CN209260711U - Synchronous device for filling is pulled out in a kind of SMW engineering method stake - Google Patents

Synchronous device for filling is pulled out in a kind of SMW engineering method stake Download PDF

Info

Publication number
CN209260711U
CN209260711U CN201822100644.4U CN201822100644U CN209260711U CN 209260711 U CN209260711 U CN 209260711U CN 201822100644 U CN201822100644 U CN 201822100644U CN 209260711 U CN209260711 U CN 209260711U
Authority
CN
China
Prior art keywords
slip casting
profile steel
steel pipe
filling
supporting element
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822100644.4U
Other languages
Chinese (zh)
Inventor
李亮
王超雄
昌钰
陈斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Surveying Geotechnical Research Institute Co Ltd of MCC
Original Assignee
Wuhan Surveying Geotechnical Research Institute Co Ltd of MCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Surveying Geotechnical Research Institute Co Ltd of MCC filed Critical Wuhan Surveying Geotechnical Research Institute Co Ltd of MCC
Priority to CN201822100644.4U priority Critical patent/CN209260711U/en
Application granted granted Critical
Publication of CN209260711U publication Critical patent/CN209260711U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The utility model provides a kind of SMW engineering method stake and pulls out synchronous device for filling.The synchronous filling device includes the H profile steel supporting element being inserted into the cement mixing method of SMW engineering method stake and the left and right slip casting steel pipe for being vertically welded on H profile steel supporting element armpit angle two sides, the left and right slip casting steel pipe abuts wing plate and the web junction of H profile steel supporting element, and the bottom end of H profile steel supporting element is extended to from the top of H profile steel supporting element;It is equipped with screw thread plug in the upper orifice of two slip casting steel pipes, lower nozzle is equipped with rubber stopper.The utility model can effectively solve the problem of gap is blocked, the cutting of discontinuous slip casting and steel pipe wastes, while ensure the connectivity in steel pipe and gap, guarantee that gap filling is closely knit.

Description

Synchronous device for filling is pulled out in a kind of SMW engineering method stake
Technical field
The present invention relates to base pit engineering technical fields, pull out synchronous device for filling more particularly to a kind of SMW engineering method stake.
Background technique
Stiffened soil-cement stirring wall engineering method (abbreviation SMW engineering method) is to utilize multiaxis deep mixer (TRD/CSM equipment) just Ground drilling cutting, while cement grout is injected, it is stirred after being sufficiently mixed repeatedly, then the core materials such as H profile steel or steel sheet pile are inserted into In churned pile wall, being formed can earth-retaining but also the compound diaphram wall body that blocks water.SMW engineering method has the characteristics that low cost, It is primarily due to fashioned iron and pulls out carry out recycling and reusing.Generally take yellow ground backfill closely knit or pressure in the gap that fashioned iron leaves after pulling out Close slip casting, but rub or tilted pull out or Support Deformation etc. due to, Soil-cement Wall is during fashioned iron rises and pulls out Will appear part cracking destruction, this will lead to gap and can be blocked in vertical height, rather than be connected to, at this time to gap into It when row filling, will be unable to fill closely knit, and then left a void under at blocking, this will lead to long period inner periphery after construction The continuous deformation of building.
It is found through being retrieved to prior art document, grant number is that the patent document of CN101929343B discloses " SMW engineering method Profile steel pulling and grouting ", proposition are boring injected hole wait pull out beside fashioned iron, when then promoting fashioned iron through injected hole into gap The method of slip casting, this method can effectively solve the problem of gap is blocked, and can prevent from gushing on underground water, but it is relatively difficult to guarantee The new connectivity bored injected hole and pull out gap with fashioned iron.Grant number is that the patent document of CN201410021017.5 discloses " SMW Engineering method profile steel pulling and grouting ", proposition is in close shape steel web center and avoids the hole for hoist welded still pipe on shape steel web, Then promote fashioned iron after, while by steel pipe transfer Grouting Pipe pulled out to fashioned iron after gap in slip casting, realize fashioned iron rise pull out and Property while slip casting, until fashioned iron and steel pipe are pulled out completely until completion with slip casting, the program can guarantee that gap is pulled out in slip casting Connectivity, but steel pipe and fashioned iron need to be segmented truncation, and slip casting is discontinuous and grouting pressure and rate are difficult to control, and high pressure water occurs Mud is excessive to there is safety accident.
Summary of the invention
Synchronous filling device is pulled out in a kind of SMW engineering method stake of insufficient offer institute to the utility model according to prior art, can be had Effect solves the problems, such as that gap is blocked and material loss and discontinuous slip casting.
Technical solution provided by the utility model: synchronous device for filling is pulled out in a kind of SMW engineering method stake, and feature exists Include H profile steel supporting element in the cement mixing method for being inserted into the stake of SMW engineering method in: the synchronous filling device and is vertically welded on The left and right slip casting steel pipe of H profile steel supporting element armpit angle two sides, the left and right slip casting steel pipe abut the wing plate and abdomen of H profile steel supporting element Plate junction, and extend to from the top of H profile steel supporting element the bottom end of H profile steel supporting element;It is set in the upper orifice of two slip casting steel pipes There is screw thread plug, lower nozzle is equipped with rubber stopper.
The utility model preferably technical solution: the synchronous filling device further includes grouting pump and Grouting Pipe, in pile pulling When synchronous grouting, grouting pump is connect by Grouting Pipe with the upper port of a wherein slip casting steel pipe.
The utility model preferably technical solution: the H profile steel supporting element is welded by Multi-section H-shaped, every section H-type Two slip casting steel pipes are equipped on steel, and the slip casting steel pipe in every section H profile steel passes through screwed connection, and is interconnected.
The utility model preferably technical solution: the left and right slip casting steel pipe is separately positioned on H profile steel web and two wings The junction of plate.
The utility model preferably technical solution: antifriction is equipped in the outer surface of H profile steel supporting element and left and right slip casting steel pipe Agent coating.
The utility model preferably technical solution: the left and right slip casting steel pipe is seamless steel pipe.
The utility model preferably technical solution: it is equipped with lifting hole(eyelet) at the top of H profile steel supporting element, in H profile steel supporting element Top is equipped with lifting hole(eyelet), and the position of lifting hole(eyelet) is higher than the nozzle of left and right slip casting steel pipe.
The utility model compared with prior art, has the following advantages that and effect: steel pipe and fashioned iron in the utility model Welded, Grouting Pipe is connect with steel tube end part, and during pulling out, the sustainable progress of slip casting, gap fills closely knit;And it is arranged Two steel pipes, can be monitored slip casting, and the steel pipe of the utility model is reusable, and cost can be effectively controlled, and fit It is easily destroyed when fashioned iron is pulled out for soil cement and surrounding enviroment is complicated, underground water especially occurred and gush situation along gap, it can benefit Two fluid grouting is carried out with reserved pressure release steel pipe, realizes that Fast synchronization fashioned iron is pulled out and gap slip casting synchronism.
Detailed description of the invention
Fig. 1 is the positive structure schematic of the utility model;
Fig. 2 is the top view of the utility model;
Fig. 3 is the SMW engineering method stake floor map for being welded with steel pipe fashioned iron;
Fig. 4 to Fig. 7 is the utility model synchronous grouting construction schematic diagram.
In figure: 1-H profile steel supporting element, 1-1-wing plate, 1-2-web, 2,3-left and right slip casting steel pipes, 4-screw threads are stifled Head, 5-rubber stoppers, 6-grouting pumps, 7-Grouting Pipes, 8-lifting hole(eyelet)s, 9-matched clamps and jack, 10-Soil-cements Stake.
Specific embodiment
The present invention will be further described with reference to the accompanying drawings and examples, a kind of SMW work as depicted in figs. 1 and 2 Synchronous device for filling is pulled out in method stake, it is characterised in that: the synchronous filling device includes the Soil-cement for being inserted into the stake of SMW engineering method H profile steel supporting element 1 in stake 10 and it is vertically welded on the left and right slip casting steel pipes 2,3 of 1 armpit angle two sides of H profile steel supporting element, the H Type steel support part 1 is welded by Multi-section H-shaped, two slip casting steel pipes is equipped in every section H profile steel, and in every section H profile steel Slip casting steel pipe by screwed connection, and be interconnected.The left and right slip casting steel pipe 2,3 is seamless steel pipe.It is described left and right Slip casting steel pipe 2,3 abuts the junction wing plate 1-1 and web 1-2 of H profile steel supporting element 1, and left and right slip casting steel pipe 2,3 is respectively set H profile steel supporting element 1 is extended in the junction of H profile steel web 1-2 and two wing plate 1-1, and from the top of H profile steel supporting element 1 Bottom end, the nozzle height of two Grouting Pipes is consistent, is equipped with lifting hole(eyelet) 8 at the top of H profile steel supporting element 1, the position of lifting hole(eyelet) 8 is high In the nozzle position of left and right slip casting steel pipe 2,3.It is equipped with screw thread plug 4 in the upper orifice of two slip casting steel pipes 2,3, lower nozzle is equipped with Rubber stopper 5.
In order to reduce friction, facilitates pile pulling, be equipped with and subtract in the outer surface of H profile steel supporting element 1 and left and right slip casting steel pipe 2,3 Rub agent coating.
The utility model further includes grouting pump 6 and Grouting Pipe 7, and in pile pulling synchronous grouting, grouting pump 6 passes through Grouting Pipe 7 connect with the upper port of a wherein slip casting steel pipe.
It further illustrates below with reference to application method of the embodiment to the utility model, is applied for certain SMW engineering method stake Work, specific as follows:
(1) first construct H profile steel supporting element 1, the length of H profile steel supporting element 1 according to the design length of SMW engineering method stake and It is fixed, plurality of sections of steel pipes first can be passed through into screwed connection into certain length, Multi-section H-shaped is then welded to design length, and will Two slip casting steel pipes of sealing connection are welded to the armpit angle two sides of H profile steel supporting element 1, and welding position abuts wing plate and web Junction, and anti-friction agent is smeared in fashioned iron and steel tube surface, steel pipe bottom is clogged with rubber stopper, and end is twisted using screw thread plug Tightly;
(2) the H profile steel supporting element 1 after processing is transferred into the cement earth pile constructed, completes applying for SMW engineering method stake Work, as shown in Figure 3;
(3) when pulling out H profile steel supporting element 1, as shown in figure 4, in 1 end of H profile steel supporting element using matched clamp and very heavy Fashioned iron leakage part is clamped on top 9, catches on H profile steel supporting element 1 using the lifting hole(eyelet) 8 that fashioned iron is reserved using crane;Start jack to make Industry starts to promote fashioned iron, after promoting 300~500mm, removes the steel pipe screw thread plug of leakage, what connection was connect with grouting pump 9 Grouting Pipe 7, and reserved slip casting steel pipe is subjected to out plug;
(4) starting jack continues to promote H profile steel supporting element 1 and slip casting steel pipe, while opening grouting pump 9, carries out slip casting, As shown in Figures 5 to 7, injection speed is consistent with 1 rate of H profile steel supporting element is promoted, while observing an other slip casting Steel pipe cement slurry frost boiling situation, detects slip casting;It is uninterrupted to promote fashioned iron, until fashioned iron and steel pipe are completed to pull out, slurries Until filling up gap.
(5) steel pipe and section steel suspended after pulling out are filled to specified region, while cleaning cement slurry inside reserved steel pipe, standby With.
The above, only one embodiment of the utility model, above described embodiment only expresses this, description compared with To be specific and detailed, but it cannot be understood as the limitations to the scope of the utility model.It should be pointed out that for ability For the those of ordinary skill in domain, without departing from the concept of the premise utility, various modifications and improvements can be made, These are all within the protection scope of the present invention.Therefore, the protection scope of the utility model should be determined by the appended claims.

Claims (7)

1. synchronous device for filling is pulled out in a kind of SMW engineering method stake, it is characterised in that: the synchronous filling device includes insertion SMW work H profile steel supporting element (1) in cement mixing method (10) in method and vertically it is welded on H profile steel supporting element (1) armpit angle two sides Left and right slip casting steel pipe (2,3), the left and right slip casting steel pipe (2,3) abut the wing plate (1-1) and web of H profile steel supporting element (1) The junction (1-2), and extend to from the top of H profile steel supporting element (1) bottom end of H profile steel supporting element (1);In two slip casting steel pipes The upper orifice of (2,3) is equipped with screw thread plug (4), and lower nozzle is equipped with rubber stopper (5).
2. synchronous device for filling is pulled out in a kind of SMW engineering method stake according to claim 1, it is characterised in that: described synchronize is filled out Fill that set further include grouting pump (6) and Grouting Pipe (7), in pile pulling synchronous grouting, grouting pump (6) by Grouting Pipe (7) with The wherein upper port connection of a slip casting steel pipe.
3. synchronous device for filling is pulled out in a kind of SMW engineering method stake according to claim 1, it is characterised in that: the H profile steel branch Support member (1) is welded by Multi-section H-shaped, and two slip casting steel pipes, and the note in every section H profile steel are equipped in every section H profile steel Steel pipe is starched by screwed connection, and is interconnected.
4. synchronous device for filling is pulled out in a kind of SMW engineering method stake according to claim 1, it is characterised in that: the left and right note Slurry steel pipe (2,3) is separately positioned on the junction of H profile steel web (1-2) Yu two wing plates (1-1).
5. synchronous device for filling is pulled out in a kind of SMW engineering method stake according to claim 1, it is characterised in that: supported in H profile steel The outer surface of part (1) and left and right slip casting steel pipe (2,3) is equipped with anti-friction agent coating.
6. synchronous device for filling is pulled out in a kind of SMW engineering method stake according to claim 1, it is characterised in that: the left and right note Starching steel pipe (2,3) is seamless steel pipe.
7. synchronous device for filling is pulled out in a kind of SMW engineering method stake according to claim 1, it is characterised in that: supported in H profile steel The top of part (1) is equipped with lifting hole(eyelet) (8), and the position of lifting hole(eyelet) (8) is higher than the nozzle of left and right slip casting steel pipe (2,3).
CN201822100644.4U 2018-12-13 2018-12-13 Synchronous device for filling is pulled out in a kind of SMW engineering method stake Active CN209260711U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822100644.4U CN209260711U (en) 2018-12-13 2018-12-13 Synchronous device for filling is pulled out in a kind of SMW engineering method stake

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822100644.4U CN209260711U (en) 2018-12-13 2018-12-13 Synchronous device for filling is pulled out in a kind of SMW engineering method stake

Publications (1)

Publication Number Publication Date
CN209260711U true CN209260711U (en) 2019-08-16

Family

ID=67563559

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822100644.4U Active CN209260711U (en) 2018-12-13 2018-12-13 Synchronous device for filling is pulled out in a kind of SMW engineering method stake

Country Status (1)

Country Link
CN (1) CN209260711U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111877364A (en) * 2020-08-06 2020-11-03 上海市基础工程集团有限公司 Deformation-controlled pile structure of prestressed section steel construction method
CN114319314A (en) * 2022-01-24 2022-04-12 信息产业部电子综合勘察研究院 Construction method for constructing large-thickness collapsible loess foundation by utilizing profile steel cement soil mixing wall

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111877364A (en) * 2020-08-06 2020-11-03 上海市基础工程集团有限公司 Deformation-controlled pile structure of prestressed section steel construction method
CN114319314A (en) * 2022-01-24 2022-04-12 信息产业部电子综合勘察研究院 Construction method for constructing large-thickness collapsible loess foundation by utilizing profile steel cement soil mixing wall

Similar Documents

Publication Publication Date Title
CN206308690U (en) Grout pile bottom stake side one grouting behind shaft or drift lining construction tool
CN209260711U (en) Synchronous device for filling is pulled out in a kind of SMW engineering method stake
CN103114578B (en) Grouting molding pedestal pile and construction method thereof and pedestal expanding device
CN107653889A (en) A kind of shaped steel pressure is poured water the construction method of soil curtain support pile
CN202510163U (en) Goaf grouting device
CN205895289U (en) Slip casting anchor rope with double -deck thick liquid and spiral stirring function of ending
CN109944236A (en) Root pile actively follows track delamination pour slurry system and construction method
CN103790160A (en) Method for pulling out structural steel and conducting grouting through SMW construction method
CN204401613U (en) The structure of bored pile perforation spillage in water prevention
CN110055959A (en) A kind of forming method of composite foundation pile and the grouting component of composite foundation pile
CN205422775U (en) Anchor rod device
CN216041298U (en) Deformed steel for SMW construction method
CN108978694B (en) Accurate guidance grouting method for building waterproof curtain in tunnel
CN206110124U (en) Bored concrete pile stake end post grouting device
CN114737559B (en) Multidirectional load-resistant small precast pile foundation and construction method
CN109555125A (en) Submersible type concreting sealing telescopic pipe
CN209585049U (en) Submersible type concreting sealing telescopic pipe
CN110761293B (en) Foundation pit anchor cable orifice device and foundation pit anchor cable orifice construction method
CN111676947B (en) Tunnel inverted arch foundation reinforcing assembly and construction method
CN109403328B (en) Perforated pipe grouting assembly and construction method
CN209293051U (en) A kind of open caisson reserved opening plugging structure
CN211368692U (en) Water stopping device in anchoring construction
CN104500108B (en) Method for treating tunnel base water return point
CN207760848U (en) A kind of grouting component of composite foundation pile
CN212452486U (en) Plug type water plugging tool for rotary spraying anchor cable

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant