CN209328261U - Power information acquisition system resultant fault checks actual training device - Google Patents
Power information acquisition system resultant fault checks actual training device Download PDFInfo
- Publication number
- CN209328261U CN209328261U CN201820629732.0U CN201820629732U CN209328261U CN 209328261 U CN209328261 U CN 209328261U CN 201820629732 U CN201820629732 U CN 201820629732U CN 209328261 U CN209328261 U CN 209328261U
- Authority
- CN
- China
- Prior art keywords
- module
- training
- information acquisition
- power information
- acquisition system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Alarm Systems (AREA)
Abstract
The utility model provides a kind of power information acquisition system resultant fault investigation actual training device, training cabinet including indoor setting, video surveillance module and communication module are set on the training cabinet, the video surveillance module is connect with communication module signal, the communication module is connect with the main control module signal for being located at control room, the main control module is also connect with sign monitoring modular signal and intercommunication module signal, and the main control module includes industrial personal computer.The utility model can carry out power information acquisition resultant fault to the new employee of power industry and check real training, and training while allowing training teacher to realize one-to-many to new employee, and the psychological quality of new employee in training process can be monitored, new employee is avoided to cause to make a fault and cause accident because psychological quality is unqualified in execute-in-place in the future, the theory of the training is more advanced, and fault rate is lower when operating after by trainer's work day.
Description
Technical field
The utility model relates to electrical energy measurement, dress tables to connect electricity, power information acquisition technique field, and in particular to a kind of electricity consumption
Information acquisition system resultant fault checks actual training device.
Background technique
Noise will affect the health of operations staff, reduce working efficiency.It is chronically in noise circumstance, the immunity of organism of people
Power can reduce, and induce some diseases.It works under strong noise environment for a long time, can lead to occupational sense of hearing decline or noise-induced ear
It is deaf;Influence of the noise to nervous system is mainly shown as central nervous system and automatic nervous system damage, and causes other devices
The variation of official generates neural symptom grouping;Influence of the noise to cardiovascular system is mainly shown as vasopasm or vascular tone
Reduction, blood pressure change, heartbeat irregularity of pulse etc..
Power user power consumption information acquisition system is the important component of smart grid construction, according to State Grid Corporation of China
The general requirement of smart grid construction, the construction of power user power consumption information acquisition system will realize that " all standing acquires entirely, is complete
Take control " overall goal, sales department, State Grid Corporation of China has been completed intelligent electric meter and power information acquisition system in 2009
The formulation of whole related specifications.With State Grid Corporation of China to intelligent electric meter uniform bidding carry out in a deep going way and power information acquire
" all standing, full acquisition " target of power information acquisition system construction can be realized in the coming five years for the all-round popularization of system.Mesh
Before, the bidding of 60,000,000 intelligent electric meters is completed in Guo Wang company, and product has been distributed in domestic 26 provinces net company.
Currently, a large amount of electrical energy data acquisition terminal equipment have been put into prefectures and cities, it is other not put into prefectures and cities also for land
The continuous each function of realization system.Equipment operation, the maintenance of acquiring electric energy information system are completed by electrical energy measurement personnel, technology content
Height, heavy workload.
Live true power information acquisition system cannot carry out technical staff since work and safety condition are limited
Line training.After power information acquisition simulation and training system Training Room is built up, it is capable of the operating condition of analog field device, it can be maximum
The professional training for meeting to limit power information collector improves its business skill, improves working efficiency, can promote electric power
The process of company's marketing informationization construction.
But current real training lacks the psychology monitoring to operator, and needs one-to-one guidance, but electric power row
Industry heavy workload can only extract seldom teacher out and give training to new employee, which results in the speed of training is slower, therefore need
Psychological monitoring is carried out to the employee for receiving training, and it is long-range one-to-many that training teacher carries out live new employee
Guidance.
The utility model of 105390053 A of Publication No. discloses a kind of intelligent electric energy meter and power information collection site mould
Quasi- training platform belongs to power information acquisition and monitoring simulation training field comprising is arranged in Training Room and uses real load
The three classes user of equipment simulating and analog acquisition debug platform;The analog acquisition debugging platform includes remote bill control single-phase intelligent
Electric energy meter, remote bill control three-phase intelligent electric-energy meter, concentrator and special transformer acquisition terminal;The three classes user specifically includes low pressure
Public affairs, which become, specially becomes the single household user for three-phase and four-line with mutual inductor for 220V small family, the straight-through single household user of three-phase and four-line and low pressure, changes
Utility model, which lacks, to be monitored the psychology by training new employee and cannot achieve one-to-many guidance of the old employee to new employee.
Utility model content
In view of this, the present invention provides a kind of power information acquisition system resultant faults to check actual training device.
To solve the above problems, the utility model provides a kind of power information acquisition system resultant fault investigation real training dress
It sets, the training cabinet including indoor setting, video surveillance module and communication module, the video surveillance mould is set on the training cabinet
Block is connect with communication module signal, and the communication module is connect with the main control module signal for being located at control room, the main control module
It is also connect with sign monitoring modular signal and intercommunication module signal, the main control module includes industrial personal computer.
Further, the video surveillance module includes the transverse arm that training cabinet upper end is arranged in, and the transverse arm end is downward
Holder is set, camera is set below the holder, the communication module is located above the transverse arm, and the communication module includes
First RS485 turns WIFI module and figure passes transmitting module, and the 2nd RS485 of setting turns WIFI module on the industrial personal computer and figure is passed and connect
Receive module.
Further, head device is set on the industrial personal computer, and the head device includes video glass, figure transmitting/receiving
Block, master control borad and plate detecting sensor, the master control borad are connect with the industrial personal computer signal, and the video glass, figure, which pass, to be received
Module, plate detecting sensor and master control partitioned signal connect.
Further, the master control borad includes single-chip microcontroller, and the plate detecting sensor uses nine axis attitude detection modules, should
Nine axis attitude detection modules include three-axis gyroscope, three axis digital accelerometers and three axis magnetoresistive sensor detection plates.
Further, the figure transmitting/receiving module and figure are passed transmitting module and are passed using ohm prestige 5.8GHz frequency 500MW figure
Suit.
Further, the sign monitoring modular includes basal part of the ear link, is arranged below the basal part of the ear link by flexible-belt
Reflective photoelectric sensor is arranged in strap, the strap inner surface, setting and the reflection on the basal part of the ear link
3rd RS485 of formula photoelectric sensor connection turns WIFI module.
Further, the intercommunication module includes the micro-interphone of basal part of the ear link upper end setting.
Further, the black flexible cover for agreeing with ear shape is arranged in activity on the basal part of the ear link, and the black is soft
Property cover outer surface be arranged sound-isolating sponge.
A kind of power information acquisition system resultant fault investigation practical training method, includes the following steps:
S1, by training employee before training starts, by sign monitoring modular band on ear, acquisition do not operate before
Heart rate data, training teacher open video surveillance module;
S2, started to operate by training employee, training teacher takes video glass by video surveillance module to scene
Training operation observed;
S3, training teacher realize the control to holder by yaw, realize the adjustment to camera angle, camera acquisition
To picture transmitting module passed by figure be sent to the figure transmitting/receiving module on video glass, and shown on video glass
Show;
Trainee's heartbeat data that sign monitoring module monitors arrive is shown on S4, industrial personal computer, and according to the heart before
Rate data calculate the maximum heart rate and limit heart rate of trainee, when heartbeat is not up to maximum heart rate without additional behaviour
Make, teacher is trained when heartbeat is between maximum heart rate and limit heart rate and is pacified by intercommunication module, when heartbeat is greater than
Stop its training operation when limit heart rate, is giveed training again after trainee's heartbeat is steady.
Further, the heart rate data acquired in step S1 includes the resting heart rate of trainee, heart rate of jogging, tranquillization
Heart rate is trainee under awake, inactive rest state, the number of heartbeat per minute;Heart rate of jogging is by trainer
The heart rate that member jogs under the speed of 5~10km/h;Maximum heart rate is that 220- is trainee's age;Limit heart rate is (most
Big heart rate-resting heart rate) × 0.8+ resting heart rate.
The training cabinet of the utility model includes digital program controlled power source, high pressure simulation cabinet, negative control cabinet, simulation low-voltage cabinet, institute
Digital program controlled power source is stated, three-phase signal generating unit, signal processing unit, three-phase signal power including being sequentially connected in series are put
Big unit, three-phase signal output unit and the power supply unit powered to each unit, are further connected in the adjustable side of signal processing unit
The digital regulated unit of three-phase signal, display unit and selftest module, display unit shows voltage, electric current and phase value, in three-phase
The output of signal output unit is terminated with three-phase voltage, electric current automatic protection unit, and three-phase signal generating unit is used to generate three
Phase alternating voltage, current signal, the digital regulated unit of three-phase signal are used to count three-phase voltage, three-phase current and phase
Regulation, and real-time dynamic regulation is carried out by touch screen, the three-phase signal after adjusting is input to signal processing unit and is counted
Word processing, and exported by signal processing unit;
The high pressure simulation cabinet shows table, analog current mutual inductor and analog voltage by analog voltage mutual inductor, voltage
Mutual inductor and the three-phase intelligent electric-energy meter of analog current mutual inductor connection, simulate with first bear respectively at the first simulation on-load switch
The Operation switch and switch state indicator lamp groups of lotus switch connection are at wherein analog voltage mutual inductor and analog current mutual inductor
Three-phase voltage and three-phase current are provided for negative control terminal and gauge table;
The negative control cabinet is handed over by terminal fault analogue unit, metering and adopts fault simulation unit, specially becomes I type terminal erector
Position, exchange acquisition module, specially I type acquisition terminal of change, power supply unit, timing control unit, timing control button and timing are shown
Unit composition, the timing control button are made of timing start button and timing conclusion button;Terminal electricity in high pressure simulation cabinet
Source signal, current signal, pulse meter reading signal, remote signals become I type terminal through terminal fault analogue unit, specially and install station
Become I type acquisition terminal to special, specially becomes I type acquisition terminal sending control signal and specially become I type terminal installation station, terminal fault
Analogue unit to high pressure simulation cabinet simulation on-load switch;Three-phase voltage, the three-phase current of high pressure simulation cabinet output are handed over through metering
Fault simulation unit, exchange acquisition module are adopted, special transformer acquisition terminal is specially become I type terminal installation station acquisition exchange acquisition mould
The voltage and current data of block;Power supply unit, timing control unit, timing control button and timing display unit constitute system meter
Shi Danyuan;Negative control cabinet provides installation, debugging and troubleshooting training platform specially to become I type acquisition terminal, and timing unit is technical ability
Examination provides timing foundation.
The simulation low-voltage cabinet, by analog current mutual inductor, intelligent electric energy meter, the special change III being connect with intelligent electric energy meter
Type terminal installs station, becomes the second simulation on-load switch and analog current mutual inductance that type III terminal installation station is connect with special
The three-phase electricity flow table of device connection is mounted on the special change type III acquisition terminal and the second mould specially become on type III terminal installation station
The switch state indicator light and switch control knob's composition of quasi- on-load switch connection;Its special secondary school become type III terminal installation station by
Terminal install hanging plate and acquisition terminal connecting terminal composition, special secondary school become type III terminal installation station by terminal installation hanging plate and
Acquisition terminal connecting terminal composition, simulates and specially becomes type III acquisition terminal scene running environment, specially to become type III acquisition terminal peace
Adjustment examination and troubleshooting provide training platform.
Therefore for needing that video surveillance module is all arranged on three cabinet bodies trained, video surveillance module can be to scene
The operation of start-up carries out long-distance video monitoring, it can be observed that by the operation correctness of training employee, proficiency whether
Qualification, communication module are responsible for communicating video surveillance module and main control module, and training teacher can be to video surveillance module
It is controlled, realizes the observation of multi-angle.Sign monitoring modular can be monitored the heartbeat of trainee, and new employee is rigid
Psychological quality is likely to unqualified when starting to more complicated electrical equipment operation, in this way it is possible that larger fault,
Monitor that teacher is trained when rapid heart beat can carry out psychological consultation to it, in order to avoid there is thing when the equipment at formal operation scene
Therefore intercommunication module realizes that the dialogue of both sides is linked up.
The utility model can carry out power information acquisition resultant fault to the new employee of power industry and check real training, and make
Teacher must be trained and trained while can realizing one-to-many to new employee, and the psychology element of new employee in training process can be monitored
Matter avoids new employee from causing to make a fault and cause accident because psychological quality is unqualified in execute-in-place in the future, the training
Theory it is more advanced, after by trainer's work day operate when fault rate it is lower.
Detailed description of the invention
Fig. 1 is the system structure diagram that the utility model power information acquisition system resultant fault checks actual training device;
Fig. 2 is the structural schematic diagram of the utility model sign monitoring modular;
Fig. 3 is the structural schematic diagram that black flexible cover is arranged in the utility model sign monitoring modular;
Fig. 4 is the structural schematic diagram of the utility model video surveillance module;
Fig. 5 is the program flow diagram of the utility model head device.
Specific embodiment
It is practical new below in conjunction with this to keep the objectives, technical solutions, and advantages of the embodiments of the present invention clearer
The attached drawing 1-5 of type embodiment, is clearly and completely described the technical solution of the utility model embodiment.Obviously, described
Embodiment be the utility model a part of the embodiment, instead of all the embodiments.Based on described the utility model
Embodiment, those of ordinary skill in the art's every other embodiment obtained fall within the protection scope of the utility model.
Embodiment one present embodiments provides a kind of power information acquisition system resultant fault investigation actual training device, including
Video surveillance module and communication module 21, the video surveillance mould are arranged on the training cabinet 20 for the training cabinet 20 of indoor setting
Block is connect with 21 signal of communication module, and the communication module 21 is connect with the main control module signal for being located at control room, the master control
Module is also connect with sign monitoring modular signal and 10 signal of intercommunication module, and the main control module includes industrial personal computer 5.
Video surveillance module can carry out long-distance video monitoring to the operation of on-site training personnel, it can be observed that being trained
Whether operation correctness, the proficiency of employee be qualified, and communication module is responsible for leading to video surveillance module and main control module
Letter, training teacher can control video surveillance module, realize the observation of multi-angle.Sign monitoring modular can be to being trained
The heartbeat of instruction personnel is monitored, and psychological quality is likely to only when new employee has just started to more complicated electrical equipment operation
It closes, in this way it is possible that larger fault, psychological consultation can be carried out to it by training teacher when monitoring rapid heart beat, in order to avoid
Occurs accident when the equipment at formal operation scene, intercommunication module realizes that the dialogue of both sides is linked up.
Embodiment two, the difference with embodiment one are:
The video surveillance module includes the transverse arm 22 that training 20 upper end of cabinet is arranged in, and 22 end of transverse arm is down-set
Holder 8, camera 9 is arranged below the holder 8, and the communication module 21 is located at 22 top of transverse arm, the communication module
21 include that the first RS485 turns WIFI module and figure biography transmitting module 7, and the 2nd RS485 of setting turns WIFI module on the industrial personal computer
23 and figure transmitting/receiving module 4.Holder is arranged in transverse arm end, and camera is arranged below holder, and such camera can be to training cabinet
It is preferably monitored, holder is connect by communication module with industrial personal computer, and figure passes the figure biography on transmitting module and industrial personal computer and receives
Module cooperation can show the picture of monitoring on industrial personal computer, and the communication of industrial personal computer and holder is realized by RS485.
Head device is set on the industrial personal computer 5, and the head device includes video glass 1, figure transmitting/receiving module 4, master
Control plate 3 and plate detecting sensor 2, the master control borad 3 are connect with 5 signal of industrial personal computer, and the video glass 1, figure, which pass, to be received
Module 4, plate detecting sensor 2 are connect with 3 signal of master control borad.Head device can be worn on the head of training teacher, pass through video
The form of glasses realizes that integrally disposed on video glass to have figure transmitting/receiving module, master control borad and plate detecting sensor, figure is passed and connect
Receiving module can receive video information and the display that transmitting module is passed from figure, and training teacher's viewing monitoring picture is more convenient,
Plate detecting sensor can be monitored training teacher head, be sent to industrial personal computer by master control borad so that information will be shaken,
The movement of industrial personal computer and holder communication control holder realizes that holder is moved with head movement, and viewing angle is more and more square
Just.User's head equipment constitutes attitude detection system using MEMS inertia device, using 8 super low-power consumption AVR single chips
The Arduino Nano of ATmega328P composition selects nine axis attitude detections as the control processing unit on master control borad, sensor
Module GY-85, its inside are integrated with three axis ITG3205 gyroscopes, three axis ADXL345B digital accelerometers and three axis
HMC5883L magnetoresistive sensor.Whole system is made of the accelerometer chip, gyroscope chip, magnetometer chip by communicating
Sensor module and microprocessor module composition.Master control borad reads data from sensor module by communication interface, utilizes card
Thalmann filter quickly handles these data, calculates itself posture.
The master control borad 3 includes single-chip microcontroller, and the plate detecting sensor 2 uses nine axis attitude detection modules, the nine axis appearance
State detection module includes three-axis gyroscope, three axis digital accelerometers and three axis magnetoresistive sensor detection plates.Using MEMS inertia
Device constitutes attitude detection system, the Arduino Nano conduct formed using 8 super low-power consumption AVR single chip ATmega328P
Control processing unit on master control borad, sensor select nine axis attitude detection module GY-85, its inside is integrated with three axis
ITG3205 gyroscope, three axis ADXL345B digital accelerometers and three axis HMC5883L magnetoresistive sensors.Whole system is by passing through
Accelerometer chip, gyroscope chip, the sensor module of magnetometer chip composition and the microprocessor module composition of communication.Magnetic
Power meter predominantly detects the horizontal magnetic field in space to complete induction head rotation direction, realizes accumulated error with this.But dynamic
Under the conditions of data reliability it is excessively poor, so the reckoning and fusion of detection data may be implemented using Kalman filtering algorithm,
Sensor is increased substantially to the real-time and precision of attitude measurement.After filtering starts, initial value is set, best increase is set
Beneficial matrix simultaneously estimates update, is successively repeatedly corrected to association's square matrix error, and more new estimation is output to and optimal is estimated
Meter output and observation input.After attitude detecting portion sorting measures accurate head pose, single-chip microcontroller converts the variation of movement
At the angle change of holder, controlling signal and use a frequency for 50Hz square-wave signal, corresponding square-wave cycle is exactly 20ms,
It to duty ratio between 2ms, is equivalent to is 5 ~ 10% that the high level lasting time for wherein indicating signal content, which is 1ms,.The utility model
Middle holder uses two axis, is transmitted to industrial personal computer for master control borad is passed through after the completion of attitude detection information, is turning WIFI skill by RS485
Art is sent to holder, realizes angle regulation.
The figure transmitting/receiving module 4 and figure pass transmitting module 7 and pass suit using ohm prestige 5.8GHz frequency 500MW figure.Figure
Transmitting/receiving module and figure pass transmitting module and pass suit using ohm prestige 5.8GHz frequency 500MW figure, and small volume, power consumption is lower,
The flight of unmanned plane will not be impacted.And communication channel is more, transmission range farther out, can using large scale integrated circuit
By property height, integrated micro air-cooled radiator, calorific value is small, and work efficiency is high.Transmitter and receiver use radio receiving transmitting module,
JF24D can be used, has the advantages that transmission speed small in size is high.
The utility model is as follows about head device system hardware connection method: the Arduino Nano of use is
Its maximum difference is for miniature version and the comparison of other products in Arduino development board series of products: without electricity
Supply socket is being powered with Mini-B type socket;Outer dimension is very small, uses on bread board very square
Just;Processor ATmega328 is the configuration of Nano3.0 version, and the functional module which has has: the input of 14 railway digitals/
Delivery outlet, wherein 6 tunnels can be used as PWM output, 8 tunnel simulation inputs, 16MHz crystal oscillator, a mini-B USB port, one
ICSP header, a reset button.The circuit connection of mainboard and sensor: the corresponding SCL pin of the A5 pin of master control borad,
The corresponding SDA pin of A4 pin, in order to minimize the volume of whole system, by master control borad and the corresponding functional interface of GY-85
Directly welded together with row's needle.GND is connected to corresponding position by the GND of wire jumper and GY-85.
As shown in Figure 5: the main program in the utility model is responsible for the communication with host computer, and the initialization to master control borad is right
Storage reading of each key variables etc.;Being started with the pin setting of Arduino, the PWM for then opening function of the MCU is interrupted,
Starting, obtain the setting for being stored in EEPROM, initializationSensor enters cyclic program after starting timer interruption
Duan Liyong key-press status judges whether into park mode, joins the program that software carries out upper and lower computer communication using serial ports and tune,
Due to there are many parameters to need to show by graphical interfaces, adjusting, ginseng software calibration magnetic field is adjusted comprising cooperating by serial communication
Then the function of sensor saves all related settings and parameter to EEPROM, can be direct when powering on use every time
It reads.Then, by obtaining the attitude data of sensor one by one, and data are subjected to packing calculating.Communication includesIt writes
Enter function and read function, is handled according to the different address of three sensors, when centre also needs to consider sensor calibration
The offset parameter of generation can finally obtain the posture information that three sensors are measured respectively, obtain not simultaneous interpretation by calculating separately
The angle information that sensor is judged.Due to gyroscopic drift as working time extension is more serious, passes through and introduce accelerometer
Data analyzed effectively to be inhibited to it, and be responsible for induction head rotation direction task rely primarily on magnetometer inspection
The horizontal magnetic field surveyed in space is completed.After calculating result, it is incorporated into array and carries out next step operation.
Embodiment three, the difference with embodiment one are:
The sign monitoring modular includes basal part of the ear link 14, is fixed below the basal part of the ear link 14 by the setting of flexible-belt 16
Reflective photoelectric sensor 24 is arranged in clamping plate 17,17 inner surface of strap, on the basal part of the ear link 14 setting with it is described
The 3rd RS485 that reflective photoelectric sensor 24 connects turns WIFI module 12.Basal part of the ear link agrees with the shape of ear base, is wearing
It is stuck in the basal part of the ear position when wearing, prevents from falling off, rubber spacer can be set in link inner surface, improves the comfort level of wearing.Fixing clamp
Plate is connected on basal part of the ear link by flexible-belt, prevents strap from falling, and strap is clamped on ear-lobe when use, interior table
The reflective photoelectric sensor in face can be monitored the case where heartbeat, and be sent data by the first radio receiving transmitting module
It goes out, the compact structure is convenient, and the operation of trainee will not be impacted by hanging over basal part of the ear position, can be very easily right
Heart rate data is monitored.
The intercommunication module 10 includes the micro-interphone 13 of 14 upper end of basal part of the ear link setting.
Activity setting agrees with the black flexible cover 19 of ear shape, the black flexible cover on the basal part of the ear link 14
Sound-isolating sponge 18 is arranged in 19 outer surfaces.Black cover can block ambient, prevent from influencing photoelectric sensor
Accuracy is monitored, sound-isolating sponge can carry out absorption isolation to extraneous sound, avoid impacting the communication of intercom.
Example IV present embodiments provides a kind of power information acquisition system resultant fault investigation practical training method, including
Following steps:
S1, by training employee before training starts, by sign monitoring modular band on ear, acquisition do not operate before
Heart rate data, training teacher open video surveillance module;
S2, started to operate by training employee, training teacher takes video glass by video surveillance module to scene
Training operation observed;
S3, training teacher realize the control to holder by yaw, realize the adjustment to camera angle, camera acquisition
To picture transmitting module passed by figure be sent to the figure transmitting/receiving module on video glass, and shown on video glass
Show;
Trainee's heartbeat data that sign monitoring module monitors arrive is shown on S4, industrial personal computer, and according to the heart before
Rate data calculate the maximum heart rate and limit heart rate of trainee, when heartbeat is not up to maximum heart rate without additional behaviour
Make, teacher is trained when heartbeat is between maximum heart rate and limit heart rate and is pacified by intercommunication module, when heartbeat is greater than
Stop its training operation when limit heart rate, is giveed training again after trainee's heartbeat is steady.
The heart rate data acquired in step S1 includes the resting heart rate of trainee, heart rate of jogging, resting heart rate be by
Start-up is under awake, inactive rest state, the number of heartbeat per minute;Heart rate of jogging be trainee 5~
The heart rate jogged under the speed of 10km/h;Maximum heart rate is that 220- is trainee's age;Limit heart rate is (the maximum heart
Rate-resting heart rate) × 0.8+ resting heart rate.
The above is preferred embodiments of the present invention, it is noted that for the ordinary skill of the art
For personnel, under the premise of not departing from principle described in the utility model, it can also make several improvements and retouch, these improvement
It also should be regarded as the protection scope of the utility model with retouching.
Claims (8)
1. a kind of power information acquisition system resultant fault checks actual training device, it is characterised in that: the training including indoor setting
Cabinet is arranged video surveillance module on the training cabinet and communication module, the video surveillance module is connect with communication module signal,
The communication module be located at control room main control module signal connect, the main control module also with sign monitoring modular signal and
The connection of intercommunication module signal, the main control module includes industrial personal computer.
2. power information acquisition system resultant fault as described in claim 1 checks actual training device, it is characterised in that: the view
Frequency monitoring modular includes the transverse arm that training cabinet upper end is arranged in, and the down-set holder in transverse arm end, the holder lower section is set
Camera is set, the communication module is located above the transverse arm, and the communication module includes that the first RS485 turns WIFI module and figure
Transmitting module is passed, the 2nd RS485 of setting turns WIFI module and figure transmitting/receiving module on the industrial personal computer.
3. power information acquisition system resultant fault as claimed in claim 2 checks actual training device, it is characterised in that: the work
Head device is set on control machine, and the head device includes video glass, figure transmitting/receiving module, master control borad and sensor detection
Plate, the master control borad are connect with the industrial personal computer signal, the video glass, figure transmitting/receiving module, plate detecting sensor and master
Control partitioned signal connection.
4. power information acquisition system resultant fault as claimed in claim 3 checks actual training device, it is characterised in that: the master
Controlling plate includes single-chip microcontroller, and the plate detecting sensor uses nine axis attitude detection modules, which includes three
Axis gyroscope, three axis digital accelerometers and three axis magnetoresistive sensor detection plates.
5. power information acquisition system resultant fault as claimed in claim 4 checks actual training device, it is characterised in that: the figure
Transmitting/receiving module and figure pass transmitting module and pass suit using ohm prestige 5.8GHz frequency 500MW figure.
6. power information acquisition system resultant fault as claimed in claim 5 checks actual training device, it is characterised in that: the body
Levying monitoring modular includes basal part of the ear link, by flexible-belt setting strap below the basal part of the ear link, in the strap
Reflective photoelectric sensor is arranged in surface, and the third connecting with the reflective photoelectric sensor is arranged on the basal part of the ear link
RS485 turns WIFI module.
7. power information acquisition system resultant fault as claimed in claim 6 checks actual training device, it is characterised in that: described right
Say that module includes the micro-interphone of basal part of the ear link upper end setting.
8. power information acquisition system resultant fault as claimed in claim 7 checks actual training device, it is characterised in that: the ear
Activity setting agrees with the black flexible cover of ear shape on root link, and sound insulation sea is arranged in black flexible cover outer surface
It is continuous.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820629732.0U CN209328261U (en) | 2018-04-28 | 2018-04-28 | Power information acquisition system resultant fault checks actual training device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820629732.0U CN209328261U (en) | 2018-04-28 | 2018-04-28 | Power information acquisition system resultant fault checks actual training device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209328261U true CN209328261U (en) | 2019-08-30 |
Family
ID=67704837
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820629732.0U Active CN209328261U (en) | 2018-04-28 | 2018-04-28 | Power information acquisition system resultant fault checks actual training device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209328261U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108538130A (en) * | 2018-04-28 | 2018-09-14 | 国网河南省电力公司漯河供电公司 | Power information acquisition system resultant fault investigates Training Room |
-
2018
- 2018-04-28 CN CN201820629732.0U patent/CN209328261U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108538130A (en) * | 2018-04-28 | 2018-09-14 | 国网河南省电力公司漯河供电公司 | Power information acquisition system resultant fault investigates Training Room |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201352233Y (en) | Three-phase multifunctional electric energy meter with power carrier communication | |
CN103933722A (en) | Bodybuilding dumbbell exercise detection device and method | |
CN103218906A (en) | Falling data acquiring and analyzing platform | |
CN106725381A (en) | A kind of intelligent body-building motion bracelet | |
AU2019101181A4 (en) | Dust Concentration Detection System in Factory Workshop | |
CN209328261U (en) | Power information acquisition system resultant fault checks actual training device | |
CN201804431U (en) | Wireless testing system for field luminous environment | |
CN201098488Y (en) | Synchronous testing system for trampoline | |
CN106353592A (en) | Test system based on simulated intelligent electric energy meter | |
CN205162141U (en) | Collect air purification function and wrist -watch function intelligent bracelet in an organic whole | |
CN108538130A (en) | Power information acquisition system resultant fault investigates Training Room | |
CN203540014U (en) | Intelligent judgment device and glove of intelligent judgment device and with sensing signal transmission function | |
CN205625912U (en) | Pulse measurement system with wireless transmission function | |
CN207804992U (en) | A kind of trainer's vital signs monitor supervision platform | |
CN206483111U (en) | A kind of light sensing-motion data recording equipment | |
CN202636919U (en) | Motion-state physical ability monitoring instrument | |
CN204066379U (en) | Power carrier collector | |
CN210299676U (en) | High-precision three-dimensional human body measuring device | |
CN107102584A (en) | A kind of superfine particulate matter and VOCs field monitoring node | |
CN206548933U (en) | A kind of infusion monitoring system | |
CN203935596U (en) | A kind of dumb-bell motion detection apparatus | |
CN207895090U (en) | A kind of rain condition automated monitor | |
CN108955776A (en) | A kind of multi-parameter rain water monitoring system based on ZigBee | |
CN205644192U (en) | Portable miniature tensile force measurement appearance of space based on singlechip | |
CN107357160A (en) | A kind of satellite intelligent clock |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |