CN209261043U - Big area roof truss suspended ceiling module, ground assemble support system - Google Patents

Big area roof truss suspended ceiling module, ground assemble support system Download PDF

Info

Publication number
CN209261043U
CN209261043U CN201821584411.XU CN201821584411U CN209261043U CN 209261043 U CN209261043 U CN 209261043U CN 201821584411 U CN201821584411 U CN 201821584411U CN 209261043 U CN209261043 U CN 209261043U
Authority
CN
China
Prior art keywords
keel
unit
ceiling
module
screw rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821584411.XU
Other languages
Chinese (zh)
Inventor
王辉平
王晟
陈莹
葛倩华
连珍
邓惠根
李骋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Building Decoration Engineering Group Co Ltd
Original Assignee
Shanghai Building Decoration Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Building Decoration Engineering Group Co Ltd filed Critical Shanghai Building Decoration Engineering Group Co Ltd
Priority to CN201821584411.XU priority Critical patent/CN209261043U/en
Application granted granted Critical
Publication of CN209261043U publication Critical patent/CN209261043U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model provides a kind of big area roof truss suspended ceiling module, ground assembling support system, it include: multiple furred ceiling unit modules, each furred ceiling unit module includes sequentially connected unit framework, ceiling joist and furred ceiling finish coat, the Y-direction of the unit framework and corresponding position converts keel connection, wherein, the Y-direction conversion keel are fixed on X-direction conversion keel, and X-direction converts keel and the truss of roofing connects;Unit module ground assembles bracket, carries out ground assembling for being set up on unit module ground assembling bracket for the unit framework, ceiling joist and furred ceiling finish coat.The utility model is by dividing furred ceiling unit module, using furred ceiling unit module as object, carries out monoblock type assembling and lifting, completes large area furred ceiling without " assembling " construction requirement under the conditions of scaffold.

Description

Big area roof truss suspended ceiling module, ground assemble support system
Technical field
The utility model relates to a kind of big area roof truss suspended ceiling module, ground to assemble support system.
Background technique
With greatly developing for assembling building, assembling road is also moved towards in more and more decorations.Large space is built It builds roofing system and mostly uses truss structure, there is the features such as span is big, height is high, more curved surfaces.Its large area abnormity ceiling construction, It can not be able to satisfy according to scaffold construction and be set up for abnormity, changeable elevation demand, it is big that scaffold takes the amount of tearing open, and it is time-consuming and laborious, It is at high cost, while influencing other job executions of ground.
Utility model content
The purpose of this utility model is to provide a kind of big area roof truss suspended ceiling module, ground to assemble support system, The construction cost being able to solve in the ceiling construction mode of traditional extra space is high, construction speed is slow, high altitude operation quality is difficult The problem of to guarantee.
To solve the above problems, the utility model provides a kind of big area roof truss suspended ceiling module, ground assembling bracket System, comprising:
Multiple furred ceiling unit modules, each furred ceiling unit module include sequentially connected unit framework, ceiling joist and hang The Y-direction conversion keel connection of cresting surface layer, the unit framework and corresponding position, wherein the Y-direction conversion keel are fixed In on X-direction conversion keel, X-direction converts keel and the truss of roofing connects;
Unit module ground assembles bracket, for being set up in list for the unit framework, ceiling joist and furred ceiling finish coat Element module ground, which assembles, carries out ground assembling on bracket.
Further, in above system, C-type steel is respectively adopted in the X-direction conversion keel and Y-direction conversion keel.
Further, in above system, the unit framework is surrounded by C-type steel, and the unit framework passes through second armful Cuffs is connect with Y-direction conversion keel, and the second anchor ear part includes two the first C fonts opening frames and third screw rod, The first perforation is symmetrically offered in the opposing sidewalls of each first C font opening frame, one of C font split ring is sheathed on institute It states on unit framework, another C font split ring is sheathed on the Y-direction conversion keel, and the third screw rod is each passed through First perforation of described two first C font opening frames simultaneously limits fixation by nut;
The unit framework is connect by third anchor ear part with the ceiling joist, is provided with second on the ceiling joist Perforation, the third anchor ear part include a 2nd C font opening frame and the 4th screw rod, the phase of the 2nd C font opening frame To third perforation is symmetrically offered on side wall, the 2nd C font opening frame is sheathed on the unit framework, the 4th spiral shell Bar is each passed through the second perforation in the third perforation and the ceiling joist of the 2nd C font opening frame and by nut limit Position is fixed.
Further, in above system, the ceiling joist is connected by the second connector with furred ceiling finish coat, described Ceiling joist is several font structures, and the two sides of several font structures include the edges of a wing of two stretchings, on the furred ceiling finish coat It is connected with the bayonet of multiple stretchings, second connector includes keel connecting member, facing connector and the 5th screw rod, wherein
The keel connecting member includes the first connecting plate, is provided with and the edge of a wing on 4 angles of first connecting plate The latch of engaging, first connecting plate are provided centrally with the 4th perforation;
The facing connector includes the second connecting plate and card slot, and the side of second connecting plate connects the card slot, For the card slot for engaging with the bayonet on the furred ceiling finish coat, second connecting plate is provided centrally with the 5th perforation;
5th screw rod is each passed through the 4th perforation and third perforation, and is fixed by nut.
It further, further include adjustment module in above system, the adjustment module includes:
Two pieces of U-shaped wedge types adjust inserted sheet, and the thickness of the open end of the U-shaped wedge type adjustment inserted sheet is less than closed end thickness, Knuckle-tooth card slot is provided on the U-shaped contact surface of each U-shaped wedge type adjustment inserted sheet, two pieces of U-shaped wedge type adjustment inserted sheets are opened by respective Mouth end is inserted between first connecting plate and the second connecting plate, and is sheathed on the 5th screw rod, two pieces of U-shaped wedge type tune Whole inserted sheet passes through the different location that the knuckle-tooth card slot engages, and realizes that two pieces of U-shaped wedge types adjust inserted sheets completely or partially weight up and down It is folded.
Further, in above system, the unit module ground assembles bracket, including the two rows assembling being oppositely arranged Bracket, it includes multiple assembling carrier units that every row, which assembles bracket, and the adjacent assembling carrier unit that every row assembles in bracket is mutual Connection, each assembling carrier unit include:
By square tubes soldering at tower-shaped ontology;
It is set to the screw rod and nut for connecting with the unit framework of tower-shaped bodies top;
It is set to the universal wheel of the tower-shaped body bottom portion.
Compared with prior art, the utility model is by multiple furred ceiling unit modules, each furred ceiling unit module include according to The Y-direction conversion keel of unit framework, ceiling joist and the furred ceiling finish coat of secondary connection, the unit framework and corresponding position connect It connects, wherein the Y-direction conversion keel are fixed on X-direction conversion keel, and X-direction converts keel and the truss of roofing connects It connects;Unit module ground assembles bracket, for being set up in unit module for the unit framework, ceiling joist and furred ceiling finish coat Ground, which assembles, carries out ground assembling on bracket.The utility model is pair with furred ceiling unit module by dividing furred ceiling unit module As carrying out monoblock type assembling and lifting, completing large area furred ceiling without " assembling " construction requirement under the conditions of scaffold.
Detailed description of the invention
Fig. 1 is the light trough position view of the roofing of an embodiment of the present invention;
Fig. 2 is the schematic diagram of the furred ceiling unit module of an embodiment of the present invention;
Fig. 3 is the truss tendency schematic diagram of the roofing of an embodiment of the present invention;
Fig. 4 is the X-direction conversion keel of an embodiment of the present invention and the installation side view of Y-direction conversion keel;
Fig. 5 is the X-direction conversion keel of an embodiment of the present invention and the installation top view of Y-direction conversion keel;
Fig. 6 is the scheme of installation of the X-direction conversion keel of an embodiment of the present invention;
Fig. 7 is the scheme of installation of the Z-direction telescopic component of an embodiment of the present invention;
Fig. 8 is the Z-direction telescopic component of an embodiment of the present invention and the fractionation schematic diagram of rotary hinge;
Fig. 9 is the structural schematic diagram of the first rotary hinge of an embodiment of the present invention;
Figure 10 is the fractionation schematic diagram of the first rotary hinge of Fig. 9;
Figure 11 is the structural schematic diagram of second of rotary hinge of an embodiment of the present invention
Figure 12 is the fractionation schematic diagram of the first rotary hinge of Figure 11;
Figure 13 is the side view of the rotary hinge of an embodiment of the present invention;
Figure 14 is the local structural graph of the Z-direction telescopic component of an embodiment of the present invention;
Figure 15 is the schematic diagram of first connector of an embodiment of the present invention;
Figure 16 is the connection schematic diagram of the X-direction conversion keel of an embodiment of the present invention;
Figure 17 is the schematic diagram of the furred ceiling unit module of an embodiment of the present invention;
Figure 18 is the scheme of installation of the second anchor ear part of an embodiment of the present invention;
Figure 19 is the scheme of installation of the furred ceiling unit module of an embodiment of the present invention;
Figure 20 is the schematic diagram of the unit framework of an embodiment of the present invention;
Figure 21 is the installation enlarged diagram of the second anchor ear part of an embodiment of the present invention;
Figure 22 is the scheme of installation of the third anchor ear part of an embodiment of the present invention;
Figure 23 is the structural schematic diagram of the third anchor ear part of an embodiment of the present invention;
Figure 24 is the installation top view of second connector of an embodiment of the present invention;
Figure 25 is the first side view of installation of second connector of an embodiment of the present invention;
Figure 26 is the second side view of installation of second connector of an embodiment of the present invention;
Figure 27 is the structural schematic diagram of the ceiling joist of an embodiment of the present invention;
Figure 28 is second connector of an embodiment of the present invention and the cooperation schematic diagram of U-shaped wedge type adjustment inserted sheet;
Figure 29 is the structural schematic diagram of the U-shaped wedge type adjustment inserted sheet of an embodiment of the present invention;
Figure 30 is the first installation cooperation schematic diagram of two pieces of U-shaped wedge types adjustment inserted sheet of an embodiment of the present invention;
Figure 31 is the second installation cooperation schematic diagram of two pieces of U-shaped wedge types adjustment inserted sheet of an embodiment of the present invention;
Figure 32 is the installation cooperation schematic diagram of the U-shaped wedge type adjustment inserted sheet of an embodiment of the present invention;
Figure 33 is the structural schematic diagram of the unit module ground assembling bracket of an embodiment of the present invention;
Figure 34 is the structural schematic diagram of the assembling carrier unit of an embodiment of the present invention;
Figure 35 is the connection schematic diagram of the assembling carrier unit and unit framework of an embodiment of the present invention.
Specific embodiment
To keep the above objects, features, and advantages of the utility model more obvious and easy to understand, with reference to the accompanying drawing and have Body embodiment is described in further detail the utility model.
As shown in figure 3, large space roofing frame mostly uses steel truss structure, and more hyperbolic moulding.Truss 1 mostly uses truss two Power bar is unit, and loading characteristic does not allow the sunpender of later period furred ceiling to be connected directly between among two power bar of truss.Roofing purlin simultaneously Frame tendency can't keep smooth vertical and horizontal on X/Y plane, and will not unify elevation in the Z-axis direction.
As shown in Fig. 1~35, the utility model provides a kind of big area roof truss suspended ceiling module, ground assembling carriage support System, comprising:
Multiple furred ceiling unit modules, each furred ceiling unit module include sequentially connected unit framework, ceiling joist and hang The Y-direction conversion keel connection of cresting surface layer, the unit framework and corresponding position, wherein the Y-direction conversion keel are fixed In on X-direction conversion keel, X-direction converts keel and the truss of roofing connects;
Unit module ground assembles bracket, for being set up in list for the unit framework, ceiling joist and furred ceiling finish coat Element module ground, which assembles, carries out ground assembling on bracket.
The big area roof truss suspended ceiling module of the utility model, ground assembling carriage support are unified in embodiment, comprising:
As shown in Fig. 4~12,16, more X-directions convert keel, are separated by pre-determined distance between two X-direction conversion keel, Every X-direction conversion keel are successively spliced from beginning to end by multistage X-direction keel 2, the both ends absolute altitude one of every section of X-direction keel 2 It causes, two sections of X-direction keel 2 are connected by rotary hinge component, and the rotary hinge component includes two panels rotary hinge 4 and the side Z To telescopic component 7, wherein the side of every rotary hinge is connect with one end of one section of X-direction keel 2 respectively, two panels rotating close The other side of page 4 is respectively arranged with hinge hole 5, and about 5 hinge hole is aligned, and one end of the Z-direction telescopic component is arranged In it is described up and down be aligned hinge hole in so that the other side of the two panels rotary hinge can be around the Z-direction telescopic component 7 The absolute altitude of one end flexible rotating, two sections of X-direction keel 2 of two panels rotary hinge connection is consistent or inconsistent, the inconsistent X of absolute altitude Gasket 6, the thickness of the gasket 6 are provided between the hinge hole 5 of the two panels rotary hinge 4 that direction keel are connected being aligned up and down Degree is equal to the elevation difference of two panels rotary hinge;The other end of the direction Z telescopic component and the truss 1 of roofing connect;
As shown in Figure 4 and 5,16, multistage Y-direction converts keel 3, and the both ends of every section of Y-direction conversion keel 3 are set up respectively It is converted on keel 2 in the adjacent two piece X-direction for being separated by pre-determined distance, conversion segmentation of keel 3 in a section direction Y is erected at each On section X-direction keel 2, therefore the curve tendency being able to satisfy in truss Y-direction;As shown in figure 16, every section of Y-direction conversion keel 3 can The direction X is fixed on by a few font fastening pieces 8 to convert on keel 2;
As shown in Fig. 2,17 to 23, multiple furred ceiling unit modules 9, each furred ceiling unit module 9 includes sequentially connected list The Y-direction conversion keel 3 of first frame 91, ceiling joist 92 and furred ceiling finish coat 93, the unit framework 91 and corresponding position connect It connects, here, unit framework 91 and Y-direction conversion keel 3 connect, therefore Y-direction conversion 3 installation site of keel need to correspond to and meet unit The installation site of frame;
As shown in figure 33, unit module ground assembles bracket 10, for for unit framework 91, ceiling joist 92 and furred ceiling Finish coat 93 is set up on unit module ground assembling bracket and carries out ground assembling.
Here, three-dimensional adjustable stress check calculation layer: converting keel by X-direction and Y-direction conversion keel 3 form.Due to The sunpender of furred ceiling cannot be directly anchored between two power bar of truss, for the effective fixation for meeting furred ceiling, add stress check calculation layer.By Power conversion layer not only meets stress, also to meet the hyperbolic tendency of truss, and this system X-direction keel are turned by rotary hinge It is dynamic, position of the X-direction keel 2 on X/Y plane is adjusted;Z-direction telescopic component 7 is adjusted, the Z axis for adjusting X-direction keel is reached The position in direction;Gasket 6, the gasket are provided between the hinge hole of the inconsistent two panels rotary hinge of absolute altitude being aligned up and down 6 thickness is equal to the elevation difference of two panels rotary hinge, when realizing that two sections of X-direction keel absolute altitudes of left and right connection are inconsistent, uses Gasket 6 and two panels rotary hinge 6 cooperate, and the elevation difference between two sections of X-direction keel 2 of left and right connection is solved by gasket 6;By It is located on X-direction keel 2 in a section Y-direction conversion keel 3, can also reach the requirement for meeting truss curve tendency.By with Upper design reaches overall conversion into the adjustable effect of three-dimensional.In addition, furred ceiling is divided into multiple furred ceiling unit modules, with furred ceiling Unit module is that object carries out whole ground assembling and integral hoisting.
In order to solve in the ceiling construction for traditional extra space, construction cost is high, construction speed is slow, high altitude operation The problem of quality is difficult to ensure, the utility model specially design it is a kind of innovation effectively, construct quickly " assembling " ceiling system, The stress check calculation layer for converting keel and multistage Y-direction conversion keel including more X-directions by adding, solves girder system and does not permit Perhaps the sunpender of later period furred ceiling is connected directly between the technical problem of the position between two power bar of truss (two power bar of truss can only be born It draws, pressure).By the three-dimensional adjustable setting of conversion layer, including the inconsistent two panels rotating close of Z-direction telescopic component and absolute altitude Setting curvature is finely tuned gasket and can also be expired so that conversion layer can continue truss hyperbolic tendency between the hinge hole of page being aligned up and down The installation of foot abnormity furred ceiling needs.In addition, using furred ceiling unit module as object, being carried out whole by dividing furred ceiling unit module Formula assembling and lifting complete large area furred ceiling without " assembling " construction requirement under the conditions of scaffold.Pass through design cell module Ground assemble bracket so that unit suspended ceiling module ground it is more efficient and efficiently complete assembly.
As shown in figure 16, the big area roof truss suspended ceiling module of the utility model, ground assemble carriage support unified implementation In example, C-type steel is respectively adopted in each section of X-direction keel 2 and Y-direction conversion keel 3, to want in the stiffness for meeting stress check calculation layer While asking, mitigate the weight of entire stress check calculation layer.
As shown in figure 13, the big area roof truss suspended ceiling module of the utility model, ground assemble carriage support unified implementation In example, the section of every rotary hinge 4 prevents hinge stress deformation using wave structure to increase hinge vertical rigidity.
The big area roof truss suspended ceiling module of the utility model, ground assembling carriage support are unified in embodiment, as Fig. 8, 14, shown in 15, the Z-direction telescopic component 7, comprising:
First screw rod 71, first screw rod 71 is elongated to be provided with the first external screw thread, and one end of first screw rod passes through The hinge hole 5 of two panels rotary hinge 4, close to the first screw rod 71 on the outside of each hinge hole on be respectively arranged with the first nut 711, with By the limit of the first screw rod 71 in the hinge hole 5 of two panels rotary hinge 4;
As shown in figure 14, Z-direction adjuster 72, the Z-direction adjuster 72 are cyclic structure, and the cyclic structure can be with It is rectangle ring structure, annular structure or oval ring-type structure etc., the first internal thread hole is symmetrically offered in the cyclic structure 721 and second internal thread hole 722, the first outer spiral shell of the first internal screw thread and first screw rod 71 on first internal thread hole Line matches, certain first external screw thread of section and first internal thread hole 721 cooperation on the other end of first screw rod 71 are fixed, Remaining first screw rod 71 passes through the inside that first internal thread hole 721 enters the first internal thread hole 721, close to described first The second nut 712 is provided on first screw rod in the outside of internal thread hole 721, to certain outer spiral shell of section first on the first screw rod The position of line and the cooperation fixation of the first internal thread hole carries out reinforcement fixation;
As shown in figure 15, the first connector 73, first connector 73 include first connecting portion 732 and the second screw rod 731, one end of the first connecting portion 732 is connect with one end of second screw rod 731, and second screw rod 731 is elongated to be set It is equipped with the second external screw thread, second external screw thread is matched with the second internal thread hole 722 in the cyclic structure, second spiral shell Certain second external screw thread of section and second internal thread hole 722 cooperation on bar 731 are fixed, and remaining second screw rod 731 passes through institute The inside that the second internal thread hole enters second internal thread hole 722 is stated, close to the of the outside of second internal thread hole 722 Third nut 733 is provided on two screw rods, to fix to certain second external screw thread of section on the second screw rod and the cooperation of the second internal thread hole Position carry out reinforcement fixation, the first connection through-hole 734 is provided in the first connecting portion 731;
As shown in Fig. 8 and 15, the first anchor ear part, the first anchor ear part includes second connecting portion 742 and anchor ear ring, In, the anchor ear ring is two the first C font split rings 741, and two open ends of each first C font split ring 741 are symmetrical It is connected with a second connecting portion, the second connection through-hole 744, two the first C words are respectively arranged in each second connecting portion 742 Type split ring 741 is opposite to be sheathed on the truss 1 of roofing, the contact surface of two the first C font split rings 741 and the truss 1 On be provided with anti-skid rubber cushion 743, two the first C font split rings are logical by the second connection in four second connecting portions 742 Hole 744, screw and nut are fixed on truss;One second connecting portion 742 of each first C font split ring by screw, Nut, the first connection through-hole 734 and the second connection through-hole 744, connect with the first connecting portion 732.
Here, X-direction conversion keel are connected at the node of truss 1 by anchor ear part, it is attached anti-skidding on the inside of the first anchor ear part Rubber pad 743;The second connection that the first connecting portion 732 of first connector 73 passes through two screw and nuts and the first anchor ear part Portion 742 connects, and the downside of first connector 73 is connected with the second screw rod 731;Z-direction adjuster 72 passes through in first Threaded hole 721 and the second internal thread hole 722 the second outer spiral shell with the first external screw thread of the first screw rod 71, the second screw rod 731 respectively Line cooperation is adjusted first on the first internal thread hole 721 and the first screw rod 71 by the rotation of Z-direction adjuster 72 itself Externally threaded cooperation position, and the second externally threaded cooperation position on the second internal thread hole 722 and the second screw rod 731 is adjusted, from And realize the position in the Z-direction for adjusting X-direction conversion keel.
As shown in figure 8,4 sets of two panels rotary hinge on the first screw rod 71, upper and lower two are secured with nuts, adjust two panels rotation Position of the hinge on the first screw rod, two panels rotary hinge 4 can be freely rotated respectively around the first screw rod, every section of X-direction keel 2 It is connected by four screws and a piece of rotary hinge 4, by the rotation of rotary hinge 4, the adjustable every section of X-direction dragon connected Position of the bone 2 on X/Y plane.So far, by adjusting Z-direction adjuster 7 and rotary hinge 6, it can reach and adjust X-direction turn Change the purpose of the spatial three-dimensional position of keel 2.
As shown in figs 20 and 21, the big area roof truss suspended ceiling module of the utility model, ground assembling carriage support are unified In embodiment, the unit framework 91 is surrounded by C-type steel, and the unit framework is turned by the second anchor ear part 94 with the Y-direction The connection of keel 3 is changed, the second anchor ear part 94 includes two the first C fonts opening frames 941,942 and third screw rod 943, each The first perforation is symmetrically offered in the opposing sidewalls of first C font opening frame 941,942, one of 942 sets of C font split ring On the unit framework 91, another C font split ring 941 is sheathed on the Y-direction conversion keel 3, the third Screw rod 943 is each passed through the first perforation of described two first C font opening frames 941,942 and is limited by nut and fixed, with The unit framework is converted keel with the Y-direction by the second anchor ear part to connect;As shown in Figure 21, unit framework passes through 6 A second anchor ear part 94 is connected with Y-direction conversion keel;
As depicted in figures 22 and 23, the unit framework 91 is connect by third anchor ear part 95 with the ceiling joist 92, institute It states and is provided with the second perforation on ceiling joist 92, the third anchor ear part 95 includes a 2nd C font opening frame 951 and the 4th Screw rod 952 symmetrically offers third perforation in the opposing sidewalls of the 2nd C font opening frame 951, and the 2nd C font is opened Mouth frame 951 is sheathed on the unit framework 91, and the 4th screw rod 952 is each passed through the 2nd C font opening frame 951 Second perforates and limits fixation by nut in third perforation and the ceiling joist 91, and the unit framework is passed through third The connection of ceiling joist described in anchor ear part.
As shown in Figure 24 to 28, the big area roof truss suspended ceiling module of the utility model, ground assembling carriage support are unified In embodiment, the ceiling joist 92 is connected by the second connector 96 and furred ceiling finish coat 93, and the ceiling joist 92 is several Font structure, the two sides of several font structures include the edge of a wing 921 of two stretchings, are connected on 93 layers of the furred ceiling facing The bayonet 931 of multiple stretchings, second connector 91 include keel connecting member, facing connector and the 5th screw rod 963, In,
The keel connecting member includes the first connecting plate 961, is provided on 4 angles of first connecting plate 961 and institute The latch 964 of the engaging of the edge of a wing 921 is stated, first connecting plate 961 is provided centrally with the 4th perforation;Here, described first connects Fishplate bar 961 is sheathed on the lower part of the ceiling joist 92 by the engaging of the latch 964 and the edge of a wing 921;
The facing connector includes the second connecting plate 962 and card slot 965, and the side of second connecting plate 962 connects The card slot 965, the card slot 965 with the bayonet 931 on the furred ceiling finish coat 93 for engaging, second connecting plate 962 be provided centrally with the 5th perforation;
5th screw rod 963 is each passed through the 4th perforation and the 5th perforation, and is fixed by nut, to realize Ceiling joist is stated to connect by the second connector with furred ceiling finish coat.
As shown in Figure 28~31, the big area roof truss suspended ceiling module of the utility model, ground assembling carriage support are unified It further include adjustment module in embodiment, the adjustment module includes that two pieces of U-shaped wedge types adjust inserted sheet 97, the U-shaped wedge type tune The thickness of the open end of whole inserted sheet 97 is less than closed end thickness, to form adjustable slope on every piece of U word wedge type adjustment inserted sheet It spends, knuckle-tooth card slot 971 is provided on the U-shaped contact surface of each U-shaped wedge type adjustment inserted sheet 97, two pieces of U-shaped wedge types adjust inserted sheets 97 It is inserted between first connecting plate 961 and the second connecting plate 962 by respective open end, and is sheathed on the 5th screw rod On 963, two pieces of U-shaped wedge type adjustment inserted sheets 97 pass through the different location that knuckle-tooth card slot 971 engages, and realize two pieces of U word wedge types up and down Adjust all or part of overlapping of inserted sheet 97.
Here, the contact surface band knuckle-tooth card slot of upper and lower two pieces of U-shaped wedge types adjustment inserted sheet, guarantees under the effect of compression power, U-shaped wedge Sliding is not generated between type adjustment inserted sheet, adjusts the engaging that inserted sheet leads to knuckle-tooth card slot different location by adjusting two pieces of U-shaped wedge types, Upper and lower two pieces of U-shaped wedge types adjustment inserted sheet is completely or partially overlapped, so that the position in the Z-direction for adjusting furred ceiling finish coat can be realized It sets, the difference in height for adjusting adjacent two pieces of furred ceiling finish coats is reached with this, realize the gradient effect of furred ceiling entirety, the adjustment of U-shaped wedge type One knuckle-tooth of every sliding between inserted sheet, module adjust height and increase (or reduce) 1mm, adjusting can increase altitude range be 5~ 20mm。
As shown in figure 32, the big area roof truss suspended ceiling module of the utility model, conversion layer, ground assemble support system It further include adjustment module in one embodiment, the adjustment module includes the U-shaped wedge type tune of the uniform thickness of at least one piece 1mm thickness Whole inserted sheet 98, at least one piece of U-shaped wedge type adjustment inserted sheet 98 are inserted in first connecting plate 961 and second by respective open end Between connecting plate 962, and it is sheathed on the 5th screw rod 963, it is adjacent when U-shaped wedge type adjustment inserted sheet 98 is muti-piece Two pieces of U-shaped wedge types adjustment about 98 inserted sheet overlapping.
Here, when module adjustment module is adjusted in 5mm altitude range below, it can be by by increasing several 1mm Thick U-shaped wedge type adjustment inserted sheet 98 realizes height adjustment.
Configuration adjustment module between ceiling joist and furred ceiling finish coat reaches the requirement of fine tuning furred ceiling facing elevation, is used for Anisotropic gradient furred ceiling is advantageously.
As shown in Figures 9 and 10, the big area roof truss suspended ceiling module of the utility model, ground assembling carriage support are unified real It applies in example, in the two panels rotary hinge 4 of the rotary hinge component, wherein the side setting of a piece of rotary hinge 4 is there are two between A height is correspondingly arranged in the middle part of columnar first hinge hole 41 of the first pre-determined distance, the side of another rotary hinge Degree is columnar second hinge hole 42 of first pre-determined distance, second hinge hole be located at two the first hinge holes it Between, one end of first screw rod 71 is sheathed in first hinge hole 41 and the second hinge hole 42.
Here, the two panels rotary hinge 4 of the present embodiment, can meet two sections of hinge or so 2 absolute altitudes of X-direction keel to be connected Unanimous circumstances.
As shown in FIG. 11 and 12, the big area roof truss suspended ceiling module of the utility model, ground assembling carriage support are unified In embodiment, in the two panels rotary hinge 4 of the rotary hinge component, wherein the upper half of the side of a piece of rotary hinge 4 is set It is equipped with a columnar third hinge hole 43, the lower half of the side of another rotary hinge 4 is provided with one the columnar 4th Hinge hole 44, the third hinge hole 43 and the alignment of the 4th about 44 hinge hole, the third hinge hole and the 4th hinge hole it Between be provided with gasket 6, the gasket 6 is provided centrally with perforation, and one end of first screw rod 71 is sheathed on the third hinge It connects in hole 43, the perforation of gasket and the 4th hinge hole 44.
Here, the two panels rotary hinge 4 of the present embodiment, is able to satisfy two sections of 2 absolute altitudes of X-direction keel to be connected in left and right not Unanimous circumstances.
As shown in Figure 33~35, the big area roof truss suspended ceiling module of the utility model, ground assembling carriage support are unified In embodiment, the unit module ground assembles bracket 10, and including the two rows of assembling brackets being oppositely arranged, every row assembles bracket packet Multiple assembling carrier units 101 are included, every row assembles the adjacent assembling carrier unit in bracket and interconnects, each assembling bracket Unit 101 includes:
By square tubes soldering at tower-shaped ontology 102;
It is set to the screw rod and nut 103 for connecting with the unit framework 91 at tower-shaped 102 top of ontology;
It is set to the universal wheel 104 of 102 bottom of tower-shaped ontology.
Here, as shown in figure 31, unit module ground assembling bracket 10 is made of six assembling carrier units 101, every three A assembling carrier unit 101 connects in a row, and to mention support stability, each assembling carrier unit 101 is by square tubes soldering at tower Shape, to further increase the stability of bracket, the bottom of each assembling carrier unit is arranged three universal wheels 104, realizes bracket Move freely, screw rod, nut is arranged in the top of each assembling carrier unit, for connecting with unit framework.Unit furred ceiling mould When block ground assembles, it can be assembled on unit module ground and carry out strange land assembling on bracket, when lifting, then by universal wheel by unit Module ground assembling bracket 10 and furred ceiling unit module thereon are moved to Hoisting Position, do not influence parallel construction to the greatest extent Content.
The utility model provides a kind of roof suspended ceiling method, comprising: one, construction survey unwrapping wire;Two, three-dimensional adjustable conversion Layer installation;Three, unit suspended ceiling module floor manufacture;Four, unit suspended ceiling module integral hoisting.
As shown in Fig. 1~35, in one embodiment of roof suspended ceiling method of the utility model, comprising:
Step S1, construction survey unwrapping wire, comprising:
Step S11 positions 1 tendency of X-direction truss and Y-direction truss of roofing, measures X-direction truss by 3-D scanning With the elevation of Y-direction truss 1;
Step S12, as shown in Figure 1, positioning the installation position of the light trough 100 under the X-direction truss and Y-direction truss 1 It sets, using the installation site of the light trough 100 as furred ceiling nature cut-off rule, roofing integrated ceiling is divided into corresponding several furred ceiling lists The region of element module 9;
Step S13 positions X-direction conversion keel in the X according to the tendency of the X-direction truss and Y-direction truss 1 Installation site on direction truss 1;
Step S2, the adjustable conversion layer installation of three-dimensional, comprising:
Step S21, as shown in Fig. 4~12,16, according to the elevation of X-direction truss and Y-direction truss 1, furred ceiling unit module The Installation Elevation of 9 height, furred ceiling finish coat 93 determines the installation of each section of X-direction keel 2 in every X-direction conversion keel Elevation converts the Installation Elevation of installation site of the keel on the X-direction truss 1, each section of X-direction keel 2 according to X-direction, More X-direction conversion keel are connect with the X-direction truss, wherein the tendency of the X-direction conversion keel and X-direction purlin The tendency of frame is consistent, and multistage X-direction keel 2 are successively spliced X-direction conversion keel from beginning to end every time, every section of X-direction The both ends absolute altitude of keel 2 is consistent, two sections of X-direction keel 2 is connected by rotary hinge component, wherein the rotary hinge group Part includes two panels rotary hinge 4 and Z-direction telescopic component 7, wherein by the side of every rotary hinge respectively with one section of X-direction One end of keel 2 connects, and the other side of two panels rotary hinge is respectively arranged with hinge hole 5, and about 5 hinge hole is aligned, One end of the Z-direction telescopic component 7 is sheathed in the hinge hole being aligned up and down, two sections of the connection of two panels rotary hinge The absolute altitude of X-direction keel is consistent or inconsistent, wherein in the two panels rotary hinge that the inconsistent X-direction keel 2 of absolute altitude are connected Gasket 6 is set between 4 hinge hole being aligned up and down, and the thickness of the gasket 6 is equal to the elevation difference of two panels rotary hinge 4;It will The other end of the Z-direction telescopic component 7 and the truss 1 of roofing connect;
Here, the tendency of X-direction conversion keel is consistent with the tendency of X-direction truss, X-direction converts the Installation Elevation of keel The elevation for cooperating furred ceiling finished surface, as X-direction keel installation elevation=furred ceiling finish coat Installation Elevation+furred ceiling unit module is effective Highly;
Step S22, to installation site of the X-direction conversion keel on the X-direction truss, the peace of each section of direction X keel Dress elevation carries out checking and corresponding to adjustment;
Step S23, as shown in Figure 4 and 5,16, according to the region of several furred ceiling unit modules 9 of the correspondence, by every section of side Y To the both ends of conversion keel 3, it is set up on the adjacent two piece X-direction conversion keel for being separated by pre-determined distance respectively;
Here, since Y-direction conversion keel 3 are used for connection unit suspended ceiling module, therefore Y-direction converts the first pre- peace of keel 3 Dress makees corresponding adjustment when specific installation site needs engagement unit suspended ceiling module 9 to lift;
Step S3, as shown in Figure 1, the installation light trough 100 of the installation site in the light trough 100, it is subsequent can be with light trough 100 Position line as each furred ceiling unit module;
Step S4, as shown in Fig. 2,17 to 23,9 floor manufacture of unit suspended ceiling module, comprising:
Step S41, unit framework 91 assemble: the assembling parts of unit framework 91 are set up in unit module ground assembling branch On frame 10, ground machine assembling is carried out;
Step S42 connects ceiling joist 92 on the unit framework 91 being completed, connects on the ceiling joist 92 Furred ceiling finish coat 93 is connect, to be assembled into multiple furred ceiling unit modules 9;
Step S5,9 integral hoisting of unit suspended ceiling module, comprising:
Step S51 is position line with the light trough 100, is hung using wirerope and electric hoist to each unit suspended ceiling module 9 It is attached to predetermined position, the position of the Y-direction conversion keel 3 of corresponding segment is adjusted according to the predetermined position, by each unit furred ceiling The unit framework 91 of module 9 is connect with the Y-direction of corresponding position conversion keel 3;
Step S52, using measuring device, installation site and Installation Elevation to each furred ceiling unit module carry out review and Corresponding adjustment.
Here, three-dimensional adjustable stress check calculation layer: converting keel by X-direction and Y-direction conversion keel 3 form.Due to The sunpender of furred ceiling cannot be directly anchored between two power bar of truss, for the effective fixation for meeting furred ceiling, add stress check calculation layer.By Power conversion layer not only meets stress, also to meet the hyperbolic tendency of truss, and this system X-direction keel are turned by rotary hinge It is dynamic, position of the X-direction keel 2 on X/Y plane is adjusted;Z-direction telescopic component is adjusted, the Z axis for adjusting X-direction keel 2 is reached The position in direction;Gasket 6, the pad are provided between the hinge hole 5 of the inconsistent two panels rotary hinge 4 of absolute altitude being aligned up and down The thickness of piece 6 is equal to the elevation difference of two panels rotary hinge, when realizing that two sections of 2 absolute altitudes of X-direction keel of left and right connection are inconsistent, Cooperated using gasket and two panels rotary hinge, the elevation difference between two sections of X-direction keel of left and right connection is solved by gasket;By It is located on X-direction keel 2 in a section Y-direction conversion keel 3, can also reach the requirement for meeting truss curve tendency.By with Upper design reaches overall conversion into the adjustable effect of three-dimensional.In addition, furred ceiling is divided into multiple furred ceiling unit modules 9, with furred ceiling Unit module is that object carries out whole ground assembling and integral hoisting.
In order to solve in the ceiling construction for traditional extra space, construction cost is high, construction speed is slow, high altitude operation The problem of quality is difficult to ensure, the utility model specially design it is a kind of innovation effectively, construct quickly " assembling " ceiling system, The stress check calculation layer for converting keel and multistage Y-direction conversion keel including more X-directions by adding, solves girder system and does not permit Perhaps the sunpender of later period furred ceiling is connected directly between the technical problem of the position between two power bar of truss (two power bar of truss can only be born It draws, pressure).By the three-dimensional adjustable setting of conversion layer, including the inconsistent two panels rotating close of Z-direction telescopic component and absolute altitude Setting curvature is finely tuned gasket and can also be expired so that conversion layer can continue truss hyperbolic tendency between the hinge hole of page being aligned up and down The installation of foot abnormity furred ceiling needs.In addition, using furred ceiling unit module as object, being carried out whole by dividing furred ceiling unit module Formula assembling and lifting complete large area furred ceiling without " assembling " construction requirement under the conditions of scaffold.Pass through design cell module Ground assemble bracket so that unit suspended ceiling module ground it is more efficient and efficiently complete assembly.
As shown in figure 16, in one embodiment of roof suspended ceiling method of the utility model, by more X-direction conversion keel and institute It states in the connection of X-direction truss,
Each section of X-direction keel 2 use C-type steel;
By the both ends of every section of Y-direction conversion keel, it is set up in the direction adjacent two piece X turn for being separated by pre-determined distance respectively It changes on keel,
Each section of Y-direction conversion keel 3 use C-type steel, to mitigate while the stiffness requirement for meeting stress check calculation layer The weight of entire stress check calculation layer.
As shown in figure 13, in one embodiment of roof suspended ceiling method of the utility model, two sections of X-direction keel are passed through into rotation In hinge assembly connection,
The section of every rotary hinge 4 uses wave structure, to increase hinge vertical rigidity, prevents hinge stress from becoming Shape.
As shown in Fig. 8,14,15, in one embodiment of roof suspended ceiling method of the utility model, by the more direction X conversion dragons Bone is connect with the X-direction truss, comprising:
Production includes that the direction Z of the first screw rod 71, Z-direction adjuster 72, the first connector 73 and the first anchor ear part is flexible Component 7, wherein
In first screw rod 71 the first external screw thread of elongated setting, one end of first screw rod 71 is rotated across two panels The first nut 711 is respectively set on the first screw rod 71 close to each 5 outside of hinge hole, by first in the hinge hole 5 of hinge 4 Screw rod 71 limits in the hinge hole 5 of two panels rotary hinge 4;
The Z-direction adjuster 72 is made as cyclic structure, the cyclic structure can be rectangle ring structure, annular shape Structure or oval ring-type structure etc. symmetrically open up the first internal thread hole 721 and the second internal thread hole in the cyclic structure 722, wherein the first internal screw thread on first internal thread hole 721 is matched with the first external screw thread of first screw rod 71, will Certain first external screw thread of section and first internal thread hole 721 cooperation on the other end of first screw rod 71 are fixed, will be remaining The first screw rod 71 pass through the inside that first internal thread hole 721 enters the first internal thread hole 721, close in described first Second nut 712 is set on first screw rod 71 in the outside of threaded hole 721, on the first screw rod certain first external screw thread of section and The fixed position of first internal thread hole cooperation carries out reinforcement fixation;
As shown in figure 15, production includes first connector 73 of first connecting portion 732 and the second screw rod 731, described The first connection through-hole 734 is arranged in second screw rod, 731 the second external screw thread of elongated setting in the first connecting portion 732, will be described One end of first connecting portion 732 is connect with one end of second screw rod 731, wherein second external screw thread and the ring-type The second internal thread hole 722 matching in structure, by spiral shell in certain second external screw thread of section and described second on second screw rod 731 The cooperation of pit 722 is fixed, and remaining second screw rod 731 is passed through second internal thread hole 722 and enters second internal screw thread Third nut 733 is arranged in the inside in hole on second screw rod 731 in the outside close to second internal thread hole 722, to the The position of certain section of the second external screw thread and the cooperation fixation of the second internal thread hole carries out reinforcement fixation on two screw rods;
As shown in Fig. 8 and 15, production includes the first anchor ear part of second connecting portion 742 and anchor ear ring, wherein described Anchor ear ring is two the first C font split rings 741, and two open ends of each first C font split ring 741 are symmetrically connected with One second connecting portion 742 is respectively arranged with the second connection through-hole 744 in each second connecting portion 742, by two the first C words Type split ring is opposite to be sheathed on the X-direction truss 1 of roofing, in two the first C font split rings and the X-direction truss Anti-skid rubber cushion 743 is set on contact surface, two the first C font split rings are passed through into second in four second connecting portions 742 Connection through-hole 744, screw and nut are fixed on X-direction truss 1;By each first C font split ring 741 one of them Two connections 742 are by screw, nut, the first connection through-hole 734 and the second connection through-hole 744, with the first connecting portion 732 Connection.
Here, X-direction conversion keel are connected at the node of X-direction truss 1 by anchor ear part, it is attached on the inside of the first anchor ear part Anti-skid rubber cushion 743;The first connecting portion 732 of first connector 73 passes through the second of two screw and nuts and the first anchor ear part Interconnecting piece 742 connects, and the downside of first connector 73 is connected with the second screw rod 731;Z-direction adjuster 72 passes through first Internal thread hole 721 and the second internal thread hole 722 respectively with the first external screw thread of the first screw rod 71, the second screw rod 731 second outside It is threadedly engaged, by the rotation of Z-direction adjuster 7 itself, is adjusted outside 71 first on the first internal thread hole and the first screw rod The cooperation position of screw thread, and the second externally threaded cooperation position on the second internal thread hole and the second screw rod 731 is adjusted, to realize Adjust the position in the Z-direction of X-direction conversion keel.
As shown in figure 8,4 sets of two panels rotary hinge on the first screw rod 71, upper and lower two are secured with nuts, adjust two panels rotation Position of the hinge on the first screw rod, two panels rotary hinge 4 can be freely rotated respectively around the first screw rod, every section of X-direction keel 2 It is connected by four screws and a piece of rotary hinge 4, by the rotation of rotary hinge, the adjustable every section of X-direction dragon connected Position of the bone 2 on X/Y plane.So far, by adjusting Z-direction adjuster 7 and rotary hinge 4, it can reach and adjust X-direction turn Change the purpose of the spatial three-dimensional position of keel.
As shown in figs 20 and 21, in one embodiment of roof suspended ceiling method of the utility model, by the assembled portion of unit framework Part is set up on unit module ground assembling bracket, carries out ground machine assembling, comprising:
The C-type steel for assembling the unit framework 91 is connected on unit module ground assembling bracket 10, ground machine is carried out Tool assembling;
The unit framework 91 of each unit suspended ceiling module 9 is connect with the Y-direction of corresponding position conversion keel, comprising:
Unit framework is converted keel 3 with the Y-direction by the second anchor ear part 94 to connect, wherein second anchor ear Part 94 includes two the first C font opening frames 941,942 and third screw rod 943, in the phase of each first C font opening frame 941 To the first perforation is symmetrically opened up on side wall, one of C font opening ring set 942 is set on the unit framework 91, and will Another C font split ring 941 is sheathed on the direction the Y conversion keel 3, the third screw rod 943 is each passed through described First perforation of two the first C font opening frames 941,942 simultaneously limits fixation by nut;
Ceiling joist is connected on the unit framework being completed, comprising:
As depicted in figures 22 and 23, the unit framework 91 is connect by third anchor ear part 95 with the ceiling joist 92, Wherein, the second perforation is provided on the ceiling joist 92, the third anchor ear part 95 includes a 2nd C font opening frame 951 and the 4th screw rod 952, third perforation is symmetrically offered in the opposing sidewalls of the 2nd C font opening frame 951, it will be described 2nd C font opening frame 951 is sheathed on the unit framework 91, and the 4th screw rod 952 is each passed through the 2nd C word Second in the third perforation and the ceiling joist 92 of type opening frame 951 perforates and limits fixation by nut, will be described Unit framework 91 is connected by ceiling joist 92 described in third anchor ear part 95.
As shown in Figure 24 to 28, in one embodiment of roof suspended ceiling method of the utility model, connect on the ceiling joist Furred ceiling finish coat is connect, to be assembled into multiple furred ceiling unit modules, comprising:
The ceiling joist 92 is connected by the second connector 96 and furred ceiling finish coat 93, wherein the ceiling joist 92 be several font structures, and the two sides of several font structures include the edge of a wing 921 of two stretchings, is connected on the furred ceiling finish coat 93 It is connected to the bayonet 931 of multiple stretchings;Second connector 96 includes keel connecting member, facing connector and the 5th screw rod 963, Wherein, the keel connecting member includes the first connecting plate 961, is provided with and the wing on 4 angles of first connecting plate 961 The latch 964 that edge 921 engages, first connecting plate 961 are provided centrally with the 4th perforation;The facing connector includes the The side of two connecting plates 962 and card slot 965, second connecting plate 962 connects the card slot, second connecting plate 962 Be provided centrally with the 5th perforation;
The card slot 965 is engaged with the bayonet on the furred ceiling finish coat 93;
5th screw rod 963 is each passed through the 4th perforation and the 5th perforation, and is fixed by nut.
As shown in Figure 28~31, in one embodiment of roof suspended ceiling method of the utility model, the 5th screw rod is distinguished Across the 4th perforation and the 5th perforation, and fixed by nut, comprising:
5th screw rod 963 is each passed through the 4th perforation and the 5th perforation;
Prepare adjustment module, wherein the adjustment module includes: two pieces of U-shaped wedge type adjustment inserted sheets 97, the U-shaped wedge type The thickness for adjusting the open end of inserted sheet 97 is less than closed end thickness, adjustable to be formed on every piece of U-shaped wedge type adjustment inserted sheet The gradient is provided with knuckle-tooth card slot 971 on the U-shaped contact surface of each U-shaped wedge type adjustment inserted sheet;
Two pieces of U-shaped wedge type adjustment inserted sheets 97 are inserted into first connecting plate 961 and the second connection by respective open end It between plate 962, and is sheathed on the 5th screw rod 963, wherein two pieces of U-shaped wedge type adjustment inserted sheets 97 pass through the knuckle-tooth card The different location that slot 971 engages realizes that two pieces of U-shaped wedge type adjustment inserted sheets are completely or partially overlapped up and down;
After all or part of overlapping of upper and lower two pieces of U-shaped wedge types adjustment inserted sheet 97, the 5th screw rod 963 is consolidated by nut It is fixed.
Here, the contact surface band knuckle-tooth card slot of upper and lower two pieces of U-shaped wedge types adjustment inserted sheet, guarantees under the effect of compression power, U-shaped wedge Sliding is not generated between type adjustment inserted sheet, adjusts the engaging that inserted sheet leads to knuckle-tooth card slot different location by adjusting two pieces of U-shaped wedge types, Upper and lower two pieces of U-shaped wedge types adjustment inserted sheet is completely or partially overlapped, so that the position in the Z-direction for adjusting furred ceiling finish coat can be realized It sets, the difference in height for adjusting adjacent two pieces of furred ceiling finish coats is reached with this, realize the gradient effect of furred ceiling entirety, the adjustment of U-shaped wedge type One knuckle-tooth of every sliding between inserted sheet, module adjust height and increase (or reduce) 1mm, adjusting can increase altitude range be 5~ 20mm。
As shown in figure 32, in one embodiment of roof suspended ceiling method of the utility model, the 5th screw rod is each passed through 4th perforation and the 5th perforation, and fixed by nut, comprising:
5th screw rod 963 is each passed through the 4th perforation and the 5th perforation;
Prepare adjustment module, wherein the adjustment module includes: the U-shaped wedge type tune of the uniform thickness of at least one piece 1mm thickness Whole inserted sheet 98;
At least one piece of U-shaped wedge type is adjusted into inserted sheet 98, first connecting plate 961 and second is inserted by respective open end Between connecting plate 962, and it is sheathed on the 5th screw rod 963, wherein when U-shaped wedge type adjustment inserted sheet 98 is muti-piece, Adjacent two pieces of U-shaped wedge types, about 98 inserted sheet of adjustment is overlapped;
After adjacent two pieces of U-shaped wedge types, about 98 inserted sheet of adjustment is overlapped, the 5th screw rod 963 is fixed by nut.
Here, when module adjustment module is adjusted in 5mm altitude range below, it can be by by increasing several 1mm Thick U-shaped wedge type adjustment inserted sheet 98 realizes height adjustment.
Configuration adjustment module between ceiling joist and furred ceiling finish coat reaches the requirement of fine tuning furred ceiling facing elevation, is used for Anisotropic gradient furred ceiling is advantageously.
As shown in Figures 9 and 10, in one embodiment of roof suspended ceiling method of the utility model, two sections of X-direction keel are passed through Rotary hinge component connects, comprising:
Prepare rotary hinge component, wherein in the two panels rotary hinge 4 of the rotary hinge component, a piece of rotation wherein Columnar first hinge holes 42 of two the first pre-determined distances of interval are arranged in the side for turning hinge 4, in another rotary hinge 4 Columnar second hinge hole 42 that a height is first pre-determined distance is correspondingly arranged in the middle part of side, described second is hinged Hole 42 is located between two the first hinge holes 41;
One end of first screw rod 71 is sheathed in first hinge hole 41 and the second hinge hole 42.
Here, the two panels rotary hinge 4 of the present embodiment, can meet two sections of hinge or so 2 absolute altitudes of X-direction keel to be connected Unanimous circumstances.
As shown in FIG. 11 and 12, in one embodiment of roof suspended ceiling method of the utility model, two sections of X-direction keel are passed through Rotary hinge component connects, comprising:
Prepare rotary hinge component, wherein in the two panels rotary hinge 4 of the rotary hinge component, a piece of rotation wherein A columnar third hinge hole 43, the lower half in the side of another rotary hinge 4 is arranged in the upper half for turning the side of hinge Columnar 4th hinge hole 44 is arranged in portion;
The third hinge hole and the 4th hinge hole are aligned up and down, in the third hinge hole 43 and the 4th hinge hole 44 Between be arranged gasket 6, the gasket 6 center be arranged perforation;
One end of first screw rod 71 is sheathed on the third hinge hole 43, the perforation of gasket 6 and the 4th hinge hole In 44.
Here, the two panels rotary hinge 4 of the present embodiment, is able to satisfy two sections of 2 absolute altitudes of X-direction keel to be connected in left and right not Unanimous circumstances.
As shown in Figure 33~35, in one embodiment of roof suspended ceiling method of the utility model, by the assembled portion of unit framework Part is set up on unit module ground assembling bracket, carries out ground machine assembling, comprising:
The two rows of assembling brackets being oppositely arranged form unit module ground assembling bracket, and it includes multiple groups that every row, which assembles bracket, Fill carrier unit 101, wherein it is each assembling carrier unit 101 include: by square tubes soldering at tower-shaped ontology 102;It is set to tower The screw rod and nut 103 for being connect with the unit framework 91 at 102 top of shape ontology;It is set to the tower-shaped ontology 102 The universal wheel 104 of bottom;
Every row is assembled the adjacent assembling carrier unit 101 in bracket to interconnect;
By the screw rod and nut 103 being connect with the unit framework 91, by the assembling parts frame of the unit framework 91 On unit module ground assembling bracket 10, ground machine assembling is carried out.
Here, unit module ground assembling bracket is made of six assembling carrier units, every three assembling carrier units connect It is in a row, to mention support stability, each assembling carrier unit by square tubes soldering at tower-shaped, to further increase the steady of bracket Qualitative, three universal wheels are arranged in the bottom of each assembling carrier unit, realize moving freely for bracket, each assembling carrier unit Top screw rod, nut are set, for being connected with unit framework.It, can in unit module when unit suspended ceiling module ground assembles Face, which assembles, carries out strange land assembling on bracket, when lifting, then by universal wheel unit module ground is assembled bracket and hanging thereon Top unit module is moved to Hoisting Position, does not influence parallel construction content to the greatest extent.
Each embodiment in this specification is described in a progressive manner, the highlights of each of the examples are with other The difference of embodiment, the same or similar parts in each embodiment may refer to each other.
Obviously, it is practical new without departing from this can to carry out various modification and variations to utility model by those skilled in the art The spirit and scope of type.If in this way, these modifications and variations of the present invention belong to the utility model claims and its Within the scope of equivalent technologies, then the utility model is also intended to including these modification and variations.

Claims (6)

1. a kind of big area roof truss suspended ceiling module, ground assemble support system characterized by comprising
Multiple furred ceiling unit modules, each furred ceiling unit module include sequentially connected unit framework, ceiling joist and furred ceiling decorations The Y-direction conversion keel connection of surface layer, the unit framework and corresponding position, wherein the Y-direction conversion keel are fixed on X Direction is converted on keel, and X-direction converts keel and the truss of roofing connects;
Unit module ground assembles bracket, for being set up in unit mould for the unit framework, ceiling joist and furred ceiling finish coat Block ground, which assembles, carries out ground assembling on bracket.
2. big area roof truss suspended ceiling module as described in claim 1, ground assemble support system, which is characterized in that institute It states X-direction conversion keel and C-type steel is respectively adopted in Y-direction conversion keel.
3. big area roof truss suspended ceiling module as described in claim 1, ground assemble support system, which is characterized in that institute It states unit framework to be surrounded by C-type steel, the unit framework is converted keel with the Y-direction by the second anchor ear part and connect, described Second anchor ear part includes two the first C fonts opening frames and third screw rod, right in the opposing sidewalls of each first C font opening frame Title offers the first perforation, and one of C font split ring is sheathed on the unit framework, another C font opening ring set On Y-direction conversion keel, the third screw rod is each passed through the first perforation of described two first C font opening frames And it is limited and is fixed by nut;
The unit framework is connect by third anchor ear part with the ceiling joist, and second is provided on the ceiling joist and is worn Hole, the third anchor ear part include the 2nd C font opening frame and the 4th screw rod, the 2nd C font opening frame it is opposite Third perforation is symmetrically offered on side wall, the 2nd C font opening frame is sheathed on the unit framework, the 4th screw rod Second be each passed through in the third perforation and the ceiling joist of the 2nd C font opening frame perforates and is limited by nut It is fixed.
4. big area roof truss suspended ceiling module as described in claim 1, ground assemble support system, which is characterized in that institute It states ceiling joist to connect by the second connector with furred ceiling finish coat, the ceiling joist is several font structures, several fonts The two sides of structure include the edge of a wing of two stretchings, and the bayonet of multiple stretchings is connected on the furred ceiling finish coat, and described second connects Fitting includes keel connecting member, facing connector and the 5th screw rod, wherein
The keel connecting member includes the first connecting plate, is provided on 4 angles of first connecting plate and engages with the edge of a wing Latch, first connecting plate be provided centrally with the 4th perforation;
The facing connector includes the second connecting plate and card slot, and the side of second connecting plate connects the card slot, described For card slot for engaging with the bayonet on the furred ceiling finish coat, second connecting plate is provided centrally with the 5th perforation;
5th screw rod is each passed through the 4th perforation and third perforation, and is fixed by nut.
5. big area roof truss suspended ceiling module as claimed in claim 4, ground assemble support system, which is characterized in that also Including adjustment module, the adjustment module includes:
Two pieces of U-shaped wedge types adjust inserted sheet, and the thickness of the open end of the U-shaped wedge type adjustment inserted sheet is less than closed end thickness, each U Knuckle-tooth card slot is provided on the U-shaped contact surface of word wedge type adjustment inserted sheet, two pieces of U-shaped wedge type adjustment inserted sheets are inserted by respective open end Enter between first connecting plate and the second connecting plate, and be sheathed on the 5th screw rod, two pieces of U-shaped wedge types adjust inserted sheet The different location engaged by the knuckle-tooth card slot realizes that two pieces of U-shaped wedge type adjustment inserted sheets are completely or partially overlapped up and down.
6. big area roof truss suspended ceiling module as described in claim 1, ground assemble support system, which is characterized in that institute Unit module ground assembling bracket is stated, including the two rows of assembling brackets being oppositely arranged, it includes multiple assembling branch that every row, which assembles bracket, Frame unit, every row assemble the adjacent assembling carrier unit in bracket and interconnect, and each assembling carrier unit includes:
By square tubes soldering at tower-shaped ontology;
It is set to the screw rod and nut for connecting with the unit framework of tower-shaped bodies top;
It is set to the universal wheel of the tower-shaped body bottom portion.
CN201821584411.XU 2018-09-27 2018-09-27 Big area roof truss suspended ceiling module, ground assemble support system Active CN209261043U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821584411.XU CN209261043U (en) 2018-09-27 2018-09-27 Big area roof truss suspended ceiling module, ground assemble support system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821584411.XU CN209261043U (en) 2018-09-27 2018-09-27 Big area roof truss suspended ceiling module, ground assemble support system

Publications (1)

Publication Number Publication Date
CN209261043U true CN209261043U (en) 2019-08-16

Family

ID=67553373

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821584411.XU Active CN209261043U (en) 2018-09-27 2018-09-27 Big area roof truss suspended ceiling module, ground assemble support system

Country Status (1)

Country Link
CN (1) CN209261043U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109441011A (en) * 2018-09-27 2019-03-08 上海市建筑装饰工程集团有限公司 Big area roof truss suspended ceiling module, ground assemble support system
CN111236650A (en) * 2020-03-12 2020-06-05 中铁建设集团有限公司 Construction method for special-shaped perforated aluminum plate combined ceiling
CN111889962A (en) * 2020-06-24 2020-11-06 上海市建筑装饰工程集团有限公司 Assembling construction method for large-area multi-curve complex artistic facing
CN117868379A (en) * 2024-01-29 2024-04-12 北京城建六建设集团有限公司 Installation method of wind-uncovering-resistant arc-adjustable aluminum plate suspended ceiling supporting system

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109441011A (en) * 2018-09-27 2019-03-08 上海市建筑装饰工程集团有限公司 Big area roof truss suspended ceiling module, ground assemble support system
CN111236650A (en) * 2020-03-12 2020-06-05 中铁建设集团有限公司 Construction method for special-shaped perforated aluminum plate combined ceiling
CN111889962A (en) * 2020-06-24 2020-11-06 上海市建筑装饰工程集团有限公司 Assembling construction method for large-area multi-curve complex artistic facing
CN111889962B (en) * 2020-06-24 2023-06-06 上海市建筑装饰工程集团有限公司 Assembly construction method for large-area multi-curve complex artistic facing
CN117868379A (en) * 2024-01-29 2024-04-12 北京城建六建设集团有限公司 Installation method of wind-uncovering-resistant arc-adjustable aluminum plate suspended ceiling supporting system

Similar Documents

Publication Publication Date Title
CN209261043U (en) Big area roof truss suspended ceiling module, ground assemble support system
CN209261047U (en) Big area roof truss hinge system
CN104612307B (en) Ceiling system and its construction method
CN109403639A (en) Big area roof truss stress check calculation layer installation method
CN109441008A (en) Big area roof truss anchor ear system
CN109441125A (en) Big area roof truss suspended ceiling module installation method
CN104120831B (en) Large span air filling type prestressing force truss string structure and construction method thereof
WO2022253310A1 (en) High-altitude rotating construction method for large venue steel canopy
CN104975670A (en) Combined-type cable dome structure for elliptic plane with unequal-height boundary
CN209637106U (en) Big area roof truss suspended ceiling module, conversion layer, ground assemble support system
CN209261046U (en) Big area roof truss anchor ear system
CN209261044U (en) Big area roof truss boom system
CN109653431A (en) Big area roof truss hinge system
CN209637107U (en) Big area roof truss suspended ceiling module, conversion layer system
CN209261045U (en) Big area roof truss suspended ceiling module
CN109441009A (en) Big area roof truss suspended ceiling module, conversion layer system
CN101457550A (en) Installation method for special-shaped arch shell type construction network frame
CN109680958A (en) Big area roof truss suspended ceiling module, conversion layer, assembling bracket installation method
CN102191856B (en) Curved surface template with adjustable curvature
CN109441010A (en) Big area roof truss suspended ceiling module
CN109653432A (en) Big area roof truss suspended ceiling module, conversion layer, ground assemble support system
CN109441011A (en) Big area roof truss suspended ceiling module, ground assemble support system
CN109505378A (en) Big area roof truss stress check calculation layer
CN109441007A (en) Big area roof truss boom system
CN113047440A (en) Double-layer radiation beam string structure with wind-resistant cable and construction method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant