CN209367749U - With the upending frame of fork truck cooperation instrument box - Google Patents
With the upending frame of fork truck cooperation instrument box Download PDFInfo
- Publication number
- CN209367749U CN209367749U CN201822106535.3U CN201822106535U CN209367749U CN 209367749 U CN209367749 U CN 209367749U CN 201822106535 U CN201822106535 U CN 201822106535U CN 209367749 U CN209367749 U CN 209367749U
- Authority
- CN
- China
- Prior art keywords
- transverse arm
- pendency
- instrument box
- fork truck
- boom
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Forklifts And Lifting Vehicles (AREA)
Abstract
A kind of upending frame with fork truck cooperation instrument box includes base body, cross slide way, movable transverse arm, four pendency booms vertically to dangle;Base body open up there are two for fork truck fork truck arm insertion socket;Cross slide way is fixedly mounted on above base body, and movable transverse arm is equipped with idler wheel, and idler wheel can be laterally rollably mounted on cross slide way;The activity transverse arm is divide into upper part and lower part, the transverse width of part is greater than the transverse width of movable transverse arm lower part point on movable transverse arm, wherein there is the upper end of two pendency booms that can be mounted on to swing the left and right ends of part on movable transverse arm, the lateral clear spacing width of this two pendency booms is 1005~1020 mm;The upper end of another two pendencys boom can be mounted on to swing the left and right ends of movable transverse arm lower part point, this two pendency boom transverse direction clear spacing width are 805~820 mm;Lateral short latch is equipped in the lower end of every pendency boom.The utility model can make instrument box accurately in place, and operate light, saving manpower, highly-safe.
Description
Technical field
The utility model belongs to the technical field of switchgear corollary equipment more particularly to a kind of and fork truck cooperates instrument box
Upending frame.
Background technique
KYN switchgear needs to be equipped with instrument box, and instrument box is exposed and utilizes bolt lock Dingan County before KYN switchgear
Upper corner, liftoff about nearly 2 meters of height.For the instrument box of standard there are two types of width, respectively 800mm wide and 1000mm wide, weight is reachable
100 kilograms or so.
When needing to install instrument box, four people is at least needed to lift fortune, help, the set-up time is long, and labor intensity is very big, and
And there is the security risks for causing instrument box to be hurted sb.'s feelings due to cooperating inaccuracy between worker, being short of physical strength.
In recent years, people attempt to sling instrument box using electric block in installation process, are then transported to KYN cabinet body
Under instrument box, then instrument box is fallen and is coupled with cabinet body, to reduce labor intensity.However reducing the same of labor intensity
When, but there is also following problems;One, low efficiency is needed respectively to be transported to instrument box and cabinet body under electric block and be assembled, dress
With cabinet body is transported again later;Two, it is difficult to when falling and cooperating with cabinet body instrument box to just;Three, easily occur instrument box with
The fortuitous event of cabinet body collision and damage.
Utility model content
A kind of upending frame with fork truck cooperation instrument box is provided the purpose of the utility model is to overcome disadvantages mentioned above, it
Instrument box can be made accurately in place, and operate light, saving manpower, it is highly-safe.
Its purpose can be realized by following scheme: a kind of upending frame with fork truck cooperation instrument box, it is characterised in that including
There are base body, cross slide way, movable transverse arm, four pendency booms vertically to dangle;Base body open up there are two for fork truck fork
The socket of vehicle arm insertion;Cross slide way is fixedly mounted on above base body, and movable transverse arm is equipped with idler wheel, and idler wheel can be rolled laterally
Ground is mounted on cross slide way;The activity transverse arm is divide into upper part and lower part, and the transverse width of part, which is greater than, on movable transverse arm lives
The transverse width of part under dynamic transverse arm, wherein having the upper end of two pendency booms can be mounted on movable transverse arm top to swing
The left and right ends divided, the lateral clear spacing width of this two pendency booms are 1005~1020 mm;Another two pendencys boom
Upper end can be mounted on to swing the left and right ends of movable transverse arm lower part point, this two pendency boom transverse direction clear spacing width are
805~820 mm;Lateral short latch is equipped in the lower end of every pendency boom.
It is preferred that the upper end of each pendency boom is equipped with slotted hole, the length of slotted hole is to be vertical, the movable transverse arm
The left and right ends of the left and right ends of upper part and lower part are fixed with lateral short axle respectively, and every lateral short axle is inserted in corresponding outstanding
Inside the slotted hole of hanging arm upper end, it is achieved in pendency boom and swings in the front-back direction, and can also upper and lower play.
It is additionally provided with limit component of the limitation activity transverse arm relative to base body transverse shifting amplitude.
So-called longitudinal direction, i.e. front-rear direction, the horizontal direction of fork truck forward-reverse when referring to use;So-called transverse direction, i.e. left and right
Direction refers to the horizontal direction being transversely to the machine direction.
The utility model has the following advantages that and effect:
One, the utility model can cooperate with fork truck and instrument box lift is sent to installation site and is realized in place, practical new with this
The instrument box of type cooperation is equipped with lifting eye in the center of top of left and right sidewall.Instrument box installation process is divided into two stages.First
Stage is the transport stage, and second stage is the instrument box stage in place.
In the stage of transport, the utility model is moved to above the assembly station of instrument box with fork truck, with the dynamic activity of hand push
Transverse arm, adjustment lateral position make its be directed at instrument box, select corresponding two pendencys boom according to the width of instrument box, by this two
In the lifting eye of the lateral short latch insertion instrument box two sides of root pendency boom, another two pendencys boom is then flexibly avoided, then
Fork truck lifting, the weight of entire instrument box, which is held by two lateral short latches by upending frame, hangs, movement forklift, by entire instrument box
To the cabinet of KYN cabinet;
In the instrument box stage in place, instrument box is lifted to the position more slightly higher than installation site using fork truck, is moved forward
Instrument box is sent to the position being bonded with cabinet body by fork truck, and when fork truck is advanced over, pendency boom is swung backward, and ensure that instrument
Also the thrust to cabinet body has been dissolved while case back is bonded with cabinet body, has realized longitudinal to just.If the transverse direction of instrument box
Position needs to adjust, then movable transverse arm can be pushed relative to a base body transverse shifting;After horizontal alignment, then fork truck can be fallen
Arm realizes being bonded between instrument box bottom and cabinet body, and the Change Weight To of instrument box all carries on the cabinet, lateral short latch
The weight of instrument box is no longer undertaken, lateral short latch can be extracted at this time, exit fork truck.
Two, the utility model can act light and handy, saving manpower with one man operation, and the shortening set-up time improves work effect
Rate is eliminated because worker's mismate leads to the danger of article high falling, it is ensured that safety.
Three, the utility model is suitable for the instrument box of two kinds of specifications of 800mm wide and 1000mm wide simultaneously.
Detailed description of the invention
Fig. 1 is a kind of schematic perspective view of specific embodiment of the utility model.
Fig. 2 is the main view of structure shown in Fig. 1.
The side view of structure shown in Fig. 3 Fig. 1.
Fig. 4 is the movable cross arm structure schematic diagram in Fig. 2.
Fig. 5 is the top view of structure shown in Fig. 3.
Fig. 6 is the usage mode schematic diagram of embodiment illustrated in fig. 1.
Fig. 7 is the schematic side view of state shown in Fig. 6.
Fig. 8 is the variable condition schematic diagram of structure shown in Fig. 2.
Specific embodiment
Fig. 1, Fig. 2, Fig. 3, Fig. 4, structure shown in fig. 5 are a kind of upending frame for cooperating instrument box with fork truck, include base
4, four pedestal 2, cross slide way 3, movable transverse arm pendency booms 5 vertically to dangle;Base body 2 open up there are two for fork truck fork
The socket 20 of vehicle arm insertion;Cross slide way 3 is fixedly mounted on above base body 2, and movable transverse arm 4 is equipped with four rolling 31, and four
A idler wheel 31 is arranged as two rows two column, and idler wheel 31 laterally can be rollably mounted on cross slide way 3;It is additionally provided with limitation movable transverse
Left and right two piece space limiting side plate 7 of the arm 4 relative to 2 transverse shifting amplitude of base body.
Shown in Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, the activity transverse arm 4 is divide into upper part and lower part, i.e., part on movable transverse arm
41 divide 42 with movable transverse arm lower part, and the transverse width (as shown in size m in Fig. 4) of part 41 is greater than movable transverse arm on movable transverse arm
The transverse width of lower part (as shown in size n in Fig. 4), wherein there is the upper end of two pendency booms 5 to be mounted on movable transverse arm
The left and right ends of part 41, the lateral clear spacing width (as shown in size b in Fig. 2) of this two pendency booms 5 are 1010 mm;
The upper end of another two pendencys booms 5 is mounted on the left and right ends of movable transverse arm lower part point 42, between this two 5 transverse directions of pendency booms are net
It is 810 mm away from (as shown in size a in Fig. 2) width;Lateral short latch 51 is equipped in the lower end of every pendency boom 5.Each outstanding
The upper end of hanging arm 5 is equipped with slotted hole 50, and the length of slotted hole 50 is to be vertical, the left and right ends of part 41 on the movable transverse arm
It is fixed with lateral short axle 6 respectively with the left and right ends of movable transverse arm lower part point 42, every lateral short axle 6 is inserted in corresponding pendency and hangs
59 the inside of slotted hole of 5 upper end of arm, being achieved in pendency boom 5 can swing and upper and lower play.
The use process of above-described embodiment is divided into two stages.First stage is the transport stage, and second stage is instrument box
Stage in place.
In the stage of transport, the fork truck arm 13 of fork truck 1 is inserted into the socket 20 of base body 2, with the rising above-described embodiment of fork truck 1
Hanger is moved to above instrument box, and with the dynamic movable transverse arm 4 of hand push, 4 lateral position of adjustment activity transverse arm makes it be directed at instrument box 8,
Wherein Fig. 2 shows respectively movable transverse arm 4 from Fig. 8 and is in different lateral positions, selects corresponding two according to the width of instrument box 8
Root dangles, and (selection is located at two pendency booms 5 of inside to boom if the width of instrument box 8 is 800 mm, if instrument box 8
Width be that 1000 mm then select two pendency booms 5 positioned at outside), two that this is selected are dangled the transverse direction of boom
Short latch 51 is inserted into the lifting eye of instrument box two sides, and another two pendencys boom 5 then flexibly avoids, then the hoisting rack of fork truck 1
12 liftings, the weight of entire instrument box, which is held by two lateral short latches 6 by upending frame, hangs, movement forklift 1, by entire instrument box
Before 8 are transported to the cabinet of KYN cabinet 9;
In the instrument box stage in place, instrument box 8 is lifted to the position more slightly higher than installation site, Xiang Qianyi using fork truck 1
Instrument box 8 is sent to the position (as shown in Figure 6, Figure 7) being bonded with cabinet body 9 by electrical forklift, and when fork truck 1 is advanced over, dangle boom 5
It swings backward, has also dissolved the thrust to cabinet body 9 while ensure that 8 back of instrument box is bonded with cabinet body 9, realize front and back
Direction to just.If the lateral position of instrument box 8 needs to adjust, movable transverse arm 4 can be pushed lateral relative to base body 2 is played
It is mobile;After horizontal alignment, fork truck arm 13 can be fallen, realizes being bonded between 8 bottom of instrument box and cabinet body 9, instrument box 8 at this time
Change Weight To be all carried on cabinet body 9, lateral short latch 6 no longer undertakes the weight of instrument box 8, can extract at this time laterally it is short
Bolt 6 exits fork truck 1, completes the in place of instrument box.
In above-described embodiment, be mounted on two of 41 left and right ends of part on movable transverse arm pendency booms 5 it is laterally net between
1005 mm or 1020 mm are readily modified as away from width (as shown in size b in Fig. 2);It is left to be mounted on movable transverse arm lower part point 42
The lateral clear spacing width (as shown in size a in Fig. 2) of two pendency booms 5 at right both ends is readily modified as 805 mm or 820
mm。
Claims (3)
1. a kind of upending frame of the cooperation instrument box with fork truck, it is characterised in that include base body, cross slide way, movable transverse arm,
Four pendency booms vertically to dangle;Base body open up there are two for fork truck fork truck arm insertion socket;Cross slide way is fixed
It is mounted on above base body, movable transverse arm is equipped with idler wheel, and idler wheel can be laterally rollably mounted on cross slide way;The activity
Transverse arm is divide into upper part and lower part, and the transverse width of part is greater than the transverse width of movable transverse arm lower part point on movable transverse arm;Wherein
There is the upper end of two pendency booms that can be mounted on to swing the left and right ends of part on movable transverse arm, this two pendency booms
Lateral clear spacing width be 1005~1020 mm;The upper end of another two pendencys boom can be mounted on movable transverse to swing
The left and right ends of part under arm, this two pendency boom transverse direction clear spacing width are 805~820 mm;Dangle boom at every
Lower end is equipped with lateral short latch.
2. the upending frame according to claim 1 with fork truck cooperation instrument box, it is characterised in that: each the upper of boom of dangling
End is equipped with slotted hole, and the length of slotted hole is to be vertical, the left and right ends of part and the left and right two of lower part on the movable transverse arm
End is fixed with lateral short axle respectively, and every lateral short axle is inserted in inside the slotted hole of corresponding pendency boom upper end.
3. the upending frame according to claim 1 or 2 with fork truck cooperation instrument box, it is characterised in that: it is additionally provided with limitation and lives
Dynamic limit component of the transverse arm relative to base body transverse shifting amplitude.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822106535.3U CN209367749U (en) | 2018-12-15 | 2018-12-15 | With the upending frame of fork truck cooperation instrument box |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822106535.3U CN209367749U (en) | 2018-12-15 | 2018-12-15 | With the upending frame of fork truck cooperation instrument box |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209367749U true CN209367749U (en) | 2019-09-10 |
Family
ID=67832834
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822106535.3U Active CN209367749U (en) | 2018-12-15 | 2018-12-15 | With the upending frame of fork truck cooperation instrument box |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209367749U (en) |
-
2018
- 2018-12-15 CN CN201822106535.3U patent/CN209367749U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209367749U (en) | With the upending frame of fork truck cooperation instrument box | |
CN203367818U (en) | Vacuum circuit breaker transit trolley | |
CN203135274U (en) | Handcart switch transport cart | |
CN208732524U (en) | For installing the support equipment of mutual inductor | |
CN208196091U (en) | A kind of quarry tipper elevating ram transhipment displacement tool | |
CN110526126A (en) | Adjustable spacing electrical cabinet lifting frame and its handling method | |
CN215439387U (en) | Positioning device for mounting urban gas pipeline | |
CN215088238U (en) | Technological equipment for conveying and coating vehicle body | |
CN202785293U (en) | Instrument desk assembly lifting appliance | |
CN201952127U (en) | Lifting device | |
CN213356821U (en) | Steel structure supporting table | |
CN204958304U (en) | Fork truck guiding mechanism | |
CN211569284U (en) | Electrolytic cathode copper rod drawing turnover device | |
CN211107467U (en) | Drill rod longitudinal movement aligning device | |
CN209737577U (en) | End effector placing support | |
CN103949840B (en) | Frame overturn unit | |
CN203639113U (en) | Hoisting system for engineering construction and single-point type overturning support of hoisting system | |
CN113200063A (en) | Self-working track flat car for disease control of operation tunnel and operation method | |
CN202808297U (en) | Lifting frame | |
CN206976909U (en) | Distribution switchgear cabinet installs transfer device | |
CN205346670U (en) | Driving of cathode bar lateral shifting single armed line | |
CN205098935U (en) | Shot transport vechicle | |
CN107915020A (en) | A kind of reversible producing line trolley | |
CN203391669U (en) | Vehicle-mounted hoisting machine | |
CN220904971U (en) | Center pin warehousing and transportation installation integrated device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |