CN209339958U - A kind of bored tunnel duck eye is into big hole pre-add solid system - Google Patents

A kind of bored tunnel duck eye is into big hole pre-add solid system Download PDF

Info

Publication number
CN209339958U
CN209339958U CN201821844358.2U CN201821844358U CN209339958U CN 209339958 U CN209339958 U CN 209339958U CN 201821844358 U CN201821844358 U CN 201821844358U CN 209339958 U CN209339958 U CN 209339958U
Authority
CN
China
Prior art keywords
tunnel
section
duck eye
big hole
steel tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821844358.2U
Other languages
Chinese (zh)
Inventor
王立新
白阳阳
李储军
汪珂
田鹏程
崔玉龙
来凯
贾少春
王博
翁木生
王天明
王海祥
王洪波
高志宏
张海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway First Survey and Design Institute Group Ltd
Original Assignee
China Railway First Survey and Design Institute Group Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway First Survey and Design Institute Group Ltd filed Critical China Railway First Survey and Design Institute Group Ltd
Priority to CN201821844358.2U priority Critical patent/CN209339958U/en
Application granted granted Critical
Publication of CN209339958U publication Critical patent/CN209339958U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a kind of bored tunnel duck eyes into big hole pre-add solid system, positioned at tunnel duck eye at the variable cross-section in big hole, including steel tube shed, advanced tubule and deep hole grouting pipe;Steel tube shed is set into stratum from narrow-bore tunnel face vault to large cross-section tunnel vault formation volumes, and grouting and reinforcing surrounding formation;Advanced tubule is set into stratum from narrow-bore tunnel vault to tunnel variable cross-section formation volumes, and grouting and reinforcing tunnel variable cross-section node stratum;Deep hole grouting pipe is set from narrow-bore tunnel face variable cross-section into stratum to large cross-section tunnel hole top and barrel formation volumes, and grouting and reinforcing surrounding formation.After shaping structures, the correlation function requirement of general formation tunnel duck eye into big hole can be met, ensure tunnel duck eye into big hole safe construction, while it is smaller to increase influence of the stratum consolidation area to ground and surrounding Important building, solves the problems, such as that tunnel duck eye is difficult into the construction of big hole, effect is poor.

Description

A kind of bored tunnel duck eye is into big hole pre-add solid system
Technical field
The utility model belongs to tunnel construction technical field, and in particular to a kind of bored tunnel duck eye is into big hole pre-add solid System.
Background technique
Tunnel is widely used in Urban Underground subway engineering, in Urban Metro Construction, often needs to meet different majors Expand tunnel cross-section under it is required that in tunnel, therefore inevitably tunnel will will appear duck eye into big hole phenomenon.
It generally requires to carry out advance reinforcement to stratum at variable cross-section when bored tunnel duck eye is into big hole, to reduce tunnel duck eye It is conventional using method is locally digged at variable cross-section into big hole construction safety, take steel mesh+jetting cement support form to be easy The security risk of construction period is caused, or makes special-shaped steelframe;Secondly the construction of later-stage secondary lining cutting increases construction investment.Therefore When constructing for bored tunnel duck eye into big hole, effectively reinforce that more stringent requirements are proposed to construction method and stratum.
Summary of the invention
The purpose of the utility model is to provide a kind of bored tunnel duck eyes into big hole pre-add solid system, and it is small to change conventional tunnel Hole performs mode into great Dong, it is ensured that tunnel duck eye is into big hole safe construction.
The technology employed by the present utility model is
A kind of bored tunnel duck eye is into big hole pre-add solid system, it is characterised in that:
Positioned at tunnel duck eye at the variable cross-section in big hole, including steel tube shed, advanced tubule and deep hole grouting pipe;
Steel tube shed is set into stratum from narrow-bore tunnel face vault to large cross-section tunnel vault formation volumes, and is infused Slurry reinforces surrounding formation;
Advanced tubule is set into stratum from narrow-bore tunnel vault to tunnel variable cross-section formation volumes, and grouting and reinforcing Tunnel variable cross-section node stratum;
Deep hole grouting pipe is set into stratum from narrow-bore tunnel face variable cross-section to large cross-section tunnel Dong Ding and hole Body formation volumes, and grouting and reinforcing surrounding formation.
Steel tube shed and advanced tubule are slip casting steel floral tube;Deep hole grouting pipe is slip casting pvc pipe.
Steel tube shed equidistantly covers large cross-section tunnel arch range.
The steelframe of steel tube shed and the first support system in tunnel is welded and fixed.
Advanced tubule equidistantly covers narrow-bore tunnel arch range.
The steelframe of advanced tubule and the first support system in tunnel is welded and fixed.
Advanced tubule and steel tube shed stabilization zone are engaged.
Deep hole grouting pipe is set with spacing 500-800mm.
Deep hole grouting pipe and steel tube shed stabilization zone, advanced tubule stabilization zone are engaged.
The utility model has the advantage that
The utility model is at tunnel variable cross-section, setting pipe canopy, ductule and deep hole grouting pre-add solid system.As needed It is flexible to determine reinforcing scope, it can be according to needing strengthening stratum condition to determine pipe canopy length and deep hole grouting range, it can be to pipe canopy quantity And set angle, horizontal space makes appropriate adjustment;It needs effectively to be welded steel tube shed and first subsystem steelframe after tube shed grouting It connects, to reinforce just subsystem structure;Advanced tubule, deep hole grouting slurry, which are reinforced, combines the synergy of pipe canopy, guarantees that stratum is steady It is fixed, it is ensured that tunnel duck eye is into big hole safe construction.Not only facilitate constructing operation, goes back cost saving;It not only can be effective Strengthening stratum is also smaller to surrounding environment influence.
After the utility model shaping structures, the correlation function requirement of general formation tunnel duck eye into big hole can be met, it is ensured that Tunnel duck eye is into big hole safe construction, while it is smaller to increase influence of the stratum consolidation area to ground and surrounding Important building.So Just solve the problems, such as that tunnel duck eye is difficult into the construction of big hole, effect is poor, in construction fields such as Hydraulic Tunnel, urban subway tunnels Have a wide range of applications.
Detailed description of the invention
Fig. 1 is tunnel just branch structure and Guan Peng, ductule, deep hole grouting pipe (cross section) schematic diagram.
Fig. 2 is tunnel just branch structure and Guan Peng, ductule, deep hole grouting pipe (vertical section) schematic diagram.
In figure, 1- steel tube shed, 2- advanced tubule, 3- deep hole grouting pipe, the first support system in the tunnel 4-.
Specific embodiment
The utility model is described in detail With reference to embodiment.
It is conventional using the part expansion digging method at variable cross-section when bored tunnel duck eye is into big hole, take steel mesh+jetting cement Support form be easy to cause the security risk of construction period, or makes special-shaped steelframe;Secondly later-stage secondary lining cutting need to expend largely Armored concrete.
The utility model reinforces stratum using pipe canopy, advanced tubule and deep hole grouting, increases the reinforcing on stratum Range, and then reduce the influence to surrounding building and environment.It is pre- in advance that the utility model takes full advantage of pipe canopy, deep hole grouting The reliability of reinforcing, not only convenient construction, reduce investment outlay, evaded construction risk, and be also greatly reduced face over the ground and its The influence of periphery construction of structures.
Bored tunnel duck eye involved in the utility model is into big hole pre-add solid system specific structure are as follows: steel tube shed 1 passes through Steel tube shed 1, which is performed, in tunnel vault carries out grouting and reinforcing;Advanced tubule 2, by tunnel vault perform advanced tubule 2 into Row grouting and reinforcing;Deep hole grouting system, by tunnel variable cross-section face perform pvc pipe and carry out grouting and reinforcing and steel tube shed 1 and 2 stabilization zone of advanced tubule be engaged;
Wherein, steel tube shed 1, advanced tubule 2 and steelframe in preliminary bracing system are welded;Steel tube shed 1 advanced small is led The degree of skewness of pipe canopy should be often measured in 3 drilling process of pipe 2 and deep hole grouting pipe using horizontal inclinometer, discovery deviant exceeds When design requirement, it should rectify a deviation in time;1 steel pipe of steel tube shed uses Φ 108mm, the seamless steel pipe of wall thickness 6mm, merogenesis installation.Slip casting Injected hole is bored on pipe, injected hole is bored on slip casting steel pipe, and aperture Φ 10mm, pitch of holes 200mm are arranged in blossom type.Aperture slip casting Slurries use cement mortar, just intend parameter: cement slurry ratio of mud 0.8:1~1:1, grouting pressure: being constructed using 0.2~0.4MPa In should factually border geological condition, and related construction parameter is determined by test.
The installation opportunity of steel tube shed 1 needs while narrow-bore tunnel Shed-pipe Advanced Support is reinforced to large cross-section tunnel arch model Enclose realization pre-reinforcement;The steel tube shed need to equidistantly cover large cross-section tunnel arch range: needed after slip casting by steel tube shed and just Subsystem steelframe is effectively welded, to reinforce just subsystem structure.
The construction of advanced tubule 2 need to set after narrow-bore tunnel daguanpeng construction according to face to headwall distance super At preceding ductule to tunnel variable cross-section, and grouting and reinforcing surrounding formation, stabilization zone need to be engaged with the stabilization zone Guan Peng, it is ensured that tunnel becomes Section construction safety.The advanced tubule need to equidistantly cover narrow-bore tunnel arch range: be needed after slip casting by steel tube shed It is effectively welded with first subsystem steelframe, to reinforce just subsystem structure.
The installation opportunity of deep hole grouting pipe 3 needs after the completion of narrow-bore tunnel is constructed, according to formation condition in light section Tunnel tunnel face sets deep hole grouting Guan Yuguan canopy stabilization zone, the occlusion of advanced tubule stabilization zone ensures that stratum is stablized at variable cross-section And large cross-section tunnel is safe into hole.
Concrete construction method is as follows:
Step 1: narrow-bore tunnel excavation performs tunnel just support system 4;According to large cross-section tunnel apart from face distance And steel tube shed 1 sets angle and determines that steel tube shed 1 performs position;
Step 2: in narrow-bore tunnel, vault position drilling appropriate performs steel tube shed 1, is set greatly with 1 °~2 ° outer limbs Pipe canopy 1,1 steel pipe of steel tube shed use Φ 108mm, the seamless steel pipe of wall thickness 6mm, merogenesis installation;The slip casting into pipe, steel tube shed 1 surpass After the completion of preceding grouting and reinforcing, continues excavation face and welded in the vertical product steelframe in 1 place of performing of steel tube shed with steel tube shed 1;
Step 3: in narrow-bore tunnel, vault position drilling appropriate performs advanced tubule 2, is beaten with 1 °~2 ° outer limbs It sets if setting to tunnel variable cross-section;After the completion of 2 grouting and reinforcing of advanced tubule, continue to excavate face in advanced tubule 2 It founds a product steelframe and is welded with advanced tubule 2 in the place of performing;
Step 4: constructing in narrow-bore tunnel to variable cross-section, sets deep hole grouting pipe 3 according to formation condition and slip casting adds Gu being engaged with steel tube shed 1,2 reinforcing scope of advanced tubule, it is ensured that large cross-section tunnel is safe into hole.
It is big into big hole construction risk that this bored tunnel duck eye into big hole pre-add solid system solves tunnel duck eye, and construction is tired Disadvantage difficult, investment is big.Ensure large cross-section tunnel into hole safety, to reduce by the reinforcement system that injecting cement paste and pipe canopy are formed Engineering risk.
The content of the utility model is not limited to cited by embodiment, and those of ordinary skill in the art are practical new by reading this Type specification and to any equivalent transformation that technical solutions of the utility model are taken, be the claim institute of the utility model Cover.

Claims (9)

1. a kind of bored tunnel duck eye is into big hole pre-add solid system, it is characterised in that:
Positioned at tunnel duck eye at the variable cross-section in big hole, including steel tube shed (1), advanced tubule (2) and deep hole grouting pipe (3);
Steel tube shed (1) is set into stratum from narrow-bore tunnel face vault to large cross-section tunnel vault formation volumes, and is infused Slurry reinforces surrounding formation;
Advanced tubule (2) is set into stratum from narrow-bore tunnel vault to tunnel variable cross-section formation volumes, and grouting and reinforcing Tunnel variable cross-section node stratum;
Deep hole grouting pipe (3) is set from narrow-bore tunnel face variable cross-section into stratum to large cross-section tunnel hole top and barrel Formation volumes, and grouting and reinforcing surrounding formation.
2. a kind of bored tunnel duck eye according to claim 1 is into big hole pre-add solid system, it is characterised in that:
Steel tube shed (1) and advanced tubule (2) are slip casting steel floral tube;Deep hole grouting pipe (3) is slip casting pvc pipe.
3. a kind of bored tunnel duck eye according to claim 1 is into big hole pre-add solid system, it is characterised in that:
Steel tube shed (1) equidistantly covers large cross-section tunnel arch range.
4. a kind of bored tunnel duck eye according to claim 1 is into big hole pre-add solid system, it is characterised in that:
Steel tube shed (1) and the steelframe of the first support system (4) in tunnel are welded and fixed.
5. a kind of bored tunnel duck eye according to claim 1 is into big hole pre-add solid system, it is characterised in that:
Advanced tubule (2) equidistantly covers narrow-bore tunnel arch range.
6. a kind of bored tunnel duck eye according to claim 1 is into big hole pre-add solid system, it is characterised in that:
Advanced tubule (2) and the steelframe of the first support system (4) in tunnel are welded and fixed.
7. a kind of bored tunnel duck eye according to claim 1 is into big hole pre-add solid system, it is characterised in that:
Advanced tubule (2) and steel tube shed (1) stabilization zone are engaged.
8. a kind of bored tunnel duck eye according to claim 1 is into big hole pre-add solid system, it is characterised in that:
Deep hole grouting pipe (3) is set with spacing 500-800mm.
9. a kind of bored tunnel duck eye according to claim 1 is into big hole pre-add solid system, it is characterised in that:
Deep hole grouting pipe (3) and steel tube shed (1) stabilization zone, advanced tubule (2) stabilization zone are engaged.
CN201821844358.2U 2018-11-09 2018-11-09 A kind of bored tunnel duck eye is into big hole pre-add solid system Active CN209339958U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821844358.2U CN209339958U (en) 2018-11-09 2018-11-09 A kind of bored tunnel duck eye is into big hole pre-add solid system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821844358.2U CN209339958U (en) 2018-11-09 2018-11-09 A kind of bored tunnel duck eye is into big hole pre-add solid system

Publications (1)

Publication Number Publication Date
CN209339958U true CN209339958U (en) 2019-09-03

Family

ID=67747250

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821844358.2U Active CN209339958U (en) 2018-11-09 2018-11-09 A kind of bored tunnel duck eye is into big hole pre-add solid system

Country Status (1)

Country Link
CN (1) CN209339958U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112253138A (en) * 2020-11-03 2021-01-22 中铁隆工程集团有限公司 Construction method for excavation of small section of subway tunnel into large section by variable section

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112253138A (en) * 2020-11-03 2021-01-22 中铁隆工程集团有限公司 Construction method for excavation of small section of subway tunnel into large section by variable section

Similar Documents

Publication Publication Date Title
CN109404005A (en) Bored tunnel duck eye is into big hole pre-add solid system and construction method
CN111119935B (en) Multi-layer grouting reinforcement method for surrounding rock of soft and broken roadway structure
CN103089275A (en) Control method of surrounding rocks in water-rich very-broken surrounding rock tunnel collapse sections
CN101709651A (en) Grouting water blocking method for undersea tunnel
CN102926757A (en) Construction method of two-sidestep and four-step excavation support of weak large-span tunnel of mountain ridge
CN103306687A (en) Construction method for deformation control via horizontal whirling jet grouting of long cantilever in soft-rock tunnel
CN112228082B (en) Tunnel collapse treatment method by combined grouting of pipe shed and advanced small guide pipe
CN107762533A (en) A kind of front pre-grouting method of high-pressure water-enriched weak surrounding rock mountain tunnel
CN108166989A (en) The asymmetric twin-arch tunnel interval wall construction method of water rich strata " OC " shape
CN104389618A (en) Method for constructing multiple-arch tunnel hole body large room-free pipe shed support
CN103982188A (en) Supporting structure system of rock stratum large-section deep vertical shaft and construction method of supporting structure system
CN108798702A (en) A kind of method for protecting support of big cross section large-deformation tunnel in soft rock
CN108035742A (en) A kind of passive harmonious method for protecting support of extreme rockburst tunnel master
CN105484763B (en) A kind of semiclosed reinforced concrete segment method for protecting support of deep coalmine
CN109209443A (en) A kind of construction method of breaking surrounding rock tunnel structure
CN108915702B (en) Shield receiving method in circular small-section tunnel
CN109184742B (en) Advanced pre-grouting method for high-pressure water-rich soft surrounding rock mountain tunnel
CN209339958U (en) A kind of bored tunnel duck eye is into big hole pre-add solid system
CN105134247A (en) Tunnel supporting structure in horizontal layered class-III surrounding rock and construction method
CN102606173A (en) Construction method for treating tunnel deformation segment and accelerating tunneling
CN104863613A (en) High-side-wall anchored primary support structure for rock strata underground excavation underground structure, and construction method of high-side-wall anchored primary support structure
CN103775102A (en) Down-the-hole drill follow-pipe hole-forming backfill concrete stable free face collapse processing construction method
CN110159276A (en) Tunnel excavation technique in a kind of disintegration in water ultimate soft rock stratum
CN109723446A (en) Four step of microdilatancy silty clay formation tunnel adds interim inverted arch construction method
CN216077129U (en) Supporting structure for arch-free supporting tunnel to pass through vault crushing section

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant