CN209354130U - Total station hanging basket - Google Patents

Total station hanging basket Download PDF

Info

Publication number
CN209354130U
CN209354130U CN201822129137.3U CN201822129137U CN209354130U CN 209354130 U CN209354130 U CN 209354130U CN 201822129137 U CN201822129137 U CN 201822129137U CN 209354130 U CN209354130 U CN 209354130U
Authority
CN
China
Prior art keywords
plate
hanging basket
connecting column
duct piece
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201822129137.3U
Other languages
Chinese (zh)
Inventor
万里明
吴昌浩
王磊
胡小海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 12th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Original Assignee
China Railway 12th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 12th Bureau Group Co Ltd, Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd filed Critical China Railway 12th Bureau Group Co Ltd
Priority to CN201822129137.3U priority Critical patent/CN209354130U/en
Application granted granted Critical
Publication of CN209354130U publication Critical patent/CN209354130U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model provides a kind of total station hanging basket, including the first connecting column, the second connecting column and middle connecting plate, first connecting column and the second connecting column are arranged in parallel and end in the same direction is connected and fixed by middle connecting plate, the middle position of middle connecting plate is provided with centring screw bolt, end on first connecting column other direction is coupling type structure, and hanging basket is placed on the segment bolt of shield duct piece to connect with shield duct piece by coupling type structure;Second connecting column is made of fixed plate and movable plate, movable plate has fixing end and movable end, one end of fixed plate is fixed with middle connecting plate, and the other end is flexibly connected with the movable end of movable plate, and the fixing end of movable plate is fixed by the segment bolt of shield duct piece with shield duct piece.Total station hanging basket provided by the utility model is directly fixedly connected using segment bolt pre-buried on shield duct piece with shield duct piece, and not only installation is simple, speed is fast but also installation is firm, it is thus also avoided that the destruction to shield duct piece.

Description

Total station hanging basket
Technical field
The utility model relates to subway work field of measuring technique, and in particular, to a kind of total station hanging basket.
Background technique
In recent years, as country greatly develops city track traffic engineering, subway work is in many city moderate heat heat constructions In, and in Urban Metro Construction, a kind of most common constructing metro tunnel method is exactly shield construction, in complicated city In underground environment, the excavation in tunnel is accurately completed with shield method just must carry out before construction, in construction, after construction and is various Work is measured, to guarantee the structures such as ground and the urban Underground pipeline that will not destroy urban architecture in formal construction.Using shield Measurement when structure method is constructed includes ground control survey, underground control measurement, rings survey, shield orientation measurement.Wherein in shield Forced centering control point pallet is used to use total station hanging basket to lead as shield as the basis of underground control measurement in structure section To the basis of measurement.
At present in the installation of total station hanging basket, hanging basket is fixed on shield duct piece using expansion bolt at the construction field (site), It is easy to form shield duct piece and destroy, influence formed pipe tablet quality, hanging basket installation stability can not be completely secured and the set-up time It is long, and influence shield-tunneling construction and normally tunnel progress.
Utility model content
Total station hanging basket be easy to cause the destruction of shield duct piece during installation in the prior art and the set-up time is long, it is difficult to install Degree is big, not firm enough defect after installation, and the utility model, which provides a kind of total station hanging basket, can overcome drawbacks described above.
The purpose of the utility model is to provide a kind of total station hanging basket, the hanging basket is connect with shield duct piece, the shield It is embedded with multiple segment bolts on section of jurisdiction, the hanging basket includes the first connecting column, the second connecting column and middle connecting plate, and described the One connecting column is arranged in parallel with second connecting column and end in the same direction is connected admittedly by the middle connecting plate Fixed, the middle position of the middle connecting plate is provided with centring screw bolt, and the end on the first connecting column other direction is to hang Hook-type structure, the hanging basket are placed on the segment bolt of the shield duct piece thus with the shield by the coupling type structure The connection of structure section of jurisdiction;
Second connecting column is made of fixed plate and movable plate, and the movable plate has fixing end and movable end, described One end of fixed plate is fixed with the middle connecting plate, and the other end is flexibly connected with the movable end of the movable plate, the activity The fixing end of plate is fixed by the segment bolt of the shield duct piece with the shield duct piece.
Preferably, first connecting column by upper junction plate, lower connecting plate, the expansion plate with fixing end and movable end with And at least two fastening bolt compositions, one end of the upper junction plate is the coupling type structure, the other end and the expansion plate Fixing end be connected and fixed, the expansion plate is equipped with waist-shaped hole, and the fastening bolt passes through the waist-shaped hole for the expansion plate One end of movable end and the lower connecting plate fix, the other end of the lower connecting plate is fixed with the middle connecting plate.
Preferably, the upper junction plate has flat part and bending part, and the bending part and the flat part are in the first folder Angle setting, the coupling type structure setting is in the bending part.
Preferably, first angle is between 160 ° -170 °.
Preferably, the other end of the fixed plate and the movable end loose-leaf of the movable plate are hinged.
Total station provided by the utility model hangs indigo plant, is placed in shield pipe by the coupling type structure of first connecting column one end Quick connection is formed on the segment bolt of piece with shield duct piece, one end of the second connecting column passes through segment bolt and the shield pipe Piece connection, the second connecting column have the fixed plate being flexibly connected and movable plate, and such connection type to connect even if first It connects column and when the second connecting column is connect with the segment bolt on shield duct piece the distance between segment bolt occurs and connect with first The distance between column and the second connecting column, also can be by adjusting the fixed plate of the second connecting column and the phases of movable plate there are when error Error is eliminated to position.Total station hanging basket provided by the utility model directly utilizes segment bolt and shield pre-buried on shield duct piece Structure section of jurisdiction is fixedly connected, and not only installation is simple, speed is fast but also installation is firm, while avoiding the destruction to shield duct piece.
Other features and advantages of the utility model will the following detailed description will be given in the detailed implementation section.
Detailed description of the invention
Attached drawing is and to constitute part of specification for providing further understanding of the present application, with following tool Body embodiment is used to explain the application together, but does not constitute the limitation to the application.
In the accompanying drawings:
Fig. 1 is the main view of the total station hanging basket provided according to the utility model embodiment;
Fig. 2 is the top view of the total station hanging basket provided according to the utility model embodiment;
Fig. 3 is the structural schematic diagram of the first connecting column of the total station hanging basket provided according to the utility model embodiment;
Fig. 4 is the structural schematic diagram of the second connecting column of the total station hanging basket provided according to the utility model embodiment.
Description of symbols
1 first connecting column, 2 second connecting column
3 middle connecting plate, 11 upper junction plate
12 lower connecting plate, 13 expansion plate
14 fastening bolt, 21 fixed plate
22 movable plate, 31 centring screw bolt
131 waist-shaped holes
Specific embodiment
Specific embodiment of the present utility model is described in detail below in conjunction with attached drawing.It should be understood that herein Described specific embodiment is only used for describing and explaining the present invention, and is not intended to limit the utility model.
It should be noted that in the absence of conflict, the feature in the embodiments of the present invention and embodiment can To be combined with each other.
In the present invention, in the absence of explanation to the contrary, the noun of locality used such as " upper and lower, top, bottom " is usually Be for direction shown in the drawings either for it is vertical, vertically or on gravity direction for each component mutual alignment Relationship description word.
The utility model will be described in detail below with reference to the accompanying drawings and embodiments.
As Figure 1-Figure 4, the utility model provides a kind of total station hanging basket, and the hanging basket is connect with shield duct piece, institute It states and is embedded with multiple segment bolts on shield duct piece, the hanging basket includes the first connecting column 1, the second connecting column 2 and intermediate connection Plate 3, first connecting column 1 and second connecting column 2 are arranged in parallel and end in the same direction passes through the centre Connecting plate 3 is connected and fixed, and the middle position of the middle connecting plate 3 is provided with centring screw bolt 31, and first connecting column 1 is another End on direction is coupling type structure, and the hanging basket is placed in the section of jurisdiction spiral shell of the shield duct piece by the coupling type structure To be connect with the shield duct piece on bolt;
Second connecting column 2 is made of fixed plate 21 and movable plate 22, and the movable plate 22 has fixing end and activity End, one end of the fixed plate 21 and the middle connecting plate 3 are fixed, and the movable end activity of the other end and the movable plate 22 connects It connects, the fixing end of the movable plate 22 is fixed by the segment bolt of the shield duct piece with the shield duct piece.
The total station hanging basket of the utility model is hung on shield duct piece using the coupling type structure of 1 one end of the first connecting column It on segment bolt, is thus connect with shield duct piece, in actual application, in order to ensure the coupling type on the first connecting column 1 Structure is not fallen off after being hung on the segment bolt, tightens segment bolt after coupling type structure is hung, so that the pipe Coupling type structure is pressed on shield duct piece by piece bolt, and the connection of such first connecting column 1 and shield duct piece is stronger can It leans on;Second connecting column 2 is equally fixedly connected by segment bolt with shield duct piece, is opened up in the fixing end of the movable plate 22 logical Hole, segment bolt pass through through-hole and movable plate 22 are pressed on shield duct piece.In practical applications, the pre-buried spacing of segment bolt It is possible that range error, if the distance between the first connecting column 1 and the second connecting column 2 are a nonadjustable definite value, When error occurs in the pre-buried spacing of segment bolt, consolidating for total station hanging basket cannot be carried out with the segment bolt on shield duct piece It is fixed, therefore, the structure of the second connecting column 2 using the flexible connecting structure being flexibly connected between movable plate 22 and fixed plate 21 come gram Clothes when the pre-buried spacing of segment bolt and the distance between the first connecting column 1 and the second connecting column 2 there are hanging baskets when error cannot The problem of installation, specifically adjusts the relative position between fixed plate 21 and movable plate 22 in the second connecting column 2 to make first The distance between connecting column 1 and the second connecting column 2 adapt to the spacing between two segment bolts, guarantee the peace of total station hanging basket Dress.
Preferably, first connecting column 1 is by upper junction plate 11, lower connecting plate 12, stretching with fixing end and movable end Contracting plate 13 and at least two fastening bolts 14 composition, one end of the upper junction plate 11 are the coupling type structure, the other end It is connected and fixed with the fixing end of the expansion plate 13, the expansion plate 13 is equipped with waist-shaped hole 131, and the fastening bolt 14 passes through institute Waist-shaped hole 131 is stated to fix the movable end of the expansion plate 13 and one end of the lower connecting plate 12, the lower connecting plate 12 The other end and the middle connecting plate 3 are fixed.
In one embodiment, as shown in figure 3, channel steel can be used for first connecting column 1 and steel plate is welded, upper company Fishplate bar 11 and lower connecting plate 12, which can be used, obtains the mode that a channel steel is cut into two sections, the fixing end of expansion plate 3 and upper company Fishplate bar 11 is fixed, and the modes such as bolt, welding, riveting can be used and fix, it is preferable that using welding.It is offered on expansion plate 13 Waist-shaped hole 131, fastening bolt 14 passes through the waist-shaped hole 131 and is fixedly connected with one end of lower connecting plate 12, when tightening fastening spiral shell When bolt 14, fastening bolt 14 compresses expansion plate 13 and lower connecting plate 12 is fixed, when needing to adjust the length of the first connecting column 1, Fastening bolt 14 is unclamped, as long as expansion plate 3 can be made mobile without screwing out fastening bolt 14 completely at this time, moving telescopic plate 13, fastening bolt 14 relatively moves in waist-shaped hole 131 with expansion plate 13, when expansion plate is moved to the specified of the first connecting column 1 After length, the length of the first connecting column 1 can be adjusted by tightening the fastening expansion plate 13 of fastening bolt 14 and lower connecting plate 12, this structure It spends, the leveling of middle connecting plate 3 after convenience.
In practice of construction, total station is fixed on middle connecting plate 3 far from the one end on ground by centring screw bolt 31, makes When with total station survey, therefore, to assure that total station is on a horizontal measurement face measurement accuracy that just can guarantee total station.It is existing There is the horizontality for the mounting plate for after installing total station hanging basket, being unable to adjust total station in technology, needs in production whole station The production precision of hanging basket is controlled when instrument hanging basket simultaneously in order to ensure the mounting plate of total station is in horizontality, cannot use shield Segment bolt on structure section of jurisdiction is fixed, and needs to be arranged on shield duct piece the installation bolt of special length dimension, so not It only needs to put into bigger energy and cost in the production of total station hanging basket, and installs, adjusts also inconvenience.This is practical new The total station hanging basket that type provides, the first connecting column 1 with adjustable in length and the second connecting column 2 with flexible structure are adjusted Position in the length of whole first connecting column 1 and the second connecting column 2 between movable plate 22 and fixed plate 21, which can be realized, works as whole station The horizontality of middle connecting plate 3 is still adjustable after instrument hanging basket and shield duct piece are fixed, and when total station is completed in tunnel After a certain section of measurement, when needing mobile total station hanging basket to next operating position, the first connecting column 1 can be quickly adjusted again Relative position in length and the second connecting column 2 between movable plate 22 and fixed plate 21 makes middle connecting plate 3 in new work Position is in horizontality.The utility model provides the flexible structure of total station hanging basket, and conveniently when using total station survey It reuses.
Preferably, the upper junction plate 11 has flat part and bending part, and the bending part and the flat part are in first Angle setting, the coupling type structure setting is in the bending part.
Total station hanging basket is generally fixed with the shield duct piece of tunnel top, is arc at the top of shield duct piece, for the first company Column 1 and shield duct piece fixation are connect, by one end bending that the upper junction plate 11 of first connecting column 1 and shield duct piece are fixed Form bending part, the shield duct piece that bending part is preferably bonded, in order to which the coupling type structure on bending part hangs over pipe Bending part can be preferably compressed when tightening segment bolt after on piece bolt and is affixed to shield duct piece, so that the first connecting column 1 and shield Section of jurisdiction is connected firmly.
Preferably, first angle is between 160 ° -170 °, it is further preferable that first angle is 165 °.
Preferably, the other end of the fixed plate 21 and the movable end loose-leaf of the movable plate 22 are hinged.
As shown in figure 4, hinged using loose-leaf between movable plate 22 and fixed plate 21, movable plate 22 can be 21 turns of opposing fixed plate It is dynamic, when adjusting the relative position of fixed plate 21 and movable plate 22, movable plate 22 is rotated, connects the activity using loose-leaf Plate 22 and the fixed plate 21 structure is simple and easy to implement and actual production in can save the production cost of total station hanging basket.
Total station provided by the utility model hangs indigo plant, is placed in shield pipe by the coupling type structure of first connecting column one end Quick connection is formed on the segment bolt of piece with shield duct piece, one end of the second connecting column passes through segment bolt and the shield pipe Piece connection, the second connecting column have the fixed plate being flexibly connected and movable plate, and such connection type to connect even if first It connects column and when the second connecting column is connect with the segment bolt on shield duct piece the distance between segment bolt occurs and connect with first The distance between column and the second connecting column, also can be by adjusting the fixed plate of the second connecting column and the phases of movable plate there are when error Error is eliminated to position.Total station hanging basket provided by the utility model directly utilizes segment bolt and shield pre-buried on shield duct piece Structure section of jurisdiction is fixedly connected, and not only installation is simple, speed is fast but also installation is firm, while avoiding the destruction to shield duct piece.
Preferred embodiments of the present invention, still, the utility model and unlimited are described in detail in conjunction with attached drawing above Detail in above embodiment can be to the skill of the utility model in the range of the technology design of the utility model Art scheme carries out a variety of simple variants, these simple variants belong to the protection scope of the utility model.
It is further to note that specific technical features described in the above specific embodiments, in not lance It in the case where shield, can be combined in any appropriate way, in order to avoid unnecessary repetition, the utility model is to each No further explanation will be given for the possible combination of kind.
In addition, any combination can also be carried out between a variety of different embodiments of the utility model, as long as it is not disobeyed The thought for carrying on the back the utility model, equally should be considered as content disclosed in the utility model.

Claims (5)

1. a kind of total station hanging basket, the hanging basket are connect with shield duct piece, multiple segment bolts are embedded on the shield duct piece, It is characterized in that, the hanging basket includes the first connecting column (1), the second connecting column (2) and middle connecting plate (3), described first connects It connects column (1) and second connecting column (2) is arranged in parallel and end in the same direction is connected by the middle connecting plate (3) Fixation is connect, the middle position of the middle connecting plate (3) is provided with centring screw bolt (31), described first connecting column (1) another party Upward end is coupling type structure, and the hanging basket is placed in the segment bolt of the shield duct piece by the coupling type structure Above to be connect with the shield duct piece;
Second connecting column (2) is made of fixed plate (21) and movable plate (22), the movable plate (22) have fixing end and Movable end, one end and the middle connecting plate (3) of the fixed plate (21) are fixed, the work of the other end and the movable plate (22) Moved end is flexibly connected, and the fixing end of the movable plate (22) is solid by the segment bolt of the shield duct piece and the shield duct piece It is fixed.
2. hanging basket according to claim 1, which is characterized in that first connecting column (1) is by upper junction plate (11), lower company Fishplate bar (12), the expansion plate (13) with fixing end and movable end and at least two fastening bolts (14) composition, the upper company One end of fishplate bar (11) is the coupling type structure, and the other end and the fixing end of the expansion plate (13) are connected and fixed, described to stretch Contracting plate (13) is equipped with waist-shaped hole (131), and the fastening bolt (14) passes through the waist-shaped hole (131) for the expansion plate (13) Movable end and the one end of the lower connecting plate (12) are fixed, the other end and the middle connecting plate of the lower connecting plate (12) (3) fixed.
3. hanging basket according to claim 2, which is characterized in that the upper junction plate (11) has flat part and bending part, The bending part and the flat part are arranged in the first angle, and the coupling type structure setting is in the bending part.
4. the hanging basket according to claim 3, which is characterized in that first angle is between 160 ° -170 °.
5. hanging basket according to claim 1, which is characterized in that the other end of the fixed plate (21) and the activity The movable end loose-leaf of plate (22) is hinged.
CN201822129137.3U 2018-12-18 2018-12-18 Total station hanging basket Expired - Fee Related CN209354130U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822129137.3U CN209354130U (en) 2018-12-18 2018-12-18 Total station hanging basket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822129137.3U CN209354130U (en) 2018-12-18 2018-12-18 Total station hanging basket

Publications (1)

Publication Number Publication Date
CN209354130U true CN209354130U (en) 2019-09-06

Family

ID=67799373

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822129137.3U Expired - Fee Related CN209354130U (en) 2018-12-18 2018-12-18 Total station hanging basket

Country Status (1)

Country Link
CN (1) CN209354130U (en)

Similar Documents

Publication Publication Date Title
CN107090775B (en) A kind of full framing space beam-ends cable guide pipe construction localization method
CN204731107U (en) A kind of high-altitude straight wall anchor pole pulling resistance testing device
CN212535033U (en) A pre-buried fixed frame of climbing attaches wall support device for building of passive room
CN207392771U (en) A kind of guide type steel column locator
CN106968687B (en) Closed type circular ring yielding support device and method for mining roadway of steep coal seam
CN205858357U (en) Shield range restraint measures the mounting structure of forced centering bracket
CN209354130U (en) Total station hanging basket
CN109930603A (en) A kind of ultra-deep is inverse to make steel pipe column verticality control device and its application method
CN206530078U (en) A kind of support meanss
CN219367018U (en) Temporary support with adjustable building engineering pipeline installation
CN204849792U (en) Precipitation well well casing underpins support
CN109631867A (en) A kind of portable forced centering pier and its installation method
CN206237081U (en) A kind of self-supporting cable tunnel frame with telescopic joint
CN206346201U (en) A kind of sand control alignment system for being used to lay lattice column
CN108662293A (en) A kind of glass solidification bead charging pipe holder
CN206638251U (en) A kind of novel column measuring instrument leg means
CN209875183U (en) Tunnel IV-level surrounding rock full-circle excavation inverted arch longitudinal water stop fixing device
CN206769416U (en) A kind of concrete filled steel tube coupled column steel pipe temporary setting jig
CN206815191U (en) A kind of full framing space beam-ends cable guide pipe positioner
CN203822340U (en) Gate-type support frame equipment
CN207093102U (en) A kind of asymmetric trouble hole supporting construction
CN208167542U (en) A kind of Steel Tubes For Bridge Application column quickly positions constructing device
CN209620101U (en) Underground pipe gallery construction steel aisle device
CN207314533U (en) A kind of house pillar stand tail structure
CN107143353B (en) Concrete supporting construction in high temperature tunnel

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190906