CN209343182U - Wind power plant wisdom analog acquisition test macro - Google Patents
Wind power plant wisdom analog acquisition test macro Download PDFInfo
- Publication number
- CN209343182U CN209343182U CN201920316909.6U CN201920316909U CN209343182U CN 209343182 U CN209343182 U CN 209343182U CN 201920316909 U CN201920316909 U CN 201920316909U CN 209343182 U CN209343182 U CN 209343182U
- Authority
- CN
- China
- Prior art keywords
- plc
- power plant
- wind power
- data
- real
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model relates to a kind of wind power plant wisdom analog acquisition test macro.The system comprises: field grade PLC, for acquiring the field grade Real-time Monitoring Data of wind power plant;Machine set PLC, for acquiring the Real-time Monitoring Data of each Wind turbines in wind power plant;Data storage server is respectively connected to the field grade PLC and the machine set PLC, for the Real-time Monitoring Data of the collected field grade Real-time Monitoring Data of the field grade PLC and the collected each Wind turbines of the machine set PLC to be carried out storage record.Wind power plant wisdom analog acquisition test macro provided by the utility model greatly improves the testing efficiency tested wind power plant, so that the actual deployment for scene saves the plenty of time.
Description
Technical field
The utility model relates to Wind turbines technical fields, test system more particularly to a kind of wind power plant wisdom analog acquisition
System.
Background technique
In recent years, China's wind-power electricity generation is quickly grown, and the wind power base for having multiple ten million multikilowatts is built up and thrown in succession
Enter to use.In the process of construction of wind power base, the various tests for building up wind power plant are played an important role.These tests are not
The practival operating condition that engineering staff understands wind power plant is only helped to, and to understand whether wind power plant can reach preparatory imagination
Operational objective provide strong evidence.
Existing test process relies on artificial on-the-spot test substantially, that is, goes by engineering staff to wind, farm site
Collecting test data.Obviously, such test process will cause a large amount of wastes of personnel and goods and materials.
Utility model content
The technical problem to be solved by the present invention is to provide a kind of wind power plant wisdom analog acquisition test macros, so that right
The testing efficiency that wind power plant is tested greatly improves, so that the actual deployment for scene saves the plenty of time.
In order to solve the above technical problems, the utility model provides a kind of wind power plant wisdom analog acquisition test macro, institute
The system of stating includes: field grade PLC, for acquiring the field grade Real-time Monitoring Data of wind power plant;Machine set PLC, for acquiring in wind power plant
The Real-time Monitoring Data of each Wind turbines;Data storage server is respectively connected to the field grade PLC and the machine set PLC,
For by the collected field grade Real-time Monitoring Data of field grade PLC and the collected each Wind turbines of the machine set PLC
Real-time Monitoring Data carries out storage record.
A kind of improvement as the utility model, further includes: data display server is respectively connected to the field grade PLC
And the machine set PLC, for the collected field grade Real-time Monitoring Data of the field grade PLC and the machine set PLC is collected
The Real-time Monitoring Data of each Wind turbines carries out calculation process, to execute the field grade Real-time Monitoring Data and each wind-powered electricity generation
The graphic software platform of the Real-time Monitoring Data of unit.
As a kind of improvement of the utility model, the data display server passes through industrial switch respectively and is connected to institute
State field grade PLC and the machine set PLC.
As a kind of improvement of the utility model, the data storage server passes through industrial switch respectively and is connected to institute
State field grade PLC and the machine set PLC.
A kind of improvement as the utility model, further includes: display is connected to the data display server, uses
In the graphic software platform for the Real-time Monitoring Data for completing the field grade Real-time Monitoring Data and each Wind turbines.
As a kind of improvement of the utility model, the display is used to show the field grade in the form of chart or curve
The Real-time Monitoring Data of Real-time Monitoring Data and each Wind turbines.
As a kind of improvement of the utility model, the data storage server is also used to: being generated and is carried out intelligence to wind power plant
The real-time testing data of intelligent simulation test.
As a kind of improvement of the utility model, the real-time testing data are second grade real-time testing data.
As a kind of improvement of the utility model, the data storage server is also used to: controlling the field grade PLC and institute
State the operation of machine set PLC.
By adopting such a design, the utility model at least has the following advantages:
Wind farm data library capture program is simulated, the exploitation of database capture program, database capture program fortune are facilitated
Row is more stable, and faster, the hardware configuration needed is lower, and cost is lower for calculating speed.Wind farm data library collection process is simulated,
Wind power plant can be deployed to by testing into, do not needed staff and tested repeatedly to scene, when reducing actual deployment
The mistake of generation, reduces machine stop times caused by wind power plant unit is interfered because of PLC controller, and cost is lower.Finally, simulation wind
Electric field data library collection process, staff can test in laboratory, improve the efficiency solved the problems, such as, be live
Actual deployment saves the plenty of time.
Detailed description of the invention
Above-mentioned is only the general introduction of technical solutions of the utility model, in order to better understand the technology hand of the utility model
Section, below in conjunction with attached drawing, the utility model is described in further detail with specific embodiment.
Fig. 1 is the system architecture diagram of the utility model wind power plant wisdom analog acquisition test macro.
Specific embodiment
It is illustrated below in conjunction with preferred embodiment of the attached drawing to the utility model, it should be understood that described herein excellent
It selects embodiment to be only used for describing and explaining the present invention, is not used to limit the utility model.
Fig. 1 is the structure chart of the utility model wind power plant wisdom analog acquisition test macro.The wind power plant wisdom simulation
Collecting test system includes: display 1, data display server 2, data storage server 3, industrial switch 4, field grade PLC
5, machine set PLC 6.
Specific mounting means is: for window system deployment on data display server 2, Linux system is deployed in number
According in storage server 3, data show that process is deployed on data display server 2, and data acquisition is deployed in data and deposits
It stores up on server 3, analogue data process is deployed on data storage server 3.Display 1 passes through with data display server 2
VGA line connection, data display server 2 are connect with industrial switch 4 by six class lines, and data storage server 3 and industry are handed over
4 are changed planes by the connection of six class lines, field grade PLC 5 is connect with industrial switch 4 by six class lines, and machine set PLC 6 is exchanged with industry
Machine 4 is connected by six class lines.
Set-up mode is to set 10.1.51.1 for the IP network section of field grade PLC 5 by solution center, is passed through
The IP network section of machine set PLC 6 is set 10.1.51.2, the IP network section setting of data display server 2 by solution center
For 10.1.51.3, the IP network section of data storage server 3 is set as 10.1.51.4, configures analogue data process, checks service
Whether transmission data packet can receive between device, and whether two can receive transmission data packet between server and PLC.
The working principle of the utility model includes the following two kinds:
The first, field grade PLC 5 or machine set PLC 6 generate Wind turbines Real-time Monitoring Data, and data acquisition is actively
The data monitored in field grade PLC 5 or machine set PLC 6 are acquired, collected data are sent to data by data acquisition
Storage server 3.The server 3 carries out storage calculating to data, and the data that storage calculates are sent to number by data acquisition
According to display server 2.Data display server 2 shows data in the form of list or curve.
Second, digital simulation process simulation generates the second grade data of entire wind power plant, and digital simulation process is by generation
The second grade data of entire wind power plant are sent to data storage server 3.The server 3 carries out storage calculating to data, and data are adopted
The data that storage calculates are sent to data display server 2 by collection process.Data display server 2 is by data with list or song
The form of line shows.
The operating method of the data gathering simulation process of field grade PLC 5 is as follows:
The operating software that field grade 5 controller of PLC is opened in the windows operating system of data display server 2, beats
The link window of prologue 5 controller of grade PLC, the IP address of 5 controller of input field grade PLC are clicked confirmation and are linked.Link
After success, the monitoring point window in grade 5 controller of PLC of field is opened, the monitoring point in grade 5 controller of PLC of field will be needed to press
According to the form export of excel table, the operating software of field grade 5 controller of PLC is closed.In the windows of data display server
By the linux operating system of remote operation software logon data storage server 3 in operating system, data storage service is opened
The terminal window of the linux operating system of device 3.Command-line data library storing process is inputted, input order operation data acquired
Journey.The log-on data display control process in the windows operating system of data display server 2, input data display service
The IP address of device 2, be connected to data storage display server 3 data storage procedure, by from field grade 5 controller of PLC in prison
Control point is directed into database according to the format of database purchase calculating process, checks the monitoring data in the grade PLC 5 of field.
The operating process of 6 data gathering simulation of single unit PLC is as follows:
The operation that 6 controller of single unit PLC is opened in the windows operating system of data display server 2 is soft
Part, opens the link window of field grade 5 controller of PLC, and the IP address of 5 controller of input field grade PLC clicks confirmation and carries out chain
It connects.After linking successfully, the monitoring point window in 6 controller of single unit PLC is opened, single unit PLC 6 will be needed to control
Monitoring point in device is exported according to the form of excel table, closes the operating software of 6 controller of single unit PLC.In data
It is operated in the windows operating system of display server 2 by the linux of remote operation software logon data storage server 3,
Open the terminal window of the linux operating system of data storage server 3.Order operation data library storage computation process is inputted,
Input order operation data collection process.The log-on data display control in the windows operating system of data display server 2
Process, the IP address of input data storage server 3 are connected to the database purchase calculating process of data storage server 3, will
Database is imported from the monitoring point in 6 controller of single unit PLC according to the format of database purchase calculating process, checks list
Platform machine set PLC 6.
The operating process of wind farm data gathering simulation is as follows:
The points acquired are needed referring to wind power plant, make wind farm data collection point table.In data display server 2
By the linux operating system of remote operation software logon data storage server 3 in windows operating system, data are opened
The terminal window of the linux operating system of storage server 3.Input order operation data library storage computation process, input order
Operation data collection process is connected to the database purchase calculating process of data storage server 3, the wind-powered electricity generation number of fields that will be made
Database, input order operation book simulation process are imported according to the format of database purchase calculating process according to collection point table.
The main function of system provided by the utility model has: firstly, wind power plant wisdom analog acquisition test macro can be with
Related monitoring data in the PLC controller of analog acquisition separate unit Wind turbines;Secondly, wind power plant wisdom analog acquisition test system
System can be with the related monitoring data in the PLC controller of all Wind turbines of the entire wind power plant of analog acquisition;Finally, wind power plant intelligence
Intelligent analog acquisition test macro can be with the related data in the grade PLC controller of analog acquisition wind power plant field and storage.Wind power plant intelligence
Intelligent analog acquisition test macro does not need tester and tests to scene, largely saves the testing time, improves test
Progress;Wind power plant wisdom analog acquisition test macro does not need wind power plant Wind turbines and shuts down repeatedly, causes unnecessary electricity
Loss;Database simulation collecting test system reduces the influence to the existing monitoring system of wind power plant, causes wind power plant work people
The erroneous judgement of member.
Currently, the data monitoring system of Chinese all wind power plants is employed entirely in windows system and data monitoring
The wind farm data library acquisition system of system support is also deployed on windows system operation platform, windows operating system pair
Server hardware is more demanding, and stability is not that very well, wind farm data library acquisition storing process generally requires long-time stable
Phenomena such as operation wind farm data library acquisition and memory system often crashes, and need to be continuously improved wanting for server hardware
It asks, increases operating cost, linux operating system speed is fast, and safety is preferable, and the data of database storage system are not easy
It is stolen, the requirement to server hardware is lower, has saved cost.Therefore, select linux operating system as wind farm data
The platform of library operation is following trend.
The purpose of this utility model is, in linux operating system environment Imitating wind farm data library collection process, to help
In the exploitation of Linux system database capture program, the operation of database capture program is more stable, and calculating speed faster, needs
Hardware configuration it is lower, cost is lower.In linux operating system environment Imitating wind farm data collection process, test is completed
It can be deployed to wind power plant, staff is not needed and tested repeatedly to scene, the mistake generated when reducing actual deployment
Accidentally, reduce machine stop times caused by wind power plant unit is interfered because of PLC controller, cost is lower.Finally, operating system in linux
System environment Imitating wind farm data library collection process, staff can test in laboratory, improve and solve the problems, such as
Efficiency, for scene actual deployment save the plenty of time.
The above descriptions are merely preferred embodiments of the present invention, not makees in any form to the utility model
Limitation, those skilled in the art make a little simple modification, equivalent variations or modification using the technology contents of the disclosure above,
It falls within the protection scope of the present utility model.
Claims (10)
1. a kind of wind power plant wisdom analog acquisition test macro characterized by comprising
Field grade PLC, for acquiring the field grade Real-time Monitoring Data of wind power plant;
Machine set PLC, for acquiring the Real-time Monitoring Data of each Wind turbines in wind power plant;
Data storage server is respectively connected to the field grade PLC and the machine set PLC, for collecting the field grade PLC
Field grade Real-time Monitoring Data and the Real-time Monitoring Datas of the collected each Wind turbines of the machine set PLC carry out storage note
Record.
2. wind power plant wisdom analog acquisition test macro according to claim 1, which is characterized in that further include:
Data display server is respectively connected to the field grade PLC and the machine set PLC, for collecting the field grade PLC
Field grade Real-time Monitoring Data and the collected each Wind turbines of the machine set PLC Real-time Monitoring Data carry out operation at
Reason, so as to execute field grade Real-time Monitoring Data and each Wind turbines Real-time Monitoring Data graphic software platform.
3. wind power plant wisdom analog acquisition test macro according to claim 2, which is characterized in that the data display clothes
Business device passes through industrial switch respectively and is connected to the field grade PLC and the machine set PLC.
4. wind power plant wisdom analog acquisition test macro according to claim 1, which is characterized in that the data storage clothes
Business device passes through industrial switch respectively and is connected to the field grade PLC and the machine set PLC.
5. wind power plant wisdom analog acquisition test macro according to claim 2, which is characterized in that further include:
Display is connected to the data display server, for completing the field grade Real-time Monitoring Data and each wind-powered electricity generation
The graphic software platform of the Real-time Monitoring Data of unit.
6. wind power plant wisdom analog acquisition test macro according to claim 5, which is characterized in that the display is used for
The Real-time Monitoring Data of the field grade Real-time Monitoring Data and each Wind turbines is shown in the form of chart or curve.
7. wind power plant wisdom analog acquisition test macro according to claim 1, which is characterized in that the data storage clothes
Business device is also used to:
Generate the real-time testing data that wisdom simulation test is carried out to wind power plant.
8. wind power plant wisdom analog acquisition test macro according to claim 7, which is characterized in that the real-time testing number
According to for the second grade real-time testing data.
9. wind power plant wisdom analog acquisition test macro according to claim 1, which is characterized in that the data storage clothes
Business device is also used to:
Control the operation of the field grade PLC and the machine set PLC.
10. wind power plant wisdom analog acquisition test macro according to claim 1, which is characterized in that the data storage
There is operation on server: linux operating system.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920316909.6U CN209343182U (en) | 2019-03-13 | 2019-03-13 | Wind power plant wisdom analog acquisition test macro |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920316909.6U CN209343182U (en) | 2019-03-13 | 2019-03-13 | Wind power plant wisdom analog acquisition test macro |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209343182U true CN209343182U (en) | 2019-09-03 |
Family
ID=67762980
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920316909.6U Active CN209343182U (en) | 2019-03-13 | 2019-03-13 | Wind power plant wisdom analog acquisition test macro |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209343182U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109725592A (en) * | 2019-03-13 | 2019-05-07 | 国电联合动力技术有限公司 | Wind power plant wisdom analog acquisition test macro |
-
2019
- 2019-03-13 CN CN201920316909.6U patent/CN209343182U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109725592A (en) * | 2019-03-13 | 2019-05-07 | 国电联合动力技术有限公司 | Wind power plant wisdom analog acquisition test macro |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103746882B (en) | The method of intelligent substation station level test | |
CN104898633B (en) | A kind of non-security grade DCS configurable test method and system of nuclear power plant | |
EP2869144B1 (en) | Simulation testing platform for wind power plant and testing method thereof | |
CN103617760B (en) | A kind of power distribution network DTS analogue system and emulation mode thereof | |
CN104865845B (en) | Large-scale wind electricity unit real time execution controls union simulation platform and its construction method | |
CN108020742A (en) | The live Auto-Test System and method of distribution feeder automation | |
CN106525415B (en) | A kind of wind turbine transmission chain health status evaluation system and method | |
CN109324601A (en) | The test platform of robot controller or control system based on hardware in loop | |
CN104217627A (en) | Intelligent experimental platform device and teaching method | |
CN107944193A (en) | Avionics semi-matter simulating system | |
CN103984335B (en) | The method of testing of electrical power distribution automatization system and system | |
CN103064412B (en) | Online simulation test and control system of wind generating set control device and test method thereof | |
CN109026558A (en) | The simulation test platform and method of wind power generating set | |
CN106681313B (en) | Stability control system function test method and system | |
CN209343182U (en) | Wind power plant wisdom analog acquisition test macro | |
CN201247097Y (en) | Apparatus for monitoring and analyzing hydroelectricity set vibration | |
CN107481598A (en) | A kind of emulation training platform of intelligent substation | |
CN103913728B (en) | A kind of method of testing based on portable radar comprehensive tester | |
CN105914884A (en) | One-to-many intelligent substation process layer virtual secondary equipment and implementation method | |
CN104834229B (en) | A kind of power closed loop real-time simulation test system and method | |
CN109951455A (en) | A kind of automation penetration test method and system | |
CN105375623B (en) | A kind of method for the data concentrated collection for dispatching power equipment | |
CN108648549B (en) | Object-oriented electricity consumption information acquisition closed-loop simulation system and control method | |
CN109725592A (en) | Wind power plant wisdom analog acquisition test macro | |
CN109870927A (en) | Million capacitance grade steam turbine island control logic verification platforms |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |