CN209262610U - Construction Support device in a kind of pipeline - Google Patents

Construction Support device in a kind of pipeline Download PDF

Info

Publication number
CN209262610U
CN209262610U CN201821700144.8U CN201821700144U CN209262610U CN 209262610 U CN209262610 U CN 209262610U CN 201821700144 U CN201821700144 U CN 201821700144U CN 209262610 U CN209262610 U CN 209262610U
Authority
CN
China
Prior art keywords
fixedly connected
screw rod
under casing
motor housing
sliding shoe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821700144.8U
Other languages
Chinese (zh)
Inventor
钱洪良
赖小波
徐小明
段长强
薛菊莉
张丽萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Ruizhong Construction Engineering Co Ltd
Original Assignee
Shanghai Ruizhong Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Ruizhong Construction Engineering Co Ltd filed Critical Shanghai Ruizhong Construction Engineering Co Ltd
Priority to CN201821700144.8U priority Critical patent/CN209262610U/en
Application granted granted Critical
Publication of CN209262610U publication Critical patent/CN209262610U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses Construction Support devices in a kind of pipeline, including under casing, the bottom of the under casing inner cavity is fixedly connected with motor housing, the inside of motor housing is fixedly connected with motor, the top of the motor output shaft runs through the top of motor housing and extends to the top of motor housing, the top of motor output shaft is fixedly connected with screw rod by shaft coupling, and the surface of screw rod is threaded with sliding shoe, screw rod guide rod is fixedly connected at the top of motor housing, the top of screw rod guide rod runs through sliding shoe and extends to the top of sliding shoe, and screw rod guide rod is slidably connected with sliding shoe, sleeve is fixedly connected at the top of under casing, the utility model relates to technical field of engineering equipment.Construction Support device is not only only applicable to a kind of caliber pipe in the pipeline, can be adapted for the support work of multiple caliber pipeline, and easy to remove and fixed use by the adjusting of screw rod, simple and easy to use, time and manpower is saved.

Description

Construction Support device in a kind of pipeline
Technical field
The utility model relates to technical field of engineering equipment, Construction Support device in specially a kind of pipeline.
Background technique
Enter new stage, enterprise's environmental protection while seeking profit recently as National Industrial modernization development Responsibility is also gradually increasing, and tradition dispersibility workshop is formed by industrial chain and has been unable to meet contemporary environmental requirement, in country It vigorously advocates down, various seriously polluted small workshop mode enterprises are gradually annexed by large enterprise and ban.It is well known that big Liquid, gaseous material thumping majority are all by pipeline transportation in type industrial working, and pipeline transportation has the advantages that many but big Diameter pipes construction is very difficult, and the control especially for its sectional dimension is even more the difficult point in difficult point;Pipeline transport and It easily deforms during construction hoisting, workpeople is usually to be used to branch in inner wall of the pipe welding support in advance when site operation Stay tube road makes it keep the state of circle, again cuts away bracket after Pipe installing, for extraordinary pressure pipeline for tube wall It is required that it is very high, and the same node of inner wall of the pipe at least through being heat-treated twice in the actual construction process, to its stable structure Property, safety exert a certain influence.
Construction Support equipment major part figure is not easy to move than cumbersome in existing pipeline, and when use needs to shift to an earlier date It is needing place to be used to install equipment, is re-starting disassembly again after the completion of use, most equipment can't Secondary use is carried out, it is time-consuming and laborious to increase labour cost.
Utility model content
In view of the deficiencies of the prior art, the utility model provides Construction Support device in a kind of pipeline, solves existing Pipeline in Construction Support equipment be not easy to move, needing place to be used to be installed when use, after the completion of use again Re-start disassembly, time-consuming and laborious the problem of increasing labour cost.
In order to achieve the above object, the utility model is achieved by the following technical programs: Construction Support in a kind of pipeline Device, including under casing, the bottom of the under casing inner cavity are fixedly connected with motor housing, and the inside of the motor housing is fixedly connected with electricity The top of machine, the motor output shaft runs through the top of motor housing and extends to the top of motor housing, the motor output shaft Top is fixedly connected with screw rod by shaft coupling, and the surface of screw rod is threaded with sliding shoe, the top of the motor housing It is fixedly connected with screw rod guide rod, the top of the screw rod guide rod runs through sliding shoe and extends to the top of sliding shoe, and Screw rod guide rod is slidably connected with sliding shoe, sleeve is fixedly connected at the top of the under casing, and the top slide of sleeve connects It is connected to pull rod, the bottom end of the pull rod sequentially passes through sleeve and under casing and extends to the inside of under casing, and the top of the pull rod is solid Surely it is connected with fixed case, and the bottom of fixed case is fixedly connected with the surface of sliding shoe, the top of the screw rod and screw rod are led The bottom of fixed case is extended through to the top of bar and extends to the inside of fixed case, and the top of the screw rod is rotatably connected to solid Determine block, the top of the screw rod guide rod is fixedly connected with the bottom end of fixed block, and the bottom end of the pull rod is fixedly connected with fixation Bar.
Preferably, the first telescopic rod is fixedly connected at the top of the fixed case, and the surface of the first telescopic rod is arranged There is the first spring.
Preferably, the top of first telescopic rod is fixedly connected with support plate.
Preferably, the surface of the under casing is fixedly connected with the second telescopic rod, and the top of the second telescopic rod and fixation The bottom of case is fixedly connected, and the surface of second telescopic rod is arranged with second spring.
Preferably, the bottom end of the fixed link runs through the bottom of under casing and extends to the lower section of under casing, and fixed link Bottom end has been bolted to connection wheel.
Preferably, the quadrangle of the under casing bottom is fixedly connected to support base.
Beneficial effect
The utility model provides Construction Support device in a kind of pipeline.Have compared with prior art following beneficial to effect Fruit:
(1), Construction Support device in the pipeline is fixedly connected with motor, motor output shaft by the inside in motor housing Top through motor housing top and extend to the top of motor housing, the top of motor output shaft is fixedly connected by shaft coupling There is screw rod, and the surface of screw rod is threaded with sliding shoe, and screw rod guide rod is fixedly connected at the top of motor housing, screw rod is led Run through the top of sliding shoe to the top of bar and extend to the top of sliding shoe, is fixedly connected with sleeve at the top of under casing, and The top slide of sleeve is connected with pull rod, and the bottom end of pull rod sequentially passes through sleeve and under casing and extends to the inside of under casing, the pipe Construction Support device is not only only applicable to a kind of caliber pipe in road, can be adapted for multiple caliber pipe by the adjusting of screw rod The support work in road, and easy to remove and fixed use, it is simple and easy to use, save working time and manpower.
(2), Construction Support device in the pipeline, by being fixedly connected with the first telescopic rod at the top of fixed case, and The surface of first telescopic rod is arranged with the first spring, and the top of the first telescopic rod is fixedly connected with support plate, and multiple directions are total to The integrality that inner wall of the pipe structure is kept with the top for firmly, supporting pipeline, reduces process, reduces human input.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model:
Fig. 2 is the top view of the utility model screw portion structure.
In figure: 1- under casing, 2- motor housing, 3- motor, 4- screw rod, 5- sliding shoe, 6- screw rod guide rod, 7- sleeve, 8- are drawn Bar, 9- second spring, 10- fixed case, 11- fixed link, the first telescopic rod of 12-, the first spring of 13-, 14- support plate, 15- shaft coupling Device, the second telescopic rod of 16-, 17- wheel, 18- support base, 19- fixed block.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
The utility model provides a kind of technical solution referring to FIG. 1-2: Construction Support device in a kind of pipeline, including bottom Case 1, the quadrangle of 1 bottom of under casing are fixedly connected to support base 18, and the collective effect of multiple support bases 18 can be such that device becomes More steady, the surface of under casing 1 is fixedly connected with the second telescopic rod 16, and flexible there are four second in the setting of the top of under casing 1 Bar 16, and the top of the second telescopic rod 16 is fixedly connected with the bottom of fixed case 10, and the surface of the second telescopic rod 16 is arranged with Second spring 9, the bottom of 1 inner cavity of under casing are fixedly connected with motor housing 2, and the inside of motor housing 2 is fixedly connected with motor 3, motor 3 The top of output shaft runs through the top of motor housing 2 and extends to the top of motor housing 2, and the top of 3 output shaft of motor passes through shaft coupling Device 15 is fixedly connected with screw rod 4, and the surface of screw rod 4 is threaded with sliding shoe 5, and the top of motor housing 2 is fixedly connected with The top of screw rod guide rod 6, screw rod guide rod 6 runs through sliding shoe 5 and extends to the top of sliding shoe 5, and screw rod guide rod 6 It being slidably connected with sliding shoe 5, the top of under casing 1 is fixedly connected with sleeve 7, and the top slide of sleeve 7 is connected with pull rod 8, The bottom end of pull rod 8 sequentially passes through sleeve 7 and under casing 1 and the inside for extending under casing 1, and sleeve 7 plays a protection for pull rod 8 The effect of guiding, the top of pull rod 8 is fixedly connected with fixed case 10, and the bottom of fixed case 10 and the surface of sliding shoe 5 are solid Fixed connection, the top of fixed case 10 is fixedly connected with the first telescopic rod 12, and the surface of the first telescopic rod 12 is arranged with first Spring 13, the top of the first telescopic rod 12 are fixedly connected with support plate 14, and the common of multiple directions exerts oneself, and support the top of pipeline Portion keeps the integrality of inner wall of the pipe structure, reduces process, reduces human input, the top of screw rod 4 and the top of screw rod guide rod 6 End extends through the bottom of fixed case 10 and extends to the inside of fixed case 10, and the top of screw rod 4 is rotatably connected to fixed block 19, The top of screw rod guide rod 6 is fixedly connected with the bottom end of fixed block 19, and the bottom end of pull rod 8 is fixedly connected with fixed link 11, fixed The bottom end of bar 11 runs through the bottom of under casing 1 and extends to the lower section of under casing 1, and the bottom end of fixed link 11 is bolted company It is connected to wheel 17, Construction Support device is not only only applicable to a kind of caliber pipe in the pipeline, can be with by the adjusting of screw rod 4 Suitable for the support work of multiple caliber pipeline, and easy to remove and fixation uses, simple and easy to use, when having saved work Between and manpower.
When work, which is pushed to the position for needing to support, the rotation of motor 3 drives screw rod by shaft coupling 15 4 rotations, screw rod 4 drive fixed case 10 to rise by sliding shoe 5, and fixed case 10, which rises, drives pull rod 8 to rise, at this time on pull rod 8 Band motor car wheel 17 is risen to rise, this support device wheel 17 rises, and support base 18 touches ground gradually and fixes support device, this When fixed case 10 rise drive the first telescopic rod 12 rise, when support plate 14 resists pipeline, close motor 3 keep support shape State, after usage, motor 3 invert the decline of wheel 17 and jack up support device, can be moved to other position at this time and carry out work Make.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (6)

1. Construction Support device in a kind of pipeline, including under casing (1), it is characterised in that: the bottom of under casing (1) inner cavity is fixed It is connected with motor housing (2), the inside of the motor housing (2) is fixedly connected with motor (3), the top of motor (3) output shaft Through motor housing (2) top and extend to the tops of motor housing (2), the top of motor (3) output shaft passes through shaft coupling (15) it is fixedly connected with screw rod (4), and the surface of screw rod (4) is threaded with sliding shoe (5), the top of the motor housing (2) Portion is fixedly connected with screw rod guide rod (6), and the top of the screw rod guide rod (6) through sliding shoe (5) and extends to sliding shoe (5) top, and screw rod guide rod (6) is slidably connected with sliding shoe (5), is fixedly connected with set at the top of the under casing (1) Cylinder (7), and the top slide of sleeve (7) is connected with pull rod (8), and the bottom end of the pull rod (8) sequentially passes through sleeve (7) and bottom The top of case (1) and the inside for extending under casing (1), the pull rod (8) is fixedly connected with fixed case (10), and fixed case (10) bottom is fixedly connected with the surface of sliding shoe (5), the top of the screw rod (4) and the top point of screw rod guide rod (6) Not Guan Chuan fixed case (10) bottom and extend to the inside of fixed case (10), the top of the screw rod (4) is rotatably connected to solid Determine block (19), the top of the screw rod guide rod (6) is fixedly connected with the bottom end of fixed block (19), the bottom end of the pull rod (8) It is fixedly connected with fixed link (11).
2. Construction Support device in a kind of pipeline according to claim 1, it is characterised in that: the top of the fixed case (10) Portion is fixedly connected with the first telescopic rod (12), and the surface of the first telescopic rod (12) is arranged with the first spring (13).
3. Construction Support device in a kind of pipeline according to claim 2, it is characterised in that: first telescopic rod (12) Top be fixedly connected with support plate (14).
4. Construction Support device in a kind of pipeline according to claim 1, it is characterised in that: the surface of the under casing (1) It is fixedly connected with the second telescopic rod (16), and the top of the second telescopic rod (16) is fixedly connected with the bottom of fixed case (10), The surface of second telescopic rod (16) is arranged with second spring (9).
5. Construction Support device in a kind of pipeline according to claim 1, it is characterised in that: the bottom of the fixed link (11) End runs through the bottom of under casing (1) and extends to the lower section of under casing (1), and the bottom end of fixed link (11) is bolted to connection There are wheel (17).
6. Construction Support device in a kind of pipeline according to claim 1, it is characterised in that: under casing (1) bottom Quadrangle is fixedly connected to support base (18).
CN201821700144.8U 2018-10-19 2018-10-19 Construction Support device in a kind of pipeline Expired - Fee Related CN209262610U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821700144.8U CN209262610U (en) 2018-10-19 2018-10-19 Construction Support device in a kind of pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821700144.8U CN209262610U (en) 2018-10-19 2018-10-19 Construction Support device in a kind of pipeline

Publications (1)

Publication Number Publication Date
CN209262610U true CN209262610U (en) 2019-08-16

Family

ID=67558511

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821700144.8U Expired - Fee Related CN209262610U (en) 2018-10-19 2018-10-19 Construction Support device in a kind of pipeline

Country Status (1)

Country Link
CN (1) CN209262610U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110883919A (en) * 2019-12-16 2020-03-17 威海君祥企业管理咨询有限公司 Precast concrete sewer pipe mold and using method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110883919A (en) * 2019-12-16 2020-03-17 威海君祥企业管理咨询有限公司 Precast concrete sewer pipe mold and using method thereof
CN112476755A (en) * 2019-12-16 2021-03-12 威海君祥企业管理咨询有限公司 Precast concrete sewer pipe mold and using method thereof
CN112497476A (en) * 2019-12-16 2021-03-16 威海君祥企业管理咨询有限公司 Precast concrete sewer pipe mold and using method thereof
CN110883919B (en) * 2019-12-16 2021-04-27 威海君祥企业管理咨询有限公司 Precast concrete sewer pipe mold and using method thereof

Similar Documents

Publication Publication Date Title
CN209262610U (en) Construction Support device in a kind of pipeline
CN105945340A (en) Cutting machine used for electrical mechanical devices
CN105710819A (en) Multifunctional oil cylinder disassembly table
CN210370703U (en) Shield constructs quick-witted section of thick bamboo frock
CN216066220U (en) Liftable positioning pipeline flange welding position device
CN103091400A (en) Bent steel tube automatic flaw detection system based on ultrasonic detection
CN211145591U (en) Ground source heat pump central air conditioning tuber pipe installation device
CN208777921U (en) A kind of spinning proof-wear sucker rod centralising device
CN207569378U (en) Inner wall of the pipe support device
CN102275148B (en) Special adapter for mounting polypropylene drainage pipe
CN203579170U (en) Vertical column cylinder disassembly machine
CN103567757B (en) A kind of column cylinder disassembling machine
CN110039486B (en) Lantern ring processing device for pipeline connection and lantern ring thereof
CN209654030U (en) A kind of booster-type path drifting machine of the replaceable jack rabbit device of band
CN214498984U (en) Lubricator convenient to replace
CN202124447U (en) Spiral shearing type jack
CN112376929A (en) Use method of slidable support system suitable for vertical narrow space
CN202805428U (en) Saw frame installation structure of stone sawing machine
CN209651760U (en) A kind of building assembly lifting device
CN207414752U (en) The press-in component of o-ring erecting device
CN114042829B (en) Steel bar bending device for installing pipe gallery engineering steel bars
CN110259203A (en) A kind of annular stereo stage setting with control mechanism
CN208734118U (en) A kind of building reconstruction mechanical steel bar dismounting device
CN202151842U (en) Special joint connector for installing polypropylene draining pipe
CN221880638U (en) Oil pipe maintenance support fixing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190816

Termination date: 20201019

CF01 Termination of patent right due to non-payment of annual fee