CN209352962U - Distributor is used in a kind of smelting of high temperature alloy master alloy - Google Patents

Distributor is used in a kind of smelting of high temperature alloy master alloy Download PDF

Info

Publication number
CN209352962U
CN209352962U CN201821776636.5U CN201821776636U CN209352962U CN 209352962 U CN209352962 U CN 209352962U CN 201821776636 U CN201821776636 U CN 201821776636U CN 209352962 U CN209352962 U CN 209352962U
Authority
CN
China
Prior art keywords
groove
distributor
plug hole
mould pipe
dam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821776636.5U
Other languages
Chinese (zh)
Inventor
谢君
侯桂臣
仉凤江
荀淑玲
谭明晖
王振江
周亦胄
孙晓峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoning Hongyin Metal Co ltd
Original Assignee
Institute of Metal Research of CAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Institute of Metal Research of CAS filed Critical Institute of Metal Research of CAS
Priority to CN201821776636.5U priority Critical patent/CN209352962U/en
Application granted granted Critical
Publication of CN209352962U publication Critical patent/CN209352962U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Continuous Casting (AREA)

Abstract

The utility model discloses a kind of high temperature alloy master alloy smelting distributors, belong to metal smelt, casting technology field.The distributor includes discoid distributor body, and distributor body includes circular inner groove and annular outer groove, is separated between inside groove and outer groove by ring dam;The inside groove is pouring metal melt drop point and a plug hole I is arranged at interior groove bottom center, and multiple plug holes II are evenly distributed in the annular groove bottom of the outer groove, is equipped between each adjacent two plug hole II and intercepts dam;The bottom of the plug hole I and plug hole II is connected with mould pipe.The utility model can be with ten mould pipes of once-cast, and it is able to achieve each mould pipe of sequential casting, molten metal can also carry out abundant feeding to the mould pipe filled has been poured when flowing to subsequent mould pipe, ensure to obtain the high quality alloy pig without a shrinkage cavity, the yield rate of alloy pig, remarkable in economical benefits is greatly improved.

Description

Distributor is used in a kind of smelting of high temperature alloy master alloy
Technical field
The present invention relates to metal smelts, casting technology field, and in particular to a kind of high temperature alloy master alloy smelting distribution Device.
Background technique
The demand of common crucible size and production unit is cast according to current high temperature alloy, while also for convenience of subsequent casting The progress of blanking procedure during making, during the preparation of high temperature alloy master alloy, it is 75- that master alloy, which is usually poured into diameter, 85mm, length are greater than the bar of 300mm.Currently used pouring procedure has single casting and more while casting etc..It is single to pour Efficiency is lower when note, and operation control difficulty is larger and feeding capacity is not easy to control, makes the casting quality fluctuation between different times Larger, advantage is to can guarantee the defects of molten metal is persistently cast in mould pipe, and alloy pig outer surface is not likely to produce cold shut;Compared to it Under, more to be poured efficiency simultaneously higher, and it is easy to operate, but cannot be guaranteed that all mould Guan Jun have continual and steady molten metal to flow into, The defects of instantaneous cutout causes alloy ingot surface to form cold shut is generated in Yi Mo pipe, while the aluminium alloy of larger capacity being needed to make The shrinkage cavity that master alloy ingot is reduced for riser feeding, causes alloy utilization rate lower.Therefore, a kind of casting efficiency is designed High, easy to operate, feeding is good and alloy utilization rate is high method and device may advantageously facilitate the development of high temperature alloy smelting technique, With good economic results in society.
Utility model content
The shortcomings that in order to overcome existing smelting technique and deficiency, smelt the present invention provides a kind of high temperature alloy master alloy and use Distributor.
The technical solution adopted in the utility model is as follows:
A kind of high temperature alloy master alloy smelting distributor, which includes discoid distributor body, distributor Ontology includes circular inner groove and annular outer groove, is separated between inside groove and outer groove by ring dam;The inside groove is pouring metal melt Simultaneously a plug hole I is arranged at interior groove bottom center in drop point, and uniformly distributed multiple plug holes II (can in the annular groove bottom of the outer groove The quantity of plug hole II is set according to the requirement of pouring technology, such as arrangement 9), it is equipped between each adjacent two plug hole II Intercept dam.
The distributor further includes annular medial launder, which is set between inside groove and outer groove, between inside groove and medial launder, And it is separated by ring dam between medial launder and outer groove;The quantity of the medial launder is at least 1, the annular groove of medial launder It is evenly distributed with multiple plug holes II on bottom surface, is equipped between each adjacent two plug hole II and intercepts dam.
The bottom of the plug hole I and plug hole II is connected with mould pipe.
A communication port is equipped between the inside groove and outer groove, which is opened on the ring dam, in inside groove Aluminium alloy is flowed into outer groove by the communication port.
The height of the ring dam is higher than the height for intercepting dam.
When interception height of dam degree when the communication port two sides is unequal, i.e., (other side phase when side height is higher than the other side It is contour to low interception dam and other interception dams), after aluminium alloy enters inside groove by crucible, molten metal is first by plug hole I in inside groove Under mould pipe pour full, then outer groove is flowed by communication port, and successively pour into plug hole II in outer groove clockwise or counterclockwise Under mould pipe, it is final realize mould pipe is poured one by one it is full.
When interception height of dam degree is equal in the outer groove, after aluminium alloy enters inside groove by crucible, molten metal is first by inside groove Mould pipe under middle plug hole I pours full, then flows into outer groove by communication port, first pours into the mould pipe under first plug hole II, then by the One plug hole II simultaneously along the mould pipe poured into other plug holes II under clockwise and counterclockwise, final realization by mould pipe by It is a to pour completely.
Filter screen is placed between the plug hole I and plug hole II and mould pipe, to improve the degree of purity of alloy pig.
The material of the distributor is refractory material.
The advantages and positive effects of the present invention are:
1, compared with the prior device, the distributor of the utility model is not only easy to operate, can be realized while being poured more Mould pipe, and can be realized sequential casting, guarantee it is continual and steady successively pour completely each mould pipe, obtain surface without cold shut, none The high quality master alloy ingot of secondary shrinkage cavity, while reducing alloy amount used in riser under the premise of guaranteeing feeding, improve alloy Overall utilization rate.
2, according to the characteristic of different-alloy, the present invention can also adjust the interception height of dam degree of interior channel opening two sides to realize list The casting of one direction or both direction are poured simultaneously, can also increase the open amount on round dam to realize multiple directions while pour Note, it is flexible and changeable, it is practical.Or increase medial launder to realize the casting of more mould pipes.
Detailed description of the invention
Fig. 1 is that high temperature alloy master alloy of the present invention smelts the structural schematic diagram (X-Y scheme) for using distributor.
Fig. 2 is that high temperature alloy master alloy of the present invention smelts the structural schematic diagram (three-dimensional figure) for using distributor.
Fig. 3 is that high temperature alloy master alloy of the present invention smelts the use figure for using distributor.
In figure: 1- inside groove;2- outer groove;3- ring dam;4- plug hole I;5- plug hole II;6- intercepts dam;7- communication port.Figure Arrow direction is the flow direction of aluminium alloy in 1.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawing.
The utility model provides a kind of high temperature alloy master alloy smelting distributor, and the distributor is generally in particular manufacturing craft It is sintered after refractory material compression moulding is added, structure is as shown in Figs. 1-3.The distributor includes discoid distributor sheet Body, distributor body include circular inner groove 1 and annular outer groove 2, are separated between inside groove 1 and outer groove 2 by ring dam 3;Molten metal Drop point is poured in inside groove, a plug hole I 4 is arranged in inside groove bottom center.Uniformly distributed multiple plug holes in the annular groove bottom of outer groove II 5, it is equipped between each adjacent two plug hole II 5 and intercepts dam 6;The bottom of plug hole I and plug hole II is connected with mould pipe. A communication port 7 is equipped between the inside groove and outer groove, which is opened on the ring dam 3, the aluminium alloy in inside groove It is flowed into outer groove by the communication port 7.
The height on dam is intercepted described in the height of the ring dam;And dam height adjustment molten metal can be intercepted outside by adjusting Allocation order in slot, specific as follows:
When interception height of dam degree when the communication port two sides is unequal, i.e., side height be higher than the other side when, aluminium alloy by After crucible enters inside groove, molten metal first pours the mould pipe under plug hole I in inside groove completely, then flows into the casting in outer groove by communication port Hole is poured metal bath surface after filling first mould pipe of outer layer and is gradually risen, initially enters more than molten metal behind relatively low interception dam Second mould pipe pours and is successively poured each mould pipe by Fig. 1 arrow direction after filling, and final realize pours mould pipe completely one by one.
When interception height of dam degree is equal in the outer groove, after aluminium alloy enters inside groove by crucible, molten metal is first by inside groove Mould pipe under middle plug hole I pours full, then flows into outer groove by communication port, first pours into the mould pipe under first plug hole II, then by the One plug hole II simultaneously along the mould pipe poured into other plug holes II under clockwise and counterclockwise, final realization by mould pipe by It is a to pour completely.
Filter screen can be placed between the plug hole I and plug hole II and mould pipe, to improve the degree of purity of alloy pig.
The distributor can increase the quantity of each casting moulds pipe by way of increasing ring dam, specifically in distributor Annular medial launder is further set, which is set between inside groove and outer groove, between inside groove and medial launder and medial launder with It is separated by ring dam between outer groove, and is equipped with communication port on ring dam;The quantity of the medial launder is at least 1, in Between slot annular groove bottom on uniformly distributed multiple plug holes II, be equipped between each adjacent two plug hole II and intercept dam.
The distributor can also increase casting efficiency by increasing the quantity of communication port on ring dam, as: in distributor Communication port quantity >=2 on each ring dam.
In distributor use process of the present invention, since inner layer metal liquid capacity is more, and thermal capacity is big, in addition in crucible High-temperature liquid metal constantly flows into, so that heat is conducted by internal layer outer layers, extends the setting time of outer sphere molten metal, to protect Demonstrate,prove the mobility of molten metal.The present invention (can also be adjusted according to process requirements with ten mould pipes of once-cast, while can be poured Filter screen is placed at hole, improves the degree of purity of alloy pig), and it is able to achieve each mould pipe of sequential casting, molten metal is behind flow direction Mould pipe can also increase feeding to the mould pipe that fills has been poured simultaneously, guarantee to obtain that feeding is sufficient, high quality without a shrinkage cavity The recovery rate of high temperature alloy master alloy ingot is greatly improved in master alloy ingot.

Claims (9)

1. a kind of high temperature alloy master alloy, which is smelted, uses distributor, it is characterised in that: the distributor includes discoid distributor sheet Body, distributor body include circular inner groove and annular outer groove, are separated between inside groove and outer groove by ring dam;The inside groove is gold Belong to liquid casting drop point and one plug hole I is set at interior groove bottom center, is evenly distributed with multiple pour in the annular groove bottom of the outer groove Orifice II is equipped between each adjacent two plug hole II and intercepts dam;The bottom of the plug hole I and plug hole II with mould pipe phase Connection.
2. high temperature alloy master alloy according to claim 1, which is smelted, uses distributor, it is characterised in that: the inside groove and outer groove Between be equipped with a communication port, which is opened on the ring dam, and the aluminium alloy in inside groove passes through the communication port stream Enter in outer groove.
3. high temperature alloy master alloy according to claim 2, which is smelted, uses distributor, it is characterised in that: the height of the ring dam Degree is higher than the height for intercepting dam.
4. high temperature alloy master alloy according to claim 2 or 3, which is smelted, uses distributor, it is characterised in that: when the circulation When the interception height of dam degree of mouth two sides is unequal, i.e., when side height is higher than the other side, after aluminium alloy enters inside groove by crucible, metal Liquid first pours the mould pipe under plug hole I in inside groove completely, then flows into outer groove by communication port, and clockwise or counterclockwise successively The mould pipe in outer groove under plug hole II is poured into, final realize pours mould pipe completely one by one.
5. high temperature alloy master alloy according to claim 2 or 3, which is smelted, uses distributor, it is characterised in that: when the outer groove When middle interception height of dam degree is equal, after aluminium alloy enters inside groove by crucible, molten metal first pours the mould pipe under plug hole I in inside groove It is full, then outer groove is flowed by communication port, the mould pipe under first plug hole II is first poured into, then by first plug hole II simultaneously along suitable Hour hands and counter clockwise direction pour into the mould pipe under other plug holes II, and final realize pours mould pipe completely one by one.
6. high temperature alloy master alloy according to claim 1, which is smelted, uses distributor, it is characterised in that: I He of plug hole Filter screen is placed between plug hole II and mould pipe, to improve the degree of purity of alloy pig.
7. high temperature alloy master alloy according to claim 1, which is smelted, uses distributor, it is characterised in that: the material of the distributor For refractory material.
8. high temperature alloy master alloy according to claim 1, which is smelted, uses distributor, it is characterised in that: the distributor further includes Annular medial launder, the medial launder are set between inside groove and outer groove, between inside groove and medial launder and between medial launder and outer groove It is separated by ring dam, and is equipped with communication port on ring dam;The quantity of the medial launder is at least 1, the annular of medial launder It is evenly distributed with multiple plug holes II in groove bottom, is equipped between each adjacent two plug hole II and intercepts dam.
9. the high temperature alloy master alloy smelting distributor according to claim 2 or 8, it is characterised in that: the distributor Communication port quantity >=2 on each ring dam.
CN201821776636.5U 2018-10-31 2018-10-31 Distributor is used in a kind of smelting of high temperature alloy master alloy Active CN209352962U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821776636.5U CN209352962U (en) 2018-10-31 2018-10-31 Distributor is used in a kind of smelting of high temperature alloy master alloy

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821776636.5U CN209352962U (en) 2018-10-31 2018-10-31 Distributor is used in a kind of smelting of high temperature alloy master alloy

Publications (1)

Publication Number Publication Date
CN209352962U true CN209352962U (en) 2019-09-06

Family

ID=67782290

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821776636.5U Active CN209352962U (en) 2018-10-31 2018-10-31 Distributor is used in a kind of smelting of high temperature alloy master alloy

Country Status (1)

Country Link
CN (1) CN209352962U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111926198A (en) * 2020-06-04 2020-11-13 广东华鳌合金新材料有限公司 Method for controlling surface quality and secondary shrinkage cavity size of K418 master alloy vacuum induction melting electrode
CN114309498A (en) * 2021-12-28 2022-04-12 江苏隆达超合金航材有限公司 Splitter plate for casting high-temperature alloy master alloy
CN114850425A (en) * 2022-03-03 2022-08-05 江苏奇纳新材料科技有限公司 Sequential pouring flow distribution disc

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111926198A (en) * 2020-06-04 2020-11-13 广东华鳌合金新材料有限公司 Method for controlling surface quality and secondary shrinkage cavity size of K418 master alloy vacuum induction melting electrode
CN114309498A (en) * 2021-12-28 2022-04-12 江苏隆达超合金航材有限公司 Splitter plate for casting high-temperature alloy master alloy
CN114309498B (en) * 2021-12-28 2023-10-20 江苏隆达超合金航材有限公司 Flow distribution disc for pouring master alloy of high-temperature alloy
CN114850425A (en) * 2022-03-03 2022-08-05 江苏奇纳新材料科技有限公司 Sequential pouring flow distribution disc
CN114850425B (en) * 2022-03-03 2024-04-09 江苏奇纳新材料科技有限公司 Sequential pouring diverter disc

Similar Documents

Publication Publication Date Title
CN209352962U (en) Distributor is used in a kind of smelting of high temperature alloy master alloy
CN104384485B (en) A kind of directed hollow moving turbine blade double buffering running gate system
CN103658542A (en) Precision casting gating system
CN106890940A (en) The running gate system of block cast guider
CN104722730B (en) A kind of continuous apparatus and method for preparing large scale high-quality aluminum alloy ingot casting
CN101664801A (en) Method and device for low overheat composite casting aluminum alloy under action of steady magnetic field
CN102211154A (en) Method for improving internal quality of continuous casting and submerged nozzle for implementing method
CN109825781A (en) A kind of method that iron-based amorphous thin band is continuously prepared
CN109822067A (en) A kind of method that Ni-based non-crystalline thin-band is continuously prepared
CN105665657A (en) Discrete casting method for preparing homogenized cast ingot
CN109332614A (en) A kind of non-equilibrium casting beam blank mould cooling controller of single-point and control method
CN108637199A (en) The method for pouring the first stove ladle molten steel temperature is unwrapped among a kind of reduction
CN102703862A (en) Molding method for copper gallium/copper indium gallium tubular cathode target material
CN106825501B (en) Aluminium alloy wheel hub of vehicle low temperature casting technique
CN206632347U (en) A kind of solder casting conduction part flow arrangement
CN205996172U (en) Water cooling spirally melts cup
CN206567497U (en) A kind of high-efficiency time-delay cooled gravity casting mold
CN107745102A (en) A kind of anaerobic photovoltaic copper bar preparation method
CN108393444A (en) A kind of independent cooling outer water direct-cooling type electromagnetic stirring mould
CN1483532A (en) Subcurrent type oxygen-free copper horizontal continuous casting technology and production eguipment thereof
CN107812904A (en) A kind of more metal step type compound casting devices and method
CN208787477U (en) One crucible multimode prepares the device of refractory metal target
CN113579203A (en) Micro-solid forming process and device
CN104259393B (en) A kind of casting technique of lead-free reflow tap
CN207857804U (en) A kind of strip continuous-casting metal delivery device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210811

Address after: 110172 block C12, south of Shendong Sixth Road, west of Zhongxing Street, Shenfu new area, Shenyang City, Liaoning Province

Patentee after: Liaoning Hongyin Metal Co.,Ltd.

Address before: 110016 No. 72, Wenhua Road, Shenhe District, Liaoning, Shenyang

Patentee before: INSTITUTE OF METAL RESEARCH CHINESE ACADEMY OF SCIENCES

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Distributor for smelting high temperature alloy master alloy

Effective date of registration: 20220225

Granted publication date: 20190906

Pledgee: Fushun Bank Co.,Ltd. Development Zone sub branch

Pledgor: Liaoning Hongyin Metal Co.,Ltd.

Registration number: Y2022210000012