CN209307951U - A kind of lattice guest gabion box fills tool - Google Patents
A kind of lattice guest gabion box fills tool Download PDFInfo
- Publication number
- CN209307951U CN209307951U CN201821829801.9U CN201821829801U CN209307951U CN 209307951 U CN209307951 U CN 209307951U CN 201821829801 U CN201821829801 U CN 201821829801U CN 209307951 U CN209307951 U CN 209307951U
- Authority
- CN
- China
- Prior art keywords
- tool
- lever
- fills
- gabion box
- lattice guest
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 abstract description 4
- 239000004575 stone Substances 0.000 description 13
- 238000010586 diagram Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 230000000903 blocking effect Effects 0.000 description 2
- 230000000994 depressogenic effect Effects 0.000 description 2
- 229910001209 Low-carbon steel Inorganic materials 0.000 description 1
- HCHKCACWOHOZIP-UHFFFAOYSA-N Zinc Chemical compound [Zn] HCHKCACWOHOZIP-UHFFFAOYSA-N 0.000 description 1
- 238000009825 accumulation Methods 0.000 description 1
- 239000004411 aluminium Substances 0.000 description 1
- 229910052782 aluminium Inorganic materials 0.000 description 1
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 238000001035 drying Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 229910052751 metal Inorganic materials 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 238000004162 soil erosion Methods 0.000 description 1
- 229910052725 zinc Inorganic materials 0.000 description 1
- 239000011701 zinc Substances 0.000 description 1
Landscapes
- Revetment (AREA)
Abstract
The utility model discloses a kind of lattice guest gabion boxes to fill tool, it is related to construction engineering technical field, the tool that fills is folded between two adjacent gabion boxes, the tool that fills includes at least two spud piles being vertically arranged, one group of lever has been at least connected between adjacent every two spud piles, every group of lever includes two, and is arranged in right-angled intersection.The midpoint of two lever length directions is hinged by articulated shaft;The T-type slideway of vertical direction is offered on spud pile side surface corresponding with the end of lever, there are two T-blocks for sliding setting in the T-type slideway, one end of the T-block is protruding from T-type slideway to be formed with extension board, and the end of the lever is respectively hinged on corresponding extension board.By the utility model, filling for gabion net cage can be made more smooth and beautiful, improve the stability for filling rear slopes.
Description
Technical field
The utility model relates to construction engineering technical field, in particular to a kind of lattice guest gabion box fills tool.
Background technique
Lattice guest's gabion box refers to the metal net shaped cabinet formed using zinc or the plastic mild steel wire of aluminium, and opening is using netted
Cover cap merge and fixed using tying up silk.Lattice guest's gabion box is commonly used for slope retaining, foundation pit fills out shield, especially in rivers loke shore and its
It is most widely used in terms of basal slope protection, can prevent current scour riverbank from it being made to cause flooding of rivers, soil erosion by destruction
Phenomena such as.
Gabion net first has to ground leveling, the drying that will put gabion net, then opens gabion net in construction of rockfilling
It is uniformly laid with and piles up at ground, successively load cobble into each net cage, make in each net cage in loading cobble
Cobble is piled up uniform, frequently with the mode for manually rockfilling and being layered addition building stones.But in large-scale engineering construction, manually
It is too low to load building stones efficiency, needs by the way of machinery filling, it is more difficult to control to each net during machinery filling building stones
The speed to feed in case is be easy to cause during rockfilling, since gabion box is flexible mesh because of the gravity shadow of building stones
It rings, building stones, which are accumulated downwards, causes the side surface of net cage that bulge phenomenon occurs, and net cage is depressed into deformation, influences filling out for adjacent net cage
It fills, causes the result for finally filling the engineering site out-of-flatness to be formed, stability difference.
Utility model content
The purpose of this utility model is to provide a kind of lattice guest gabion boxes to fill tool, can make filling more for gabion net cage
Add smooth and beautiful, improves and fill the stability of rear slopes.
The above-mentioned purpose of the utility model has the technical scheme that a kind of lattice guest gabion box fills work
Tool, the tool that fills is folded between two adjacent gabion boxes, it is described fill tool and include at least two be vertically arranged
Spud pile has been at least connected with one group of lever between adjacent every two spud piles, and every group of lever includes two, and is in ten
Word is arranged in a crossed manner.
By using above-mentioned technical proposal, in the process of deployment of gabion box, the tool of filling is placed on to adjacent gabion
Between net, spud pile is stood upright on ground, since two levers are arranged in a crossed manner, during dosing building stones into gabion box,
Lever can play the role of blocking to the building stones in gabion box, and building stones will not strut dictyosome outward, so that in each gabion box
Building stones can uniform ground pile up.
Preferably, the midpoint of two lever length directions is hinged by articulated shaft;The spud pile and lever
The corresponding side surface in end on offer the T-type slideway of vertical direction, there are two T-types for sliding setting in the T-type slideway
Block, one end of the T-block is protruding from T-type slideway to be formed with extension board, and the end of the lever is respectively hinged at pair
On the extension board answered.
By using above-mentioned technical proposal, in practical applications, can be adjusted between spud pile according to the size of gabion box
Distance pulls the spud pile of two sides, lever is rotated around the articulated shaft of the center, simultaneously because the end of lever is hinged on and prolongs
It stretches on plate, lever can control T-block to slide up and down along T-type slideway, and the angle between two levers is changed, and entirely fills work
Tool is stretched.
It is stretched preferably, being located at T-type slideway length direction two sides between two adjacent spud piles and being respectively arranged with
Contracting component, the telescopic component include the telescopic rod and casing being respectively fixedly connected on spud pile, the telescopic rod sliding peace
In casing, locking member is additionally provided between the telescopic rod and casing.
By using above-mentioned technical proposal, telescopic component is set, makes to enhance and entirely fill out between its lateral connection spud pile
Build the stability of tool frame structure.
Preferably, the locking member is clamping screw, described sleeve pipe is far from offering screw thread on the side surface of spud pile
Hole, the clamping screw are threaded through in threaded hole and are pushed against on telescopic rod.
By using above-mentioned technical proposal, when adjusting the spacing between adjacent spud pile, telescopic rod can be along the pipe of casing
Wall sliding, after spacing determines, turn clamping screw carries out telescopic rod and casing effectively fixed.
Preferably, offering through-hole in the spud pile along its length, fixed link, institute are equipped in the through-hole
It states fixed link and the one end on ground is provided with tapered portion.
By using above-mentioned technical proposal, fixed link is threaded through in spud pile, and is plugged in fixed link by tapered portion
Tool will be filled in ground to be fixed on ground.
The fixed link is provided with screw thread far from one end of tapered portion, offers on the inner wall of the through-hole and fixed link phase
The internal screw thread of cooperation;Spiral thread is provided on the side surface of the tapered portion.
By using above-mentioned technical proposal, setting is threadedly coupled more stable in fixed link, and spiral is arranged in tapered portion
Lines, while by inside the end of thread precession through-hole of fixed link, tapered portion can also be operated more laborsaving in precession ground.
Preferably, the fixed link is connected with cross bar far from one end of tapered portion.
By using above-mentioned technical proposal, cross bar is set and facilitates staff's turn fixed link, more convenient operation.
Preferably, the spud pile is set as three, the lever is respectively provided between every two adjacent spud piles
There are two groups.
By using above-mentioned technical proposal, lever is provided with four groups, more crypto set, forms reticular structure, strengthens and fill
Occlusion effect of the tool to building stones.
In conclusion the utility model has the following beneficial effects:
1, by lever arranged in a crossed manner, every group of lever plays the role of blocking to the building stones in gabion box, prevents stone
Accumulation struts the side wire side of gabion box to material downwards.
2, every group of lever is hinged together, and both ends are slided in slideway, so that overall structure is scalable, it being capable of basis
Various sizes of gabion box is adjusted.
Detailed description of the invention
Fig. 1 is the application scenario diagram of the utility model;
Fig. 2 is the overall structure diagram of the utility model;
Fig. 3 is the portion the A enlarged drawing in Fig. 2;
Fig. 4 is the structural schematic diagram of fixed link.
In figure, 1, spud pile;100, gabion box;11, T-type slideway;12, T-block;13, through-hole;121, extension board;2, shelves
Bar;3, telescopic component;31, telescopic rod;32, casing;33, clamping screw;4, fixed link;41, tapered portion;42, cross bar.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
A kind of lattice guest gabion box fills tool, as shown in Fig. 1, fills tool to be arranged in two neighboring gabion box 100
Between frame body be vertically disposed between every two adjacent spud piles 1 including three upright spud piles 1 on the ground
Two groups of levers 2, every group includes two levers 2 arranged in a crossed manner.
In conjunction with shown in attached drawing 2 and 3, circular hole is offered at the center of two 2 length directions of lever respectively, and wear in hole
There is articulated shaft, the center of two levers 2 is hinged;Position on spud pile 1 corresponding to 2 end of lever offers edge respectively
The T-type slideway 11 of 1 length direction of spud pile, for the interior sliding setting of T-type slideway 11 there are two T-block 12, T-block 12 is sliding far from T-type
One end of 11 bottom of road is protruding and is formed with extension board 121, and two ends of lever 2 are respectively hinged at corresponding extension board
On 121 side surface.In practical applications, the distance between three spud piles 1 can be adjusted according to the size of gabion box 100, i.e.,
The spud pile 1 of two sides is pulled, lever 2 is rotated around the articulated shaft of the center, simultaneously because the end of lever 2 is hinged on extension board
On 121, lever 2 can control T-block 12 to slide up and down along T-type slideway 11, and the angle between two levers 2 is changed, entirely
The tool of filling is stretched.
As shown in Fig. 2, multiple groups telescopic component 3 is also connected between two adjacent spud piles 1, telescopic component 3 is distinguished
The both ends of T-type slideway 11 are set, and telescopic component 3 includes telescopic rod 31, casing 32 and clamping screw 33, telescopic rod 31 and casing
32 are respectively fixedly connected on the side surface of spud pile 1, and telescopic rod 31 is slidably arranged in casing 32, and casing 32 is far from spud pile
Threaded hole is offered on the side surface of 1 one end, clamping screw 33 is threaded through in threaded hole, and turn clamping screw 33 can make its end
It is pushed against on the bar wall of telescopic rod 31.When adjusting the spacing between adjacent spud pile 1, telescopic rod 31 can be along the tube wall of casing 32
Sliding, after spacing determines, turn clamping screw 33 is fixed by telescopic rod 31 and casing 32.
Through-hole 13 being offered on each spud pile 1 along its length, is equipped in through-hole 13 for will entirely fill work
The fixed link 4 that tool is fixed with ground, the lower end of fixed link 4 are fixedly installed tapered portion 41, on the side surface of tapered portion 41
It is additionally provided with spiral thread;Its bar wall of the upper end edge of fixed link 4 offers external screw thread, is provided in through-hole 13 and matches with external screw thread
The internal screw thread of conjunction, end of the fixed link 4 far from tapered portion 41 are also fixedly connected with cross bar 42, by rotating horizontal pole 42 by fixed link
In 4 downward precession through-holes 13, while tool will be filled in 41 precession ground of tapered portion and will be fixed on ground.
This specific embodiment is laid on gabion box 100 is smooth on ground when in use, first, then according to gabion box
Spacing between each spud pile 1 of 100 width adjusting, and be fixed by clamping screw 33, it will finally fill tool abutting
One side surface of gabion box 100 is stood upright on ground, will be filled tool by fixed link 4 and is fixed, then can will be next
A abutting of gabion box 100 fills tool placement, is successively laid with, during dosing building stones into gabion box 100, gabion box
100 will not be depressed into deformation, so that the final slopes for loading formation are more smooth and stablize.
This specific embodiment is only the explanation to the utility model, is not limitations of the present invention, ability
Field technique personnel can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but
As long as all by the protection of Patent Law in the scope of the claims of the utility model.
Claims (8)
1. a kind of lattice guest gabion box fills tool, it is characterised in that: the tool that fills is folded in two adjacent gabion boxes
(100) between, the tool that fills includes at least two spud piles (1) being vertically arranged, adjacent every two spud piles (1) it
Between be at least connected with one group of lever (2), every group of lever (2) includes two, and is arranged in right-angled intersection.
2. a kind of lattice guest gabion box according to claim 1 fills tool, it is characterised in that: two levers (2) are long
The midpoint in degree direction is hinged by articulated shaft;The spud pile (1) opens up on side surface corresponding with the end of lever (2)
There is the T-type slideway (11) of vertical direction, there are two T-block (12), the T-blocks for sliding setting in the T-type slideway (11)
(12) one end is protruding from T-type slideway (11) to be formed with extension board (121), and the end of the lever (2) is respectively articulated with
On corresponding extension board (121).
3. a kind of lattice guest gabion box according to claim 2 fills tool, it is characterised in that: two adjacent fixations
It is located at T-type slideway (11) length direction two sides between stake (1) to be respectively arranged with telescopic component (3), the telescopic component (3) includes
It is respectively fixedly connected with telescopic rod (31) and casing (32) on spud pile (1), the telescopic rod (31) is slidably mounted on casing
(32) in, locking member is additionally provided between the telescopic rod (31) and casing (32).
4. a kind of lattice guest gabion box according to claim 3 fills tool, it is characterised in that: the locking member is locking screw
Bolt (33), far from threaded hole is offered on the side surface of spud pile (1), the clamping screw (33) is threaded through described sleeve pipe (32)
In threaded hole and it is pushed against on telescopic rod (31).
5. a kind of lattice guest gabion box according to claim 1 fills tool, it is characterised in that: the interior edge of the spud pile (1)
Its length direction offers through-hole (13), is equipped with fixed link (4) in the through-hole (13), and the fixed link (4) is close to ground
One end be provided with tapered portion (41).
6. a kind of lattice guest gabion box according to claim 5 fills tool, it is characterised in that: the fixed link (4) is separate
One end of tapered portion (41) is provided with screw thread, offers the interior spiral shell matched with fixed link (4) on the inner wall of the through-hole (13)
Line;Spiral thread is provided on the side surface of the tapered portion (41).
7. a kind of lattice guest gabion box according to claim 6 fills tool, it is characterised in that: the fixed link (4) is separate
One end of tapered portion (41) is connected with cross bar (42).
8. a kind of lattice guest gabion box according to claim 1 fills tool, it is characterised in that: spud pile (1) setting
It is three, the lever (2) is provided with two groups between every two adjacent spud piles (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821829801.9U CN209307951U (en) | 2018-11-07 | 2018-11-07 | A kind of lattice guest gabion box fills tool |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821829801.9U CN209307951U (en) | 2018-11-07 | 2018-11-07 | A kind of lattice guest gabion box fills tool |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209307951U true CN209307951U (en) | 2019-08-27 |
Family
ID=67672682
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821829801.9U Expired - Fee Related CN209307951U (en) | 2018-11-07 | 2018-11-07 | A kind of lattice guest gabion box fills tool |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209307951U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112030872A (en) * | 2020-07-15 | 2020-12-04 | 中交第一航务工程局有限公司 | Gabion linear control construction method |
-
2018
- 2018-11-07 CN CN201821829801.9U patent/CN209307951U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112030872A (en) * | 2020-07-15 | 2020-12-04 | 中交第一航务工程局有限公司 | Gabion linear control construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207597284U (en) | Road and bridge crack bracing means | |
EP1712687B1 (en) | Retaining apparatus | |
CN206204986U (en) | A kind of civil construction retaining wall structure | |
CN209307951U (en) | A kind of lattice guest gabion box fills tool | |
CN103806451B (en) | A kind of anchorage type foundation ditch strengthening structure and construction method thereof | |
DE3917357A1 (en) | Embankments and flood dams - prepd. from rammed posts and rock filled netting based on plastic material | |
CN208004283U (en) | A kind of intermittent blanking formula multilevel screening device for building | |
DE202008003472U1 (en) | Arrangement of at least one solar collector and a ground foundation | |
CN209508986U (en) | A kind of building underground engineering slope retaining ruggedized construction | |
CN207905481U (en) | A kind of spiral ground pile fence | |
CN203007977U (en) | Composite protective structure for reinforced net-plane stopping wall | |
DE1484385A1 (en) | Construction, especially river and lake construction | |
CN207109925U (en) | A kind of building site reservoir structure | |
EP2955277B1 (en) | Foundation structure for offshore assemblies, in particular wind turbines | |
CN211773854U (en) | Soil retaining structure permeates water with soil nail | |
LU87288A1 (en) | TREE DISC | |
CN209260754U (en) | A kind of reinforced earth corrugated steel retaining wall structure | |
RU129948U1 (en) | HIGH STRENGTH GABIONS | |
CN207392201U (en) | A kind of packaged type slip casting platform | |
CN207597178U (en) | A kind of cast-in-place light concrete strengthening structure based on spiral steel pile | |
CN207469270U (en) | High slope combined bearing structure | |
CN206928259U (en) | Brick wall and rock hole hole wall attachment structure | |
DE10201374B4 (en) | Wall and support structure | |
CN208183787U (en) | A kind of barrier wall structure | |
CN215758811U (en) | River course flood control structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190827 |