hole medicament is stirred;
104, it extracts the U-shaped fork arm of blender out after the sealing of hole medicament is uniformly mixed, stands predetermined amount of time, institute Sealing of hole medicament setting expansion is stated, anchor pole or anchor cable hole are closed.
In the present embodiment, the sealing of hole medicament is spawn, meeting after it encounters air when not contacting with air Setting expansion blocks the hole among the wall of a borehole and anchor pole or anchor cable after medicament expansion, reaches fast and convenient effective closure anchor Bar or the effect of anchor cable drilling.
A kind of water zone anchor cable of the utility model embodiment or bolthole method for sealing, by sealing prefabricated tubing string shape Hole agent covers on anchor cable or anchor pole are appeared, and is pushed into anchor pole or anchor cable drilling;The tubing string shape hole sealing agent includes: moccasin material system The sack of work, the sack are tubing string shape, are filled at least two gel sealing of hole medicaments, different gels in the sack Sealing of hole medicament is mutually isolated to be filled in the sack;Again with the U-shaped fork arm hollow space of blender alignment anchor pole or anchor cable into Row positioning pushes ahead U-shaped fork arm insertion hole sealing agent, until U-shaped fork arm bottom appears with anchor pole or anchor cable and contacts stopping, i.e. U-shaped Fork arm bottom stops at country rock wall;The blender includes U-shaped fork arm;The blender is rotated, it will by the U-shaped fork arm The crust of the hole sealing agent punctures, and is stirred to the sealing of hole medicament;It is taken out after the sealing of hole medicament is uniformly mixed The U-shaped fork arm of blender out, stands predetermined amount of time, and the sealing of hole medicament setting expansion closes anchor pole or anchor cable hole.It can It is easy to implement and hole section near anchor pole in nurse's journey or anchor cable hole aperture is blocked, to keep the steady of country rock and anchor pole or anchor cable It is fixed.
Further, the utility model additionally provides a kind of hole sealing agent, comprising: the sack of moccasin material production, the bag At least two gel sealing of hole medicaments are filled in son, different gel sealing of hole medicaments is mutually isolated to be filled in the sack Interior, the sack has pipe column structure after being filled by sealing of hole medicament;By the way that sealing of hole medicament to be fitted into moccasin material, after filling Tubing string shape hole sealing agent is formed, by that can be easy to implement to anchor cable on covering tubing string shape hole sealing agent and appearing outside anchor cable or anchor pole Or bolthole closing;Moreover, in the anchor cable of the up-holes such as top plate or suspension roof support, since long-term water drenching leads to the country rock that drills Medium outflow, country rock is loose, existing to be easy failure in such a way that Anchor Agent anchors, and influences the stability of supporting, and this kind Sealing of hole is carried out to anchor cable or bolthole using the hole sealing agent of gel sealing of hole pharmaceutical production, it is not vulnerable, supporting is effectively ensured Stability can be suitable for the water zones such as underground engineering anchor pole or anchor cable hole sealing of hole.
Referring to Fig. 2 and Figure 6 and shown in Figure 10, as a preferred embodiment, the blender further include: connector 2 and Connecting rod 3,3 first end of connecting rod are equipped with the connector, and the connecting rod second end is equipped with the U-shaped fork arm 1, described U-shaped fork arm 1 includes the first fork arm 11, the second fork arm 12, the first cantilever 13 and the second cantilever 14, and first cantilever and second are hanged Horizontal connection is distinguished in 3 second end of connecting rod in arm one end, and the first cantilever other end is vertically installed with first fork Bar 11, the second cantilever other end are vertically installed with second fork arm 12, first cantilever and the second cantilever axial symmetry It is set to 3 two sides of connecting rod.
First fork arm 11 is equipped with the first orientation line 15 and the second orientation line 16, and the first orientation line and second is determined To line about fork arm length midpoint be symmetrical arranged, it is described first orientation line be set on the fork arm, be located at the midpoint with Between first cantilever, the first orientation line and the second orientation line direction of rotation are on the contrary, in the first fork for being equipped with the first orientation line The periphery of bar is equipped with the first thorn and hooks 17, and first thorn hooks upward, in the circumference for the first fork arm for being equipped with the second orientation line Face is equipped with the second thorn and hooks 18, and second thorn hooks downward, and first thorn is hooked to hook with the second thorn and be set about the middle point symmetry It sets;
Second fork arm is equipped with the first orientation line 15 and the second orientation line 16, is being equipped with the first orientation line The second fork arm periphery be equipped with it is described first thorn hook, it is described first thorn hook upward, be equipped with second orientation line second The periphery of fork arm is equipped with second thorn and hooks, and second thorn hooks downward, and first thorn on the second fork arm hooks and the Two thorns are hooked to be symmetrical arranged about the midpoint.
It is described to be positioned again with the U-shaped fork arm hollow space of blender alignment anchor pole or anchor cable, push ahead U-shaped fork arm It is inserted into hole sealing agent, until U-shaped fork arm bottom is appeared with anchor pole or anchor cable contacts stopping, i.e., U-shaped fork arm bottom stops at country rock wall; The blender is rotated, is punctured the crust of the hole sealing agent by the U-shaped fork arm, and the sealing of hole medicament is stirred Include:
The connector of blender is connected on jumbolter or pneumatic hammer;The blender rotation is driven with drilling machine or pneumatic hammer Turn, hole sealing agent bag interior is pierced by the first fork arm and the second fork arm;Utilize first on first and second fork arm periphery Thorn hooks and second pierces the sack that ditch punctures hole sealing agent, is stirred to the sealing of hole medicament in sack;With the first fork arm and second The sack of the rotation of fork arm, hole sealing agent is crushed under the cutting that the first thorn hooks and the second thorn hooks, and prevents the sack large area It is contacted with anchor cable or bolthole country rock wall, influences sealing of hole effect.
Symmetrically arranged first orientation line and the second orientation line are to the sealing of hole medicine in sack on first fork arm and the second fork arm Agent carries out two-way stirring, prevents medicament from spreading to fork arm both ends, concentrates on medicament around fork arm periphery, convenient for quickly by medicine Agent is uniformly mixed, and guarantees that sealing of hole is closely knit.
Referring to shown in Fig. 2 to 6, the blender further includes conical hopper shape location hole 4, the conical hopper shape location hole 4 are set to the connecting rod and the fork arm junction, and the conical hopper shape location hole includes hollow cone structure 5 and is set to The tubular column structure 6 of the vertebral body structure bottom surface, the cone of the conical hopper shape location hole is connected to the connecting rod 3, described The U-shaped fork arm 1 is connected at the top of the tubular column structure 6 of conical hopper shape location hole.
It is described to be positioned again with the U-shaped fork arm hollow space of blender alignment anchor pole or anchor cable, push ahead U-shaped fork arm It is inserted into hole sealing agent, until U-shaped fork arm bottom is appeared with anchor pole or anchor cable contacts stopping, i.e., U-shaped fork arm bottom stops at country rock wall; The blender is rotated, is punctured the crust of the hole sealing agent by the U-shaped fork arm, and the sealing of hole medicament is stirred Further include:
It is covered on anchor pole or anchor cable exposed junction by the conical hopper location hole, the conical hopper location hole and institute State anchor pole or anchor cable hole coaxial arrangement;Prevent blender from position deflection occurring in whipping process using the location hole.
Referring to Fig. 3 and shown in Fig. 7, as an alternative embodiment, it is also cased with hole sealing pad 7 on the conical hopper location hole 4, The hole sealing pad 7 is equipped with for the first through hole 8 across the first fork arm and the second fork arm, and the first through hole 8 is used for institute Hole sealing pad positioning is stated, the hole sealing pad is additionally provided with central through hole 9, and the hole sealing pad is by the center by covering in the taper On funnel location hole, the anchor pole or anchor cable exposed junction pass through the central through hole and connect with conical hopper location hole;
It is described to be positioned again with the U-shaped fork arm hollow space of blender alignment anchor pole or anchor cable, push ahead U-shaped fork arm It is inserted into hole sealing agent, until U-shaped fork arm bottom is appeared with anchor pole or anchor cable contacts stopping, i.e., U-shaped fork arm bottom stops at country rock wall Include:
With sealing of hole cushion cover on anchor pole or anchor cable are appeared, the hole sealing pad is pushed into seal using the blender U-shaped fork arm Hole agent bottom continues that hole sealing agent is pushed into drilling and is in close contact to hole sealing pad periphery and country rock wall to stop.
The rotation blender, the crust of the hole sealing agent is punctured, and is stirred also to the sealing of hole medicament It include: when low whipping speed is excessive, to prevent underlying medicament from getting rid of using the hole sealing pad in sealing of hole medicament whipping process Anchor cable or bolthole out.
It is described after the sealing of hole medicament is uniformly mixed extract out blender U-shaped fork arm include:
The blender is extracted out from the anchor cable or bolthole, is reduced using the hole sealing pad in fork arm extraction process In the sealing of hole pharmaceutical quantities taken out of, guarantee that sealing of hole is closely knit.
It is understood that the hole sealing pad can also be when making tubing string shape hole sealing agent in the present embodiment, it directly will envelope Hole pad is arranged in the hole sealing agent end, it is made to link together with hole sealing agent, is first convenient for the installation of hole sealing pad;Second can have Prevent medicament from leaking out and positioning hole sealing agent.
As an optionally embodiment, the U-shaped fork for extracting blender out after the sealing of hole medicament is uniformly mixed Bar, stands predetermined amount of time, and anchor pole or anchor cable hole closing are included: by the sealing of hole medicament setting expansion
It will be in Grouting Pipe insertion drilling before sealing of hole medicament does not solidify;Pallet is mounted on anchor pole or anchor cable exposed junction, And fixing anchor bar or anchor cable;After the sealing of hole medicament setting expansion, the Grouting Pipe is closed in drilling together.
In the present embodiment, it is to be understood that the Grouting Pipe can according to need setting, and envelope is then taken advantage of if necessary to slip casting Hole agent do not solidify before be inserted into, after later need slip casting when facilitate slip casting.
Referring to shown in Fig. 8 and Fig. 9, in the present embodiment, as an alternative embodiment, the hole sealing agent includes the first sealing of hole medicine Agent A and the second sealing of hole medicament B, the first sealing of hole medicament A includes: isocyanates or hydrophober, the second sealing of hole medicament B packet It includes: polyether polyol or foaming agent.
It is understood that in the up-holes such as top plate, if to anchor cable or anchor pole after directlying adopt the mixing of sealing of hole medicament It is perfused in hole, it may appear that the phenomenon that underflow stream, therefore, in order to avoid appearing in the medicament overflow occurred when up-hole sealing of hole Phenomenon, formation pipe column structure two kinds of gelationus agents are individually encapsulated with moccasin material by the application respectively pioneeringly after, one Then match with anchor pole or anchor cable structure, convenient for filling sealing of hole;Second it can prevent that the downward overflow phenomena of medicament is directly perfused.
As an alternative embodiment, the proportion of the first sealing of hole medicament and the second sealing of hole medicament are as follows: 1: 3-1: 1.It can be with Understand, which is mainly used for carrying out sealing of hole to section near anchor cable or armature boring aperture, it is therefore preferred that institute State hole sealing agent length: 200~500mm, 30~100mm of outer diameter, for the ease of in whipping process, the U-shaped fork arm of blender will Hole sealing agent moccasin sack, which punctures, to be blended, and moccasin sack will also guarantee there are certain load-carrying properties, the hole sealing agent moccasin sack wall thickness For 10~40mm.Preferably, the predetermined amount of time is 1min~5min.
It is understood that it is 2~3 times that the hole sealing agent is uniformly mixed the expansion multiple after solidification in the borehole, Can densely close anchor cable or armature boring, and increased to anchor cable or anchor pole in country rock by extrusion anchor cable or anchor pole The stability of supporting.
Referring to shown in Fig. 2 or Fig. 3, in order to guarantee that any of the above-described embodiment the method smoothly can preferably carry out, this A kind of blender of utility model also embodiment, in the method for sealing.The blender includes: connector 2, connecting rod 3 and U-shaped fork arm 1, the connector be generally hexagonal prisms structure, also can according to need setting, the connecting rod first end is set There is the connector 2, for connecting with equipment such as jumbolter or pneumatic hammers.
The connecting rod second end is equipped with the U-shaped fork arm, in order to realize the stirring to hole sealing agent overall length direction, institute The length for stating U-shaped fork arm is greater than the length of hole sealing agent;The U-shaped fork arm includes the first fork arm, the second fork arm, the first cantilever and the Two cantilevers, first cantilever and the difference horizontal connection of second cantilever one end are in the connecting rod second end, first cantilever The other end is vertically installed with first fork arm, and the second cantilever other end is vertically installed with second fork arm, and described One cantilever and the second cantilevered axle are symmetrically disposed on the connecting rod two sides.First fork arm is equipped with the first orientation line and second Line is oriented, the first orientation line and the second orientation line are symmetrical arranged about the midpoint of fork arm length, and the first orientation line is set It is placed on the fork arm, between the midpoint and the first cantilever, the first orientation line and the second orientation line direction of rotation On the contrary;By the first opposite orientation line of setting direction and the second orientation line can make that sealing of hole medicine is sufficiently stirred in whipping process Agent, while preventing medicament from spreading downwards upwards, it is closely knit to be conducive to hole sealing agent.
The first thorn is equipped on the periphery of the first fork arm for orienting line equipped with first to hook, described first pierces hook upward, The periphery of the first fork arm equipped with the second orientation line is equipped with the second thorn and hooks, and second thorn hooks downward, and first thorn hooks It hooks with the second thorn and is symmetrical arranged about the midpoint.
Second fork arm is equipped with the first orientation line and the second orientation line, is being equipped with the of the first orientation line The periphery of two fork arms is equipped with first thorn and hooks, and first thorn hooks upward, in the second fork arm for being equipped with the second orientation line Periphery be equipped with it is described second thorn hook, it is described second thorn hook downward, on the second fork arm it is described first thorn hook with second thorn It hooks and is symmetrical arranged about the midpoint.
It is understood that the present embodiment on the first fork arm and the second fork arm periphery by being arranged thorn ditch, Ke Yi The crust (i.e. sack) that hole sealing agent is punctured and crushed in whipping process, prevents crust from coming into contact in a large area with country rock, anchor pole or anchor cable, Influence sealing of hole effect.
The blender further includes conical hopper shape location hole, the conical hopper shape location hole be set to the connecting rod with U-shaped fork arm junction, the conical hopper shape location hole include hollow cone structure and be set to the vertebral body structure bottom The tubular column structure in face, the cone of the conical hopper shape location hole are connected to the connecting rod, the conical hopper shape location hole Tubular column structure at the top of be connected with the U-shaped fork arm.By the way that conical hopper shape location hole is arranged, covers on anchor pole or anchor cable, prevent Spin-ended blender when turning glances off, and guarantees mixing effect.
Also it is cased with hole sealing pad on the conical hopper location hole, the hole sealing pad is equipped with for across the first fork arm and the The first through hole of two fork arms, the first through hole are used to position the hole sealing pad, and the hole sealing pad is additionally provided with central through hole, institute Hole sealing pad is stated by the center by covering on the conical hopper location hole, the anchor pole or anchor cable exposed junction are across described Central through hole is connect with conical hopper location hole.It, when in use, will by the way that the hole sealing pad is arranged on conical hopper location hole First fork arm and the second fork arm pass through the first through hole of the hole sealing pad, push the blender, make hole sealing pad surrounding and country rock Inner wall contact is located at the medicament of drilling lower section (close to drilling orifice position) by gravity shadow to prevent in upper drilling and sealing Sound is fallen, meanwhile, the amount that fork arm takes medicament out of is reduced when extraction fork arm is completed in stirring, is conducive to the closely knit of sealing of hole effect.
In the present embodiment, the hole sealing pad can also link together setting, first when making hole sealing agent with hole sealing agent It can be convenient for the installation of hole sealing pad, second have the function of preventing medicament from leaking out and positioning hole sealing agent.
A kind of blender of the utility model embodiment, comprising: connector, connecting rod and U-shaped fork arm, the connecting rod first End is equipped with the connector, and the connecting rod second end is equipped with the U-shaped fork arm, and the U-shaped fork arm includes the first fork arm, second Fork arm, the first cantilever and the second cantilever, first cantilever and the difference horizontal connection of second cantilever one end are in the connecting rod the Two ends, the first cantilever other end are vertically installed with first fork arm, and the second cantilever other end is vertically arranged The second fork arm is stated, first cantilever and the second cantilevered axle are symmetrically disposed on the connecting rod two sides;It is set on first fork arm There are the first orientation line and the second orientation line, the first orientation line is set with the second orientation line about the middle point symmetry of fork arm length Set, it is described first orientation line is set on the fork arm, positioned at the midpoint and the first cantilever between, it is described first orientation line and Second orientation line direction of rotation hooks on the contrary, being equipped with the first thorn on the periphery of the first fork arm for being equipped with the first orientation line, described First thorn hooks upward, is equipped with the second thorn on the periphery of the first fork arm for being equipped with the second orientation line and hooks, second thorn hooks court Under, first thorn is hooked to hook with the second thorn and is symmetrical arranged about the midpoint;Second fork arm is equipped with first orientation Line and the second orientation line are equipped with first thorn on the periphery of the second fork arm for being equipped with the first orientation line and hook, described First thorn hooks upward, is equipped with second thorn on the periphery of the second fork arm for being equipped with the second orientation line and hooks, second thorn It hooks downward, first thorn on the second fork arm hooks to hook with the second thorn to be symmetrical arranged about the midpoint.It is easy to implement to supporting Anchor pole or the hole section hole sealing agent stirring nearby of anchor cable hole aperture are used in engineering, are especially adapted for use in water zone support anchor rod or anchor Sealing of hole is stirred in rope hole, to keep the stabilization of country rock and anchor pole or anchor cable.
It is understood that described as far as possible under the premise of clearly disclosed for specification, it is concise.The utility model Each embodiment base the spirit of the present invention is consistent, and different in narration emphasis, scheme and scheme works between each other may be used With reference, details are not described herein again.
It should be noted that, in this document, the term of the orientation or positional relationship of the instructions such as term " on ", "lower", is only For ease of description the utility model and simplify description, rather than the device or element of indication or suggestion meaning must have it is specific Orientation, be constructed and operated in a specific orientation, therefore should not be understood as limiting the present invention.Unless otherwise specific Regulation and restriction, term " installation ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, be also possible to It is detachably connected, or is integrally connected;It can be directly connected, it can also be indirectly connected through an intermediary.Such as, the first He Second or the like relational terms are only used to distinguish one entity or operation from another entity or operation, without It is certain to require or imply that there are any actual relationship or orders between these entities or operation.Moreover, term " packet Include ", "comprising" or any other variant thereof is intended to cover non-exclusive inclusion so that including the mistake of a series of elements Journey, method, article or equipment not only include those elements, but also including other elements that are not explicitly listed, either It further include for elements inherent to such a process, method, article, or device.In the absence of more restrictions, by sentence The element that " including one ... " limits, it is not excluded that in the process, method, article or apparatus that includes the element also There are other identical elements.For the ordinary skill in the art, can be understood by concrete condition.
Above description is only a specific implementation of the present invention, but the protection scope of the utility model is not limited to In this, anyone skilled in the art within the technical scope disclosed by the utility model, the change that can be readily occurred in Change or replace, should be covered within the scope of the utility model.Therefore, the protection scope of the utility model should be with right It is required that protection scope subject to.

Claims (1)

1. a kind of blender characterized by comprising connector, connecting rod and U-shaped fork arm, the connecting rod first end are equipped with The connector, the connecting rod second end be equipped with the U-shaped fork arm, the U-shaped fork arm include the first fork arm, the second fork arm, First cantilever and the second cantilever, first cantilever and the difference horizontal connection of second cantilever one end in the connecting rod second end, The first cantilever other end is vertically installed with first fork arm, and the second cantilever other end is vertically installed with described second Fork arm, first cantilever and the second cantilevered axle are symmetrically disposed on the connecting rod two sides;
First fork arm is equipped with the first orientation line and the second orientation line, and the first orientation line and the second orientation line are about fork The midpoint of pole length is symmetrical arranged, the first orientation line is set on the fork arm, be located at the midpoint and the first cantilever it Between, the first orientation line and the second orientation line direction of rotation are on the contrary, in the periphery for being equipped with the first fork arm that first orients line It is equipped with the first thorn to hook, first thorn hooks upward, is equipped with second on the periphery of the first fork arm for being equipped with the second orientation line Thorn hooks, and second thorn hooks downward, and first thorn is hooked to hook with the second thorn and is symmetrical arranged about the midpoint;
Second fork arm is equipped with the first orientation line and the second orientation line, in the second fork for being equipped with the first orientation line The periphery of bar is equipped with first thorn and hooks, and first thorn hooks upward, in the circle for the second fork arm for being equipped with the second orientation line Circumferential surface is equipped with second thorn and hooks, and second thorn hooks downward, and first thorn on the second fork arm, which hooks to hook with the second thorn, to close It is symmetrical arranged in the midpoint.
CN201821160461.5U 2018-07-20 2018-07-20 A kind of blender Active CN209369846U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821160461.5U CN209369846U (en) 2018-07-20 2018-07-20 A kind of blender

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821160461.5U CN209369846U (en) 2018-07-20 2018-07-20 A kind of blender

Publications (1)

Publication Number Publication Date
CN209369846U true CN209369846U (en) 2019-09-10

Family

ID=67822828

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821160461.5U Active CN209369846U (en) 2018-07-20 2018-07-20 A kind of blender

Country Status (1)

Country Link
CN (1) CN209369846U (en)

Similar Documents

Publication Publication Date Title
CN108979584A (en) A kind of water zone anchor cable or bolthole method for sealing, hole sealing agent and blender
CN104632075B (en) A kind of brill for the detection of overlying strata crack surveys integral system and method
CN104533452B (en) A kind of underground coal mine crushes coal body stagewise grouting strengthening method
CN112647972B (en) Shield tunnel segment orientation method
CN101892841A (en) Observation system of water injection in fractured zone in coal seam goaf
CN108678772A (en) A kind of multilevel hierarchy suspension device and its construction method for rich water sandy gravel stratum tunnel
CN106320354A (en) Anti-seepage construction method for karst cave development stratum under overburden
CN107091091A (en) A kind of steeply-inclined seam mining gob-side entry retaining method of prefabricated arc support
CN105937407A (en) Gob-side entry retaining concrete filled wall annular air bag construction method
CN102561950A (en) Process for realizing grouting consolidation for aggregates filled in cavities of strata and jetting drill bit
CN106089252A (en) Grouting reinforcement method for inhomogeneous loose bodies
CN110397451A (en) It is a kind of to form the construction method that cavity excavate cavern's pre-reinforcement using deep soft rock
CN109024710A (en) A kind of method for blocking of deep-foundation pit engineering artesian water piping
CN209369846U (en) A kind of blender
CN109973115B (en) Construction method for drainage of vault of tunnel in karst area
CN108374672A (en) A method of reinforcing Deep Mine soft coal level roadway surrounding rock
CN108914911B (en) Stratum pre-stressed advanced excavation stability control method
CN106194250A (en) A kind of gob-side entry retaining concrete filling wall annular air-pocket template
CN112943306A (en) Roadway fault zone supporting method and step based on instability deformation research
CN201696048U (en) Coal seam gob fracture zone water-injection observation system
CN110565452A (en) Railway roadbed body steel flower tube grouting reinforcement method and railway roadbed
CN206368693U (en) The device of armlet sleeve pipe in a kind of fixed drilling
CN113719255B (en) Gas extraction and hole sealing method for directional long-drilled-hole fractured zone at top
CN111894601B (en) Coal seam roadway surrounding rock structure passing geological structure and advanced modification tunneling method thereof
CN208845202U (en) Automatic anchor pole big-elevation is constructed from anchor bolt grouting apparatus and system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant