CN209277404U - Tile and the roofing layer for using the tile - Google Patents
Tile and the roofing layer for using the tile Download PDFInfo
- Publication number
- CN209277404U CN209277404U CN201821840013.XU CN201821840013U CN209277404U CN 209277404 U CN209277404 U CN 209277404U CN 201821840013 U CN201821840013 U CN 201821840013U CN 209277404 U CN209277404 U CN 209277404U
- Authority
- CN
- China
- Prior art keywords
- connecting portion
- tile
- card slot
- tile body
- jiao
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Floor Finish (AREA)
Abstract
This application discloses a kind of tile and using the roofing layer of the tile.The tile includes tile body, first connecting portion and second connecting portion are correspondingly arranged on the two opposite sides edge of the tile body, the bottom of the first connecting portion offers the first card slot that can cooperate clamping with the second connecting portion, the second connecting portion of one piece of tile body is inserted into first card slot of another piece of tile body adjacent thereto, is snapped connection between the two adjacent tile bodies by the first connecting portion and the second connecting portion.The application is not necessarily to the higher Special lock catch tool of price in tile body process of deployment, solves tile and is laid with technical problem that is at high cost, being laid with connective stability difference between low efficiency, adjacent tiles.
Description
Technical field
This application involves building fields, in particular to a kind of tile and using the roofing layer of the tile.
Background technique
It watt is a kind of construction material for roof comprising multiple tile elements, multiple tile elements are along tile element
Width direction be sequentially connected, but require staff in process of deployment and be laid with manually in tile, and spread in tile
If when also need to be cooperated using the higher Special lock catch tool of price, therefore the laying higher cost of tile, and being laid with
Efficiency is lower.In addition, each tile is individually laid with, there is no connection structure between adjacent tiles, fastness is poor, and stability is low, significantly
Shorten the service life of tile.
For tile in the related technology be laid with it is at high cost, be laid with low efficiency, connective stability difference asks between adjacent tiles
Topic, currently no effective solution has been proposed.
Utility model content
The main purpose of the application is to provide a kind of tile and the roofing layer using the tile, to solve tile paving
If problem that is at high cost, being laid with connective stability difference between low efficiency, adjacent tiles.
To achieve the goals above, the one aspect of the application provides a kind of tile.
According to the tile of the application, comprising: tile body is correspondingly arranged on the two opposite sides edge of the tile body
First connecting portion and second connecting portion, the bottom of the first connecting portion, which offers, to cooperate clamping with the second connecting portion
First card slot, the second connecting portion of one piece of tile body are inserted into the institute of another piece of tile body adjacent thereto
It states in the first card slot, is connected between the two adjacent tile bodies by the first connecting portion and second connecting portion buckle
It connects.
Further, fixing piece is folded between the second connecting portion and the first connecting portion, the fixing piece
Top is buckled on the top surface of the second connecting portion, and the paving location of the bottom of the fixing piece and the tile is fixed to be connected
It connects.
Further, second that the second connecting portion is fixed is provided in the lower inner wall of first card slot
Card slot, the bottom of the second connecting portion be provided with to the outside of the second connecting portion extend the second Ka Jiao, described first
Interconnecting piece and the second connecting portion snap connection state, and the inner wall of second Ka Jiao and second card slot offset.
Further, the first Ka Jiao is provided in the lower inner wall of first card slot, first Ka Jiao is located at described
The lower section of second card slot, first card slot of first Ka Jiao corresponding thereto inner wall cooperation to the second connecting portion into
Row buckle is fixed.
Further, the longitudinal section of first Ka Jiao is the triangular shape structure to the inner bulge of first card slot.
Further, the longitudinal section of second Ka Jiao is the plate structure extended to the outside of the second connecting portion.
Further, the first connecting portion is arranged along the extending direction of the tile body one side edge, and described second
Extending direction of the interconnecting piece along the tile body edge of the first connecting portion opposite side is arranged.
Further, the longitudinal section of the first connecting portion is the barb-like structure on the outside of the tile body;Institute
The longitudinal section of second connecting portion is stated as the barb-like structure on the inside of the tile body.
To achieve the goals above, further aspect of the application provides a kind of roofing layer.
According to the roofing layer of the application, comprising: several above-mentioned tiles, several tiles are in same paved surface
It is laid side by side.
Further, it is provided with first connecting portion in the one side edge of the tile, it is opposite with the first connecting portion
Second connecting portion, the first connecting portion of one block of tile and another piece of institute are provided in another side edge of the tile
The second connecting portion for stating tile snaps connection.
In the embodiment of the present application, using be correspondingly arranged on the two opposite sides edge of tile body first connecting portion and
Second connecting portion, and the bottom of first connecting portion offers the mode that can cooperate the first card slot of clamping with second connecting portion,
In two tile body process of deployment, another piece of tile body adjacent thereto is inserted by the second connecting portion of one piece of tile body
The first card slot in, reached the mesh snapped connection between two adjacent tile bodies by first connecting portion and second connecting portion
, it not only realizes and facilitates the laying of tile, improves the technical effect that tile is laid with efficiency, but also substantially increase adjacent tiles
The stability of connection extends the service life for being laid with layer.
Detailed description of the invention
The attached drawing constituted part of this application is used to provide further understanding of the present application, so that the application's is other
Feature, objects and advantages become more apparent upon.The illustrative examples attached drawing and its explanation of the application is for explaining the application, not
Constitute the improper restriction to the application.In the accompanying drawings:
Fig. 1 is the structural schematic diagram of the utility model tile;
Fig. 2 is the partial enlarged view of first connecting portion in the utility model tile;
Fig. 3 is the partial enlarged view of second connecting portion in the utility model tile;
Fig. 4 is two adjacent tiles attachment structure schematic diagram in the utility model;
Fig. 5 is the schematic view of the mounting position of fixing piece in the utility model;
Fig. 6 is fixing piece and two adjacent tiles attachment structure schematic diagrams in the utility model.
Specific embodiment
In order to make those skilled in the art more fully understand application scheme, below in conjunction in the embodiment of the present application
Attached drawing, the technical scheme in the embodiment of the application is clearly and completely described, it is clear that described embodiment is only
The embodiment of the application a part, instead of all the embodiments.Based on the embodiment in the application, ordinary skill people
Member's every other embodiment obtained without making creative work, all should belong to the model of the application protection
It encloses.
It should be noted that the description and claims of this application and term " first " in above-mentioned attached drawing, "
Two " etc. be to be used to distinguish similar objects, without being used to describe a particular order or precedence order.It should be understood that using in this way
Data be interchangeable under appropriate circumstances, so as to embodiments herein described herein.In addition, term " includes " and " tool
Have " and their any deformation, it is intended that cover it is non-exclusive include, for example, containing a series of steps or units
Process, method, system, product or equipment those of are not necessarily limited to be clearly listed step or unit, but may include without clear
Other step or units listing to Chu or intrinsic for these process, methods, product or equipment.
In this application, term " on ", "lower", "left", "right", "front", "rear", "top", "bottom", "inner", "outside",
" in ", "vertical", "horizontal", " transverse direction ", the orientation or positional relationship of the instructions such as " longitudinal direction " be orientation based on the figure or
Positional relationship.These terms are not intended to limit indicated primarily to better describe the utility model and embodiment
Device, element or component must have particular orientation, or be constructed and operated with particular orientation.
Also, above-mentioned part term is other than it can be used to indicate that orientation or positional relationship, it is also possible to for indicating it
His meaning, such as term " on " also are likely used for indicating certain relations of dependence or connection relationship in some cases.For ability
For the those of ordinary skill of domain, the concrete meaning of these terms in the present invention can be understood as the case may be.
In addition, term " installation ", " setting ", " being equipped with ", " connection ", " connected ", " socket " shall be understood in a broad sense.For example,
It may be a fixed connection, be detachably connected or monolithic construction;It can be mechanical connection, or electrical connection;It can be direct phase
It even, or indirectly connected through an intermediary, or is two connections internal between device, element or component.
For those of ordinary skills, can understand as the case may be above-mentioned term in the present invention specifically contain
Justice.
It should be noted that in the absence of conflict, the features in the embodiments and the embodiments of the present application can phase
Mutually combination.The application is described in detail below with reference to the accompanying drawings and in conjunction with the embodiments.
As shown in Figures 1 to 4, this application involves a kind of tile, which includes tile body 1, a side of tile body 1
It is provided with first connecting portion 2 on edge, second connecting portion 3,2 He of first connecting portion are provided in another side edge of tile body 1
Second connecting portion 3 is oppositely arranged in tile body 1, and the bottom of first connecting portion 2, which offers to cooperate with second connecting portion 2, blocks
The first tight card slot 201.For muti-piece tile body 1 when being laid with, the second connecting portion 3 of one piece of tile body 1 is inserted into and it
In first card slot 201 of another piece of adjacent tile body 1, pass through first connecting portion 2 and second between two adjacent tile bodies 1
Interconnecting piece 3 snaps connection.By being correspondingly arranged on first connecting portion and the second connection on the two opposite sides edge of tile body
Portion is snapped connection by first connecting portion and second connecting portion between two adjacent tile bodies, using mechanical equipment can to watt
Piece main body 1 carries out laying connection, not only facilitates the laying of tile, improves tile laying efficiency, but also greatly improves adjacent tiles
The stability connected between main body 1 extends the service life of tile body 1.The application is not necessarily in tile body process of deployment
The higher Special lock catch tool of price, substantially reduces laying cost.
As shown in Figure 5, Figure 6, fixing piece 4, the top of fixing piece 4 are folded between second connecting portion 3 and first connecting portion 2
Lower part for barb-like structure, fixing piece 4 is plate-like structure, and the top of fixing piece 4 is buckled in second by barb-like structure
On the top surface of interconnecting piece 3, the bottom of fixing piece 4 is close to the paving location of tile by plate-like structure, in 4 lower part of fixing piece
It is opened up side by side on plate-like structure there are two mounting hole, fixing piece 4 is fixed on laying position by the way that screw is arranged in mounting hole
It sets.Tile can be firmly fixed to paving location by the setting of fixing piece 4, guarantee the stability of tile installation.In addition, solid
The clearance position between second connecting portion 3 and first connecting portion 2 can also be filled by determining part 4, guarantee two adjacent tiles masters
The link position of body 1 comes into full contact with.
As described in Fig. 1 to Fig. 3, that second connecting portion 3 is fixed is provided in the lower inner wall of the first card slot 201
Two draw-in groove 203, the bottom of second connecting portion 3 are provided with the second card angle 302 extended to the outside of second connecting portion 3, and first connects
Socket part 2 and second connecting portion 3 snap connection state, and the second card angle 302 and the inner wall of the second card slot 203 offset, and pass through the second card
Slot 203 carries out buckle fixation to the second card angle 302 in second connecting portion 3, so that second connecting portion 3 is fixed on the first connection
In portion 2.The first card angle 202 is provided in the lower inner wall of first card slot 201, the first card angle 202 is located under the second card slot 203
The inner wall cooperation of side, the first card slot 201 of the first card angle 202 corresponding thereto carries out buckle fixation to second connecting portion 3.
Specifically, as shown in Fig. 2, the longitudinal section at the first card angle 202 is the triangular shape to the inner bulge of the first card slot 201
Structure.
Specifically, as shown in figure 3, the longitudinal section at the second card angle 302 is the plate knot extended to the outside of second connecting portion 3
Structure.
Specifically, as shown in Figure 1, first connecting portion 2 and second connecting portion 3 are strip structure part, first connecting portion 2
Extending direction along 1 one side edge of tile body is arranged, tile body 1 side of the second connecting portion 3 along 2 opposite side of first connecting portion
The extending direction of edge is arranged.
As shown in Figure 2 and Figure 3, the longitudinal section of first connecting portion 2 and second connecting portion 3 is barb-like structure, the first connection
Portion 2 is located at the outside of tile body 1, and second connecting portion 3 is located at the inside of tile body 1.First connecting portion 2 and second connecting portion
3 shape and structure setting and position setting, can guarantee contract with higher under 1 connection status of adjacent two pieces of tile bodies
It is right, improve the stability of connection.
In some embodiments of the utility model, material used by tile body 1 can be but be not limited to steel.
The utility model can also be fixed tile body 1 in the process of deployment of roofing by other pendants, be not necessarily to
Nailing is fixed in tile body 1, is substantially prolonged service life and the waterproof performance of tile body 1, is avoided the waste of resource.
It can be seen from the above description that the utility model realizes following technical effect:
Barb-like first connecting portion 2 and second connecting portion are correspondingly arranged on the two opposite sides edge of tile body 1
3, the bottom of first connecting portion 2 offers the first card slot 201 that can cooperate clamping with second connecting portion 2, two adjacent tile bodies 1
In process of deployment, the of another piece of tile body 1 adjacent thereto is inserted by the second connecting portion 2 of one piece of tile body 1
In one card slot 201, the mesh snapped connection between two adjacent tile bodies 1 by first connecting portion 2 and second connecting portion 3 is reached
, it not only realizes and facilitates the laying of tile, improves the technical effect that tile is laid with efficiency, but also substantially increase adjacent tiles
The stability of connection extends the service life for being laid with layer.In addition, the application in 1 process of deployment of tile body without price compared with
High Special lock catch tool reduces and is laid with cost.
This application involves a kind of roofing layer, which includes several above-mentioned tiles, and several tiles are same
It is laid side by side in one paved surface.First connecting portion 2 is provided in the one side edge of tile, the tile opposite with first connecting portion 2
Another side edge on be provided with second connecting portion 3, the second of the first connecting portion 2 of one block of tile and another block of adjacent tile
It is snapped connection between interconnecting piece 3.
The roofing layer of the application is correspondingly arranged on first connecting portion 2 and second on the two opposite sides edge of tile
Interconnecting piece 3, roofing layer are buckled between two adjacent tiles by first connecting portion 2 and second connecting portion 3 in process of deployment
Connection improves the stability connected between tile, guarantees that roofing layer has good globality, machine can be used in process of deployment
Tool equipment is installed, and the laying of tile is facilitated, and improves the laying efficiency of tile.
The foregoing is merely preferred embodiment of the present application, are not intended to limit this application, for the skill of this field
For art personnel, various changes and changes are possible in this application.Within the spirit and principles of this application, made any to repair
Change, equivalent replacement, improvement etc., should be included within the scope of protection of this application.
Claims (10)
1. a kind of tile characterized by comprising tile body (1) is right on the two opposite sides edge of the tile body (1)
It should be provided with first connecting portion (2) and second connecting portion (3), the bottom of the first connecting portion (2) offers can be with described
Two interconnecting pieces (3) cooperate the first card slot (201) of clamping, the second connecting portion (3) insertion of one piece of tile body (1)
In first card slot (201) of the tile body (1) of adjacent thereto another piece, the two adjacent tile bodies (1) it
Between snapped connection by the first connecting portion (2) and the second connecting portion (3).
2. tile according to claim 1, which is characterized in that the second connecting portion (3) and the first connecting portion (2)
Between be folded with fixing piece (4), be buckled on the top surface of the second connecting portion (3) at the top of the fixing piece (4), it is described solid
The bottom for determining part (4) is fixedly connected with the paving location of the tile.
3. tile according to claim 1, which is characterized in that be provided in the lower inner wall of first card slot (201)
To the second card slot (203) that the second connecting portion (3) is fixed, the bottom of the second connecting portion (3) is provided with to institute
State the second Ka Jiao (302) that the outside of second connecting portion (3) extends, the first connecting portion (2) and the second connecting portion (3)
State is snapped connection, the inner wall of second Ka Jiao (302) and second card slot (203) offsets.
4. tile according to claim 3, which is characterized in that be provided in the lower inner wall of first card slot (201)
First Ka Jiao (202), first Ka Jiao (202) are located at the lower section of second card slot (203), first Ka Jiao (202)
The inner wall cooperation of first card slot (201) corresponding thereto carries out buckle fixation to the second connecting portion (3).
5. tile according to claim 4, which is characterized in that the longitudinal section of first Ka Jiao (202) is to described the
The triangular shape structure of the inner bulge of one card slot (201).
6. tile according to claim 3, which is characterized in that the longitudinal section of second Ka Jiao (302) is to described the
The plate structure that the outside of two interconnecting pieces (3) extends.
7. tile according to claim 1, which is characterized in that the first connecting portion (2) is along the tile body (1) one
The extending direction of side edge is arranged, the tile body of the second connecting portion (3) along the first connecting portion (2) opposite side
(1) the extending direction setting at edge.
8. tile according to claim 1, which is characterized in that the longitudinal section of the first connecting portion (2) is positioned at described
Barb-like structure on the outside of tile body (1);The longitudinal section of the second connecting portion (3) is in the tile body (1)
The barb-like structure of side.
9. a kind of roofing layer, which is characterized in that several including tile described in any one of several claims 1 to 8
The tile is laid side by side in same paved surface.
10. roofing layer according to claim 9, which is characterized in that be provided in the one side edge of the tile
One interconnecting piece (2) is provided with second connecting portion in another side edge of the opposite tile with the first connecting portion (2)
(3), the first connecting portion (2) of one block of tile and the second connecting portion (3) of another block of tile buckle and connect
It connects.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821840013.XU CN209277404U (en) | 2018-11-08 | 2018-11-08 | Tile and the roofing layer for using the tile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821840013.XU CN209277404U (en) | 2018-11-08 | 2018-11-08 | Tile and the roofing layer for using the tile |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209277404U true CN209277404U (en) | 2019-08-20 |
Family
ID=67600741
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821840013.XU Active CN209277404U (en) | 2018-11-08 | 2018-11-08 | Tile and the roofing layer for using the tile |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209277404U (en) |
-
2018
- 2018-11-08 CN CN201821840013.XU patent/CN209277404U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20190326851A1 (en) | Solar panel frame assembly | |
CA2893726C (en) | Modular solar panel roof system | |
EA010876B1 (en) | Roofing tile | |
CN209277404U (en) | Tile and the roofing layer for using the tile | |
CN116591401B (en) | photovoltaic roof | |
CN112400086B (en) | Solar roof forming element, building and method of forming a roof | |
CN216921105U (en) | Assembled fast-assembling wall built-up member | |
CN110872876B (en) | Built-in world fossil fragments connecting piece and wall body thereof | |
CN205661300U (en) | Skylight drainer | |
CN209941917U (en) | Connecting structure for assembled wallboard | |
CN210342455U (en) | Combined wall board unit | |
KR100628737B1 (en) | An eaves tile | |
CN110872888B (en) | Clamping hook type keel assembly and wall thereof | |
CN218933622U (en) | Assembled tile frame | |
KR20100006921A (en) | Fixing pannel of thin film solar cell | |
CN209211775U (en) | Fish scale tile and the laying layer for using the fish scale tile | |
CN110872880A (en) | Assembled wall body that trip was connected | |
CN216475975U (en) | Assembly type building roof waterproof engineering structure convenient to overhaul | |
CN210316299U (en) | Assembled fitment shingle nail structure | |
CN220620822U (en) | External corner hanging structure for assembled wallboard | |
CN110872884A (en) | Assembly type wall with built-in top and bottom keel connecting piece | |
JP6857866B2 (en) | Roofing material and roof | |
CN217027858U (en) | Assembled ceramic decorative surface | |
CN216195892U (en) | Lamp track, elastic connecting piece, buckle connecting piece and connecting system with suspended ceiling | |
CN216664830U (en) | Combined standard plate structure and ground overhead system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |