CN209353226U - Railway deck embedded sleeve barrel positioning mold - Google Patents

Railway deck embedded sleeve barrel positioning mold Download PDF

Info

Publication number
CN209353226U
CN209353226U CN201822277187.6U CN201822277187U CN209353226U CN 209353226 U CN209353226 U CN 209353226U CN 201822277187 U CN201822277187 U CN 201822277187U CN 209353226 U CN209353226 U CN 209353226U
Authority
CN
China
Prior art keywords
sleeve barrel
embedded sleeve
locating slot
positioning mold
slot steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822277187.6U
Other languages
Chinese (zh)
Inventor
孙毅
张磊
许可
刘军锋
胡志安
吴庆革
周起鸿
张赫然
张开
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Sixth Group Co Ltd
Tianjin Railway Construction Co Ltd of China Railway Sixth Group Co Ltd
Original Assignee
China Railway Sixth Group Co Ltd
Tianjin Railway Construction Co Ltd of China Railway Sixth Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Sixth Group Co Ltd, Tianjin Railway Construction Co Ltd of China Railway Sixth Group Co Ltd filed Critical China Railway Sixth Group Co Ltd
Priority to CN201822277187.6U priority Critical patent/CN209353226U/en
Application granted granted Critical
Publication of CN209353226U publication Critical patent/CN209353226U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Machines For Laying And Maintaining Railways (AREA)

Abstract

A kind of railway deck embedded sleeve barrel positioning mold.It includes locating slot steel and Duo Gen lag bolt;Wherein, locating slot steel is horizontally disposed and opening up, and the position that a line embedded sleeve barrel is corresponded on bottom plate is formed with multiple circular holes;Every lag bolt passes through the internal upper part that a circular hole rear thread in locating slot steel is connected to an embedded sleeve barrel from the top down.Railway deck embedded sleeve barrel positioning mold provided by the utility model have the advantages that construction efficiency is fast, construction quality is high, integral linear is good, can during standard construction embedded sleeve barrel spacing, linear and designed elevation, ensure that construction quality.In addition, this mould structure is simple, easy to use and operate and at low cost.

Description

Railway deck embedded sleeve barrel positioning mold
Technical field
The utility model belongs to railway bridge construction auxiliary device technical field, more particularly to a kind of pre-buried set of railway deck Cylinder positioning mold.
Background technique
During Construction of continuous beam on railway bridge, the previous embedded sleeve barrel installation method for mounting rail guidance tape is by making Industry personnel measure the specification absolute altitude of embedded sleeve barrel using ruler on the continuous beam steel reinforcement cage set up, and hanging wire is mounted on company On continuous beam steel cage, then in the template of continuous beam casting concrete and continuous beam is made, thus embedded sleeve barrel is embedded in At the bridge floor of continuous beam.But it is influenced sometimes by reinforcing bar lashing location, it is pre-buried linear to have some setbacks so that embedded sleeve barrel position is inaccurate Directly, verticality is poor, and sleeve top mark height is not easy to control, to make troubles to subsequent track slab construction, as a result influences entire The quality of railway bridge.
Summary of the invention
To solve the above-mentioned problems, the purpose of this utility model is to provide a kind of railway deck embedded sleeve barrel positioning moulds Tool.
In order to achieve the above object, railway deck embedded sleeve barrel positioning mold provided by the utility model includes locating slot steel With more lag bolts;Wherein, locating slot steel is horizontally disposed and opening up, and the position of a line embedded sleeve barrel is corresponded on bottom plate It is formed with multiple circular holes;Every lag bolt pass through from the top down a circular hole rear thread in locating slot steel be connected to one it is pre-buried The internal upper part of sleeve.
The distance between the bottom plate of the locating slot steel and the upper end of embedded sleeve barrel are 2mm.
Railway deck embedded sleeve barrel positioning mold provided by the utility model has the advantages that construction efficiency is fast, constructs Quality is high, integral linear is good, can during standard construction embedded sleeve barrel spacing, linear and designed elevation, ensure that and apply Working medium amount.In addition, this mould structure is simple, easy to use and operate and at low cost.
Detailed description of the invention
Fig. 1 is railway deck embedded sleeve barrel positioning mold side view provided by the utility model.
Fig. 2 is railway deck embedded sleeve barrel positioning mold top view provided by the utility model.
Fig. 3 is railway deck embedded sleeve barrel positioning mold use state top view provided by the utility model.
Fig. 4 is railway deck embedded sleeve barrel positioning mold use state side view provided by the utility model.
Specific embodiment
The utility model is described in detail in the following with reference to the drawings and specific embodiments.
As shown in Fig. 1-Fig. 2, railway deck embedded sleeve barrel positioning mold provided by the utility model includes locating slot steel 1 With more lag bolts 2;Wherein, locating slot steel 1 is horizontally disposed and opening up, and a line embedded sleeve barrel 3 is corresponded on bottom plate Position is formed with multiple circular holes;The circular hole rear thread that every lag bolt 2 is passed through from the top down in locating slot steel 1 is connected to one The internal upper part of root embedded sleeve barrel 3.
The distance between the bottom plate of the locating slot steel 1 and the upper end of embedded sleeve barrel 3 are 2mm.
Now the application method of bridge floor embedded sleeve barrel positioning mold provided by the utility model is described below:
As shown in Figure 3, Figure 4, when needing on the continuous beam 4 of railway bridge, by the position of near surface, setting is used for track plates When embedded sleeve barrel 3, a lag bolt 2 is passed through to spiral shell after a circular hole in locating slot steel 1 from the top down by operating personnel first Line is connected to the internal upper part of an embedded sleeve barrel 3, and makes the bottom plate of locating slot steel 1 and the distance between the upper end of embedded sleeve barrel 3 It is maintained at 2mm.Then multiple embedded sleeve barrels 3 in locating slot steel 1 are placed on the design position of certain a line embedded sleeve barrel 3 and made The bottom plate of locating slot steel 1 is concordant with the surface level of continuous beam 4, later casting concrete and the company of being made in the template of continuous beam Continuous beam removes lag bolt 2 and locating slot steel 1 after the intensity of concrete reaches the requirement of design, thus buries embedded sleeve barrel 3 It is located at the bridge floor of continuous beam 4, with the installation for track plates.

Claims (2)

1. a kind of railway deck embedded sleeve barrel positioning mold, it is characterised in that: the railway deck embedded sleeve barrel positioning mold Including locating slot steel (1) He Duogen lag bolt (2);Wherein, locating slot steel (1) is horizontally disposed and opening up, opposite on bottom plate Multiple circular holes should be formed in the position of a line embedded sleeve barrel (3);Every lag bolt (2) passes through locating slot steel (1) from the top down On a circular hole rear thread be connected to the internal upper part of an embedded sleeve barrel (3).
2. railway deck embedded sleeve barrel positioning mold according to claim 1, it is characterised in that: the locating slot steel (1) the distance between upper end of bottom plate and embedded sleeve barrel (3) is 2mm.
CN201822277187.6U 2018-12-27 2018-12-27 Railway deck embedded sleeve barrel positioning mold Active CN209353226U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822277187.6U CN209353226U (en) 2018-12-27 2018-12-27 Railway deck embedded sleeve barrel positioning mold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822277187.6U CN209353226U (en) 2018-12-27 2018-12-27 Railway deck embedded sleeve barrel positioning mold

Publications (1)

Publication Number Publication Date
CN209353226U true CN209353226U (en) 2019-09-06

Family

ID=67802271

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822277187.6U Active CN209353226U (en) 2018-12-27 2018-12-27 Railway deck embedded sleeve barrel positioning mold

Country Status (1)

Country Link
CN (1) CN209353226U (en)

Similar Documents

Publication Publication Date Title
CN105040717B (en) Foundation bolt fixing support and installation method
CN101348213B (en) Mounting method of crane sliding contact line in workshop
CN100538011C (en) Railway large-bore tunnel overhead contact built-in sliding chute construction method
CN201633115U (en) Track beam form
CN108086355B (en) Pre-buried channel flow installing and fixing method under cast-in-place piping lane traditional handicraft
CN206784951U (en) A kind of concreting floorslab thickness control device
CN209353226U (en) Railway deck embedded sleeve barrel positioning mold
CN202925896U (en) A hole reservation device for constructional engineering
CN208072455U (en) Groove type section of jurisdiction
CN206768606U (en) The positioning auxiliary device of Thin-wall Hollow Pier pier shaft reinforcing bar
CN205591250U (en) Fixed portable location frock with rag bolt of tower machine
CN206763907U (en) Continuous casting tundish Integral nozzle builds centralising device by laying bricks or stones
CN210036529U (en) Thickness measuring tool for measuring thickness of cast-in-place concrete
CN209323390U (en) Absolute altitude iron box beam catenary mast and the bracing wire pre-cast bolt positioning device that casts anchor
CN210066813U (en) Pre-buried installation device who breathes out groove
CN104232824B (en) The bolt clip plate stationary installation of cooling stave heat edge refractory brick and fixing means
CN207499463U (en) A kind of cast-in-place concrete floor elevation control device
CN208183782U (en) A kind of fixed device of the foundation bolt of contact net basic
CN102286940B (en) Construction method for remoulding old pier columns of bridges
CN206800401U (en) Cast-in-place pile casing positions and operating platform integrated apparatus
CN208830172U (en) A kind of Novel road bridge concrete steel form
CN210657953U (en) Building embedded part
CN203834932U (en) Positioning die for embedment construction of bay window board reinforcements
CN220133506U (en) Fixing structure of cast-in-place concrete embedded sleeve
CN211949680U (en) Auxiliary device for ensuring accurate pre-embedding of beam-penetrating sleeve

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant