CN209251337U - Sheepfold warming equipment - Google Patents

Sheepfold warming equipment Download PDF

Info

Publication number
CN209251337U
CN209251337U CN201821630938.1U CN201821630938U CN209251337U CN 209251337 U CN209251337 U CN 209251337U CN 201821630938 U CN201821630938 U CN 201821630938U CN 209251337 U CN209251337 U CN 209251337U
Authority
CN
China
Prior art keywords
sheepfold
hot
air
air outlet
hot wind
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821630938.1U
Other languages
Chinese (zh)
Inventor
孟详人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Institute of Animal Husbandry of Heilongjiang Academy of Agricultural Sciences
Original Assignee
Institute of Animal Husbandry of Heilongjiang Academy of Agricultural Sciences
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Institute of Animal Husbandry of Heilongjiang Academy of Agricultural Sciences filed Critical Institute of Animal Husbandry of Heilongjiang Academy of Agricultural Sciences
Priority to CN201821630938.1U priority Critical patent/CN209251337U/en
Application granted granted Critical
Publication of CN209251337U publication Critical patent/CN209251337U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Drying Of Solid Materials (AREA)

Abstract

The utility model discloses a kind of sheepfold warming equipments, if air-heater and hot dry wind distributor box straight line are connected in series by the equipment by hot blast conveying pipe, one hot wind distributor box of corresponding arrangement above each sheepfold, so that each sheepfold can either maintain the circulation of air, also has the effect of preferable warming, conducive to the growth of sheep;The air inlet and main air outlet of hot wind distributor box participate in being formed the hot wind conveying main road of whole equipment, and wind deflector is used to the hot wind for being passed through cabinet being divided into two parts, a portion continues downward first-level transport with hot wind conveying main road, and another part is then blowed in sheepfold by secondary air outlet, ensure that hot wind distributor box has high hot wind allocative efficiency.

Description

Sheepfold warming equipment
Technical field
The utility model belongs to technical field of livestock husbandry, specifically, being to be related to a kind of sheepfold warming equipment.
Background technique
Sheep farm builds appropriately sized sheep hurdle according to the quantity size of sheep, play keep out wind and rain, the work of warming With.Sheep hurdle includes enclosure wall, ceiling, using enclosure wall as fixed point inside sheep hurdle, crosses multiple sheepfolds, packet in general sheep hurdle using fence The two rows of sheepfolds in left and right are included, there are ventilation windows between ceiling and enclosure wall, to guarantee sheep hurdle inner air flow.Existing this sheep hurdle Interior sheepfold, thermal property is poor, and in cold winter, flock of sheep cannot be enjoyed conducive to the welfare grown.
Utility model content
The purpose of this utility model is that solve the above-mentioned problems and provides a kind of sheepfold warming equipment.
The utility model achieves the above object through the following technical schemes:
A kind of sheepfold warming equipment, it is described including air-heater and several hot wind distributor boxes for being mounted at sheepfold Hot wind distributor box is sequentially connected in series at the hot-blast outlet of the air-heater by hot blast conveying pipe, each hot wind distributor box and described It is connected between air-heater;
The hot wind distributor box includes the cabinet of wind deflector and flat-shaped cube structure;
The cabinet is provided with air inlet, main air outlet and several secondary air outlets, and the air inlet and the master go out The hot blast conveying pipe, the main air outlet and the air inlet are arranged and have been connected respectively in the horizontal direction in air port It is arranged symmetrically in the left and right sides of the cabinet, the pair outlet air mouth down is simultaneously used for blowing hot-air, the air inlet into sheepfold The rear of the secondary air outlet is respectively positioned on the main air outlet;
The wind deflector is the rectangular slab for being fixed on the box house, the side, opposite relative to the cabinet It is tilted in the bottom surface of the cabinet, edge is located at the right of its preceding edge, lower edge and the intracorporal bottom surface of the case thereafter Between there are wind gap, lower inclined plane is towards the air inlet, and ramp is towards the main air outlet;
The cabinet and the hot blast conveying pipe are heat insulation structure body.
As a kind of technical solution of this patent selection, the hot blast conveying pipe is stereoplasm tube.
As a kind of technical solution of this patent selection, the gear housing rigidity is connected with trunnion, and the trunnion opens up useful In the connecting hole being fixedly connected with sheepfold enclosure wall.
As a kind of technical solution of this patent selection, the intracorporal bottom of case is provided with square groove, and the pair goes out Air port opens up in the groove.
As a kind of technical solution of this patent selection, the pair air outlet is strip mouth.
Compared with prior art, the utility model has the following beneficial effects:
If air-heater and hot dry wind distributor box straight line are connected in series by the sheepfold warming equipment by hot blast conveying pipe, each One hot wind distributor box of corresponding arrangement above sheepfold, so that each sheepfold can either maintain the circulation of air, it may have preferable anti- Cold warming effect, conducive to the growth of sheep;The air inlet and main air outlet of hot wind distributor box participate in being formed the hot wind of whole equipment Convey main road, and wind deflector is used to the hot wind for being passed through cabinet being divided into two parts, a portion with hot wind conveying main road after Continue downward first-level transport, and another part is then blowed in sheepfold by secondary air outlet, ensure that hot wind distributor box has high heat Wind allocative efficiency.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of sheepfold warming equipment described in the utility model;
Fig. 2 is the schematic cross-sectional view of A-A in Fig. 3;
Fig. 3 is the main cross section structure diagram of hot wind distributor box described in the utility model;
In above-mentioned attached drawing, the corresponding component names of appended drawing reference are as follows:
1- air-heater, 2- hot wind distributor box, 3- hot blast conveying pipe, 21- cabinet, 22- air inlet, 23- main air outlet, 24- Groove, 25- pair air outlet, 26- wind deflector, 27- trunnion.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawing:
In conjunction with shown in Fig. 1, Fig. 2 and Fig. 3, the utility model includes air-heater 1 and several for being mounted at sheepfold Hot wind distributor box 2, hot wind distributor box 2 are sequentially connected in series at the hot-blast outlet of air-heater 1 by hot blast conveying pipe 3, each hot wind point With being connected between case 2 and air-heater 1;
Hot wind distributor box 2 includes the cabinet 21 of wind deflector 26 and flat-shaped cube structure;
Cabinet 21 is provided with air inlet 21, main air outlet 23 and several secondary air outlets 25, air inlet 21 and main outlet air Hot blast conveying pipe 3, main air outlet 23 and the symmetrical cloth of air inlet 21 are arranged in the horizontal direction and be connected respectively to mouth 23 It sets in the left and right sides of cabinet 21, secondary air outlet 25 is downward and for blowing hot-air, air inlet 21 and main air outlet 23 into sheepfold It is respectively positioned on the rear of secondary air outlet 25;
Wind deflector 26 is the rectangular slab being fixed on inside cabinet 21, relative to the side of cabinet 21, relative to cabinet 21 bottom surface tilts, and edge is located at the right of its preceding edge thereafter, and there are mistakes between the bottom surface in lower edge and cabinet 21 Wind gap, lower inclined plane is towards air inlet 21, and ramp is towards main air outlet 23;
The inclined design of 26 both direction of wind deflector can be improved its hot wind boot efficiency;
Cabinet 21 and hot blast conveying pipe 3 are heat insulation structure body.
As a kind of technical solution of this patent selection, hot blast conveying pipe 3 is stereoplasm tube, long service life.
As a kind of technical solution of this patent selection, the rigid connection of cabinet 21 has trunnion 27, and trunnion 27, which offers, to be used for The connecting hole being fixedly connected with sheepfold enclosure wall can be used bolt and trunnion 27 be fixedly connected on sheepfold enclosure wall.
As a kind of technical solution of this patent selection, the bottom in cabinet 21 is provided with square groove 24, secondary air outlet 25 are provided in groove 24, are conducive to hot wind flow to each secondary air outlet 25.
As a kind of technical solution of this patent selection, secondary air outlet 25 is strip mouth, relative to round hole, processing Convenient, sphere of action is larger.
The working principle of the utility model is as follows:
The equipment uses in sheep hurdle, can be used in the row's sheepfold being arranged in a linear, if there is two rows of sheepfolds in sheep hurdle, Then use two sets of this equipment;
When installing the equipment, air-heater 1 is arranged in the end of row's sheepfold, and hot blast conveying pipe 3 and hot wind distribute Case 2 then arranges that top one hot wind distributor box 2 of corresponding arrangement of each sheepfold consolidates hot wind distributor box 2 along sheepfold platoon leader direction It is scheduled on sheepfold enclosure wall, and the secondary air outlet 25 of hot wind distributor box 2 then downwardly sheepfold;
The hot wind that air-heater 1 is blown out is delivered in each hot wind distributor box 2 by hot blast conveying pipe 3, and from each hot wind The secondary air outlet 25 of distributor box 2 blows in sheepfold, so that sheepfold inner ventilation and warming, each hot wind distributor box 2 is relative to sheepfold It is smaller, so that sheep will not be frightened when blowing in case sheepfold;
The air inlet 21 and main air outlet 23 of hot wind distributor box 2 participate in being formed the hot wind conveying main road of whole equipment, and lead Aerofoil 26 is used to for the hot wind for being passed through cabinet 21 being divided into two parts, and a portion continues with hot wind conveying main road to next stage Conveying, and another part is then blowed in sheepfold by secondary air outlet 25, ensure that the high hot wind allocative efficiency of hot wind distributor box 2.
It is expanded as a kind of structure, it can be by the level inclination (acute angle referred to) of the wind deflector 26 of each hot wind distributor box 2, by heat Wind conveying higher level conveys junior to hot wind and is sequentially increased, so that the heat that the secondary air outlet 25 of each hot wind distributor box 2 is discharged Air quantity comparatively balances.
According to above embodiment, the utility model can be realized well.It is worth noting that being set based on above structure Under the premise of meter, to solve same technical problem, even if made on the utility model it is some without substantive change or Polishing, the essence of used technical solution is still as the utility model, therefore it should also be as the protection in the utility model In range.

Claims (5)

1. a kind of sheepfold warming equipment, it is characterised in that: including air-heater and several hot winds point for being mounted at sheepfold With case, the hot wind distributor box is sequentially connected in series at the hot-blast outlet of the air-heater by hot blast conveying pipe, each hot wind distribution It is connected between case and the air-heater;
The hot wind distributor box includes the cabinet of wind deflector and flat-shaped cube structure;
The cabinet is provided with air inlet, main air outlet and several secondary air outlets, the air inlet and the main air outlet The hot blast conveying pipe is arranged and has been connected respectively in the horizontal direction, and the main air outlet and the air inlet are symmetrical It is arranged in the left and right sides of the cabinet, the pair outlet air mouth down is simultaneously used for blowing hot-air, the air inlet and institute into sheepfold State the rear that main air outlet is respectively positioned on the secondary air outlet;
The wind deflector is the rectangular slab for being fixed on the box house, relative to the side of the cabinet, relative to institute The bottom surface for stating cabinet tilts, and edge is located at the right of its preceding edge thereafter, between lower edge and the intracorporal bottom surface of the case There are wind gap, lower inclined plane is towards the air inlet, and ramp is towards the main air outlet;
The cabinet and the hot blast conveying pipe are heat insulation structure body.
2. sheepfold warming equipment according to claim 1, it is characterised in that: the hot blast conveying pipe is stereoplasm tube.
3. sheepfold warming equipment according to claim 1, it is characterised in that: the gear housing rigidity is connected with trunnion, described Trunnion offers the connecting hole for being fixedly connected with sheepfold enclosure wall.
4. sheepfold warming equipment according to claim 1, it is characterised in that: the intracorporal bottom of case is provided with rectangular recessed Slot, the pair air outlet open up in the groove.
5. sheepfold warming equipment according to claim 4, it is characterised in that: the pair air outlet is strip mouth.
CN201821630938.1U 2018-10-08 2018-10-08 Sheepfold warming equipment Expired - Fee Related CN209251337U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821630938.1U CN209251337U (en) 2018-10-08 2018-10-08 Sheepfold warming equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821630938.1U CN209251337U (en) 2018-10-08 2018-10-08 Sheepfold warming equipment

Publications (1)

Publication Number Publication Date
CN209251337U true CN209251337U (en) 2019-08-16

Family

ID=67553523

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821630938.1U Expired - Fee Related CN209251337U (en) 2018-10-08 2018-10-08 Sheepfold warming equipment

Country Status (1)

Country Link
CN (1) CN209251337U (en)

Similar Documents

Publication Publication Date Title
CN206150092U (en) A integrated environment regulates and control system that is used for beasts and birds to give up different seasons
CN104121648B (en) Dew-point indirect evaporative cooling device and temperature and humidity independent control air conditioning system
Wang et al. Reducing dust deposition and temperature fluctuations in the laying hen houses of Northwest China using a surge chamber
CN104082156B (en) A kind of large-scale Continuous building type cowshed
CN209251337U (en) Sheepfold warming equipment
CN207555870U (en) A kind of poultry house heat recovery ventilator
CN205946840U (en) Animal house
CN104879765B (en) Air and gas system combination layout structure after the six outlet biserials with flue gas waste heat recovery apparatus
CN208940628U (en) Pig house with fermentation bed
CN203985445U (en) A kind of breeding pig house
CN205623723U (en) Improvement formula summer ventilation pig is with breeding house
CN205756304U (en) Modernization solar energy canopy of raising pigs
CN104756877B (en) Jet-flow type peaked end ventilation system for dairy cow house
CN211476502U (en) Titanium plate drying box
CN209089636U (en) A kind of ventilated type cowshed
CN106900565A (en) The temperature regulation structure of animal room
CN207491779U (en) A kind of sheep hurdle snow defence ceiling
CN207589750U (en) Displaced type ventilating system
CN105580738A (en) Air self-purification cowshed
CN206776673U (en) A kind of tealeaves, which withers, adjusts groove and tealeaves to wither adjusting system
CN204466530U (en) A kind of sharp mouth ventilating system for cow house
CN208850424U (en) Novel young bird house
CN111567408A (en) Dog cooling consignment box based on cooling water curtain structure and use method
Ikeguchi et al. Air flow pattern in an enclosed Japanese dairy house with push and pull low profile cross ventilation system
CN209268175U (en) Seedling cultivation greenhouse structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190816

Termination date: 20201008

CF01 Termination of patent right due to non-payment of annual fee