CN209248803U - A kind of synthesis behavioural norm training device for nuclear power plant staff - Google Patents
A kind of synthesis behavioural norm training device for nuclear power plant staff Download PDFInfo
- Publication number
- CN209248803U CN209248803U CN201820955952.2U CN201820955952U CN209248803U CN 209248803 U CN209248803 U CN 209248803U CN 201820955952 U CN201820955952 U CN 201820955952U CN 209248803 U CN209248803 U CN 209248803U
- Authority
- CN
- China
- Prior art keywords
- religion
- power plant
- nuclear power
- switch
- alarm
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Alarm Systems (AREA)
Abstract
The utility model relates to nuclear power plant's skills training fields, a kind of synthesis behavioural norm training device for nuclear power plant staff is specifically disclosed, controls the communication cable of computer, the religion control software being mounted in religion control computer including operation platform, religion control computer, attended operation dish platform and religion and for showing the display for teaching control software action pane, Process flow diaphragm.The utility model behavioural norm training device has specific aim for carrying out anti-human-equation error behavioural norm training, personnel suitable for each profession carry out anti-people because of tool operating specification Training in Comprehensive Skills, have filled up the blank of the comprehensive human behavior specification training of carrying out the work in nuclear power plant anti-human-equation error skills training field well.
Description
Technical field
The utility model belongs to nuclear power plant's skills training field, and in particular to a kind of synthesis for nuclear power plant staff
Behavioural norm training device.
Background technique
Nuclear power field personnel accidentally touches, maloperation, goes to the wrong way the faults events such as interval and happens occasionally, and current anti-people is because losing
Accidentally skills training facility is the training facilities of individual event, focuses on and strengthens single anti-people because of the application method of tool, such as palace lattice blanket
It is to be printed in different grid using the device coding for being easy to obscure, student enters into grid according to program step, is mainly used for
Training use/abide by regulation;Three-dimensional exchanges telephone booth, transmits graphical information by communication on telephone, is mainly used for that three-dimensional is trained to hand over
Stream;Meeting Training scene before work, for meeting before dividing role playing to hold work;Electrical matrix is to carry out electrically tearing patching operations open, mainly
For self-test and monitoring training;Electronic building blocks training device is spliced using electronic building blocks, and whether test student can find to scheme in time
Trap in paper and splicing, the attitude that emphasis training is queried.
The above infrastructure function is relatively single, and facility is simple, operating process and response with execute-in-place difference compared with
Greatly, be not suitable for comprehensive training, thus need to research and develop a set of operating process and field device close to again can the anti-people of integrated use because
The device of fault tool.
Summary of the invention
The purpose of this utility model is to provide a kind of synthesis behavioural norm training device for nuclear power plant staff,
Nuclear power plant staff is allowed to form good behavioural habits by way of skills training.
The technical solution of the utility model is as follows:
A kind of synthesis behavioural norm training device for nuclear power plant staff, including communication cable, religion are controlled computer, are shown
Show device, religion control software and operation platform;
The operation platform includes that shell, process demonstration screen, combined aural and visual alarm, digital displaying meter, rotary switch, button are opened
Pass, toggle switch and universal wheel;
The shell is polyhedral structure, and shape is similar to master-control room of nuclear power plant dish platform;Vertical behaviour is equipped on shell
Make disk and inclined-plane operation disk, wherein vertical operation disk is set to the top of inclined-plane operation disk;
Process demonstration screen, combined aural and visual alarm, digital displaying meter and rotary switch are equipped in the vertical operation disk,
The inclined-plane operation disk is equipped with rotary switch, button switch and toggle switch;
The process demonstration screen is liquid crystal display, set on the top of vertical operation disk, is connected and is taught by DVI interface
Computer is controlled, the analog machine flow chart on religion control computer is thrown on process demonstration screen;
The combined aural and visual alarm is made of alarm lamp, alarm and sound equipment;The alarm lamp is set to vertical operation disk
First row on face, below process demonstration screen;The alarm and sound equipment is located in the shell at alarm lamp rear, and outside can not
See;
The digital displaying meter is set to the lower section of combined aural and visual alarm, including flowmeter and pressure gauge, pumps for real-time display
Outlet pressure, flow and fan outlet pressure;Wherein every corresponding 1 piece of pressure gauge of pump and 1 piece of flowmeter, every Fans are corresponding
1 piece of pressure gauge;
The rotary switch has multiple, a part of in vertical operation disk, the lower section of digital displaying meter, another part
In inclined-plane operation disk, the right side of button switch and toggle switch;Rotary switch is twisted when operation to designated position, thus
Realize pump and the opening/stop of blower, the operation of the ON/OFF of valve, the on/off of breaker;
The rotary switch bottom all connects corresponding control route, and signal is uniformly sent to religion control by communication cable
The I/O data acquisition interface module of computer;
There are two the button switches, set on the left side of inclined-plane operation disk, is connected by pressing down on corresponding
Control route, respectively lamp examination and alarming determining button;The corresponding control route of bottom connection of the button switch, by communication electricity
Signal is uniformly sent to the I/O data acquisition interface module of religion control computer by cable;
The toggle switch is set in inclined-plane operation disk, positioned at the lower section of button switch, is broken by stirring up and down
Open or connect the power supply of equipment;
Be equipped with control cabinet below the described inclined-plane operation disk, in control cabinet proper alignment all kinds of rotary switches,
There is corresponding coding on the control route of the facilities such as button switch, digital displaying meter, alarm, each route road, distinguish convenient for searching;
The universal wheel is mounted on the quadrangle of housing bottom, has brake function, for the movement of operation platform and solid
It is fixed;
The communication cable has two, and one is signal transmssion line, the digital serial port and religion control electricity of attended operation dish platform
Brain side serial ports, the data being used for transmission between operation platform and religion control computer;Another is DVI interface line, connection religion control computer
It demonstrates and shields with process, for the flow chart on religion control computer to be launched process demonstration screen in real time;
The religion control computer is a PC machine, for installing religion control software, realizes that religion control platform is believed in real time with operation platform
Number transmitting;
The display is used to show action pane, the Process flow diaphragm of religion control software;
The described religion control software real-time reception and the operation signal for analyzing operation platform, can be on forcibly changing system flow chart
The switch state for all devices for being included, flow value size, pressure value size, the religion control software can also show that student operates
Step, the fault message list of teacher's insertion, positive erroneous judgement information of the every step operation of student etc., and there are warning message column
Table, to realize the long-range control of training.
The digital displaying meter includes 4 pieces of flowmeters and 6 pieces of pressure gauges, for real-time display 4 outlet pressures pumped, stream
Amount and 2 Fans outlet pressures.
The rotary switch one shares 54, wherein 18 be located in vertical operation disk, the lower section of digital displaying meter;Separately
Outer 36 in inclined-plane operation disk, the right side of button switch and toggle switch.
The rotary switch in vertical operation disk, at 2 row, 9 column proper alignment;In inclined-plane operation disk
Rotary switch, at 4 row, 9 column proper alignment.
Whole rotary switches encode with the letter and number layout for being easy to obscure.
When operating when the error occurs, triggering alarm, alarm lamp is glittering, alarm sounding, needs to press " alarming determining " and presses
Button eliminates alarm the tinkle of bells, and after student's operation is correct or after teacher's removing failure, alarm is eliminated, and alarm lamp extinguishes.
The analog machine flow chart by religion control computer is thrown on process demonstration screen, and it is upper real can to demonstrate screen in process
When show water supply, ventilation, electrical three circuits flow chart, the coding one of device coding and rotary switch on flow chart is a pair of
It answers, when student operates one of switch, then the state of the switch in flow charts can occur to change accordingly;It is each in flow chart
The state of item equipment shows that red indicates the starting of valve opened, pumped, the starting of blower, open circuit with two different colors of
The states such as the closure of device, green indicates the states such as the pass of valve, the stoppage in transit of pump, blower stoppage in transit, the disconnection of breaker, convenient with this
Student checks verification operation result.
The alarm lamp one shares 6, is red LED lamp;Alarm has the low alarm of 0LMBA1 water level, 0LMBA1 water level
Height alarm, there are also tetra- false alarms of 9LMBA1,9LMBA2,9LMBA3,9LMBA4, when processing press " alarming determining " button into
Row confirmation: if false alarms, then sound-light alarm can all disappear;Such as there is the low alarm of 0LMBA1 water level, student can beat
0EFXS6 valve is opened, alarm will disappear automatically after 0LMBA1 water level restores normal;If there is the alarm of 0LMBA1 water level height, answer
0EFXS6 valve is closed, the alarm will disappear automatically when cistern water level restores normal.
The religion control computer memory matches 7 operating system of Windows XP or Windows in 2GB or more.
The body height is 215cm, top width 30cm, bottom end width 80cm, and intermediate widest part width is
102cm, vertical operation disk height are 114cm, and inclined-plane operation panel side length is 72cm.
The utility model has the beneficial effects that:
(1) the utility model behavioural norm training device has specific aim.The utility model Behavioral training device is to divide
Analyse what a large amount of personel accidents designed later, physiology and psychic science rule based on ordinary people, from operation platform height, equipment
The various aspects such as code Design, the design of training program used, accident design, equipment response time and state have reproduced nuclear power plant's work
Make the incidental fault inducement of personnel, there is specific aim for carrying out anti-human-equation error behavioural norm training.
(2) the utility model behavioural norm training device, which is applied, has popularity.The utility model Behavioral training device
Training scene can meeting before integrated use to work, in accordance with use regulation, self-test, monitoring, query attitude, it is uncertain when pause, three
The anti-human-equation error tool such as meeting, observation guidance after to exchange, work, and complete operation and technical difficulty is not present, it is suitable for each
The personnel of profession carry out anti-people because of tool operating specification Training in Comprehensive Skills, have wide range of applications.
(3) the utility model behavioural norm training device has originality.The utility model training device is filled up well
The blank of the comprehensive human behavior specification training of carrying out the work in nuclear power plant anti-human-equation error skills training field, at present both at home and abroad also
There is no the training device of said function.
Detailed description of the invention
Fig. 1 is utility model device schematic diagram;
Fig. 2 is the shell side view of operation platform;
Fig. 3 is vertical operation disk layout drawing;
Fig. 4 is that inclined-plane operates disk layout drawing.
In figure: 1. shells;2. process demonstration screen;3. combined aural and visual alarm;4. digital displaying meter;5. rotary switch;6. button is opened
It closes;7. toggle switch;8. universal wheel;9. communication cable;10. religion control computer;11. display;12. religion control software;13. operation panel
Platform.
Specific embodiment
With reference to the accompanying drawing and specific embodiment is described in further detail the utility model.
A kind of synthesis behavioural norm training device for nuclear power plant staff as shown in Figs. 1-2, including communication electricity
Cable 9, religion control computer 10, display 11, religion control software 12 and operation platform 13.
The operation platform 13 includes shell 1, process demonstration screen 2, combined aural and visual alarm 3, digital displaying meter 4, rotary switch
5, button switch 6, toggle switch 7 and universal wheel 8.
The shell 1 is polyhedral structure, and shape is similar to master-control room of nuclear power plant dish platform.It is equipped on shell 1 vertical
It operates disk and inclined-plane operates disk, wherein vertical operation disk is set to the top of inclined-plane operation disk.1 height of shell
For 215cm, top width 30cm, bottom end width 80cm, intermediate widest part width is 102cm, and vertical operation disk height is
114cm, inclined-plane operation panel side length are 72cm.
Process demonstration screen 2, alarm lamp, digital displaying meter 4 and rotary switch 5 are equipped in the vertical operation disk,
Inclined-plane operates disk and is equipped with button switch 6 and toggle switch 7.
The process demonstration screen 2 is connected set on the top of vertical operation disk by DVI interface for liquid crystal display
Religion control computer 10, will religion control computer 10 on analog machine flow chart be thrown to process demonstration screen 2 on, real-time display supply water, ventilation,
The flow chart in electrical three circuits.Wherein, the water supply loop has four column altogether, adds water, column and column to four water tanks respectively
Between by by-pass line be connected, it may be necessary to by open bypass valve give adjacent water tank moisturizing;Furthermore the ventilation circuit
There are two column, electric loop there are two column.The coding of device coding and rotary switch 5 on flow chart corresponds, when student operates
One of switch, then the state of the switch in flow charts can occur to change accordingly, the state of items of equipment in flow chart
Shown with two different colors, red indicate the starting of valve opened, pumped, the starting of blower, breaker the shapes such as closure
State, green indicate the states such as the pass of valve, the stoppage in transit of pump, blower stoppage in transit, the disconnection of breaker, facilitate student to check verifying with this
Operating result.
As shown in figure 3, the combined aural and visual alarm 3 is collectively constituted by alarm lamp, alarm and sound equipment, alarm lamp is installed on
In vertical operation disk, positioned at the lower section first row of process demonstration screen 2, it is red LED lamp that one, which shares 6,;The alarm
Device and sound equipment are located in the shell 1 at alarm lamp rear, external invisible.When operating when the error occurs, triggering alarm, alarm lamp dodges
Bright, alarm sounding needs to press " alarming determining " button and eliminates alarm the tinkle of bells, and after student's operation is correct or teacher removes
After failure, alarm is eliminated, and alarm lamp extinguishes.
Some alarms are implanted in every set program, wherein having the low alarm of 0LMBA1 water level, the alarm of 0LMBA1 water level height, also
Tetra- false alarms of 9LMBA1,9LMBA2,9LMBA3,9LMBA4, when processing, press " alarming determining " button and are confirmed: if
False alarms, then sound-light alarm can all disappear;Such as there is the low alarm of 0LMBA1 water level, student can open 0EFXS6 valve
Door, alarm will disappear automatically after 0LMBA1 water level restores normal;If there is the alarm of 0LMBA1 water level height, should close
0EFXS6, the alarm will disappear automatically when cistern water level restores normal.When student operation when the error occurs, current operation equipment
Display lamp it is glittering, alarm is triggered, alarm by sound equipment amplify, need student find and confirm alarm after report teach
Member, after teacher's confirmation, student completes correctly operation.
As shown in figure 3, the digital displaying meter 4 is set to the lower section of combined aural and visual alarm 3, including 4 pieces of flowmeters and 6 pieces of pressure
Table, outlet pressure, flow and the 2 Fans outlet pressures pumped for real-time display 4, wherein the corresponding 1 piece of pressure gauge of every pump
With 1 piece of flowmeter, the corresponding 1 piece of pressure gauge of every Fans.Current flux table default setting indication range is 0-4000m3/ h, pressure
Table default setting indication range is 0-40bar, is accurate to 2 significant digits, and operating voltage is 24V safe voltage.
The rotary switch 5 shares 54, wherein 18 as shown in figure 3, be located at vertical operation disk on, digital display instrument
The lower section of table 4, at 2 row, 9 column proper alignment;Other 36 as shown in figure 4, be located at inclined-plane operation disk on, button switch 6 and dial
The right side of dynamic switch 7, at 4 row, 9 column proper alignment.Above-mentioned all rotary switches 5 encode with the alphabetical sum number for being easy to obscure
Word layout.Rotary switch 5 is twisted when operation and arrives designated position, to realize the opening/stop of pump and blower, the ON/OFF of valve, open circuit
The on/off of device operates.5 bottom of rotary switch all connects corresponding control route, is passed signal unification by communication cable 9
It send to the I/O data acquisition interface module of religion control computer 10.
There are two the button switches 6, set on the left side of inclined-plane operation disk, is connected by pressing down on corresponding
Control route, respectively lamp examination and " alarming determining " button.The corresponding control route of bottom connection of the button switch 6, by leading to
Signal is uniformly sent to the I/O data acquisition interface module of religion control computer 10 by communication cable 9.
The toggle switch 7 is set in inclined-plane operation disk, positioned at the lower section of button switch 6, by stir up and down come
The power supply of open or closed equipment.
Be equipped with control cabinet below the described inclined-plane operation disk, in control cabinet proper alignment all kinds of rotary switches 5,
The control route of the facilities such as button switch 6, digital displaying meter 4, combined aural and visual alarm 3, there is corresponding coding on each route road, convenient for looking into
Look for discrimination.
The universal wheel 8 is mounted on the quadrangle of 1 bottom of shell, has brake function, the movement for operation platform 13
And fixation.
The communication cable 9 has two, and one is signal transmssion line, the digital serial port of attended operation dish platform 13 and religion control
10 side serial ports of computer, the data being used for transmission between operation platform 13 and religion control computer 10;Another is DVI interface line, connection
Religion control computer 10 and process demonstration screen 2, for the flow chart on religion control computer 10 to be launched process demonstration screen 2 in real time.
The religion control computer 10 is that there are the ordinary PCs of 2GB or more in one, matches Windows XP or Windows
7 operating systems, for installing religion control software 12, so as to the signal that real-time processing operation dish platform 13 passes over, monitoring is simultaneously
Control the equipment state of operation platform 13.
The display 11 is used to show action pane, the Process flow diaphragm of religion control software 12.
The operation signal of religion control 12 real-time reception of software and analysis operation platform, can forcibly changing system flow chart
On included the switch states of all devices, flow value size, pressure value size, which can also show that student grasps
Make step, the fault message list of teacher's insertion, positive erroneous judgement information of the every step operation of student etc., and warning message column occurs
Table, to realize the long-range control of training.
Claims (9)
1. a kind of synthesis behavioural norm training device for nuclear power plant staff, it is characterised in that: including communication cable
(9), religion control computer (10), display (11), religion control software (12) and operation platform (13);
The operation platform (13) includes shell (1), process demonstration screen (2), combined aural and visual alarm (3), digital displaying meter (4), rotation
Button switch (5), button switch (6), toggle switch (7) and universal wheel (8);
The shell (1) is polyhedral structure, and shape is similar to master-control room of nuclear power plant dish platform;It is equipped on shell (1) vertical
It operates disk and inclined-plane operates disk, wherein vertical operation disk is set to the top of inclined-plane operation disk;
Process demonstration screen (2), combined aural and visual alarm (3), digital displaying meter (4) and knob is equipped in the vertical operation disk to open
It closes (5), is equipped with rotary switch (5), button switch (6) and toggle switch (7) in the inclined-plane operation disk;
The process demonstration screen (2) is liquid crystal display, set on the top of vertical operation disk, is connected and is taught by DVI interface
It controls computer (10), the analog machine flow chart in religion control computer (10) is thrown on process demonstration screen (2);
The combined aural and visual alarm (3) is made of alarm lamp, alarm and sound equipment;The alarm lamp is set to vertical operation disk
First row upper, below process demonstration screen (2);The alarm and sound equipment is located in the shell (1) at alarm lamp rear, external
It is invisible;
The digital displaying meter (4) is set to the lower section of combined aural and visual alarm (3), including flowmeter and pressure gauge, is used for real-time display
Outlet pressure, flow and the fan outlet pressure of pump;Wherein every corresponding 1 piece of pressure gauge of pump and 1 piece of flowmeter, every Fans pair
Answer 1 piece of pressure gauge;
The rotary switch (5) has multiple, a part of in vertical operation disk, the lower section of digital displaying meter (4), another portion
It is divided into inclined-plane operation disk, the right side of button switch (6) and toggle switch (7);Rotary switch (5) are twisted when operation to finger
Positioning is set, to realize the opening/stop of pump and blower, the operation of the ON/OFF of valve, the on/off of breaker;
Described rotary switch (5) bottom all connects corresponding control route, and signal is uniformly sent to religion by communication cable (9)
Control the I/O data acquisition interface module of computer (10);
There are two the button switches (6), and set on the left side of inclined-plane operation disk, corresponding control is connected by pressing down on
The examination of route processed, respectively lamp and alarming determining button;The corresponding control route of bottom connection of the button switch (6), by communicating
Signal is uniformly sent to the I/O data acquisition interface module of religion control computer (10) by cable (9);
The toggle switch (7) be set to inclined-plane operation disk on, be located at button switch (6) lower section, by stir up and down come
The power supply of open or closed equipment;
Be equipped with control cabinet below the described inclined-plane operation disk, in control cabinet proper alignment all kinds of rotary switches (5), press
There is corresponding coding on the control route of the facilities such as button switch (6), digital displaying meter (4), alarm, each route road, convenient for searching
It distinguishes;
The universal wheel (8) is mounted on the quadrangle of shell (1) bottom, has brake function, is used for the shifting of operation platform (13)
It is dynamic and fixed;
The communication cable (9) has two, and one is signal transmssion line, the digital serial port and religion control computer of attended operation dish platform
(10) side serial ports, the data being used for transmission between operation platform and religion control computer (10);Another is DVI interface line, connection religion
Computer (10) and process demonstration screen (2) are controlled, for the flow chart in control computer (10) will to be taught to be launched in real time to process demonstration screen (2)
On;
The religion control computer (10) is a PC machine, for installing religion control software (12), realizes that religion control platform and operation platform are real
When signal transmit;
The display (11) is used to show action pane, the Process flow diaphragm of religion control software (12);
The operation signal of religion control software (12) real-time reception and analysis operation platform, can be on forcibly changing system flow chart
The switch state for all devices for being included, flow value size, pressure value size, the religion control software can also show that student operates
Step, the fault message list of teacher's insertion, positive erroneous judgement information of the every step operation of student etc., and there are warning message column
Table, to realize the long-range control of training.
2. a kind of synthesis behavioural norm training device for nuclear power plant staff as described in claim 1, feature exist
In: the digital displaying meter (4) includes 4 pieces of flowmeters and 6 pieces of pressure gauges, for real-time display 4 outlet pressures pumped, flows
And 2 Fans outlet pressure.
3. a kind of synthesis behavioural norm training device for nuclear power plant staff as claimed in claim 2, feature exist
In: the rotary switch (5) one shares 54, wherein 18 be located in vertical operation disk, the lower section of digital displaying meter (4);
Other 36 in inclined-plane operation disk, the right side of button switch (6) and toggle switch (7).
4. a kind of synthesis behavioural norm training device for nuclear power plant staff as claimed in claim 3, feature exist
In: the rotary switch (5) in vertical operation disk, at 2 row, 9 column proper alignment;In inclined-plane operation disk
Rotary switch (5), at 4 row, 9 column proper alignment.
5. a kind of synthesis behavioural norm training device for nuclear power plant staff as claimed in claim 4, feature exist
In: whole rotary switches (5) encode with the letter and number layout for being easy to obscure.
6. a kind of synthesis behavioural norm training device for nuclear power plant staff as claimed in claim 5, feature exist
In: the analog machine flow chart by religion control computer (10) is thrown on process demonstration screen (2), can be demonstrated and be shielded in process
(2) on real-time display supply water, ventilation, electrical three circuits flow chart, device coding and rotary switch (5) on flow chart
Coding corresponds, and when student operates one of switch, then the state of the switch in flow charts can occur to change accordingly;
The state of items of equipment is shown with two different colors of in flow chart, and red indicates the starting opened, pumped of valve, blower
Starting, breaker the states such as closure, green indicate the pass of valve, the stoppage in transit of pump, blower stop transport, the shapes such as the disconnection of breaker
State facilitates student to check verification operation result with this.
7. a kind of synthesis behavioural norm training device for nuclear power plant staff as claimed in claim 6, feature exist
In: the alarm lamp one shares 6, is red LED lamp;Alarm has the low alarm of 0LMBA1 water level, 0LMBA1 water level height report
Alert, there are also tetra- false alarms of 9LMBA1,9LMBA2,9LMBA3,9LMBA4.
8. a kind of synthesis behavioural norm training device for nuclear power plant staff as claimed in claim 7, feature exist
In: there are 2GB or more in the religion control computer (10), match Windows XP or Windows7 operating system.
9. a kind of synthesis behavioural norm training device for nuclear power plant staff as claimed in claim 8, feature exist
In: the shell (1) is highly 215cm, top width 30cm, bottom end width 80cm, and intermediate widest part width is
102cm, vertical operation disk height are 114cm, and inclined-plane operation panel side length is 72cm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820955952.2U CN209248803U (en) | 2018-06-20 | 2018-06-20 | A kind of synthesis behavioural norm training device for nuclear power plant staff |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820955952.2U CN209248803U (en) | 2018-06-20 | 2018-06-20 | A kind of synthesis behavioural norm training device for nuclear power plant staff |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209248803U true CN209248803U (en) | 2019-08-13 |
Family
ID=67516299
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820955952.2U Active CN209248803U (en) | 2018-06-20 | 2018-06-20 | A kind of synthesis behavioural norm training device for nuclear power plant staff |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209248803U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112331012A (en) * | 2020-11-12 | 2021-02-05 | 辽宁红沿河核电有限公司 | Nuclear power station prevents because of error action standard training teaching aid |
CN115880963A (en) * | 2022-11-24 | 2023-03-31 | 中广核核电运营有限公司 | Behavior specification training box, behavior specification detection method, device and storage medium |
-
2018
- 2018-06-20 CN CN201820955952.2U patent/CN209248803U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112331012A (en) * | 2020-11-12 | 2021-02-05 | 辽宁红沿河核电有限公司 | Nuclear power station prevents because of error action standard training teaching aid |
CN115880963A (en) * | 2022-11-24 | 2023-03-31 | 中广核核电运营有限公司 | Behavior specification training box, behavior specification detection method, device and storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204229196U (en) | A kind of Internet of Things practice teaching platform that can be applicable to Smart Home, intelligent grid | |
CN100508091C (en) | Intelligent remote control locking method and apparatus for preventing electric misoperation | |
CN209248803U (en) | A kind of synthesis behavioural norm training device for nuclear power plant staff | |
CN107240340B (en) | Five-prevention operation exercise examination device for power grid transformation system | |
CN106548676A (en) | A kind of Campus Fire rehearsal simulated scenario system based on VR technologies | |
CN103400481B (en) | A kind of detection method for fire control alarm leakage system and system thereof and device | |
CN107369346B (en) | Training device special for five-prevention operation of electric power system | |
CN107918993A (en) | Wisdom Safe Campus big data safe early warning platform | |
CN209417958U (en) | A kind of skills training device based on augmented reality | |
CN109697903A (en) | A kind of substation relay protection safety practical training method based on VR | |
CN206192429U (en) | Electronic type teletransmission diaphragm type gas meter system | |
CN111243358A (en) | Teaching system based on Internet of things | |
CN109378067A (en) | Terminal control method and healthy and safe educational management all-in-one machine | |
CN205318662U (en) | Electrician instructs switching operation examination analogue means in fact | |
CN108108053A (en) | Wisdom interactive terminal applied to campus | |
CN202976570U (en) | Nuclear power station anti human error training device and system | |
CN201315104Y (en) | Simulation training and examination system for unmanned comprehensive automation substation | |
CN208922523U (en) | A kind of nuclear power plant personnel combined training platform | |
CN106406191A (en) | Virtual reality-based 3D computer room management system | |
CN111028568A (en) | VR education equipment | |
CN207037745U (en) | School safety monitoring system based on wireless sensing location technology | |
CN210836470U (en) | Automatic fire alarm simulation system | |
CN109974765A (en) | A kind of intelligent assistant of Auto-Test System use | |
CN204066226U (en) | A kind of portable intelligent building actual training device | |
CN113126759A (en) | Interactive virtual reality system for building teaching |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |