CN209277524U - Scaffold ladder - Google Patents
Scaffold ladder Download PDFInfo
- Publication number
- CN209277524U CN209277524U CN201822067900.4U CN201822067900U CN209277524U CN 209277524 U CN209277524 U CN 209277524U CN 201822067900 U CN201822067900 U CN 201822067900U CN 209277524 U CN209277524 U CN 209277524U
- Authority
- CN
- China
- Prior art keywords
- ladder
- handrail
- weight
- scaffold
- fixedly connected
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a kind of scaffold ladders, belong to technical field of building construction comprising arm-rest frame;Arm-rest frame includes two pillars and the handrail that is fixedly connected between two pillars, and two pillars are vertical with the upper and lower ends of ladder respectively to be fixedly connected, and the tilt angle of handrail and the tilt angle of ladder are identical;Weight conveying device is installed, which can convey weight along the inclined direction of ladder on the outside of arm-rest frame.The design of the scaffold ladder so that construction personnel does not have to walking with load on scaffold ladder, can scaffold ladder upper end by heavy lift of the weight conveying device by lower end come, it is easy to operate, substantially reduce security risk;In addition, weight conveying device is the simple hand gear of structure, the weight demands for the weight that construction personnel can move both was met, and had also ensured that the cost of manufacture of scaffold ladder will not be too high.
Description
Technical field
The utility model belongs to technical field of building construction, specifically, being to be related to a kind of scaffold ladder.
Background technique
Scaffold is to guarantee that each work progress is gone on smoothly and is set up workbench, scaffold ladder are then used for
Climb the ladder of scaffold.Scaffold ladder generally comprises ladder, stepboard, upper lower platform, is fixedly connected on the ladder at present
Arm-rest frame on frame, has a single function, only construction personnel can up and down scaffold and design.But in practice of construction process
In, construction personnel, which can many times bear a heavy burden, climbs up scaffold ladder, and weight, which is in, can move but carry very laboriously model
It encloses, construction personnel walks on scaffold ladder in this case, and there are some potential safety problemss.
Utility model content
The purpose of this utility model is that solve the above-mentioned problems and provides a kind of scaffold ladder.
The utility model achieves the above object through the following technical schemes:
A kind of scaffold ladder exists including inclined ladder, several stepboards being sequentially fixed on the ladder, setting
The platform of the ladder upper and lower ends, the arm-rest frame being fixedly connected on the ladder;
The arm-rest frame includes two pillars and the handrail that is fixedly connected between two pillars, described in two
Pillar is vertical with the upper and lower ends of the ladder respectively to be fixedly connected, the inclination of the tilt angle of the handrail and the ladder
Angle is identical;
Weight conveying device is installed, which can be along the inclination side of ladder on the outside of the arm-rest frame
To conveying weight;
The weight conveying device includes two fixed pulleys, drawstring, weight placement pocket, sliding sleeve and fixed frame, two institutes
It states fixed pulley to be separately mounted on two pillars, the sliding sleeve is covered in the handrail and can be slided along bar length direction
Dynamic, described slide over is not able to rotate in the handrail, and the weight placement pocket is fixedly connected on described by the fixed frame
On sliding sleeve, the drawstring tool is both connected to institute after two movable end bypasses two fixed pulleys respectively there are two movable end
It states on fixed frame, the axis in the high-order fixed pulley is fixedly connected with laborsaving handwheel.
Preferably, the laborsaving handwheel is located at the inside of the arm-rest frame.
Preferably, the diameter of the laborsaving handwheel is at least 2.5 times of the diameter of the fixed pulley.
Preferably, the handrail there are two, it is respectively provided with that there are two the sliding sleeves in the every handrail, it is described solid
Determine frame to be fixedly connected with all sliding sleeves simultaneously.
Preferably, the handrail is provided with limiting slot along bar length direction, the sliding sleeve inner wall is installed with rotatable
Ball, the ball are stuck in the limiting slot simultaneously, and can be rolled along the limiting slot, and the sliding sleeve passes through the ball
It is supported in the handrail.
Compared with prior art, the utility model has the following beneficial effects:
By installing weight conveying device on the arm-rest frame of ladder, so that construction personnel does not have to walking with load in scaffold
On ladder, can scaffold ladder upper end by heavy lift of the weight conveying device by lower end come, it is easy to operate, significantly
Reduce security risk;In addition, weight conveying device is the simple hand gear of structure, both met what construction personnel can move
The weight demands of weight also ensure that the cost of manufacture of scaffold ladder will not be too high.
Detailed description of the invention
Fig. 1 is the broken section structural schematic diagram of scaffold ladder described in the utility model;
Fig. 2 is the partial enlarged view in Fig. 1 at A;
Fig. 3 is the partial enlarged view in Fig. 1 at B;
In above-mentioned attached drawing, the corresponding component names of appended drawing reference are as follows:
1- ladder, 2- stepboard, 3- platform, 4- pillar, 5- drawstring, 6- handrail, 7- limiting slot, 8- fixed frame, 9- weight
Object places pocket, 10- fixed pulley, 11- sliding sleeve, 12- ball, the laborsaving handwheel of 13-.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawing:
In conjunction with shown in Fig. 1, Fig. 2 and Fig. 3, the utility model includes inclined ladder 1, is sequentially fixed on the ladder 1
Several stepboards 2, the platform 3 that 1 upper and lower ends of ladder are set, the arm-rest frame being fixedly connected on ladder 1;
Arm-rest frame includes two pillars 4 and the handrail 6 that is fixedly connected between two pillars 4, and two pillars 4 are distinguished
Vertical with the upper and lower ends of ladder 1 to be fixedly connected, the tilt angle of handrail 6 is identical as the tilt angle of ladder 1;
Weight conveying device is installed, which can be along the inclined direction of ladder 1 on the outside of arm-rest frame
Convey weight;Here it is referred on the outside of arm-rest frame away from the side of stepboard 2.
Weight conveying device includes that two fixed pulleys 10, drawstring 5, weight place pocket 9, sliding sleeve 11 and fixed frame 8, and two
Fixed pulley 10 is separately mounted on two pillars 4, and 11 sets of sliding sleeve can slide in handrail 6 and along bar length direction, sliding sleeve 11
It is not able to rotate in handrail 6, weight is placed pocket 9 and is fixedly connected on sliding sleeve 11 by fixed frame 8, and there are two living for the tool of drawstring 5
Moved end is both connected on fixed frame 8 after two movable end bypasses two fixed pulleys 10 respectively, in high-order fixed pulley 10
Axis be fixedly connected with laborsaving handwheel 13.
The working principle of the utility model is as follows:
Use condition is: the weight that construction personnel itself can move, but comparatively laborious, and such case makes
It is too high with the cost of loop wheel machine, in particular, loop wheel machine is difficult to for weight to be hung to there, and weight category at the dead angle of some scaffolds
When in the range of it can move, be most suitable for using, in addition, manpower is inadequate, a people alone carrying heavy goods when, be also applicable in very much.
For construction personnel in the lower end platform 3 of ladder, it is very painstaking to upper end platform 3 that carrying heavy goods walk ladder, at this point, can
Weight is placed on weight to place in pocket 9, then oneself easily reaches the upper end platform 3 of ladder in the case where not bearing a heavy burden, so
After hold laborsaving handwheel 13 and rotate high-order fixed pulley 10, the weight equipped with weight is placed by pocket 9 by drawstring 5 and is pulled to close to upper end
Fixed pulley 10, is then blocked that (10 device of fixed pulley generally has wheel brake apparatus, and under normal circumstances, not having to will by the position of platform 3
Fixed pulley 10, which blocks, can also take out weight), weight is placed in pocket 9 from weight and is moved out, then discharges fixed pulley 10,
To use next time.
In the present embodiment, 2 place side of stepboard is referred on the inside of arm-rest frame, is convenient for holding laborsaving handwheel 13 simultaneously in this way
Rotation operation is carried out, to drive pulley rotation.
In the present embodiment, the diameter of laborsaving handwheel 13 is at least 2.5 times of the diameter of fixed pulley 10.
In the present embodiment, handrail 6 has two, is respectively provided in every handrail 6 there are two sliding sleeve 11, fixed frame 8 is same
When be fixedly connected with all sliding sleeves 11, structure design is conducive to so that the structural stability of entire weight conveying device is higher
Steady conveying weight.
In the present embodiment, handrail 6 is provided with limiting slot 7 along bar length direction, and 11 inner wall of sliding sleeve is installed with rotatable
Ball 12, ball 12 are stuck in limiting slot 7 simultaneously, and can be rolled along limiting slot 7, and sliding sleeve 11 is supported on handrail by ball 12
On bar 6.The design of ball 12 and limiting slot 7, can not only anti-anti-skid sheath 11 rotated in handrail 6, and make sliding sleeve
11 can more smoothly slide in handrail 6.
According to above embodiment, the utility model can be realized well.It is worth noting that being set based on above structure
Under the premise of meter, to solve same technical problem, even if made on the utility model it is some without substantive change or
Polishing, the essence of used technical solution is still as the utility model, therefore it should also be as the protection in the utility model
In range.
Claims (5)
1. a kind of scaffold ladder including inclined ladder, several stepboards being sequentially fixed on the ladder, is arranged in institute
The arm-rest frame stating the platform of ladder upper and lower ends, being fixedly connected on the ladder, it is characterised in that:
The arm-rest frame includes two pillars and the handrail that is fixedly connected between two pillars, two pillars
It is vertical with the upper and lower ends of the ladder respectively to be fixedly connected, the tilt angle of the tilt angle of the handrail and the ladder
It is identical;
Weight conveying device is installed, which can be defeated along the inclined direction of ladder on the outside of the arm-rest frame
Send weight;
The weight conveying device includes two fixed pulleys, drawstring, weight placement pocket, sliding sleeve and fixed frame, and two described fixed
Pulley is separately mounted on two pillars, and the sliding sleeve is covered in the handrail and can be slided along bar length direction, institute
It states to slide over and be not able to rotate in the handrail, the weight places pocket and is fixedly connected on the sliding sleeve by the fixed frame
On, there are two movable ends for the drawstring tool, after two movable end bypasses two fixed pulleys respectively, are both connected to described solid
Determine on frame, the axis in the high-order fixed pulley is fixedly connected with laborsaving handwheel.
2. scaffold ladder according to claim 1, it is characterised in that: the laborsaving handwheel is located at the interior of the arm-rest frame
Side.
3. scaffold ladder according to claim 2, it is characterised in that: it is described fixed that the diameter of the laborsaving handwheel is at least
2.5 times of the diameter of pulley.
4. scaffold ladder according to claim 1, it is characterised in that: the handrail has two, the every handrail
It is respectively provided on bar there are two the sliding sleeve, the fixed frame is fixedly connected with all sliding sleeves simultaneously.
5. scaffold ladder according to claim 1 or 4, it is characterised in that: the handrail is provided with along bar length direction
Limiting slot, the sliding sleeve inner wall are installed with rotatable ball, and the ball is stuck in the limiting slot simultaneously, and can be along institute
Limiting slot rolling is stated, the sliding sleeve is supported in the handrail by the ball.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822067900.4U CN209277524U (en) | 2018-12-11 | 2018-12-11 | Scaffold ladder |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822067900.4U CN209277524U (en) | 2018-12-11 | 2018-12-11 | Scaffold ladder |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209277524U true CN209277524U (en) | 2019-08-20 |
Family
ID=67610245
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822067900.4U Expired - Fee Related CN209277524U (en) | 2018-12-11 | 2018-12-11 | Scaffold ladder |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209277524U (en) |
-
2018
- 2018-12-11 CN CN201822067900.4U patent/CN209277524U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106829323B (en) | A kind of architectural engineering material elevator | |
CN112392247B (en) | Building outer wall construction operation platform | |
CN211900435U (en) | Foldable ladder | |
CN209277524U (en) | Scaffold ladder | |
CN110734014B (en) | Safety lifting device for underground rescue | |
CN109704246A (en) | A kind of architectural engineering ladder with Telescopic | |
CN106429737A (en) | Stair handrail load carrier | |
CN210738446U (en) | Folding ladder with tool box | |
CN210067378U (en) | Fall-proof housing construction support | |
CN205444855U (en) | Can move movable sleeve formula elevating platform | |
CN106426005A (en) | Lifting type ceiling perforating machine | |
US3464520A (en) | Self-operated elevator | |
CN207406013U (en) | A kind of FRAME ON THE ROOF OF HIGH-RISE BUILDING curtain wall lifting device | |
CN206154240U (en) | Over -and -under type ceiling puncher | |
CN207076672U (en) | A kind of hoisting type building steel tube sorter lifting apparatus | |
CN115959605A (en) | Lifter for construction site | |
CN110924850B (en) | Working method of climbing equipment for high-altitude construction of bridge | |
CN110924851B (en) | Climbing equipment for high-altitude construction of bridge | |
CN210648654U (en) | Top plate drilling device | |
CN219840355U (en) | Hanging basket device suitable for arc-shaped structure | |
CN212406059U (en) | Hanging basket for construction of bidirectional curved surface building exterior finish | |
CN112922306B (en) | Independent column operation platform for building | |
CN219952630U (en) | Electric hanging basket for aloft work | |
CN219863927U (en) | Building construction scaffold and building construction bearing frame | |
CN218375127U (en) | Workman high altitude hanging flower basket for construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190820 Termination date: 20201211 |