CN209259842U - A kind of high-purity wetting system of clinical laboratory - Google Patents

A kind of high-purity wetting system of clinical laboratory Download PDF

Info

Publication number
CN209259842U
CN209259842U CN201822046152.1U CN201822046152U CN209259842U CN 209259842 U CN209259842 U CN 209259842U CN 201822046152 U CN201822046152 U CN 201822046152U CN 209259842 U CN209259842 U CN 209259842U
Authority
CN
China
Prior art keywords
water
water tank
tank
purity
valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201822046152.1U
Other languages
Chinese (zh)
Inventor
曹华梅
肖瑶
付举欣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Provincial Police Hospital
Original Assignee
Guizhou Provincial Police Hospital
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Provincial Police Hospital filed Critical Guizhou Provincial Police Hospital
Priority to CN201822046152.1U priority Critical patent/CN209259842U/en
Application granted granted Critical
Publication of CN209259842U publication Critical patent/CN209259842U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Physical Water Treatments (AREA)

Abstract

The utility model relates to a kind of high-purity wetting systems of clinical laboratory, including at least pure water equipment, the water inlet of the pure water equipment is connected with the first water tank and the water outlet of the pure water equipment is connected with the second water tank, depassing unit is additionally provided with above first water tank and second water tank, in the case where the pure water equipment generates high purity water, the depassing unit passes sequentially through second water tank according to can make the high purity water, the mode that the depassing unit and first water tank are transmitted back to the pure water equipment formation circulation is connect with first water tank and the second water tank respectively.The utility model can be realized the function of high purity water circulation degasification, can not only be using tap water or close water source as raw water, additionally it is possible to remove the gas dissolved in raw water and high purity water, guarantee the quality of high purity water.

Description

A kind of high-purity wetting system of clinical laboratory
Technical field
The utility model relates to the high-purity wetting systems of the field of medical instrument technology more particularly to a kind of clinical laboratory.
Background technique
Currently, pure water, high purity water, ultrapure water are that modern industry is indispensable and one of highly important basic material, The fields such as electronics, electric power, chemistry, medicine, biology, information have very extensive purposes;It is especially all kinds of for medical institutions Clinical laboratory, due to it is larger to pure water demand and also to water quality requirement it is higher, it is accordingly required in particular to one kind can utilize tap water or phase Nearly water source facilitates the integral intelligent equipment for preparing high purity water as raw water.
In high purity water producing process, mixed bed (ion exchange bed) or EDI (electrochemical deionization) equipment is generally used, it will be former Water carries out deionization purification, makes the resistivity of water up to 15m Ω .cm or more.And after mixed bed or EDI electrification deionization apparatus, it needs When buffer tank is set, the storage problem of high purity water must be just paid the utmost attention to.Because high purity water after contacting with the air will It is heavily polluted, containing impurity such as carbon dioxide, bacterium, dust in air, and high purity water is pure solvent, to these impurity Solvability is very strong, once its resistivity will be made to decline rapidly, in practice it has proved that 15m Ω .cm so high purity water is contacted with air Above high purity water, water quality will drop to 3-4m Ω .cm after 1 minute in air for exposure, will drop to 2m after 3 minutes Ω .cm or so.Therefore it has to reduce the chance that high purity water is contacted with air.High purity water is unable to reach user if contaminated Requirement causes back segment system to purify burden, leads to the increase of operating cost.
In the prior art, prevent high purity water from having following 3 kinds by the common methods of air pollution:
(1) nitrogen charging method: nitrogen is filled on the water tank water surface to be made to maintain normal pressure appropriate in water tank, prevents atmosphere and water The water surface contacts in case, and air-isolation prevents pollution effects up to 95% or more;
(2) bag film method: being arranged bag-shaped film i.e. in water tank and be covered on the water surface, and bag film following water-level lifting is reduced The water surface and air contact area, due to the sealing problem of bag film and four wall of water tank, so air-isolation prevents pollution effects only Have 50% or so;
(3) floating roof method: monolith plate floating roof is made in water tank with the light light material of density ratio water and is bubbled through the water column, is used in combination Light elastic material (such as sponge, foamed plastic) covers the gap between floating roof and water tank, and floating roof is with water surface fluctuation, to reduce The touch opportunity of air and the water surface;Also due to the sealing problem of floating roof method material and four wall of water tank, air-isolation prevent from polluting Effect only has 50% or so.
It is most common that high purity water is stored in a manner of nitrogen envelope in the prior art, implements most simple, and effect is best.And it uses at some In the industry of high purity water, many users can not provide nitrogen, therefore be difficult to guarantee the quality of high purity water, cause back segment system negative Load increases, and the serious company that will directly influence normally produces.
Chinese patent (Publication No. CN202108075U) discloses water seal device for high purity water storage The connected high-purity water tank of pure water equipment, is additionally provided with prime water tank before mixed bed or EDI pure water equipment, and high-purity water tank top is original Gas vent is connected by return pipe with prime tank top water inlet, and prime water tank bottom water outlet is set with mixed bed or EDI pure water Standby water inlet is connected.High-purity water tank fills after high purity water extra pure water and is back to prime water tank from the return pipe of tank top, together When high purity water water tank form a closed space completely and air insulated, after high purity water roof tank water quality reaches requirement, water Case water can be supplied or be used backward, according to live actual used water amount, in water seal return pipe always can some water flowing back, Water seal is formed, prevents high-purity water pollution, effect can be suitable with nitrogen charging method.But the high purity water storage water seal dress that the patent provides Set the gas for not accounting for and dissolving in raw water, in raw water dissolved with gas by constantly accumulating, generate a large amount of gas not It will result only in high purity water secondary pollution, can also destroy the internal pressure of water seal increase high-purity water tank in return pipe by being temporarily stored in, The high purity water for the water seal device for high purity water storage production that the patent provides can not obtain the pure water of high-quality.
Utility model content
In view of the deficienciess of the prior art, the utility model provides a kind of high-purity wetting system of clinical laboratory, at least wrap Include pure water equipment.The water inlet of the pure water equipment is connected with the first water tank and the water outlet of the pure water equipment is connected with second Water tank.Depassing unit is additionally provided with above first water tank and second water tank.It is generated in the pure water equipment high In the case where pure water, according to that can make, the high purity water passes sequentially through second water tank to the depassing unit, the degasification fills Set and first water tank be transmitted back to the pure water equipment formed the mode of circulation respectively with first water tank and the second water Case connection.
According to a kind of preferred embodiment, the gas vent of second water tank is connected with return pipe.First water tank is logical The return pipe is crossed to connect with second water tank.The feelings of second water tank are filled in the high purity water that the pure water equipment generates Under condition, the high purity water in second water tank is according to the confined space for enabling to the second water tank formation and air insulated Mode is transmitted to first water tank by the return pipe.
According to a kind of preferred embodiment, the depassing unit include vacuum plant and connect with the vacuum plant Three-tank.The third water tank is provided with the second water valve connecting with second water tank.It is detached in the vacuum plant described In the case that gas in third water tank makes the third water tank generate negative pressure suction force, the high purity water in second water tank The third water tank is transmitted to by second water valve in the way of it can be drained by the third water tank.
According to a kind of preferred embodiment, the third water tank is additionally provided with the first water connecting with first water tank Valve.In the case that high-purity water degassing in second water valve closing and the third water tank is completed, in the third water tank High purity water be transmitted to first water tank by first water valve.
According to a kind of preferred embodiment, it is provided in third water tank for accelerating the high purity water/raw water effectively to analyse Protrusion out.The protrusion is between the third water tank and second water valve and to be arranged in the third water tank side wall Protrusion.The slender type element in the third water tank is either arranged in the protrusion.The slender type element and third The inner wall of water tank connects and extends to or be connected to second water valve.
According to a kind of preferred embodiment, it is additionally provided between the vacuum plant and the third water tank for being discharged Gas in the third water tank and the exhaust valve being connected to ambient atmosphere.
According to a kind of preferred embodiment, vacuum pump and be used to open/close and is described that the vacuum plant includes at least The solenoid valve of vacuum pump.It is provided between the vacuum pump and the solenoid valve for preventing liquid from flowing into the slow of the vacuum Rush device.The vacuum pump is connect with the buffer.The buffer is indirectly connected with by the solenoid valve and the exhaust valve.
According to a kind of preferred embodiment, the clinical laboratory is additionally provided with high-purity wetting system positioned at first water tank The power device for water supply between the pure water equipment.The power device includes at least two in the way of in parallel The water pump of connection and the third water valve being connect with the water outlet of first water tank.The water inlet of the water pump passes through described the Three water valves are connect with first water tank.The water outlet of the water pump is connect with the water inlet of the pure water equipment.
According to a kind of preferred embodiment, the water pump further includes the 4th water valve and check-valves.4th water valve and institute State the water inlet connection of water pump.The check-valves of the water outlet connection of the water pump.
According to a kind of preferred embodiment, the clinical laboratory is additionally provided with the water level for showing water level with high-purity wetting system Metering device.The water level metering device is separately positioned on the top of first water tank, the second water tank and third water tank.
The beneficial effects of the utility model are:
1. the depassing unit that clinical laboratory provided by the utility model is connected with high-purity wetting system by closed loop mode, One water tank, pure water equipment and the second water tank realize the function of high purity water circulation degasification, can not only utilize tap water or close water Source is as raw water, additionally it is possible to remove the gas dissolved in raw water and high purity water, guarantee the quality of high purity water;
2. clinical laboratory provided by the utility model with high-purity wetting system by setting return pipe respectively with the first water tank and the The connection structure of two water tanks realizes water seal resistance, effectively can prevent high purity water from contacting with air and causing secondary pollution.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of preferred embodiment of the utility model.
Reference signs list
1: 2: the first water tank of pure water equipment, 3: the second water tank
4: depassing unit 5: power device 6: water level metering device
7: water-supply-pipe 8: outlet pipe 31: return pipe
41: vacuum plant 42: third water tank 43: exhaust valve
51: 52: the four water valve 53 of water pump: check-valves
54: third water valve 411: vacuum pump 412: buffer
413: 421: the first water valve of solenoid valve, 422: the second water valve
423: protrusion
Specific embodiment
In the description of the present invention, it should be understood that if there is term " center ", " longitudinal direction ", " transverse direction ", " length Degree ", " width ", " thickness ", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom" "inner", The orientation or positional relationship of the instructions such as "outside", " clockwise ", " counterclockwise " is to be based on the orientation or positional relationship shown in the drawings, only It is the utility model and simplified description for ease of description, rather than the device or element of indication or suggestion meaning must have spy Fixed orientation is constructed and operated in a specific orientation, therefore should not be understood as limiting the present invention.
In the description of the present invention, it is also to be appreciated that unless otherwise clearly defined and limited, fisrt feature Second feature "upper" or "lower" may include that the first and second features directly contact, also may include first and second spy Sign is not direct contact but by the other characterisation contact between them.Moreover, fisrt feature second feature " on ", " top " and " above " includes fisrt feature right above second feature and oblique upper, or is merely representative of first feature horizontal height Higher than second feature.Fisrt feature under the second feature " below ", " below " and " below " include fisrt feature second feature just Lower section and obliquely downward, or first feature horizontal height is merely representative of less than second feature.
It is described in detail with reference to the accompanying drawing.
As shown in Figure 1, a kind of high-purity wetting system of clinical laboratory provided by the utility model, includes at least pure water equipment 1.It is pure The water inlet of wetting system 1 is connected with the first water tank 2 and the water outlet of pure water equipment 1 is connected with the second water tank 3.In the first water tank 2 Depassing unit 4 is additionally provided with the top of the second water tank 3.In the case where pure water equipment 1 generates high purity water, depassing unit 4 is pressed The formation circulation of pure water equipment 1 is transmitted back to according to high purity water can be made to pass sequentially through the second water tank 3, depassing unit 4 and the first water tank 2 Mode connect respectively with the first water tank 2 and the second water tank 3.Preferably, pure water equipment can be using mixed bed (ion exchange Bed) or EDI (electrochemical deionization) equipment, raw water is subjected to deionization purification, makes the resistivity of water up to 15m Ω .cm or more.It is preferred that Ground, the first water tank 2 and the second water tank 3 have crushing resistance, corrosion resistance gentle using nontoxic, the tasteless container of PE material production Close property and easy to clean, and also there is the relief valve for pressure release.Preferably, raw water can be tap water or nearest water Source enters 4 degasification of depassing unit by water-supply-pipe 7, and the raw water by degassing processing enters the first water tank 2, this is needed in the process The balance that relief valve keeps 2 inner and outer air pressure of the first water tank is opened, after the first water tank 2 full of closing relief valve after raw water, and by the Raw water in one water tank 2 leads to pure water equipment 1 to obtain preliminary high purity water, after preliminary high purity water enters the second water tank 2, the Air in two water tanks 2 is discharged by relief valve, after in the second water tank 2 full of preliminary high purity water after close relief valve and beat It discharges device of air 4 from, the preliminary high purity water in the second water tank 2 is introduced by depassing unit and degasification by the principle of negative pressure drainage, Repeat the above steps later to be formed high purity water circulation degasification, system it is pure.Preferably, it is obtained tentatively in above-mentioned second water tank 3 High purity water when, simultaneously the raw water in depassing unit can degasification and the raw water after degasification is passed through in the first water tank 2, made In the first water tank 2 full of the raw water after degasification, and repeat above-mentioned blowdown step and be passed through pure water equipment 1 and etc. so that the Two water tanks 3 remain full of the state of high purity water, guarantee that the second water tank 3 forms a closed space completely and air insulated, are Guarantee that the second water tank 3 continually forms a closed space, the volume of the first water tank 2 is set greater than the second water tank 3 Volume.Preferably, in the case where guaranteeing one closed space of the second water tank 3 formation completely with air insulated, depassing unit 4 Stop that the preliminary high purity water in the second water tank 2 is introduced depassing unit to raw water degasification and by the principle of negative pressure drainage, it is right Preliminary high purity water persistent loop degasification and system are pure to obtain the high purity water of high-quality.
According to a kind of preferred embodiment, the gas vent of the second water tank 3 is connected with return pipe 31.First water tank 2 passes through back Flow tube 31 is connect with the second water tank 3.In the case where the high purity water that pure water equipment 1 generates fills the second water tank 3, the second water tank 3 Interior high purity water transmits in the way of enabling to the second water tank 3 to form the confined space with air insulated by return pipe 31 To the first water tank 2.Preferably due to which the second water tank 3 is connect by return pipe 31 with the first water tank 2, therefore first in pure water equipment 1 It is secondary be passed through preliminary high purity water into the second water tank 3 in the case where, gas in the second water tank 3 enters first by return pipe 31 Water tank 2, therefore only need to carry out pressure release to the first water tank 2.Preferably, it is filled in the preliminary high purity water that pure water equipment 1 generates When the second water tank 3, the preliminary high purity water in the second water tank 3 can enter the first water tank 2 by return pipe 31, at this time the first water tank It is the raw water and the mixing liquid of preliminary high purity water after degasification in 2, is simultaneously filled with liquid in the first water tank 2 and the second water tank 3 In the case where body, the first water tank 2, pure water equipment 1 and the second water tank 3 form closed liquid circulation by return pipe 31 at this time Circuit is full of preliminary high purity water in the first water tank 2 and the second water tank 3 after repeatedly recycling, and the second water tank 3 is filled with degasification The access for setting 4 is opened, so that the preliminary high purity water in the second water tank 3 is transmitted to degasification in depassing unit 4, in the same of degasification When, the preliminary high purity water in the first water tank 2 is passed through in pure water equipment 1, make it is pure after be passed through the second water tank 3, weight in the second water tank 3 It is newly full of preliminary high purity water, to guarantee that the second water tank 3 forms a closed space completely and air insulated, eventually by weight Multiple above step makes in the case where the first water tank 2 and the second water tank all form a closed space with air insulated, Depassing unit 4 has been passed through the preliminary high purity water that can fill the first water tank 2, then recycles degasification by depassing unit 4 and obtains The high purity water of the high purity water of high-quality, high-quality is exported by outlet pipe 8.
According to a kind of preferred embodiment, depassing unit 4 includes vacuum plant 41 and the third connecting with vacuum plant 41 Water tank 42.Third water tank 42 is provided with the second water valve 422 connecting with the second water tank 3.Third water tank is detached in vacuum plant 41 In the case that gas in 42 makes third water tank 42 generate negative pressure suction force, high purity water in the second water tank 2 is according to can be by The mode of 42 negative pressure drainage of third water tank is transmitted to third water tank 42 by the second water valve 422.
According to a kind of preferred embodiment, it is additionally provided between vacuum plant 41 and third water tank 42 for third to be discharged Gas in water tank 42 and the exhaust valve 43 being connected to ambient atmosphere.
According to a kind of preferred embodiment, vacuum pump 411 that vacuum plant 41 includes at least and be used to open/close vacuum The solenoid valve 413 of pump 411.The buffer for preventing liquid from flowing into vacuum 411 is provided between vacuum pump 411 and solenoid valve 412.Vacuum pump 411 is connect with buffer 412.Buffer 412 is indirectly connected with by solenoid valve 413 with exhaust valve 43.
According to a kind of preferred embodiment, it is provided in third water tank 42 for accelerating high purity water/raw water to be effectively precipitated Protrusion 423.Protrusion 423 is that between third water tank 42 and the second water valve 422 and the prominent of 42 side wall of third water tank is arranged in Object out.The slender type element in third water tank 42 is either arranged in protrusion 423.The inner wall of slender type element and third water tank 42 It connects and extends to or be connected to the second water valve 422.
According to a kind of preferred embodiment, third water tank 42 is additionally provided with the first water valve 421 connecting with the first water tank 2. High purity water in the case that high-purity water degassing in the closing of the second water valve 422 and third water tank 42 is completed, in third water tank 42 The first water tank 2 is transmitted to by the first water valve 421.
Preferably, it needs to open vacuum pump 411 and third water tank by solenoid valve 413 before depassing unit 4 starts degasification Then access between 42 opens the gas in the extraction third water tank 42 of vacuum pump 411, so that being formed in third water tank 42 true Sky opens the second water valve 422 of three-way, and the raw water in water-supply-pipe 7 or the preliminary high purity water in the second water tank 3 are passed through It is big with extraneous pressure difference since third water tank 42 is in vacuum state in three-tank 43, when raw water or preliminary high purity water enter It can sharply be expanded after third water tank 42, promote the gas in raw water or preliminary high purity water that the degasification for completing raw water is quickly precipitated, And the protrusion 423 for accelerating high purity water/raw water to be effectively precipitated is provided in third water tank 42, so that into third water tank 42 Interior raw water or preliminary high purity water collide with protrusion 423, so that the gas in raw water or preliminary high purity water is easier It is precipitated, increases the efficiency of degasification.Preferably, when the water in third water tank 42 has been at least up to the half of 42 volume of third water tank When to 5/6ths, the second water valve 422 is closed, stops water inlet.Preferably, third water tank 42 is additionally provided with watch window, can be with Whether raw water/preliminary high purity water in observation third water tank 42 has bubble generation, produces when can't see bubble in third water tank 42 Raw and when rising, degassing procedure terminates, and opens the first water valve 421 after opening exhaust valve 43, by the raw water in third water tank 42/just The high purity water of step is passed through in the first water tank 2.Preferably, which can also be the pipe in front of the water inlet in third water tank 42 Wall.Preferably, buffer 412 can prevent the liquid countercurrent in third water tank 2 from generating damage to vacuum pump 411.
According to a kind of preferred embodiment, clinical laboratory be additionally provided with high-purity wetting system positioned at the first water tank 2 and pure water The power device 5 for water supply between equipment 1.Power device 5 includes at least two water pumps connected in the way of in parallel 51 and the third water valve 54 that is connect with the water outlet of the first water tank 2.The water inlet of water pump 51 passes through third water valve 21 and first Water tank 2 connects.The water outlet of water pump 51 is connect with the water inlet of pure water equipment 1.
According to a kind of preferred embodiment, water pump 51 further includes the 4th water valve 52 and check-valves 53.4th water valve 52 and water The water inlet connection of pump 51.The check-valves 53 of the water outlet connection of water pump 51.
Preferably, power device 5 is flow in order to increase the high purity water of raw water/preliminary and adjusts flow, and can be with Guarantee send water not interrupt.
According to a kind of preferred embodiment, clinical laboratory is additionally provided with the water level for showing water level with high-purity wetting system and measures Device 6.Water level metering device 6 is separately positioned on the top of the first water tank 2, the second water tank 3 and third water tank 42.Preferably, According to the high-purity of 42 inside raw water of available first water tank 2 of water level metering device, the second water tank 3 and third water tank/preliminary The water level information of water is to determine whether be full of.
In order to make it easy to understand, the section that tests of the utility model is described with the use process of high-purity wetting system.
Before tap water or other nearest water sources enter the utility model by water-supply-pipe 7 as raw water, it is necessary first to logical The access between the opening vacuum pump 411 of solenoid valve 413 and third water tank 42 is crossed, vacuum pump 411 is then opened and extracts third water tank Gas in 42 opens the second water valve 422 of three-way, by the raw water in water-supply-pipe 7 so that forming vacuum in third water tank 42 It is passed through in third water tank 43, it is big with extraneous pressure difference since third water tank 42 is in vacuum state, when raw water enters third water tank It can sharply be expanded after 42, promote the gas dissolved in raw water that the degasification for completing raw water is quickly precipitated, and set in third water tank 42 It is equipped with the protrusion 423 for accelerating raw water to be effectively precipitated, so that touching into the raw water in third water tank 42 with protrusion 423 It hits, so that the gas in raw water is easier to be precipitated, increases the efficiency of degasification.When the water in third water tank 42 has been at least up to When the half of 42 volume of three-tank is to 5/6ths, the second water valve 422 is closed, stops water inlet.Third water tank 42 is additionally provided with sight Window being examined, can observe whether the raw water in third water tank 42 has bubble generation, being generated when can't see bubble in third water tank 42 When with rising, degassing procedure terminates, and opens the first water valve 421 after opening exhaust valve 43, the raw water in third water tank 42 is passed through In first water tank 2.It needs to open the balance that relief valve keeps 2 inner and outer air pressure of the first water tank during this, is full of to the first water tank 2 It closes relief valve after raw water, and the raw water in the first water tank 2 is led into pure water equipment 1 to obtain preliminary high purity water, preliminary After high purity water enters the second water tank 2, the air in the second water tank 2 is discharged by relief valve or is transmitted to first by return pipe 31 Water tank 2 simultaneously excludes, after in the second water tank 2 full of preliminary high purity water after open depassing unit 4 and be passed through raw water so that after degasification Raw water be full of the first water tank 2, the raw water in the first water tank 2 is passed through in pure water equipment 1, make it is pure after be passed through the second water tank 3, second Preliminary high purity water is refilled in water tank 3, to guarantee that the second water tank 3 forms a closed space completely and air insulated. Then, it closes water-supply-pipe 7 and opens depassing unit 4, drawn the preliminary high purity water in the second water tank 2 by the principle of negative pressure drainage Enter depassing unit 4 and degasification, the circulation degasification to form high purity water that repeats the above steps later, system are pure, finally obtain high-quality High purity water.
It should be noted that above-mentioned specific embodiment is exemplary, those skilled in the art can be in the utility model Various solutions are found out under the inspiration of disclosure, and these solutions also belong to the open scope of the utility model simultaneously It falls within the protection scope of the utility model.It will be understood by those skilled in the art that the utility model specification and its attached drawing It is illustrative and not constitutes limitations on claims.The protection scope of the utility model is by claim and its equivalent It limits.

Claims (10)

1. a kind of high-purity wetting system of clinical laboratory includes at least pure water equipment (1), which is characterized in that the pure water equipment (1) Water inlet is connected with the first water tank (2) and the water outlet of the pure water equipment (1) is connected with the second water tank (3), wherein
Depassing unit (4) are additionally provided with above first water tank (2) and second water tank (3), are set in the pure water In the case that standby (1) generates high purity water, the depassing unit (4) passes sequentially through second water according to can make the high purity water Case (3), the depassing unit (4) and first water tank (2) are transmitted back to the mode point that the pure water equipment (1) forms circulation It is not connect with first water tank (2) and the second water tank (3).
2. the high-purity wetting system of clinical laboratory as described in claim 1, which is characterized in that the gas vent of second water tank (3) It is connected with return pipe (31), first water tank (2) is connect by the return pipe (31) with second water tank (3), wherein
In the case where the high purity water that the pure water equipment (1) generates fills the second water tank (3), second water tank (3) Interior high purity water returns in the way of enabling to second water tank (3) to form the confined space with air insulated by described Flow tube (31) is transmitted to first water tank (2).
3. the high-purity wetting system of clinical laboratory as claimed in claim 1 or 2, which is characterized in that the depassing unit (4) includes true Empty device (41) and the third water tank (42) being connect with the vacuum plant (41), wherein
The third water tank (42) is provided with the second water valve (422) connecting with second water tank (3), in the vacuum plant (41) it detaches in the case that the gas in the third water tank (42) makes the third water tank (42) generate negative pressure suction force, institute The high purity water in the second water tank (3) is stated in the way of it can be drained by the third water tank (42) by second water valve (422) it is transmitted to the third water tank (42).
4. the high-purity wetting system of clinical laboratory according to claim 3, characterized in that the third water tank (42) is additionally provided with The first water valve (421) being connect with first water tank (2), in second water valve (422) closing and the third water tank (42) in the case that high-purity water degassing in is completed, the high purity water in the third water tank (42) passes through first water valve (421) it is transmitted to first water tank (2).
5. the high-purity wetting system of clinical laboratory according to claim 4, characterized in that setting is useful in third water tank (42) In the protrusion (423) for accelerating the high purity water or/raw water to be effectively precipitated, wherein
The protrusion (423) is between the third water tank (42) and second water valve (422) and to be arranged described the The protrusion of three-tank (42) side wall, or the slender type element being arranged in the third water tank (42), the slender type Element connect with the inner wall of third water tank (42) and extends to or be connected to second water valve (422).
6. the high-purity wetting system of clinical laboratory according to claim 3, characterized in that in the vacuum plant (41) and described The row for being additionally provided with the gas for being discharged in the third water tank (42) between third water tank (42) and being connected to ambient atmosphere Air valve (43).
7. the high-purity wetting system of clinical laboratory according to claim 6, characterized in that the vacuum plant (41) includes at least Vacuum pump (411) and be used to open/close the solenoid valves (413) of the vacuum pump (411), wherein
It is provided between the vacuum pump (411) and the solenoid valve for preventing liquid from flowing into the vacuum pump (411) Buffer (412), the vacuum pump (411) connect with the buffer (412), and the buffer (412) passes through the electromagnetism Valve (413) is indirectly connected with the exhaust valve (43).
8. the high-purity wetting system of clinical laboratory according to claim 1, characterized in that the high-purity wetting system of the clinical laboratory The power device (5) for water supply being additionally provided between first water tank (2) and the pure water equipment (1), wherein
The power device (5) include at least two water pumps (51) connected in the way of in parallel and with first water tank (2) the third water valve (54) of water outlet connection, wherein
The water inlet of the water pump (51) is connect by the third water valve (54) with first water tank (2), and the water The water outlet of pump (51) is connect with the water inlet of the pure water equipment (1).
9. the high-purity wetting system of clinical laboratory according to claim 8, characterized in that the water pump (51) further includes the 4th water Valve (52) and check-valves (53), wherein
4th water valve (52) connect with the water inlet of the water pump (51), and the water outlet connection of the water pump (51) Check-valves (53).
10. the high-purity wetting system of clinical laboratory according to claim 3, which is characterized in that the clinical laboratory is set with high purity water The standby water level metering device (6) being additionally provided with for showing water level, wherein
The water level metering device (6) is separately positioned on first water tank (2), the second water tank (3) and third water tank (42) Top.
CN201822046152.1U 2018-12-06 2018-12-06 A kind of high-purity wetting system of clinical laboratory Expired - Fee Related CN209259842U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822046152.1U CN209259842U (en) 2018-12-06 2018-12-06 A kind of high-purity wetting system of clinical laboratory

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822046152.1U CN209259842U (en) 2018-12-06 2018-12-06 A kind of high-purity wetting system of clinical laboratory

Publications (1)

Publication Number Publication Date
CN209259842U true CN209259842U (en) 2019-08-16

Family

ID=67562370

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822046152.1U Expired - Fee Related CN209259842U (en) 2018-12-06 2018-12-06 A kind of high-purity wetting system of clinical laboratory

Country Status (1)

Country Link
CN (1) CN209259842U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021083039A1 (en) * 2019-10-29 2021-05-06 北京天地玛珂电液控制系统有限公司 Aqueous medium guarantee system for coal face

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021083039A1 (en) * 2019-10-29 2021-05-06 北京天地玛珂电液控制系统有限公司 Aqueous medium guarantee system for coal face

Similar Documents

Publication Publication Date Title
CN206955727U (en) A kind of preparation facilities of hydrogen rich water
CN101972553B (en) Device for discharging condensed liquid in vacuum state
CN105355835B (en) A kind of multi-buffer continuous vacuum absorption type lithium-ion battery liquid injection device
CN207287159U (en) It is a kind of using receiving the new ultramicro air bubble generating means of micron hydropneumatics
CN209259842U (en) A kind of high-purity wetting system of clinical laboratory
CN206228987U (en) A kind of device being automatically separated for water and organic solvent
CN104591417A (en) Preparation method and preparation equipment of hydrogen-rich water
CN206897200U (en) A kind of novel high density Ozone Water manufacturing machine
CN204447539U (en) With the water purifier of humidification function
CN217377423U (en) Hydrogen liquid cup matched with external hydrogen source
CN209873130U (en) Water electrolysis hydrogen production device with gas pre-purification function
CN109852985B (en) Water electrolysis hydrogen production device with gas pre-purification function
CN207221717U (en) A kind of Liqiud-gas mixing device suitable for soda
CN207978183U (en) Pcb board technique liquid medicine defoaming system
CN202785855U (en) Constant-pressure exhaust water quality stabilizing integral machine
CN211771587U (en) Be applied to hydrogen discharging device of equipment is prepared to sodium hypochlorite
CN211946526U (en) Hydrogen-rich water preparation facilities
CN107540052A (en) A kind of soft brush treatment system containing chlorination equipment
CN210356607U (en) Synthetic acid mist absorption treatment device
CN206843100U (en) A kind of water seal case apparatus produced for ultra-pure water
CN206818590U (en) Acid salt spray test chamber with acid mist treatment device
CN111732178A (en) Hydrogen-rich water generating device and method for generating hydrogen-rich water using same
CN207551975U (en) A kind of high-concentration salt-containing wastewater removal device
CN215674164U (en) Chemical conveying pipeline
CN207391026U (en) Constant pressure supply water dosing unit

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190816

Termination date: 20211206