CN209323706U - A kind of compound connection by post-installed fastenings device of ductility - Google Patents

A kind of compound connection by post-installed fastenings device of ductility Download PDF

Info

Publication number
CN209323706U
CN209323706U CN201822162150.9U CN201822162150U CN209323706U CN 209323706 U CN209323706 U CN 209323706U CN 201822162150 U CN201822162150 U CN 201822162150U CN 209323706 U CN209323706 U CN 209323706U
Authority
CN
China
Prior art keywords
steel bushing
rubber stopper
baffler
anchor pole
binder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201822162150.9U
Other languages
Chinese (zh)
Inventor
于周健
谢群
张跃
薛松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
University of Jinan
Original Assignee
University of Jinan
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by University of Jinan filed Critical University of Jinan
Priority to CN201822162150.9U priority Critical patent/CN209323706U/en
Application granted granted Critical
Publication of CN209323706U publication Critical patent/CN209323706U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of compound connection by post-installed fastenings device of ductility, it include steel bushing, the inside of steel bushing is provided through anchor pole, the tail portion welding of anchor pole is equipped with baffler B, baffler top is equipped with rubber stopper B, binder is poured into above rubber stopper B, and rubber stopper A is equipped with above binder, is equipped with baffler A above rubber stopper A;Baffler A, rubber stopper A, binder, rubber stopper B and the equal housing of baffler are set to the outside of anchor pole, and are integrally located at the inside of steel bushing;The top of anchor pole is equipped with the anchor slab in circular ring shape, and the top of anchor slab is equipped with locking nut.It is its simple structure, easy for construction;In the case where guaranteeing anchoring strength, the ductility and energy dissipation capacity of rear anchorage element are substantially increased.

Description

A kind of compound connection by post-installed fastenings device of ductility
Technical field
The utility model relates to field of civil engineering, are related to connection by post-installed fastenings device, anchor after especially a kind of ductility is compound Be connected connection device.
Background technique
In field of civil engineering, the connection for increasing steel member and original armored concrete substrate newly connects frequently with rear-anchorage inserted bar Connection technology.Currently, the building anchor bolt used is broadly divided into mechanical anchor and bonding anchor bolt, it is made of anchor pole, anchor slab and nut.This In place of two kinds of connection types all Shortcomings, the failure mode of mechanical anchor often shows as brittle break, and energy dissipation capacity is insufficient, prolongs Property is poor;Although biggish sliding has occurred in bonding anchor bolt before destruction, deformation is very fast, still falls within brittle break.Especially It is that structural failure is serious when encountering middle shake or big shake, it is difficult to meet China's shockproof requirements.
Utility model content
To solve the problems, such as that ductility existing for traditional connection by post-installed fastenings mode is poor, it is multiple that the utility model proposes a kind of ductility Close connection by post-installed fastenings device.
The technical scheme adopted by the utility model to solve the technical problem is as follows: a kind of compound connection by post-installed fastenings dress of ductility It sets, includes steel bushing, the inside of steel bushing is provided through anchor pole, and the tail portion welding of anchor pole is equipped with baffler B, baffler B Top is equipped with rubber stopper B, and binder is poured into above rubber stopper B, and rubber stopper A is equipped with above binder, is equipped with resistance above rubber stopper A Partition A;Baffler A, rubber stopper A, binder, rubber stopper B and the equal housing of baffler B are set to the outside of anchor pole, and whole position In the inside of steel bushing;The top of anchor pole is equipped with the anchor slab in circular ring shape, and the top of anchor slab is equipped with locking nut.
The utility model also has following additional technical feature: steel bushing is in two kinds of embodiment settings;Embodiment one is side Shape steel disc is rolled up to the hollow ring sleeve for being in, and the both ends of rectangular steel disc are in the double-deck overlap joint setting;Embodiment two is on the upside of including Steel bushing and lower layer's steel bushing;The bottom of upside steel bushing is placed in the top of lower layer's steel bushing.
The utility model compared to the prior art, the advantage is that: a kind of compound connection by post-installed fastenings device of ductility, construction Simply, easy for construction;In the case where guaranteeing anchoring strength, the ductility and energy dissipation capacity of rear anchorage element are substantially increased.
The additional aspect and advantage of the utility model will be set forth in part in the description, partially will be from following description In become obvious, or recognized by the practice of the utility model.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only It is some embodiments of the utility model, for those of ordinary skill in the art, in the premise not made the creative labor Under, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is the overall structure diagram of the compound connection by post-installed fastenings device of the utility model ductility;
Fig. 2 is the structural schematic diagram of the utility model steel bushing embodiment one;
Fig. 3 is the structural schematic diagram of the utility model steel bushing embodiment one;
Fig. 4 is the structural schematic diagram of the utility model steel bushing embodiment two;
Fig. 5 is the structural schematic diagram of the utility model steel bushing embodiment two;
Description of symbols: anchor pole 1, locking nut 2, anchor slab 3, baffler A4, rubber stopper A5, binder 6, steel bushing 7, Concrete eight, rubber stopper B9, baffler B10.
Specific embodiment
Exemplary embodiment disclosed by the utility model is more fully described below with reference to accompanying drawings, these embodiments be for It can thoroughly understand the utility model, and range disclosed by the utility model can be communicated completely to this field Technical staff.Although showing exemplary embodiment disclosed by the utility model in attached drawing, it being understood, however, that this is practical new Type and should not be limited by the embodiments set forth herein.
A kind of compound connection by post-installed fastenings device of ductility, including anchor pole 1, locking nut 2, anchor slab 3, baffler A4, rubber stopper A5, binder 6, steel bushing 7, rubber stopper B9, baffler B10.Wherein, anchor pole 1, locking nut 2, anchor slab 3, baffler A4, steel Sleeve 7 and baffler B10 are all made of stainless steel material and are made.Baffler A4, rubber stopper A5, binder 6, rubber stopper B9 and barrier The equal housing of plate B10 is set to the outside of anchor pole 1, and is integrally located at the inside of steel bushing 7.
The inside of steel bushing 7 is provided through anchor pole 1, and anchor pole 1 opens screw thread axially outside, and screw thread is spiral burr.
The tail portion welding of anchor pole 1 is equipped with baffler B10, and baffler B10 and anchor pole 1 are in unitary design, and baffler B10 is Circle, outer diameter are equal to the internal diameter of steel bushing 7.The top baffler B10 is equipped with rubber stopper B9, and rubber stopper B9 is circle, and outer diameter is bigger In the internal diameter of steel bushing 7.
Binder 6 is poured into above rubber stopper B9, the material of binder 6 is the mixture of modified cement and water;Modified water Mud is soundless cracking agent, one kind of expanding cement or combinations thereof;Binder 6 is the modification cement of no pollution to the environment, by changing The expansion of property cement and aqueous mixtures is so that anchor pole 1 is anchored on 7 inner surface of steel bushing.The cost of the general adhesive of the prior art is 25 yuan/kg or more, being such as using 6 cost of binder of the utility model is only 2 yuan/kg, is not influencing connection by post-installed fastenings device Under the premise of basic performance, cost can be effectively reduced, it is environment friendly and pollution-free, while ensure that the high-strength of connection by post-installed fastenings device Spend ductility and energy dissipation capacity.
Rubber stopper A5 is equipped with above binder 6, rubber stopper A5 is circle, and outer diameter is slightly larger than the internal diameter of steel bushing 7.Rubber stopper Baffler A4 is equipped with above A5, baffler A4 is circle, and circular hole is placed on 1 outside of anchor pole at center, and outer diameter is equal to steel bushing 7 Internal diameter.
The top of anchor pole 1 is equipped with the anchor slab 3 in circular ring shape, and the top of anchor slab 3 is equipped with locking nut 2.
Steel bushing 7 in actual use can be in two kinds of embodiment settings.
Embodiment one is that rectangular steel disc is rolled up to the hollow ring sleeve for being in, and the both ends of rectangular steel disc are arranged in the double-deck overlap joint, As Figure 2-3.It is compared with common steel bushing, when in use, outer diameter can be become larger this steel bushing 7 by swelling, into And it fits closely with the inner wall of concrete eight with this increasing friction force.This steel bushing 7 is in use, with common steel bushing user Formula is identical.
Embodiment two is steel bushing 701 and lower layer's steel bushing 702 on the upside of including;Upside is placed in the top of lower layer's steel bushing 702 The bottom of steel bushing 701, as illustrated in figures 4-5.It is compared with common steel bushing, this steel bushing 7 when in use, passes through the drawing of anchor pole 1 Tight left and right, upside steel bushing 701 and lower layer's steel bushing 702 suit swelling, and the entire outer diameter of steel bushing 7 becomes larger, so with concrete eight Inner wall is fitted closely with this increasing friction force.
Baffler B10 when in use, is first welded in the tail portion of anchor pole 1, will obstructed by the compound connection by post-installed fastenings device of ductility Plate B10 protrudes into the bottom of steel bushing 7, and rubber stopper B9 is covered in 1 outside of anchor pole and protrudes into the bottom of steel bushing 7, in anchor pole 1 and steel Suitable binder 6 is poured into 7 gap of sleeve, and rubber stopper A5 and baffler A4 are sequentially sleeved in 1 outside of anchor pole and protrudes into steel bushing The top of cylinder 7.Above structure is integrally placed in the anchor bolt hole being drilled on concrete eight in advance, by 3 sets of anchor slab in anchor pole 1 Top and locked by locking nut 2.It stands, forbids disturbing anchor pole 1 during placement, it is complete to internal binder 6 It solidifies and by after the complete swelling of connection by post-installed fastenings device, it can normal use.
Although the various embodiments described above are described, once a person skilled in the art knows basic wounds The property made concept, then additional changes and modifications can be made to these embodiments, so the foregoing is merely the realities of the utility model Example is applied, the scope of patent protection of the utility model is not intended to limit, it is all to utilize the utility model specification and accompanying drawing content Made equivalent structure or equivalent flow shift, is applied directly or indirectly in other relevant technical fields, and similarly includes Within the scope of patent protection of the utility model.

Claims (2)

1. a kind of compound connection by post-installed fastenings device of ductility, which is characterized in that include steel bushing (7), the inside of steel bushing (7) is passed through Wear and be equipped with anchor pole (1), the welding of the tail portion of anchor pole (1) is equipped with baffler B(10), baffler B(10) top is equipped with rubber stopper B (9), rubber stopper B(9) top pours into binder (6), rubber stopper A(5 is equipped with above binder (6)), rubber stopper A(5) top sets There is baffler A(4);The baffler A(4), rubber stopper A(5), binder (6), rubber stopper B(9) and baffler B(10) it is outer Set is set to the outside of anchor pole (1), and is integrally located at the inside of steel bushing (7);It is in circular ring shape that the top of the anchor pole (1), which is equipped with, Anchor slab (3), the top of anchor slab (3) is equipped with locking nut (2).
2. the compound connection by post-installed fastenings device of ductility according to claim 1, it is characterised in that:
The steel bushing (7) is that rectangular steel disc is rolled up to the hollow ring sleeve for being in, and the both ends of rectangular steel disc are in the double-deck overlap joint setting;
Or
The steel bushing (7) is steel bushing (701) and lower layer's steel bushing (702) on the upside of including, the top of lower layer's steel bushing (702) Inside it is placed on the bottom of upside steel bushing (701).
CN201822162150.9U 2018-12-23 2018-12-23 A kind of compound connection by post-installed fastenings device of ductility Expired - Fee Related CN209323706U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822162150.9U CN209323706U (en) 2018-12-23 2018-12-23 A kind of compound connection by post-installed fastenings device of ductility

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822162150.9U CN209323706U (en) 2018-12-23 2018-12-23 A kind of compound connection by post-installed fastenings device of ductility

Publications (1)

Publication Number Publication Date
CN209323706U true CN209323706U (en) 2019-08-30

Family

ID=67728020

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822162150.9U Expired - Fee Related CN209323706U (en) 2018-12-23 2018-12-23 A kind of compound connection by post-installed fastenings device of ductility

Country Status (1)

Country Link
CN (1) CN209323706U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112253198A (en) * 2020-09-25 2021-01-22 中铁隆昌铁路器材有限公司 Composite hollow anchor rod assembly and mounting method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112253198A (en) * 2020-09-25 2021-01-22 中铁隆昌铁路器材有限公司 Composite hollow anchor rod assembly and mounting method thereof

Similar Documents

Publication Publication Date Title
CN108678508A (en) The I-shaped energy consumption connector of Coupled Shear Wall structure
CN206512588U (en) A kind of T-shaped steel tube confinement reinforced concrete bridge pier beam-column connection of assembled
CN106149937B (en) Assembly concrete beam and its dry type connection method
CN209323706U (en) A kind of compound connection by post-installed fastenings device of ductility
CN203729498U (en) Vertical reinforcement-steel sleeve but joint connection structure of assembled wall
CN109667350A (en) A kind of assembling frame structure node based on screw rod tenon structure
CN110273420A (en) A kind of anchor pole cage core pouch and pouch anchor pole
CN209025322U (en) A kind of fibre reinforced composites linked system based on cement base cementing medium
CN209686597U (en) A kind of assembling frame structure node based on screw rod tenon structure
CN204456670U (en) Fabricated construction straight screw sleeve connection joint
CN207761065U (en) A kind of full grout sleeve sealing-plug
CN208396148U (en) A kind of grout sleeve component
CN206681270U (en) A kind of reinforcement component for concrete anchoring
CN205857456U (en) A kind of built-in fabric strengthens the compound shear wall of composite material tube
CN205917873U (en) Connected node of prefab
CN209293199U (en) A kind of compound connection by post-installed fastenings device of new ductile
CN209194857U (en) A kind of reinforcing steel bar connecting device of assembly concrete component
CN208604479U (en) A kind of class socket joint connection structure of column and adjacent members
CN207672574U (en) A kind of pile foundation flushing slip casting dual-purpose valve
CN208455932U (en) A kind of prefabricated assembled concrete wallboard for fabricated construction
CN201546208U (en) Dam corridor
CN208415546U (en) A kind of thermal-insulation connecting piece with Bar Anchorage ring
CN207776116U (en) A kind of monoblock type side plate reinforcement node that girder steel is connect with wide steel core concrete column
CN207063244U (en) A kind of connecting node of non-bearing precast concrete external wall panel
CN209942047U (en) Sleeve for connecting reinforcing steel bars

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190830

Termination date: 20201223

CF01 Termination of patent right due to non-payment of annual fee