CN209277887U - A kind of pipe jacking tunnelling machine - Google Patents
A kind of pipe jacking tunnelling machine Download PDFInfo
- Publication number
- CN209277887U CN209277887U CN201821979087.1U CN201821979087U CN209277887U CN 209277887 U CN209277887 U CN 209277887U CN 201821979087 U CN201821979087 U CN 201821979087U CN 209277887 U CN209277887 U CN 209277887U
- Authority
- CN
- China
- Prior art keywords
- pipe
- sludge
- cutter head
- shell
- oil cylinder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
The embodiments of the present invention disclose a kind of pipe jacking tunnelling machine, including shell, cut stirring system, dynamical system, deviation-rectifying system, into sludge drainage system, propulsion system and electric control system, shell includes procapsid and back casing, cutting stirring system includes cutter head, scalpel body is provided on cutter head, stirring rod and mud inlet, dynamical system includes main shaft and rotary electric machine, deviation-rectifying system includes the hinged correction oil cylinder with shell, correction oil cylinder is connected to procapsid and back casing, it include water inlet pipe into sludge drainage system, sludge pipe and muddy water storehouse, water inlet pipe is connected with sludge pipe, one end of sludge pipe is connected with mud inlet, the other end is communicated with muddy water storehouse.This equipment has the advantages that compact-sized, easy to operate, by setting deviation-rectifying system and measuring system, construction problem caused by shell deflection is effectively prevented, by being arranged into sludge drainage system, efficiently solve construction in mud, water treatment problems, ensure that the stability and reliability of construction.
Description
Technical field
The utility model relates to road heading machinery technical fields, and in particular to a kind of pipe jacking tunnelling machine.
Background technique
In existing excavation operation, it is typically used for pipe jacking tunnelling machine, but existing pipe jacking tunnelling machine does not have deviation-correcting function,
Cause job execution to go wrong, influences construction quality and speed, while the muddy water generated when tunneling cannot be discharged, influence to apply
Work speed.Existing pipe jacking tunnelling machine is rotated by hydraulic-driven main shaft, but causes maintenance complicated, inconvenient by hydraulic-driven.
Utility model content
To solve the above-mentioned problems in the prior art, the utility model provides a kind of pipe jacking tunnelling machine, feature
It is, including shell, cutting stirring system that described shell one end is arranged in, the power being connected with the cutting stirring system
In the intracorporal deviation-rectifying system of the shell and into sludge drainage system, the shell cuts the one of stirring system far from described for system, setting
End is provided with propulsion system, further includes and the cutting stirring system, dynamical system, the deviation-rectifying system, described into row
The electric control system of mud system and propulsion system communication connection,
The shell includes procapsid and back casing,
The cutting stirring system includes cutter head, and scalpel body, stirring rod and mud inlet are provided on the cutter head,
The dynamical system includes the main shaft being connected with the cutter head and the rotary electric machine that is connected with the main shaft,
The deviation-rectifying system includes hinged and shell correction oil cylinder, and the correction oil cylinder is connected to the procapsid
With the back casing,
Described into sludge drainage system includes water inlet pipe, sludge pipe and muddy water storehouse, and the water inlet pipe is connected with the sludge pipe,
One end of the sludge pipe is connected with the mud inlet, and the other end is communicated with the muddy water storehouse.
It preferably, further include measuring system, the measuring system includes being arranged on the procapsid to measure target and setting
It is described that in front housing intracorporal dipmeter, the measurement target is matched with the laser transit in foundation pit, the dipmeter with it is described
Electric control system communication connection.
Preferably, the scalpel body is detachably connected with cutter head, and through slot, the stirring rod are offered on the cutter head
It is connected in the through slot, the scalpel body has cone structure far from one end of cutter head, and the surface of the scalpel body is removable
It unloads and is connected with several groups blade, every group of blade includes No.1 blade and No. two blades;The cutter head is equipped with the side of scalpel body
It is symmetrically connected with several groups cutting blocks about the center of circle, is provided with wearing layer on the cutting blocks.
Preferably, one end of the main shaft is provided with center cutter, and the one end for being provided with the center cutter passes through the knife
Disk body is provided with gear wheel on the side wall of the main shaft, and is cooperatively connected by the gear wheel and the rotary electric machine, described
Main shaft is provided with muddy water channel along central axes, and the muddy water channel is communicated with described into sludge drainage system.
Preferably, the deviation-rectifying system further includes hydraulic power supply, and the correction oil cylinder passes through correction pipeline and the liquid
Pressure power source is connected, and correction control valve is provided on the correction pipeline, is equipped with hydraulic lock in the correction oil cylinder.
Preferably, the water inlet pipe is communicated by communicating pipe with the sludge pipe, and the both ends of the communicating pipe are provided with control
Valve processed is provided with by-passing valve on the sludge pipe, and the muddy water storehouse is communicated by the by-passing valve with the sludge pipe, the side
Sludge out pipe is also connected in port valve, the bottom in the muddy water storehouse is provided with mud discharging mouth, and the mud discharging mouth is communicated with the sludge out pipe,
Mud extraction control valve is provided on the sludge out pipe between the mud discharging mouth and the by-passing valve.
Preferably, the propulsion system includes the guide rail for being laid on foundation pit ground, is vertically arranged in described guide rail one end
Backup plate, at least one the described main top oil cylinder being vertically fixed on the rear backup plate, the main top oil cylinder and the back casing afterwards
Between be provided with U-shaped top iron and/or circular top iron.
Preferably, the shell, the U-shaped top iron and/or the circular top iron are slidably connected on the guide rail.
Preferably, side of the cutting blocks far from cutter head is affixed is connected to several predecessor blocks, and the predecessor block is separate to be cut
The side for cutting block is connected with dual-pilot cutter;The section of the dual-pilot cutter is in inverted " v ", and the section smaller part of dual-pilot cutter is far from cutting
Block.
Preferably, the side that the cutter head is equipped with scalpel body is circumferentially provided with mouth spray, and the mouth spray passes through pipeline
It is connected to the middle part of cutter head, whitewashing check valve is connected at the mouth spray.
The utility model has the advantages that
A kind of pipe jacking tunnelling machine provided in the embodiments of the present invention has compact-sized, easy to operate excellent
Point effectively prevents construction problem caused by shell deflection, by being arranged into spoil disposal by setting deviation-rectifying system and measuring system
System, efficiently solve construction in mud, water treatment problems, ensure that the stability and reliability of construction.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram without propulsion system of the embodiment of pipe jacking tunnelling machine of the utility model;
Fig. 2 is a kind of A-A cross-sectional view of the embodiment of pipe jacking tunnelling machine of the utility model;
Fig. 3 is a kind of structural schematic diagram of the cutter head of the embodiment of pipe jacking tunnelling machine of the utility model;
Fig. 4 is a kind of structural schematic diagram of the propulsion system of the embodiment of pipe jacking tunnelling machine of the utility model.
Wherein:
11, procapsid;12, back casing, 13, cutter head;14, cutting blocks;21, main shaft;22, center cutter;23, rotation electricity
Machine;31, correction oil cylinder;41, sludge pipe;42, muddy water storehouse;43, by-passing valve;44, sludge out pipe;51, rear backup plate;52, guide rail;53,
Main top oil cylinder;54, cylinder rack.
Specific embodiment
Technical solutions of the utility model are described in detail below.
Embodiment 1
As shown in Figure 1-3, a kind of pipe jacking tunnelling machine, including shell, cutting stirring system that described shell one end is set,
The dynamical system that is connected with the cutting stirring system, setting are in the intracorporal deviation-rectifying system of the shell and into sludge drainage system, institute
It states shell and one end of the cutting stirring system is provided with propulsion system, further include and the cutting stirring system, described
Dynamical system, the deviation-rectifying system, the electric control system communicated to connect into sludge drainage system and propulsion system,
The shell includes procapsid 11 and back casing 12,
The cutting stirring system includes cutter head 13, scalpel body, stirring rod is provided on the cutter head 13 and into mud
Mouthful,
The dynamical system includes the main shaft 21 being connected with the cutter head 13 and turn being connected with the main shaft 21
Dynamic motor 23,
The deviation-rectifying system includes hinged with shell correction oil cylinder 31, the correction oil cylinder 31 be connected to it is described before
Shell 11 and the back casing 12,
It is described into sludge drainage system include water inlet pipe, sludge pipe 41 and muddy water storehouse 42, the water inlet pipe and the sludge pipe 41
It is connected, one end of the sludge pipe 41 is connected with the mud inlet, and the other end is communicated with the muddy water storehouse 42.
Further, the front end of the back casing 12 is provided with two seals slot, and bird shape sealing ring is placed in the sealing
In slot, just can be inserted into after glue jail in front of housing rear end, illumination, cable connector are installed, in machine in the back casing 12
Threeway work ball valve (screw conveyor machine), oil cylinder and pipeline etc..
Further, the procapsid 11 and the back casing 12 have circle ring column structure.
Further, the one end of the procapsid 11 far from the back casing 12 is arranged in the cutter head 13, described to push away
Into system, the one end of the back casing 12 far from the procapsid 11 is set, the dynamical system, deviation-rectifying system and it is described into
Sludge drainage system is arranged in the shell, the remote controlled pipe jacking tunnelling machine of electric control system.
Further include measuring system, the measuring system include be arranged on the procapsid 11 measure target and setting it is described
Dipmeter in procapsid 11, the measurement target are matched with the laser transit in foundation pit, the dipmeter and described electrical
Control system communication connection.
Further, the laser beam for the laser transit being fixed in foundation pit impinges upon on measurement target, can judge to push up with it
The effect of the direction of pipe development machine, vertical deviation and correction, dipmeter are also for judging the horizontal attitude of procapsid 11, pitching
State and deflection.
On the station facade plate of the electric control system, Data Detection includes numerical value and the correction of dipmeter in machine
The stroke of oil cylinder 31 shows, the display of dipmeter: first is that the state of flexion-extension, if at positive value, then it represents that front housing is in shape of facing upward
State, if it is 0, then it represents that front housing is in horizontality.If it is negative value, then it represents that front housing is in dive status.Second is that
Deflection state, if at positive value, then it represents that front housing is in deflection state to the right, if it is negative value, then it represents that front housing is in
Deflection state to the left.It needs to be illustrated, because transport or other reasons will cause its display error, so whenever push pipe
When development machine is placed on foundation pit guide rail 52, the display reading of dipmeter is a critically important original reading, it is necessary to which it is recorded
It is on record, to be analyzed, to be compared in jack-in process from now on.
The scalpel body is detachably connected with cutter head 13, and through slot is offered on the cutter head 13, and the stirring rod connects
It connects in the through slot, the scalpel body has cone structure far from one end of cutter head 13, and the surface of the scalpel body is removable
It unloads and is connected with several groups blade, every group of blade includes No.1 blade and No. two blades;The cutter head 13 is equipped with the one of scalpel body
Side is symmetrically connected with several groups cutting blocks 14 about the center of circle, is provided with wearing layer on the cutting blocks 14.
The side of the cutting blocks 14 far from cutter head 13 is affixed to be connected to several predecessor blocks, and the predecessor block is far from cutting blocks
14 side is connected with dual-pilot cutter;The section of the dual-pilot cutter is in inverted " v ", and the section smaller part of dual-pilot cutter is far from cutting blocks
14。
The side that the cutter head 13 is equipped with scalpel body is circumferentially provided with mouth spray, and the mouth spray passes through pipeline and cutterhead
The middle part of body 13 is connected to, and is connected with whitewashing check valve at the mouth spray.
Further, the No.1 blade is slightly shorter than No. two blades.
Further, the dual-pilot cutter and cutter tilt are arranged, and inclination angle is 30 degree.
Specifically, the cutterhead, which is equipped at predecessor block, is connected with main stripping and slicing, and the main stripping and slicing is arranged far from one end of cutterhead
There are two link block, the link block is connected with main cutter far from one end of main stripping and slicing, and the main cutter is in inverted " V " shape.
Further, the link block is equipped with main cutter and is connected with wearing plate, and the predecessor block is equipped at dual-pilot cutter
It is connected with wearing plate.
Further, the side that the cutterhead is equipped with scalpel body is circumferentially connected with grid.
Further, the side that the cutterhead is equipped with scalpel body is connected with wearing layer.
Further, the scalpel body is equipped with one group of blade and is provided with wearing layer.
One end of the main shaft 21 is provided with center cutter 22, and the one end for being provided with the center cutter 22 passes through the cutterhead
Body 13 is provided with gear wheel on the side wall of the main shaft 21, and is cooperatively connected by the gear wheel and the rotary electric machine 23,
The main shaft 21 is provided with muddy water channel along central axes, and the muddy water channel is communicated with described into sludge drainage system.
Further, the rotary electric machine 23 by speed reducer connect sprocket drive spindle, and by the gear shaft with it is described
Gear wheel is cooperatively connected, and runs for drive gear wheel.
Specifically, the quantity of the rotary electric machine 23 is 4, be separately positioned on the upper left side of the main shaft 21, lower left,
Upper right side and lower right.
Further, the rotary electric machine 23 is 30KW-4-B5 grades of motor.Hydraulic drive is used using motor drive ratio
Dynamic advantage is more: first is that high-efficient, power loss is small;Second is that it is compact-sized, it is not restricted by factors such as fuel tank, heat dissipations;Third is that
More hydraulic convenience is repaired in operation.
The deviation-rectifying system further includes hydraulic power supply, and the correction oil cylinder 31 passes through correction pipeline and the hydraulic power
Source is connected, and correction control valve is provided on the correction pipeline, is equipped with hydraulic lock in the correction oil cylinder 31.
Further, including 4 correction oil cylinders 31, by 4 group 450 between the procapsid 11 and the back casing 12
The correction oil cylinder 31 of angle distribution connects,
Further, oil pump used by hydraulic power supply is plunger pump, its operating pressure is generally set up 25-
28Mpa (pump maximum pressure 31.5Mpa), the overflow valve being mounted on valve plate is to set up system pressure.
Further, 4 correction oil cylinders 31 are equipped with 4 groups of solenoid directional control valves, and pass through electromagnetism described in four groups
The commutation of 31 oil inlet and oil return of reversal valve error correct oil cylinder, and pass through the working condition of 1 group of solenoid directional control valve error correct control valve.For
Ensure that the oil cylinder stroke after correction of correction oil cylinder 31 is constant, in each correction oil cylinder 31 is equipped with hydraulic lock, it can
Ensure reliable in action.
For the water inlet pipe by communicating with the sludge pipe 41 communicating pipe, the both ends of the communicating pipe are provided with control valve,
By-passing valve 43 is provided on the sludge pipe 41, the muddy water storehouse 42 is communicated by the by-passing valve 43 with the sludge pipe 41,
Sludge out pipe 44 is also connected on the by-passing valve 43, the bottom in the muddy water storehouse 42 is provided with mud discharging mouth, the mud discharging mouth and institute
It states sludge out pipe 44 to communicate, is provided with mud extraction control valve on the sludge out pipe 44 between the mud discharging mouth and the by-passing valve 43.
Further, the muddy water storehouse 42 is arranged in the back casing 12, and passes through 44 phase of sludge out pipe with the external world
Connection, for muddy water to be drained into the external world.
Further, by the soil that cuts of cutting stirring system by being squeezed into muddy water storehouse 42 into Tu Kou,
Muddy water storehouse 42 is reached by the water of water inlet pipe indentation again, so that soil is mixed with water and is become mud in muddy water storehouse 42, then from mud extraction
It is discharged in pipe 44.
The propulsion system includes the guide rail 52 for being laid on foundation pit ground, rear the leaning on for being vertically arranged in described 52 one end of guide rail
Plate 51, be vertically fixed on it is described after at least one described main top oil cylinder 53 on backup plate 51, the main top oil cylinder 53 and it is described after
U-shaped top iron and/or circular top iron are provided between shell 12.
Further, including 6 main top oil cylinders 53 of main top oil cylinder 53,6 are 200T × 1800mm.
It further, further include that cylinder rack 54, the 6 main top oil cylinders 53 are symmetricly set in the cylinder rack 54.
The shell, the U-shaped top iron and/or the circular top iron are slidably connected on the guide rail 52.
This pipe jacking tunnelling machine slowly moves forward, cutterhead rotary cutting soil, knife under the thrust of main top oil cylinder 53
The soil that disk is cut is entered in muddy water storehouse 42 by mud inlet, and the slime water of certain weight proportion is transported to by mud-water conveying system
It mixes in muddy water storehouse 42 with the soil scaled off, then is transferred out soil by pipeline.
When installation:
First, it checks whether junction has loosened (mainly screw connection), need to be tightened as loosened;
Second, it connects with the mains, checks whether three-phase voltage is normal, and whether phase is correct, if abnormal and incorrect,
Try to keep it normal, otherwise forbids to be switched on;Third, also needs whether test electric leakage, electric protective device work just after power supply is normal
Often, further work can just be carried out.4th, try inspection and is placed on the horizontality of push-bench and foundation pit guide rail on guide rail 52
52 gradient is consistent.In general, push-bench had been made to correct to the instruction state of its dipmeter when leaving the factory.Its
Method is that all correction oil cylinders 31 are first retracted into bottom, is then placed on the top outside push pipe casing with frame level, if
State is spent in " 0 " that push-bench is adjusted to frame level instruction by method.Then, the adjusting spiral shell under the tilted instrument mounting rack of machine is adjusted
Silk, the numerical value for allowing dipmeter show are " 00.000 ", then fixed screw are tightened, and allow dipmeter fix tightly.Sometimes, this is adjusted
Process will be repeated could harmonize several times.
During long-distance transport, the fixed screw of dipmeter, it is possible to loosen, instruction is also just inaccurate.If
Dipmeter is tuned into horizontality, that just must once be adjusted using such as above-mentioned adjusting method.But at the construction field (site), in this way
Do often highly difficult, we can be used later approach, i.e., the gradient of push-bench and guide rail 52 is adjusted consistent.Specifically do
Method is the gradient that guide rail 52 is first accurately measured with level meter and straight steel ruler or level etc. towards jacking direction, then push pipe
Machine is placed on guide rail 52, unclamps the fixed screw of dipmeter later, and the angle that dipmeter indicates is transferred to and 52 gradient phase of guide rail
Unanimously.Finally the tilted instrument fixed screw of machine is tightened, fix tightly.
In a period of time of push-bench when just appearing or thereafter, soil is cut due to cutterhead and is formed by counter-force more than push pipe
Frictional force between machine and foundation pit guide rail 52 is big, so entire push-bench is possible to that opposite with cutterhead direction of rotation turn occurs
It is dynamic.Even if at this moment the fltting speed of push-bench is dropped to very low, it is intended to prevent such case to reduce the method for cutter disc torque
Generation, but rotation be often also inevitable.Therefore it has just appeared in a period of time in push-bench, we must use one
A little methods prevent its deflection, are such as coupled in push-bench side joint hinge or between the borehole wall with the chain block of a large-tonnage
Come, while push-bench promotes on one side, tightens chain on one side, can prevent push-bench from deflecting in this way.Or on push-bench shell
It burn-ons block, allows foundation pit guide rail 52 to block it and deflect, at this moment foundation pit guide rail 52 has to fix very firm.
Push-bench is typically due to than heavier, it, should be push-bench and preceding 3-5 in order not to allow it to plant down when encountering Soft Soil Layer
Section concrete pipe joins together, to prevent head relatively low.In addition, the effect that push-bench joins together with preceding 3-5 section concrete pipe is to prevent from pushing up
For pipe machine in progradation, the cutting moment of torque of cutterhead is excessive suddenly, and makes the generation of entire push-bench overturning accident.
With the propulsion of push-bench or pipe, various cables and pipeline can be also moved along, in order to prevent move in electricity
Cable etc. is broken, and fixed point of the cable in active well must be fixed on the borehole wall near hole, in this way with push-bench
It promotes, cable can increasingly relax, and without the more drawing the more tight, just not allow accident-proneness.
After push-bench fuselage fully enters hole sealing collar, it must just start slip casting, slurry set in this way is easy for being formed.
When use:
1, at hole, closure door is removed, and is confirmed without there are after any obstacle, and jacking can be just carried out.The initial top of jacking point
Into with two stages of normal jacking.Initial jacking refers to that push-bench connects to first segment pipe since jacking and connects with push-bench
Jack-in process before connecting.It is known as normal jacking after this.
It 2, should be depending on the steerings that are different and determining cutterhead of soil property before initial jacking.After cutterhead rotation, with main top oil cylinder
53, slowly by push-bench forward impelling, control threeway work ball valve and are in the water inlet of normal construction, spoil disposal state progress spoil disposal;When
When push-bench stops jacking work, control threeway work ball valve is in cleaning pipeline conditions and carries out cleaning pipeline.Push-bench is pushing up
Into in the course of work, it is necessary to control move speed and match with sludge volume, the relationship for only controlling them could be effective
Control the stabilization of excavation surface.
3, in the initial jacking stage, the service condition of observation push-bench is given much attention to, note abnormalities to find out in time
Analysis of causes processing.It cannot rectify a deviation in the initial jacking stage, can just rectify a deviation in normal jacking, but frequently to entangle, micro- entangle and see
Trend correction.
4, correction explanation: 31 position distribution of correction oil cylinder square tube after push-bench looks forward.
1) 2 are one group when correction oil cylinder 31 acts, and select 31 combination button of correction oil cylinder upwards, downwards, to the left, to the right
Any position presses the stretching of oil cylinder, contracting button.Such as selection 31 combination button of correction oil cylinder it is upward, press oil cylinder stretch by
Button, i.e. upper left, upper right oil cylinder are stretched together;The contracting button of oil cylinder is pressed, upper left, upper right oil cylinder are the same as contracting.Similarly, lower-left, bottom right or a left side
Same stretch, with contracting may be implemented in upper, lower-left and upper right, bottom right.
2) corresponding relationship of 31 stroke of correction oil cylinder and deviation adjustment angle see the table below:
Whether deviation correcting technology is grasped, and also can be considered the critically important foundation whether pipe-jacking technology is grasped.In correction process
In, if elevation and left and right at the same generate deviation, at this moment should first entangle height variation, after entangle left-right deviation.Because elevation is than left and right
Deviation difficulty is entangled.
In jack-in process, whether operator should give much attention to observe each current of electric and voltage in range of normal value
It is interior, once discovery is abnormal, it should shut down and be excluded.
This pipe jacking tunnelling machine is separately furnished with soil pressure formula cutterhead and screw conveyor machine, and the purpose is to be converted into mud water type push-bench
Soil pressure formula push-bench is constructed.Conversion method: the muddy water cutterhead and water inlet sludge drainage system of push-bench are removed, soil pressure is installed
Formula cutterhead and screw conveyor machine.
A kind of pipe jacking tunnelling machine provided in the embodiments of the present invention has compact-sized, easy to operate excellent
Point effectively prevents construction problem caused by shell deflection, by being arranged into spoil disposal by setting deviation-rectifying system and measuring system
System, efficiently solve construction in mud, water treatment problems, ensure that the stability and reliability of construction.
Finally, it should be noted that the above descriptions are merely preferred embodiments of the present invention, it is not limited to this
Utility model, although the utility model is described in detail with reference to the foregoing embodiments, for those skilled in the art
For, it is still possible to modify the technical solutions described in the foregoing embodiments, or to part of technical characteristic
It is equivalently replaced.Within the spirit and principle of the utility model, any modification, equivalent replacement, improvement and so on,
It should be included within the scope of protection of this utility model.
Claims (10)
1. a kind of pipe jacking tunnelling machine, which is characterized in that including shell, cutting stirring system that described shell one end is set, with
It is described cutting stirring system be connected dynamical system, be arranged in the intracorporal deviation-rectifying system of the shell and into sludge drainage system, it is described
Shell far from it is described cutting stirring system one end be provided with propulsion system, further include with the cutting stirring system, it is described move
Force system, the deviation-rectifying system, the electric control system communicated to connect into sludge drainage system and propulsion system,
The shell includes procapsid and back casing,
The cutting stirring system includes cutter head, and scalpel body, stirring rod and mud inlet are provided on the cutter head,
The dynamical system includes the main shaft being connected with the cutter head and the rotary electric machine that is connected with the main shaft,
The deviation-rectifying system includes hinged and shell correction oil cylinder, and the correction oil cylinder is connected to the procapsid and institute
Back casing is stated,
Described into sludge drainage system includes water inlet pipe, sludge pipe and muddy water storehouse, and the water inlet pipe is connected with the sludge pipe, described
One end of sludge pipe is connected with the mud inlet, and the other end is communicated with the muddy water storehouse.
2. a kind of pipe jacking tunnelling machine according to claim 1, which is characterized in that it further include measuring system, the measurement system
System includes that setting measurement target and setting on the procapsid are described in the intracorporal dipmeter of front housing, the measurement target and foundation pit
Laser transit match, the dipmeter and the electric control system communicate to connect.
3. a kind of pipe jacking tunnelling machine according to claim 1, which is characterized in that the scalpel body detachably connects with cutter head
Connect, through slot offered on the cutter head, the stirring rod is connected in the through slot, the scalpel body far from cutter head one
End has cone structure, and the surface of the scalpel body is removably connected with several groups blade, every group of blade include No.1 blade and
No. two blades;The side that the cutter head is equipped with scalpel body is symmetrically connected with several groups cutting blocks, the cutting blocks about the center of circle
On be provided with wearing layer.
4. a kind of pipe jacking tunnelling machine according to claim 1, which is characterized in that one end of the main shaft is provided with center
Knife, and the one end for being provided with the center cutter passes through the cutter head, is provided with gear wheel on the side wall of the main shaft, and pass through
The gear wheel and the rotary electric machine are cooperatively connected, and the main shaft is provided with muddy water channel, the muddy water channel along central axes
It is communicated with described into sludge drainage system.
5. a kind of pipe jacking tunnelling machine according to claim 1, which is characterized in that the deviation-rectifying system further includes hydraulic power
Source, the correction oil cylinder are connected by correction pipeline with the hydraulic power supply, and correction control is provided on the correction pipeline
Valve processed is equipped with hydraulic lock in the correction oil cylinder.
6. a kind of pipe jacking tunnelling machine according to claim 1, which is characterized in that the water inlet pipe by communicating pipe with it is described
Sludge pipe communicates, and the both ends of the communicating pipe are provided with control valve, and by-passing valve is provided on the sludge pipe, and the muddy water storehouse is logical
It crosses the by-passing valve to communicate with the sludge pipe, sludge out pipe, the bottom setting in the muddy water storehouse is also connected on the by-passing valve
There is mud discharging mouth, the mud discharging mouth is communicated with the sludge out pipe, on the sludge out pipe between the mud discharging mouth and the by-passing valve
It is provided with mud extraction control valve.
7. a kind of pipe jacking tunnelling machine according to claim 1, which is characterized in that the propulsion system includes being laid on foundation pit
The guide rail on ground, the rear backup plate for being vertically arranged in described guide rail one end, be vertically fixed on it is described after on backup plate described at least one
A main top oil cylinder is provided with U-shaped top iron and/or circular top iron, the main top oil between the main top oil cylinder and the back casing
Cylinder is connected to main top pumping plant.
8. a kind of pipe jacking tunnelling machine according to claim 7, which is characterized in that the shell, the U-shaped top iron and/or
The circular top iron is slidably connected on the guide rail.
9. a kind of pipe jacking tunnelling machine according to claim 3, which is characterized in that side of the cutting blocks far from cutter head
Affixed to be connected to several predecessor blocks, the predecessor block is connected with dual-pilot cutter far from the side of cutting blocks;The section of the dual-pilot cutter is in
Inverted " v ", and the section smaller part of dual-pilot cutter is far from cutting blocks.
10. a kind of pipe jacking tunnelling machine according to claim 1, which is characterized in that the cutter head is equipped with the one of scalpel body
Side is circumferentially provided with mouth spray, and the mouth spray is connected to by pipeline with the middle part of cutter head, and spray is connected at the mouth spray
Slurry check valve.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821979087.1U CN209277887U (en) | 2018-11-27 | 2018-11-27 | A kind of pipe jacking tunnelling machine |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821979087.1U CN209277887U (en) | 2018-11-27 | 2018-11-27 | A kind of pipe jacking tunnelling machine |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209277887U true CN209277887U (en) | 2019-08-20 |
Family
ID=67608978
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821979087.1U Active CN209277887U (en) | 2018-11-27 | 2018-11-27 | A kind of pipe jacking tunnelling machine |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209277887U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109339813A (en) * | 2018-11-27 | 2019-02-15 | 中国水利水电第四工程局有限公司 | A kind of pipe jacking tunnelling machine |
-
2018
- 2018-11-27 CN CN201821979087.1U patent/CN209277887U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109339813A (en) * | 2018-11-27 | 2019-02-15 | 中国水利水电第四工程局有限公司 | A kind of pipe jacking tunnelling machine |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109339813A (en) | A kind of pipe jacking tunnelling machine | |
CN104265321B (en) | Ultra-large type tunneling boring rectangular top pipe tunneling construction method | |
US10697246B2 (en) | Shaft enlargement arrangement for a boring system | |
US4681483A (en) | Casting of structural walls | |
CN112253129B (en) | Full-automatic shaft shield constructs equipment | |
CN112664197A (en) | Shaft excavation device, large-diameter shaft heading machine and construction method | |
CN209277887U (en) | A kind of pipe jacking tunnelling machine | |
CN112012757B (en) | Muddy water balance type pipe jacking machine and construction process thereof in flowing sand stratum | |
CN108425680A (en) | A kind of shield driving surface collapse pushes away processing method and its supporting construction again | |
CN108265766B (en) | Full-automatic dredging device for harbour pool deep digging dredging | |
CN107585979A (en) | Riverway sludge curing process | |
AU2012244112A1 (en) | Excavation devices and methods | |
CN111173528A (en) | Large-diameter long-interval tunnel shield construction method for water-rich sandy gravel stratum | |
EP0411560B1 (en) | Apparatus for consolidating soil | |
CN112065425A (en) | Slurry balance type pipe jacking equipment and construction process thereof on sand and stone superposed layer | |
CN106032674A (en) | Bulldozer for groove digging and backfill excavation | |
US2786284A (en) | Marsh ditcher | |
CN104328815B (en) | A kind of guide wall of underground continuous wall groove automatic excavator | |
CN210507587U (en) | Vertical dredging system for crawler-type vertical shaft | |
CN208669206U (en) | A kind of intelligent multifunction horizontal directional drilling machine | |
CN114555888A (en) | Square pile construction method and equipment for rotary drilling rig | |
CN114319482B (en) | Grooving work device and method for constructing slotted hole | |
CN218439210U (en) | Drilling machine for drilling and expanding disk | |
CN216914391U (en) | Pile foundation rotary excavating hole protecting wall mud stirring and conveying device | |
EP0186921A1 (en) | Device for the construction of a vertical channel in the soil |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |