CN209250198U - Double rod is taken shelter from the thunder line bracket - Google Patents

Double rod is taken shelter from the thunder line bracket Download PDF

Info

Publication number
CN209250198U
CN209250198U CN201822278679.7U CN201822278679U CN209250198U CN 209250198 U CN209250198 U CN 209250198U CN 201822278679 U CN201822278679 U CN 201822278679U CN 209250198 U CN209250198 U CN 209250198U
Authority
CN
China
Prior art keywords
earth wire
wire support
support
earth
cement pole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822278679.7U
Other languages
Chinese (zh)
Inventor
唐小亮
叶万余
罗建军
曾穗明
杨芳
宁国标
何海勇
康刚
李鹏
康善斌
黄永锋
宾泼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingyuan Electric Power Planning And Design Institute Co ltd
Guangdong Power Grid Co Ltd
Qingyuan Power Supply Bureau of Guangdong Power Grid Co Ltd
Original Assignee
Qingyuan Electric Power Planning And Design Institute Co ltd
Guangdong Power Grid Co Ltd
Qingyuan Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingyuan Electric Power Planning And Design Institute Co ltd, Guangdong Power Grid Co Ltd, Qingyuan Power Supply Bureau of Guangdong Power Grid Co Ltd filed Critical Qingyuan Electric Power Planning And Design Institute Co ltd
Priority to CN201822278679.7U priority Critical patent/CN209250198U/en
Application granted granted Critical
Publication of CN209250198U publication Critical patent/CN209250198U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model provides a kind of lightning-arrest line bracket of double rod, is related to the technical field of lightning protection.The lightning-arrest line bracket of double rod includes the first earth wire support, the second earth wire support, cross bracing wire, the first lightning conducter and the second lightning conducter;First earth wire support is connected on the first cement pole, and the first lightning conducter is connected to the top of the first earth wire support, and the second earth wire support is connected on the second cement pole, and the second lightning conducter is connected to the top of the second earth wire support;The right end of cross bracing wire is connected on the second earth wire support, and the middle position of cross bracing wire is connected on the first earth wire support, and the exterior angle bracing wire of cross bracing wire left end fixes on the ground.The problem of voltage for solving the distribution line of 10KV is low, and the diameter of cement pole is small, can not fix lightning conducter.The utility model installs lightning conducter using two earth wire supports, and conducting wire is included in 25 ° of protection angular regions by lightning conducter, forms a kind of protection of umbrella dress, can effectively prevent the damage of direct thunder and inductive lightning to distribution line.

Description

Double rod is taken shelter from the thunder line bracket
Technical field
The utility model relates to the technical fields of lightning protection, more particularly, to a kind of lightning-arrest line bracket of double rod.
Background technique
Area, mostly mountainous region in south China, summer, more thunderstorm weathers usually installed lightning conducter for Electrical Safety On electric distribution network overhead wire, as lightning protection facility.Lightning conducter refers to protect equipment, avoids being struck by lightning and that installs draw thunder Enter the conducting wire on ground, also referred to as lightning protection line.Lightning conducter is widely used in building, transformer electric pole, computer room, launcher etc..
It is above-mentioned in the prior art, lightning conducter is installed on utility poles, is mainly pacified on the distribution line of 3.5 ten thousand KV or more Lightning conducter is filled, when installation, lightning conducter is directly installed on the top of cement pole, lightning-arrest to have the function that.And matching for 10KV Electric line, usually not installation lightning conducter, with the rapid industrial development in our country, the connection type multiplicity of distribution line, 10KV Distribution line use when it is more and more dangerous, it is also desirable to lightning conducter is installed.But the voltage of the distribution line due to 10KV Low, the diameter of cement pole is small, causes lightning conducter that can not fix.
Utility model content
It is existing in the prior art to solve the purpose of this utility model is to provide a kind of lightning-arrest line bracket of double rod, The voltage of the distribution line of 10KV is low, and the diameter of cement pole is small, the technical problem that lightning conducter can not be fixed.
A kind of double rod provided by the utility model is taken shelter from the thunder line bracket, including the first earth wire support, the second earth wire support, horizontal drawing Line, the first lightning conducter and the second lightning conducter;
First earth wire support is connected on the first cement pole, and the first lightning conducter is connected to the top of the first earth wire support, the Two earth wire supports are connected on the second cement pole, and the second lightning conducter is connected to the top of the second earth wire support;First earth wire support It is identical as the structure of the second earth wire support;
The right end of cross bracing wire is connected on the second earth wire support, and the middle position of cross bracing wire is connected to the first earth wire support On, the exterior angle bracing wire of cross bracing wire left end fixes on the ground.
Further, the first earth wire support is regular polygon frame body;
It is connected between first earth wire support and the first cement pole by first support anchor ear, the second earth wire support and the second water It is connected between mud bar by second support anchor ear;First support anchor ear is identical as the structure of second support anchor ear.
Further, first support anchor ear includes the first arc frame, the second arc frame and the first connector;
It being enclosed between first arc frame and the second arc frame equipped with limit chamber, limit chamber is interior for accommodating the first cement pole, the One arc frame is connect with the second arc frame by the first connector;
On first arc frame, and/or, the second arc frame is equipped with connecting plate, and connecting plate passes through the second connector and first Earth wire support connection.
Further, the quantity of first support anchor ear is multiple;
The quantity of second support anchor ear is multiple.
Further, the first wiring part is connected on the outside of the upper end of the first earth wire support, the first wiring part is for fixed outer Angle bracing wire.
Further, it is connected with the first U-shaped ring on the inside of the upper end of the first earth wire support, is connected with the first U in the first U-shaped ring Shaped cable clamp, the first U-shaped wire clamp are used to fix the middle position of cross bracing wire.
Further, the second wiring part is connected on the inside of the upper end of the second earth wire support, the second wiring part is for fixed horizontal The right end of bracing wire.
Further, the first earth wire support is L shape frame body;
First earth wire support includes circular connecting frame and connecting rod, and circular connecting frame is socketed in first by third connector On cement pole, the lower end of connecting rod is connected on circular connecting frame.
Further, it is connected with the second U-shaped ring on the inside of the upper end of the second earth wire support, is connected with the 2nd U in the second U-shaped ring Shaped cable clamp, the second U-shaped wire clamp are used to fix the right end of cross bracing wire.
It further, further include cross-arm, one end of cross-arm is equipped with first and falls tripod, and first, which falls tripod, is connected to first Between earth wire support and the first cement pole;
The other end of cross-arm be equipped with second fall tripod, second fall tripod be connected to the second earth wire support and the second cement Between bar.
A kind of double rod provided by the utility model is taken shelter from the thunder line bracket, and the first earth wire support is connected on the first cement pole, with It is fixed using position of first cement pole to the first earth wire support;First lightning conducter is connected to the top of the first earth wire support Position is fixed by position of first earth wire support to the first lightning conducter;Second earth wire support is connected to the second cement pole On, to be fixed using position of second cement pole to the second earth wire support;Second lightning conducter is connected to the second earth wire support Apical position, be fixed by position of second earth wire support to the second lightning conducter;The structure of two earth wire supports is identical, So that the structure of two lightning conducters connection is identical, have the function that while lightning-arrest;The right end of cross bracing wire is connected to the second ground wire branch On frame, the middle position of cross bracing wire is connected on the first earth wire support, to be carried out using cross bracing wire between two earth wire supports It is fixed;The exterior angle bracing wire of the left end of cross bracing wire fixes on the ground, to realize the ground connection of lightning conducter using exterior angle bracing wire, realizes Lightning-arrest effect.
Detailed description of the invention
It, below will be right in order to illustrate more clearly of specific embodiment of the present invention or technical solution in the prior art Specific embodiment or attached drawing needed to be used in the description of the prior art are briefly described, it should be apparent that, it is described below In attached drawing be that some embodiments of the utility model are not paying creativeness for those of ordinary skill in the art Under the premise of labour, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is the schematic view of the front view of the lightning-arrest line bracket of the first double rod provided by the embodiment of the utility model;
Fig. 2 is the cross-sectional view in Fig. 1 along the direction A-A;
Fig. 3 is the cross-sectional view in Fig. 1 along the direction B-B;
Fig. 4 is the portion C enlarged drawing in Fig. 1;
Fig. 5 is the portion D enlarged drawing in Fig. 1;
Fig. 6 is the portion E enlarged drawing in Fig. 1;
Fig. 7 is the top view of the lightning-arrest line bracket of the first double rod provided by the embodiment of the utility model;
Fig. 8 is the schematic view of the front view of the lightning-arrest line bracket of second of double rod provided by the embodiment of the utility model;
Fig. 9 is the cross-sectional view in Fig. 8 along the direction F-F;
Figure 10 is the portion G enlarged drawing in Fig. 8;
Figure 11 is the top view of the lightning-arrest line bracket of second of double rod provided by the embodiment of the utility model;
Figure 12 is the portion H enlarged drawing in Figure 11;
Figure 13 is the portion I enlarged drawing in Figure 11.
Icon: the first earth wire support of 100-;The second earth wire support of 200-;300- cross bracing wire;The first lightning conducter of 400-; The second lightning conducter of 500-;The first cement pole of 600-;The second cement pole of 700-;800- cross-arm;101- first support anchor ear; The first arc frame of 102-;The second arc frame of 103-;The first connector of 104-;105- limit chamber;106- connecting plate;107- Second connector;108- the first wiring part;The U-shaped ring of 109- first;The U-shaped wire clamp of 110- first;111- the second wiring part; 112- circular connecting frame;113- connecting rod;114- third connector;The U-shaped ring of 115- second;The U-shaped wire clamp of 116- second; 201- second support anchor ear;The bracing wire of the exterior angle 301-;801- first fall tripod;802- second fall tripod.
Specific embodiment
The technical solution of the utility model is clearly and completely described below in conjunction with attached drawing, it is clear that described Embodiment is the utility model a part of the embodiment, instead of all the embodiments.Based on the embodiments of the present invention, originally Field those of ordinary skill every other embodiment obtained without making creative work belongs to practical Novel protected range.
It is in the description of the present invention, it should be noted that term " center ", "upper", "lower", "left", "right", " perpendicular Directly ", the orientation or positional relationship of the instructions such as "horizontal", "inner", "outside" is to be based on the orientation or positional relationship shown in the drawings, and is only For ease of description the utility model and simplify description, rather than the device or element of indication or suggestion meaning must have it is specific Orientation, be constructed and operated in a specific orientation, therefore should not be understood as limiting the present invention.In addition, term " the One ", " second ", " third " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " is pacified Dress ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integrally Connection;It can be mechanical connection, be also possible to be electrically connected;Can be directly connected, can also indirectly connected through an intermediary, It can be the connection inside two elements.For the ordinary skill in the art, above-mentioned art can be understood with concrete condition The concrete meaning of language in the present invention.
Fig. 1 is the schematic view of the front view of the lightning-arrest line bracket of the first double rod provided by the embodiment of the utility model.
The line bracket as shown in Figure 1, a kind of double rod provided by the utility model is taken shelter from the thunder, including the first earth wire support 100, second Earth wire support 200, cross bracing wire 300, the first lightning conducter 400 and the second lightning conducter 500;
First earth wire support 100 is connected on the first cement pole 600, and the first lightning conducter 400 is connected to the first earth wire support 100 top, the second earth wire support 200 are connected on the second cement pole 700, and the second lightning conducter 500 is connected to the second ground wire branch The top of frame 200;First earth wire support 100 is identical as the structure of the second earth wire support 200;
The right end of cross bracing wire 300 is connected on the second earth wire support 200, and the middle position of cross bracing wire 300 is connected to first On earth wire support 100, the exterior angle bracing wire 301 of 300 left end of cross bracing wire is fixed on the ground.
In Fig. 1, in one embodiment of the utility model, the first earth wire support 100 is socketed in the first cement pole 600 On, the first lightning conducter 400 is connected to the top of the first earth wire support 100, to complete the fixation to 400 position of the first lightning conducter; Second earth wire support 200 is socketed on the second cement pole 700, and the second lightning conducter 500 is connected to the top of the second earth wire support 200 End, to complete the fixation of 500 position of the second lightning conducter, the structure of two earth wire supports is identical, completes the fixed lightning conducter of double rod Process;Two earth wire supports are fixed using cross bracing wire 300, and are grounded using exterior angle bracing wire 301, it is ensured that two A lightning conducter safety ground.
The structure design of the lightning-arrest line bracket of the utility model is simple, easy to process, facilitates installation, design, construction period It is short;Lightning conducter is supported using two earth wire supports, auxiliary lightning conducter carries out lightning protection operation, can effectively reduce direct lightning strike and sense Damage of the Ying Lei to overhead transmission line.
First earth wire support 100 uses the connection knot of channel steel using the connection structure of angle steel or the first earth wire support 100 Structure keeps the connection structure of the first earth wire support 100 secured.
The structure of second earth wire support 200 is identical as the structure of the first earth wire support 100.
Further, the first earth wire support 100 is regular polygon frame body;
It is connected between first earth wire support 100 and the first cement pole 600 by first support anchor ear 101, the second ground wire branch It is connected between frame 200 and the second cement pole 700 by second support anchor ear 201;First support anchor ear 101 and second support anchor ear 201 structure is identical.
In Fig. 1, the first earth wire support 100 uses the cuboid support body structure being vertically arranged, and the first earth wire support 100 lower end is open type, so that the lower ending opening of the first earth wire support 100 can be along the upper end cap of the first cement pole 600 Enter fixation.
First earth wire support 100 and the first cement pole 600 are connected by first support anchor ear 101, to utilize first support Position of first earth wire support 100 on the first cement pole 600 is fixed in anchor ear 101.
Second earth wire support 200 and the second cement pole 700 are connected by second support anchor ear 201, to utilize second support Position of second earth wire support 200 on the second cement pole 700 is fixed in anchor ear 201.
The position of two earth wire supports is fixed respectively using two bracket anchor ears, makes the connection of two earth wire supports Position is secured.
Fig. 2 is the cross-sectional view in Fig. 1 along the direction A-A;Fig. 3 is the cross-sectional view in Fig. 1 along the direction B-B.
As shown in figures 2-3, further, first support anchor ear 101 includes the first arc frame 102, the second arc frame 103 With the first connector 104;
It is enclosed between first arc frame 102 and the second arc frame 103 equipped with limit chamber 105, for accommodating the in limit chamber 105 One cement pole 600, the first arc frame 102 are connect with the second arc frame 103 by the first connector 104;
On first arc frame 102, and/or, the second arc frame 103 is equipped with connecting plate 106, and connecting plate 106 passes through second Connector 107 is connect with the first earth wire support 100.
In Fig. 2, the first connector 104 uses bolt, and the quantity of the first connector 104 is two.
The upper end of first arc frame 102, the second arc frame 103 upper end by the connection of first connector 104, first The lower end of arc frame 102, the second arc frame 103 lower end by another first connector 104 connect, with utilize two first Connector 104 is respectively fixed the end positions of two arc frames.Limit chamber 105 between two arc frames is for fixing First cement pole 600.
Second connector 107 uses bolt.
In one embodiment of the utility model, connecting plate 106, connecting plate are equipped in the outer peripheral surface of the first arc frame 102 Through-hole is set on 106, and the second connector 107 sequentially passes through the through-hole on connecting plate 106, the through-hole on the first earth wire support 100 It is fixed, fixation is attached between connecting plate 106 and the first earth wire support 100 using the second connector 107.
In the other embodiments of the utility model, multiple connecting plates 106 are set in the outer peripheral surface of the first arc frame 102, Fixation is attached between multiple connecting plates 106 and the first earth wire support 100 using multiple second connectors 107, it is ensured that the The position connected between one arc frame 102 and the first earth wire support 100 is secured.
In the other embodiments of the utility model, multiple connecting plates 106 are set in the outer peripheral surface of the second arc frame 103, Fixation is attached between multiple connecting plates 106 and the first earth wire support 100 using multiple second connectors 107, it is ensured that the The position connected between two arc frames 103 and the first earth wire support 100 is secured.
In the other embodiments of the utility model, multiple connecting plates 106 are set in the outer peripheral surface of the first arc frame 102, Multiple connecting plates 106 are set in the outer peripheral surface of the second arc frame 103, each connecting plate 106 utilizes second connector 107 It is connected on the first earth wire support 100, more multiple directions ensure to connect between the first earth wire support 100 and the first cement pole 600 Position it is secured.
The structure of second support anchor ear 201 is identical as the structure of first support anchor ear 101, to utilize second support anchor ear Fixation is attached between 201 pair of second earth wire support 200 and the second cement pole 700.
Further, the quantity of first support anchor ear 101 is multiple;
The quantity of second support anchor ear 201 is multiple.
In one embodiment of the utility model, three are connected between the first earth wire support 100 and the first cement pole 600 First support anchor ear 101, it may be assumed that pass through first the in the position that 600 top of the first cement pole is connect with the first earth wire support 100 The connection of one bracket anchor ear 101 passes through second in the position that the bottom end of the first earth wire support 100 is connect with the first cement pole 600 First support anchor ear 101 connects, and position between 100 bottom end of 600 top of the first cement pole and the first earth wire support passes through the Three first support anchor ears 101 connect, it is ensured that the position connected between the first earth wire support 100 and the first cement pole 600 is firm; It is connected between second earth wire support 200 and the second cement pole 700 by three second support anchor ears 201, three second supports are embraced The link position of hoop 201 is identical as the link position of three first support anchor ears 101, to ensure the second earth wire support 200 and the The position connected between two cement poles 700 is firm.
Fig. 4 is the portion C enlarged drawing in Fig. 1.
As shown in figure 4, further, it is connected with the first wiring part 108 on the outside of the upper end of the first earth wire support 100, first Wiring part 108 is for fixing exterior angle bracing wire 301.
In Fig. 4, the first wiring part 108 is wedge clamp, and the upper end of wedge clamp is connected by screw bolts in the first ground wire On the outside of the upper end of bracket 100, the upper end of exterior angle bracing wire 301 is connected on wedge clamp using steel clamp.
Fig. 5 is the portion D enlarged drawing in Fig. 1.
As shown in figure 5, it is further, the first U-shaped ring 109, the first U are connected on the inside of the upper end of the first earth wire support 100 The first U-shaped wire clamp 110 is connected in type ring 109, the first U-shaped wire clamp 110 is used to fix the middle position of cross bracing wire 300.
In Fig. 5, the inner end of the first U-shaped ring 109 is connected by screw bolts on the inside of the upper end of the first earth wire support 100, The outboard end of first U-shaped ring 109 is connected by screw bolts the first U-shaped wire clamp 110, and the middle position of cross bracing wire 300 uses steel clamp It is connected in the first U-shaped wire clamp 110.
Fig. 6 is the portion E enlarged drawing in Fig. 1;Fig. 7 is the lightning-arrest line bracket of the first double rod provided by the embodiment of the utility model Top view.
As shown in figs. 6-7, further, it is connected with the second wiring part 111 on the inside of the upper end of the second earth wire support 200, the Two wiring parts 111 are used to fix the right end of cross bracing wire 300.
In Fig. 6, the second wiring part 111 is wedge clamp, and the upper end of wedge clamp is connected by screw bolts in the second ground wire On the inside of the upper end of bracket 200, the right end of cross bracing wire 300 is connected on wedge clamp using steel clamp.
Fig. 8 is the schematic view of the front view of the lightning-arrest line bracket of second of double rod provided by the embodiment of the utility model;Fig. 9 is Along the cross-sectional view in the direction F-F in Fig. 8;Figure 10 is the portion G enlarged drawing in Fig. 8;Figure 11 is provided by the embodiment of the utility model second The top view of the lightning-arrest line bracket of kind double rod;Figure 12 is the portion H enlarged drawing in Figure 11;Figure 13 is the portion I enlarged drawing in Figure 11.
As depicted in figures 8-13, further, the first earth wire support 100 is L shape frame body;
First earth wire support 100 includes circular connecting frame 112 and connecting rod 113, and circular connecting frame 112 is connected by third Part 114 is socketed on the first cement pole 600, and the lower end of connecting rod 113 is connected on circular connecting frame 112.
In one embodiment of the utility model, third connector 114 is bolt, and circular connecting frame 112 is socketed in the It on one cement pole 600, and is connected by screw bolts, fixes the first cement pole 600 using circular connecting frame 112;Under connecting rod 113 End is connected on circular connecting frame 112, and connecting rod 113 is vertically arranged, so that the first cement pole 600 and connecting rod 113 are flat Row setting.The structure of second earth wire support 200 is identical as the structure of the first earth wire support 100.
Further, it is connected with the second U-shaped ring 115 on the inside of the upper end of the second earth wire support 200, connected in the second U-shaped ring 115 It is connected to the second U-shaped wire clamp 116, the second U-shaped wire clamp 116 is used to fix the right end of cross bracing wire 300.
In Figure 13, the right end of the second U-shaped ring 115 is connected by screw bolts on the inside of the upper end of the second earth wire support 200, the Two U-shaped wire clamps 116 are connected in the second U-shaped ring 115, and the right end of cross bracing wire 300 is connected to the second U-shaped wire clamp by steel clamp In 116.
It further, further include cross-arm 800, one end of cross-arm 800 is equipped with first and falls tripod 801, and first falls tripod 801 are connected between the first earth wire support 100 and the first cement pole 600;
The other end of cross-arm 800 be equipped with second fall tripod 802, second fall tripod 802 be connected to the second earth wire support 200 and second between cement pole 700.
In Fig. 1, cross-arm 800 includes that horizon bar and two fall tripod, and tripod is fallen in the left end setting first of cross-arm 800 801, first fall tripod 801 upper end be connected on the first earth wire support 100 by horizon bar left position, first three feet The lower end of frame 801 is connected on the first cement pole 600;Cross-arm 800 right end setting second fall tripod 802, second fall three feet The upper end of frame 802 is connected on the second earth wire support 200 by horizon bar location right, and the second lower end for falling tripod 802 connects It connects on the second cement pole 700.Two fall tripod be located on two cement poles respectively, two shaft tower equipment are included in respectively Within the scope of degree of protection, the structure of a umbrella is formed.
Finally, it should be noted that the above various embodiments is only to illustrate the technical solution of the utility model, rather than it is limited System;Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should Understand: it is still possible to modify the technical solutions described in the foregoing embodiments, or to some or all of Technical characteristic is equivalently replaced;And these are modified or replaceed, it does not separate the essence of the corresponding technical solution, and this is practical new The range of each embodiment technical solution of type.

Claims (10)

  1. The line bracket 1. a kind of double rod is taken shelter from the thunder, which is characterized in that including the first earth wire support (100), the second earth wire support (200), Cross bracing wire (300), the first lightning conducter (400) and the second lightning conducter (500);
    First earth wire support (100) is connected on the first cement pole (600), and first lightning conducter (400) is connected to institute The top of the first earth wire support (100) is stated, second earth wire support (200) is connected on the second cement pole (700), and described Two lightning conducters (500) are connected to the top of second earth wire support (200);First earth wire support (100) and described the The structure of two earth wire supports (200) is identical;
    The right end of the cross bracing wire (300) is connected on second earth wire support (200), the centre of the cross bracing wire (300) Position is connected on first earth wire support (100), and the exterior angle bracing wire (301) of cross bracing wire (300) left end is fixed on ground On face.
  2. The line bracket 2. double rod according to claim 1 is taken shelter from the thunder, which is characterized in that first earth wire support (100) is positive Polygon frame body;
    It is connect between first earth wire support (100) and the first cement pole (600) by first support anchor ear (101), it is described It is connect between second earth wire support (200) and the second cement pole (700) by second support anchor ear (201);The first support Anchor ear (101) is identical as the structure of the second support anchor ear (201).
  3. The line bracket 3. double rod according to claim 2 is taken shelter from the thunder, which is characterized in that the first support anchor ear (101) includes First arc frame (102), the second arc frame (103) and the first connector (104);
    It encloses between first arc frame (102) and second arc frame (103) equipped with limit chamber (105), the limit chamber (105) for accommodating the first cement pole (600) in, first arc frame (102) and second arc frame (103) pass through institute State the first connector (104) connection;
    On first arc frame (102), and/or, second arc frame (103) is equipped with connecting plate (106), the connection Plate (106) is connect by the second connector (107) with the first earth wire support (100).
  4. The line bracket 4. double rod according to claim 2 is taken shelter from the thunder, which is characterized in that the number of the first support anchor ear (101) Amount is multiple;
    The quantity of the second support anchor ear (201) is multiple.
  5. The line bracket 5. double rod according to claim 1 is taken shelter from the thunder, which is characterized in that first earth wire support (100) it is upper End outside is connected with the first wiring part (108), and the first wiring part (108) is for fixing the exterior angle bracing wire (301).
  6. The line bracket 6. double rod according to claim 1 is taken shelter from the thunder, which is characterized in that first earth wire support (100) it is upper End inside is connected with the first U-shaped ring (109), is connected with the first U-shaped wire clamp (110) in the first U-shaped ring (109), and described the One U-shaped wire clamp (110) is used to fix the middle position of the cross bracing wire (300).
  7. The line bracket 7. double rod according to claim 1 is taken shelter from the thunder, which is characterized in that second earth wire support (200) it is upper End inside is connected with the second wiring part (111), and the second wiring part (111) is used to fix the right end of the cross bracing wire (300).
  8. The line bracket 8. double rod according to claim 1 is taken shelter from the thunder, which is characterized in that first earth wire support (100) is L shape Frame body;
    First earth wire support (100) includes circular connecting frame (112) and connecting rod (113), the circular connecting frame (112) It is socketed on the first cement pole (600) by third connector (114), the lower end of the connecting rod (113) is connected to the ring On shape connection frame (112).
  9. The line bracket 9. double rod according to claim 8 is taken shelter from the thunder, which is characterized in that second earth wire support (200) it is upper End inside is connected with the second U-shaped ring (115), is connected with the second U-shaped wire clamp (116) in the second U-shaped ring (115), and described the Two U-shaped wire clamps (116) are used to fix the right end of the cross bracing wire (300).
  10. The line bracket 10. double rod according to claim 1 is taken shelter from the thunder, which is characterized in that further include cross-arm (800), the cross-arm (800) one end be equipped with first fall tripod (801), described first fall tripod (801) be connected to first earth wire support (100) between the first cement pole (600);
    The other end of the cross-arm (800) be equipped with second fall tripod (802), described second fall tripod (802) be connected to institute It states between the second earth wire support (200) and the second cement pole (700).
CN201822278679.7U 2018-12-30 2018-12-30 Double rod is taken shelter from the thunder line bracket Active CN209250198U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822278679.7U CN209250198U (en) 2018-12-30 2018-12-30 Double rod is taken shelter from the thunder line bracket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822278679.7U CN209250198U (en) 2018-12-30 2018-12-30 Double rod is taken shelter from the thunder line bracket

Publications (1)

Publication Number Publication Date
CN209250198U true CN209250198U (en) 2019-08-13

Family

ID=67535759

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822278679.7U Active CN209250198U (en) 2018-12-30 2018-12-30 Double rod is taken shelter from the thunder line bracket

Country Status (1)

Country Link
CN (1) CN209250198U (en)

Similar Documents

Publication Publication Date Title
CN209250198U (en) Double rod is taken shelter from the thunder line bracket
CN108963948A (en) A kind of lightning protection device for super large formed steel construction radar
CN205231675U (en) High tension power line improved generation lightning protection structure system
CN204577640U (en) A kind of high-voltage prepayment switch-box outlet cable jockey
CN205160010U (en) Ground connection system that hinders falls in electric power lightning protection
CN205212183U (en) Lightning rod convenient to installation
CN105305357A (en) High tension power line improved lightning protection structure
CN203406589U (en) Concrete pole grounding lead wire protecting apparatus
CN209250197U (en) Single pole is taken shelter from the thunder line bracket
CN209561637U (en) A kind of earthing or grounding means being easily installed disassembly
CN108386056A (en) A kind of insulation head of 10kV high-tension lines
CN205211610U (en) Static contact gold utensil
CN208015077U (en) A kind of lightning protection device and its system for ancient building
CN208337126U (en) The lightning-arrest line bracket of straight line single pole and electric pole
CN208618911U (en) A kind of insulation head of 10kV high-tension line
CN209250195U (en) Arrester mounting device
CN218347030U (en) Prevent wind partially, prevent high tension overhead transmission line door type shaft tower that waves
CN112167236A (en) Novel snake is driven to shaft tower device
CN111864546A (en) Power transformation framework
CN207194595U (en) A kind of equilateral triangle power distribution equipment framework pattern of composite insulating material
CN211239277U (en) Lightning conductor fixing device
CN213144026U (en) Lightning-proof telegraph pole
CN210867141U (en) Lightning-resistant device of overhead transmission line and tower
CN209402136U (en) Lightning-arrest line bracket
CN204531573U (en) Heat-resistant anticorrosive Telegraph pole guy structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant