CN209369409U CN201822124515.9U CN201822124515U CN209369409U CN 209369409 U CN209369409 U CN 209369409U CN 201822124515 U CN201822124515 U CN 201822124515U CN 209369409 U CN209369409 U CN 209369409U
Authority
CN
China
Prior art keywords
bar
vertical
connector
cross bar
sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201822124515.9U
Other languages
Chinese (zh)
Inventor
叶冠华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201822124515.9U priority Critical patent/CN209369409U/en
Application granted granted Critical
Publication of CN209369409U publication Critical patent/CN209369409U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a kind of adjustable construction exit passageways, including connector, vertical bar, cross bar and vertical pole, the cross bar is provided with each two up and down, and cross bar front and back or setting symmetrical above and below two-by-two, it is described be vertically arranged between two cross bars up and down there are three or three or more vertical bars, the upper and lower ends of the vertical bar pass through second sleeve and connect with upper and lower two cross bars.The utility model realizes the splicing between vertical bar and cross bar by the second sleeve being arranged on cross bar, and the connector by being arranged realizes the splicing between vertical pole and cross bar, realize entire exit passageway frame facilitates installation and removal, and break the more convenient transport of the component to come, the utility model selects telescopic rod to realize the height and width adjusting of exit passageway by vertical bar and vertical pole simultaneously, with preferable using flexible, and the fixation sized to vertical bar and vertical pole is realized by the lock screw of setting, guarantee to adjust stability.

Description

A kind of adjustable construction exit passageway
Technical field
The utility model relates to construct to use exit passageway technical field, specifically a kind of adjustable construction is logical with safety Road.
Background technique
Exit passageway uses and its frequently in constructions work, and is that engineering related personnel enters the necessary logical of operating space Road, therefore, setting up for exit passageway is that construction site is constructed essential link, the design in channel of constructing and is set up for side Just site operation, save construction cost and to ensure that engineering safety plays the role of vital.
And existing construction either installed or dismantled with exit passageway it is all more troublesome, and transport it is inconvenient, and The height and width of exit passageway can not be adjusted according to actual needs, and it is poor to install and use flexibility.
Utility model content
The purpose of this utility model is to provide a kind of adjustable construction exit passageways, to solve to apply in the prior art Work exit passageway dismounts the problem of trouble, transport inconvenience and using flexible difference.
To achieve the above object, the utility model provides the following technical solutions: a kind of adjustable construction exit passageway, Including connector, vertical bar, cross bar and vertical pole, the cross bar is provided with each two up and down, and cross bar front and back or symmetrical above and below two-by-two Setting, it is described be vertically arranged between two cross bars up and down there are three or three or more vertical bars, the upper and lower ends of the vertical bar it is equal Connect by second sleeve with upper and lower two cross bars, between former and later two described cross bars setting there are three or three with upper vertical bar, The vertical pole rear and front end passes through connector and connect with former and later two cross bars, and the downside of two cross bars of the downside is solid Surely multiple fixed plates are provided with, the vertical bar and vertical pole select telescopic rod, and locking is provided on the bottom bar of telescopic rod Screw is provided with locking hole multiple being arranged above and below and with lock screw cooperation, the cross bar on the mandril of the telescopic rod It is made of first crossbar and second crossbar, the second connector and second crossbar that the first crossbar is wholely set by right end connect It connects, the side of second connector is provided with location hole, and the left end of second crossbar is provided with through-hole corresponding with location hole.
Preferably, the connector is made of first sleeve and clip, and the first sleeve is disposed longitudinally on the upper of clip End, and first sleeve and clip pass through welded connecting.
Preferably, the clip is fastened on cross bar, and the clip is hingedly made of upper and lower two semicircular brackets, and Upper and lower two semicircular brackets are provided with fixed edge in the other side opposite with articulated position.
Preferably, the bottom bar of the vertical bar and vertical pole is respectively arranged with the first connector and third in one end opposite with mandril The mandril and the first connector and third bond diameter of connector, the vertical bar and vertical pole are all the same.
Preferably, the first sleeve is identical with the internal diameter of second sleeve, and the second sleeve is vertically welded on cross bar.
Compared with prior art, the utility model has the beneficial effects that 1, the utility model on cross bar by being arranged Second sleeve realizes the splicing between vertical bar and cross bar, and the connector by being arranged realizes the spelling between vertical pole and cross bar It connects, realize entire exit passageway frame facilitates installation and removal, and breaks the more convenient transport of the component to come;2, simultaneously The utility model selects telescopic rod to realize the height and width adjusting of exit passageway by vertical bar and vertical pole, has preferable Using flexible, and the fixation sized to vertical bar and vertical pole is realized by the lock screw of setting, guarantee to adjust stability.
Detailed description of the invention
Fig. 1 is the structural schematic diagram that exit passageway is used in a kind of adjustable construction of the utility model.
Fig. 2 is the right view that exit passageway is used in a kind of adjustable construction of the utility model.
Fig. 3 is the partial enlarged view that exit passageway is used in a kind of adjustable construction of the utility model.
Fig. 4 is the connector schematic diagram that exit passageway is used in a kind of adjustable construction of the utility model.
In figure: 1- connector, 101- first sleeve, 102- clip, 103- fixed edge, 2- second sleeve, 3- vertical bar, 31- First connector, 4- lock screw, 5- fixed plate, 6- cross bar, 61- first crossbar, the second connector of 611-, 612- location hole, 62- Two cross bars, 7- vertical pole, 71- third connector.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Please refer to Fig. 1, Fig. 2, Fig. 3 and Fig. 4, in the utility model embodiment, a kind of adjustable construction exit passageway, Including connector 1, vertical bar 3, cross bar 6 and vertical pole 7, cross bar 6 is provided with each two up and down, and the front and back or right up and down two-by-two of cross bar 6 The support beam for claiming setting to constitute exit passageway, be vertically arranged between upper and lower two cross bars 6 there are three or three or more vertical bars 3 Support column is constituted, the upper and lower ends of vertical bar 3 pass through the dismounting of second sleeve 2 Yu upper and lower two cross bars 6 vertical bar 3 easy to connect, There are three being arranged between former and later two cross bars 6 or three with 7 trussed stringer of upper vertical bar, and 7 rear and front end of vertical pole passes through connector 1 With the dismounting of former and later two vertical poles 7 easy to connect of cross bar 6, the downside of two cross bars 6 of downside is fixedly installed multiple solid Cross bar 6 of the fixed board 5 for fixed downside, vertical bar 3 and vertical pole 7 select telescopic rod that can realize exit passageway height and width tune Section, and the adjustment length that lock screw 4 is used to fix telescopic rod is provided on the bottom bar of telescopic rod, on the mandril of telescopic rod It is provided with locking hole that is multiple being arranged above and below and cooperating with lock screw 4 and guarantees the stability that lock screw 4 fastens, cross bar 6 Be made of first crossbar 61 and second crossbar 62 and realize sliceable cross bar 6, first crossbar 61 be wholely set by right end the Two connectors 611 and the connection easy to connect of second crossbar 62, the side of the second connector 611 is provided with location hole 612, and second crossbar 62 left end is provided with through-hole corresponding with location hole 612 and can be fixed by positioning pin, and connector 1 is by first sleeve 101 It is constituted with clip 102, first sleeve 101 is used to connect the third connector 71 of vertical pole 7, and first sleeve 101 is disposed longitudinally on clip 102 upper end, and first sleeve 101 and clip 102, by being welded to connect, clip 102 is fastened on cross bar 6, and clip 102 is by upper Lower two semicircular brackets hingedly constitute the opening for facilitating clip 102, and upper and lower two semicircular brackets with hinge position It sets the opposite other side and is provided with the clamping that fixed edge 103 realizes clip 102, the bottom bar of vertical bar 3 and vertical pole 7 is opposite with mandril One end be respectively arranged with the first connector 31 and third connector 71, the mandril and the first connector 31 and third of vertical bar 3 and vertical pole 7 71 diameter of connector is all the same, and first sleeve 101 is identical with the internal diameter of second sleeve 2 to facilitate unified specification to produce, and second sleeve 2 is hung down Directly it is welded on cross bar 6.
The working principle of the utility model is: being inserted in upper and lower two by the both ends of vertical bar 3 when carrying out exit passageway installation In the second sleeve 2 of a cross bar 6, connector 1 is connect with vertical pole 7 by first sleeve 101, and by by 102 cutting ferrule of clip Building for exit passageway frame is realized on cross bar 6, and realizes as desired by adjusting vertical bar 3 and vertical pole 7 and safety is led to Fixed plate 5 is fixed on the ground after the completion of adjusting by fixing glue, then prevents safety by the height in road and the adjusting of width Protective net is on exit passageway frame.
It is obvious to a person skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and And without departing substantially from the spirit or essential attributes of the utility model, it can realize that this is practical new in other specific forms Type, therefore, in all respects, the present embodiments are to be considered as illustrative and not restrictive, this is practical new The range of type is indicated by the appended claims rather than the foregoing description, it is intended that containing for the equivalent requirements of the claims will be fallen in All changes in justice and range are embraced therein.It should not treat any reference in the claims as limiting Related claim.

Claims (5)

1. a kind of adjustable construction exit passageway, including connector (1), vertical bar (3), cross bar (6) and vertical pole (7), special Sign is: the cross bar (6) is provided with each two up and down, and cross bar (6) front and back or setting symmetrical above and below two-by-two, and described up and down two Be vertically arranged between a cross bar (6) there are three or three or more vertical bars (3), the upper and lower ends of the vertical bar (3) pass through the Two sleeves (2) are connect with upper and lower two cross bars (6), between former and later two described cross bars (6) setting there are three or three or more indulge Bar (7), vertical pole (7) rear and front end pass through connector (1) and connect with former and later two cross bars (6), and two of the downside The downside of cross bar (6) is fixedly installed multiple fixed plates (5), and the vertical bar (3) and vertical pole (7) select telescopic rod, and Be provided on the bottom bar of telescopic rod lock screw (4), be provided on the mandril of the telescopic rod it is multiple being arranged above and below and With the locking hole of lock screw (4) cooperation, the cross bar (6) is made of first crossbar (61) and second crossbar (62), and described the The second connector (611) that one cross bar (61) is wholely set by right end is connect with second crossbar (62), second connector (611) Side be provided with location hole (612), and the left end of second crossbar (62) is provided with through-hole corresponding with location hole (612).
2. the adjustable construction exit passageway of one kind according to claim 1, it is characterised in that: the connector (1) It being made of first sleeve (101) and clip (102), the first sleeve (101) is disposed longitudinally on the upper end of clip (102), and First sleeve (101) and clip (102) pass through welded connecting.
3. the adjustable construction exit passageway of one kind according to claim 2, it is characterised in that: the clip (102) It is fastened on cross bar (6), the clip (102) is hingedly made of upper and lower two semicircular brackets, and upper and lower two semicircles Bracket be provided with fixed edge (103) in the other side opposite with articulated position.
4. the adjustable construction exit passageway of one kind according to claim 1, it is characterised in that: the vertical bar (3) and The bottom bar of vertical pole (7) is respectively arranged with the first connector (31) and third connector (71), the vertical bar in one end opposite with mandril (3) and the mandril of vertical pole (7) and the first connector (31) and third connector (71) diameter it is all the same.
5. the adjustable construction exit passageway of one kind according to claim 3, it is characterised in that: the first sleeve (101) identical with the internal diameter of second sleeve (2), the second sleeve (2) is vertically welded on cross bar (6).
CN201822124515.9U 2018-12-18 2018-12-18 A kind of adjustable construction exit passageway Expired - Fee Related CN209369409U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822124515.9U CN209369409U (en) 2018-12-18 2018-12-18 A kind of adjustable construction exit passageway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822124515.9U CN209369409U (en) 2018-12-18 2018-12-18 A kind of adjustable construction exit passageway

Publications (1)

Publication Number Publication Date
CN209369409U true CN209369409U (en) 2019-09-10

Family

ID=67833209

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822124515.9U Expired - Fee Related CN209369409U (en) 2018-12-18 2018-12-18 A kind of adjustable construction exit passageway

Country Status (1)

Country Link
CN (1) CN209369409U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112234530A (en) * 2020-09-10 2021-01-15 金华送变电工程有限公司 Device for regulating and controlling installation environment of high-voltage cable intermediate connector

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112234530A (en) * 2020-09-10 2021-01-15 金华送变电工程有限公司 Device for regulating and controlling installation environment of high-voltage cable intermediate connector

Similar Documents

Publication Publication Date Title
CN109695344A (en) Square tube joist support frame and its construction method is adjusted in a kind of self-locking
CN209369409U (en) A kind of adjustable construction exit passageway
CN106939690B (en) The anti-load-bearing scaffold that inclines of one kind
EP0383317B1 (en) Scaffold with lattice girder
CN205805148U (en) Pin-connected panel enclosing
CN204590556U (en) With the steel pipe lifting scaffold of steel sash net safeguard structure
CN213062884U (en) Patch board structure and scaffold with same
CN210216614U (en) Adjustable integrative steelframe of counter basin and wall row closestool
CN204901227U (en) Display screen installation mount
CN203336518U (en) Combined type metal halide lamp overhead support
CN207812985U (en) A kind of protection network connector of universal elevating scaffold
CN109859645A (en) A kind of hung type LED screen mounting structure and installation method
CN204759931U (en) Outdoor display screen installation frame
CN108978487B (en) A easily set up quick detachable protection rack for bridge construction
CN208702123U (en) A kind of outer protective net of rotation fixed chute formula steel
CN206059913U (en) One kind is easy to field erected low voltage complete set switch cubicle
CN211312340U (en) A guardrail subassembly for traffic safety
CN210917909U (en) Concatenation formula aluminium smallpox
CN217105773U (en) Suspended ceiling structure for end socket
CN107916794A (en) A kind of guardrail used in construction engineering for being readily disassembled assembling
CN218856781U (en) Assembly type assembling jig frame
CN214227718U (en) Cable bridge structure
CN209703999U (en) A kind of scaffold connection structure
CN215760621U (en) Hang and irritate roof beam with hanging basket end and face limit protector convenient to adjust
CN219411397U (en) Large-scale constructional column concatenation formula project organization

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190910

Termination date: 20201218