CN209368810U - A kind of novel PTC perforated pipe stake with ribbing - Google Patents

A kind of novel PTC perforated pipe stake with ribbing Download PDF

Info

Publication number
CN209368810U
CN209368810U CN201822231977.0U CN201822231977U CN209368810U CN 209368810 U CN209368810 U CN 209368810U CN 201822231977 U CN201822231977 U CN 201822231977U CN 209368810 U CN209368810 U CN 209368810U
Authority
CN
China
Prior art keywords
stake
rib
along
pile
ptc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822231977.0U
Other languages
Chinese (zh)
Inventor
乐腾胜
童智能
项炳泉
雷金波
柯宅邦
陶俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Construction Engineering Testing Technology Group Co ltd
Anhui Institute of Architectural Research and Design
Original Assignee
ANHUI SUPERVISION AND INSPECTION STATION NO II OF CONSTRUCTION ENGINEERING QUALITY
Anhui Institute of Architectural Research and Design
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANHUI SUPERVISION AND INSPECTION STATION NO II OF CONSTRUCTION ENGINEERING QUALITY, Anhui Institute of Architectural Research and Design filed Critical ANHUI SUPERVISION AND INSPECTION STATION NO II OF CONSTRUCTION ENGINEERING QUALITY
Priority to CN201822231977.0U priority Critical patent/CN209368810U/en
Application granted granted Critical
Publication of CN209368810U publication Critical patent/CN209368810U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a kind of novel PTC perforated pipe stakes with ribbing, the filtration hole that L is opened up successively is spaced including PTC tubular pole and from stake top to stake bottom, the filtration hole is in same section along 120 ° of stake circumferential direction interval arrangement, equidistantly it is laid with several ribs along the setting of stake length direction the stake week of the PTC tubular pole, the rib is special-shaped protrusion, rib is in triangular pyramid type columnar projections to stake top at stake top 3L/2 node along stake length direction, to the trapezoidal columnar projections in stake bottom, the filtration hole of the utility model pile body setting can effectively reduce soil compaction effect effect;The rib that PTC tubular pole is equally spaced along stake circumferential direction can increase the contact area of stake soil, improve pile side friction to a certain extent, can effectively improve ultimate bearing capacity of single pile;Triangular pyramidal column rib is set apart from stake top 3h/2 pile cutoff along stake length direction, rib section is approximately equilateral triangle at stake top, can effectively reduce the differential settlement of pile body after the completion of pile sinking, improves the safety coefficient of pile foundation engineering construction.

Description

A kind of novel PTC perforated pipe stake with ribbing
Technical field
The utility model relates to PTC perforated pipe stake technical fields, more particularly to a kind of novel PTC perforated pipe stake with ribbing.
Background technique
In recent years, obvious for soft clay area PTC type tubular pole effect of driving pile phenomenon, it successively has developed unidirectionally to wearing Perforated pipe stake, it is two-way to be installed with hole tubular pole, it is starlike to being installed with a variety of PTC perforated pipe stakes such as hole tubular pole, can be effectively by it Reduce the excess pore water pressure of pile sinking generation in pile peripheral earth, improve foundation bearing capacity and obtained certain popularization.
But the excess pore water pressure generated when PTC type tubular pole pile sinking is gradually increased along the increase of depth, and it is above-mentioned PTC perforated pipe stake body bore size is remained unchanged along stake length direction, is caused unknown close to stake bottom reduction soil compaction effect effect It is aobvious, and pile body filtration hole easily blocks, and can not play a role well.
Meanwhile filtration hole is arranged in PTC type tubular pile body, reduces tubular pole bearing capacity to a certain extent.Therefore, how to have While effect ground reduces effect of driving pile influence, guarantee pile sinking quality, improving bearing capacity of pile foundation is art technology research and development people Member makes great efforts to solve the problems, such as always.
In order to effectively reduce the adverse effect of PTC tubular pole effect of driving pile, and guarantee pile sinking quality, improves pile foundation carrying Power and pile foundation construction safety coefficient, this just has to take certain measure.
Utility model content
The purpose of this utility model is to provide a kind of novel PTC perforated pipe stakes with ribbing, can improve to a certain extent existing There is the shortcoming of PTC perforated pipe stake technology, further decrease the adverse effect of effect of driving pile, improves single pile ultimate bearing Power reduces the differential settlement after the completion of pile sinking, guarantees pile sinking quality.
To achieve the goals above, the utility model adopts the technical scheme that a kind of novel PTC perforated pipe with ribbing Stake, the filtration hole that L is opened up successively is spaced including PTC tubular pole and from stake top to stake bottom, the filtration hole is in same section along stake 120 ° of circumferential direction interval arrangement, is equidistantly laid with several ribs along the setting of stake length direction, institute the stake week of the PTC tubular pole Rib is stated as special-shaped protrusion, rib is in triangular pyramidal columnar projections to stake top at stake top 3L/2 node along stake length direction, to Stake bottom trapezoidal columnar projections, and the height of the triangular pyramidal columnar projections along stake length direction from stake top to apart from stake top 3L/2 Uniformly successively decrease at node, the rib and filtration hole are arranged alternately for 60 ° along stake circumferential direction interval.
It is as above-mentioned technical proposal to further describe:
The filtration hole is gradually increased along the pore size of stake length direction according to d/10 rate of change from stake top to stake bottom, In, d is drainage bore dia.
It is as above-mentioned technical proposal to further describe:
Triangular pyramidal columnar projections section at stake top is equilateral triangle, and section is isoceles triangle at 3L/2 node Shape, the rib bottom a length of 2t of diameter of triangular pyramidal columnar projections.
It is as above-mentioned technical proposal to further describe:
The section of the trapezoidal columnar projections is isosceles trapezoid, the rib bottom a length of 2t of diameter of trapezoidal columnar projections, and from 3L/2 Cross sectional shape at node along stake length direction to stake bottom remains unchanged.
The utility model has the beneficial effects that:
The filtration hole of the utility model pile body setting can effectively reduce soil compaction effect effect;Filtration hole is from stake top to stake Bottom is gradually increased along stake length direction pore size by the rate of change of d/10, can preferably inhibit the soil compaction of pile peripheral earth depths Effect effect;The rib that PTC tubular pole is equally spaced along stake circumferential direction can increase the contact area of stake soil, to a certain extent Pile side friction is improved, ultimate bearing capacity of single pile can be effectively improved;Along stake length direction apart from stake top 3h/2 pile cutoff setting three Pyramid column rib, rib section is approximately equilateral triangle at stake top, and pile body is not after the completion of capable of effectively reducing pile sinking Uniform settlement improves the safety coefficient of pile foundation engineering construction.
Detailed description of the invention
Fig. 1 be the utility model proposes the novel PTC perforated pipe stake triangular pyramidal columnar projections with ribbing of one kind cross section Structural schematic diagram;
Fig. 2 is the cross-sectional structure schematic diagram of trapezoidal columnar projections in the utility model;
Fig. 3 is the schematic diagram of the section structure of A-A in Fig. 1.
Marginal data:
1-PTC tubular pole, 2- filtration hole, 3- triangular pyramidal columnar projections, the trapezoidal columnar projections of 4-.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.
Referring to Fig.1-3, a kind of novel PTC perforated pipe stake with ribbing, including PTC tubular pole 1 and from stake top to stake bottom successively Every the filtration hole 2 that L is opened up, filtration hole 2 is in same section along 120 ° of stake circumferential direction interval arrangement, and PTC tubular pole is during the pile driving process The super quiet interstitial hydraulic pressure moment generated has little time to dissipate, and the filtration hole 2 that can be arranged by pile body enters inside lumen, effectively The effect for reducing soil compaction effect is equidistantly laid with several ribs along the setting of stake length direction, rib the stake week of PTC tubular pole 1 To be special-shaped raised, as shown in figure 3, rib is in triangular pyramidal columnar projections to stake top at stake top 3L/2 node along stake length direction 3, to the trapezoidal columnar projections 4 in stake bottom, and the height of triangular pyramidal columnar projections 3 along stake length direction from stake top to apart from stake top Uniformly successively decrease at 3L/2 node, it is intended that several ribs are arranged on pile body, one contributes to increase the contact surface of stake soil Product improves the frictional resistance of stake side to a certain extent, and another aspect rib is arranged to triangular pyramidal columnar projections 3 and trapezoidal column is convex The abnormally-structured of 4 combinations is played, there is the slope surface slowed down downwards close to triangular pyramidal columnar projections 3 at stake top, slowly transit to ladder The structure of shape columnar projections 4 both will not influence piling construction, can also effectively reduce the differential settlement of pile body after the completion of pile sinking, The safety coefficient of pile foundation engineering construction is improved, rib is arranged alternately for 60 ° with filtration hole 2 along stake circumferential direction interval.
Embodiment 1, filtration hole 2 gradually increase along the pore size of stake length direction according to d/10 rate of change from stake top to stake bottom Greatly, wherein d is drainage bore dia, and due to more settling toward ground end, the excess pore water pressure that pile driving process generates is bigger, will be filtered Water hole 2 is arranged to the aperture being sequentially increased, and can effectively inhibit the soil compaction effect effect of pile peripheral earth depths.
Embodiment 2, the section at stake top of triangular pyramidal columnar projections 3 are equilateral triangle, are cut at side length 2t, 3L/2 node Face is isosceles triangle, the rib bottom a length of 2t of diameter of triangular pyramidal columnar projections 3.
Embodiment 3, the section of trapezoidal columnar projections 4 are isosceles trapezoid, the rib bottom a length of 2t of diameter of trapezoidal columnar projections 4, rib Thickness and rib top length are t, and the cross sectional shape from 3L/2 node along stake length direction to stake bottom remains unchanged.
Novel PTC perforated pipe stake with ribbing in the utility model only need to use special PTC perforated pipe stake steel with ribbing in factory Mould produces as required, method compared with perforated pipe stake production technology.In view of pile lining aperture generates stress concentration phenomenon, the structure Part site operation uses static pressure pile-sinking mode, must not use hammer piling and pile vibrosinking mode.In pile driving process, tubular pole pile lining Several holes of upper design allow the interior pore water generated of pile peripheral earth to flow into lumen by side chamber, then extract row with micro pump Out, the moisture content for reducing pile peripheral earth improves the shearing strength of the soil body, enhances foundation bearing capacity, effectively reduces soil compaction during pile driving Influence of the effect to surrounding buildings environment.
The preferable specific embodiment of the above, only the utility model, but the protection scope of the utility model is not It is confined to this, anyone skilled in the art is within the technical scope disclosed by the utility model, practical according to this Novel technical solution and its utility model design are subject to equivalent substitution or change, should all cover the protection model in the utility model Within enclosing.

Claims (4)

1. a kind of novel PTC perforated pipe stake with ribbing, is successively spaced the filter that L is opened up including PTC tubular pole (1) and from stake top to stake bottom Water hole (2), which is characterized in that the filtration hole (2) is in same section along 120 ° of stake circumferential direction interval arrangement, the PTC tubular pole (1) several ribs along the setting of stake length direction are equidistantly laid with stake week, the rib is special-shaped protrusion, and rib is long along stake Direction is in triangular pyramidal columnar projections (3) to stake top at stake top 3L/2 node, to the trapezoidal columnar projections in stake bottom (4), and The height of the triangular pyramidal columnar projections (3) is uniformly successively decreased along stake length direction from stake top at stake top 3L/2 node, institute It states rib and is arranged alternately for 60 ° with filtration hole (2) along stake circumferential direction interval.
2. the novel PTC perforated pipe stake with ribbing of one kind according to claim 1, which is characterized in that the filtration hole (2) is from stake The pore size that stake bottom is pushed up along stake length direction is gradually increased according to d/10 rate of change, wherein d is drainage bore dia.
3. the novel PTC perforated pipe stake with ribbing of one kind according to claim 1, which is characterized in that the triangular pyramidal column Raised (3) section at stake top is equilateral triangle, and section is isosceles triangle, triangular pyramidal columnar projections (3) at 3L/2 node The rib bottom a length of 2t of diameter.
4. the novel PTC perforated pipe stake with ribbing of one kind according to claim 1, which is characterized in that the trapezoidal columnar projections (4) section be isosceles trapezoid, the rib bottom a length of 2t of diameter of trapezoidal columnar projections (4), and from 3L/2 node along stake length direction extremely The cross sectional shape at stake bottom remains unchanged.
CN201822231977.0U 2018-12-28 2018-12-28 A kind of novel PTC perforated pipe stake with ribbing Active CN209368810U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822231977.0U CN209368810U (en) 2018-12-28 2018-12-28 A kind of novel PTC perforated pipe stake with ribbing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822231977.0U CN209368810U (en) 2018-12-28 2018-12-28 A kind of novel PTC perforated pipe stake with ribbing

Publications (1)

Publication Number Publication Date
CN209368810U true CN209368810U (en) 2019-09-10

Family

ID=67827969

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822231977.0U Active CN209368810U (en) 2018-12-28 2018-12-28 A kind of novel PTC perforated pipe stake with ribbing

Country Status (1)

Country Link
CN (1) CN209368810U (en)

Similar Documents

Publication Publication Date Title
CN206220085U (en) A kind of permeable pile tube system for accelerating to consolidate
CN209368810U (en) A kind of novel PTC perforated pipe stake with ribbing
CN109797764A (en) A kind of anti-liquefaction pile foundation suitable for easy liquefaction soil layers
CN204551434U (en) A kind of novel resistance to plucking miniature steel pipe pilework
CN208346812U (en) A kind of band cap Bamboo-shaped threaded hole pipe pile composite foundation
CN207739251U (en) A kind of tapered pile pile of Bamboo-shaped threaded hole
CN204898649U (en) A novel PTC type has a heliciform hole tubular pile that is used for deep soft base to handle
CN205591212U (en) Multi -functional precast tubular pile
CN202023185U (en) Concrete tubular pile
CN107268581A (en) A kind of method that lateral soil compaction discharging consolidation improves Squeezing Soil Pile pile foundation performance
CN209368811U (en) A kind of reinforced PTC perforated pipe stake with ribbing
CN208586605U (en) A kind of drainage type basement process stake
CN102943480A (en) Loess foundation pit supporting method
CN206015511U (en) One implant post steel pipe column
CN205000346U (en) Slope frame for slope reinforcement and water drainage
CN202164598U (en) Precast impacted-expanded pile
CN209243705U (en) A kind of PTC type that geotextile is arranged is starlike to perforation tubular pole
CN209703541U (en) The tamper dentiform pile of superior performance
CN204898650U (en) A novel PTC type has a heliciform hole toper tubular pile that is used for deep soft base to handle
CN205501991U (en) Prevent blockking up multi -functional precast tubular pile
CN205399504U (en) Open section tunnel structure's anti structure of floating
RU99498U1 (en) DRIVING PILES
CN206368371U (en) High polymer material tubulose seepage well
CN206768802U (en) A kind of reinforced PTC perforated pipes stake
CN205990619U (en) A kind of rich groundwater and geology bad deep pit digging supporting construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: No.567, Shanhu Road, Shushan District, Hefei City, Anhui Province 230000

Patentee after: Anhui Construction Engineering Testing Technology Group Co.,Ltd.

Patentee after: ANHUI INSTITUTE OF BUILDING RESEARCH & DESIGN

Address before: No.567, Shanhu Road, Shushan District, Hefei City, Anhui Province 230000

Patentee before: QUALITY OF CONTRUCTION IN ANHUI PROVINCE SUPERVISION AND INSPECTION STATION

Patentee before: ANHUI INSTITUTE OF BUILDING RESEARCH & DESIGN