A kind of separable connector rear joint delivery test tooling Download PDFInfo
- Publication number
- CN209247937U CN209247937U CN201822087461.3U CN201822087461U CN209247937U CN 209247937 U CN209247937 U CN 209247937U CN 201822087461 U CN201822087461 U CN 201822087461U CN 209247937 U CN209247937 U CN 209247937U
- Authority
- CN
- China
- Prior art keywords
- connector
- plug
- rear joint
- test
- hydraulic cylinder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
- 238000012360 testing method Methods 0.000 title claims abstract description 96
- 239000004020 conductor Substances 0.000 claims abstract description 5
- 230000002146 bilateral effect Effects 0.000 claims description 10
- 230000006835 compression Effects 0.000 claims description 5
- 238000007906 compression Methods 0.000 claims description 5
- 238000009413 insulation Methods 0.000 claims description 5
- 238000009434 installation Methods 0.000 claims description 2
- 239000007787 solid Substances 0.000 claims 1
- 230000000750 progressive effect Effects 0.000 description 5
- 230000008878 coupling Effects 0.000 description 4
- 238000010168 coupling process Methods 0.000 description 4
- 238000005859 coupling reaction Methods 0.000 description 4
- 230000009471 action Effects 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 238000003780 insertion Methods 0.000 description 3
- 230000037431 insertion Effects 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 238000007689 inspection Methods 0.000 description 2
- 238000007789 sealing Methods 0.000 description 2
- 238000002788 crimping Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000002474 experimental method Methods 0.000 description 1
- 239000000284 extract Substances 0.000 description 1
- 239000012530 fluid Substances 0.000 description 1
- PCHJSUWPFVWCPO-UHFFFAOYSA-N gold Chemical compound [Au] PCHJSUWPFVWCPO-UHFFFAOYSA-N 0.000 description 1
- 239000010931 gold Substances 0.000 description 1
- 229910052737 gold Inorganic materials 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000003032 molecular docking Methods 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 238000011160 research Methods 0.000 description 1
Landscapes
- Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)
Abstract
A kind of separable connector rear joint delivery test tooling, including test bracket, the test bracket is equipped with the left and right rail laid along X axis and the front and rear guide rails laid along Y-axis, L-type end is fixed with by A sliding block on the left and right rail, the L-type end, which will be vertically inserted in outdoor terminal therein and be inserted into connect-disconnect plug therein with level, to be connected, the outdoor terminal is equipped with the outlet fitting connecting with testing equipment conductor electrical, the connecting pin of the connect-disconnect plug is mounted on left and right rail along the x axis, the A sliding block is driven by the A hydraulic cylinder being mounted on test bracket and is moved on left and right rail.When the present apparatus can solve separable connector and carry out delivery test with rear joint, the problem of connection fast and reliable with testing equipment.
Description
Technical field
The utility model relates to a kind of separable connector rear joint delivery test toolings.
Background technique
With urban development planning requirement and the continuous improvement of industrial automatization, it is raw that electric energy is increasingly becoming society now
Major impetus source living is generated, the spatter property and high efficiency of electric power energy bring very big convenience.Due to supply network
The huge, factors such as power supply system is complicated, power supply link is more, power supply distance is long, the use of power cable and cable accessory is also therewith
It is more and more.Wherein demand of the market to separable connector is also increasing, the requirement to its performance and reliability
It is higher and higher, to ensure that separable connector dispatches from the factory the reliability of performance, in delivery test, it is necessary to carry out full inspection, and existing
Research technique, it is basic to be attached it with testing equipment by manual fastening connection piece, therefore in batch delivery test, need
It is frequently dismounted, it is time-consuming and laborious.
Utility model content
The utility model solves the deficiencies in the prior art and provides a kind of pair of separable connector and gone out with rear joint
When factory tests, the separable connector rear joint delivery test tooling with the fast and reliable connection of testing equipment.
To achieve the goals above, the utility model adopts the following technical solution:
A kind of separable connector rear joint delivery test tooling, including test bracket, the test bracket are equipped with
The left and right rail laid along X axis and the front and rear guide rails laid along Y-axis, are fixed with L-type by A sliding block on the left and right rail
End, the L-type end, which will be vertically inserted in outdoor terminal therein and be inserted into connect-disconnect plug therein with level, to be connected, institute
It states outdoor terminal and is equipped with the outlet fitting connecting with testing equipment conductor electrical, the connecting pin of the connect-disconnect plug is along the x axis
It being mounted on left and right rail, the A sliding block is driven by the A hydraulic cylinder being mounted on test bracket and is moved on left and right rail,
End on the test bracket in front and rear guide rails is fixed with D fixed frame, and the fixed left and right that is placed on the D is led
In the expanded range of rail, rear joint to be checked is fixed on the D fixed frame, the rear joint to be checked is T connector, the plug
Head central axis and the rear joint first interface to be checked central axis be arranged, the rear joint to be checked second, third
The central axis of interface is conllinear and consistent with front and rear guide rails installation direction, is provided in the front and rear guide rails for fixing tentative module
B sliding block and C sliding block,
The tentative module includes detecting qualified B plug to stop connector, diameter progressive screw, the first front connector, bilateral head, the
Two front connectors and cored screw, first front connector are fixed on B sliding block, and second front connector is fixed on C sliding block, institute
Stating the first front connector and the second front connector is T connector, on the first interface of first front connector and the second front connector
Inserted with the first insulation plug, the second insulation plug, outside is equipped with the terminal for connecting with the ground wire of testing equipment PD meter,
One end of the bilateral head passes through the diameter progressive screw being arranged in the first front connector and is fixed in the first front connector, and the other end passes through
The cored screw being arranged in the second front connector is fixed in the second front connector, and the bilateral head will be before the first front connector and second
The third interface of the second front connector and the second interface with rear joint to be checked are stretched out in connector connection, the end of the cored screw
Position, inner diameter size it is corresponding, B plug is fixed in the second interface of first front connector and stops connector, B plug only connects
Connector is connect with B hydraulic cylinder, and the second interface side of rear joint to be checked, and the central axis of B hydraulic cylinder is arranged in the B hydraulic cylinder
Conllinear with the central axis of the second interface of rear joint to be checked, the third interface side of rear joint to be checked is equipped with and third interface center
Axis is conllinear and the C hydraulic cylinder that moves toward one another with B hydraulic cylinder, is equipped on the movable end of the C hydraulic cylinder and rear joint to be checked the
The corresponding A plug of three interface position sizes stops connector, and the A, which fills in, is respectively equipped with bullet on the opposite face for stopping connector and cored screw
Property connectedness and connector corresponding with elastic connectedness, pass through A respectively when connect-disconnect plug, the second front connector and A plug stop connector
It is described when hydraulic cylinder, B hydraulic cylinder and C hydraulic cylinder are pressed in first interface, second interface and the third interface of rear joint to be checked
Connect-disconnect plug passes through elastic connectedness and connect with the cored screw of the second front connector, so that connecing before connect-disconnect plug, rear joint to be checked, first
Head is connected to the second front connector.
Using the above structure, by the A hydraulic cylinder that is arranged on the left of test bracket and the B of side before and after test bracket is set
Hydraulic cylinder and C hydraulic cylinder, three push all kinds of tentative modules and product to be checked on connected sliding block to lock by hydraulic power
It is tight to be tightly connected, performance is electrically connected between product to be checked and corresponding tentative module to have the function that quickly to detect, with existing
There is technology to compare, sealed by the pushing tow of hydraulic cylinder, it is no longer necessary to the connection of bolt, therefore test it is very convenient, quick,
It is time saving and energy saving without carrying out cumbersome dismounting.
Further, the elastic connectedness setting stops on connector in A plug, and it includes first embedding that the A plug, which stops connector,
Part, insulating plug stop head, headless screw and the second inserts, and the elasticity connectedness includes spring, tightening screw rod and contact bar fitting,
First inserts is connect with C hydraulic cylinder, and second inserts stops head by insulating plug and is fixedly connected with the first inserts, and described
Tightening screw rod is fixed in two inserts, the tightening screw rod is equipped with inner hole, is successively arranged spiral shell without a head from the inside to surface in the inner hole
Nail, spring and contact bar fitting, the contact bar fitting are stopped by spring and headless screw elastic compression in tightening screw rod inner hole
The end face of mouth.
Further, the bottom of the test bracket is equipped with the universal caster wheel for facilitating test bracket mobile.
Further, the test bracket is equipped with test platform, and the front and rear guide rails and D fixed frame are installed in test
On platform, the test platform is equipped with oil groove, is provided with oil tray below the oil dripping mouth of the flume outlet.
Further, D fixed frame bottom is welded and fixed with test bracket.
Further, the B sliding block, C sliding block and D fixed frame are equipped with card slot, first front connector, the second front connector
It is respectively embedded in rear joint to be checked in the card slot of the B sliding block, C sliding block and D fixed frame.
Due to using said mechanism, the present apparatus by three hydraulic cylinders drive connect-disconnect plugs and tentative module quickly with to
Inspection rear joint corresponding interface is sealed docking, electrically connects to quickly to be formed between testing equipment and rear joint to be checked
It connects, in the installation process entirely tested, it is only necessary to it can reach the purpose being reliably connected by the mechanical force locking of hydraulic cylinder, and
It is time saving and energy saving without carrying out cumbersome dismounting.
In conclusion the present apparatus, which can be realized, carries out delivery test, the test tool to the various components of separable connector
It is versatile.
Detailed description of the invention
Fig. 1 is the main view of the present apparatus.
Fig. 2 is the top view of the present apparatus.
Fig. 3 is that A plug shown in Fig. 2 stops enlarged diagram of the connector at I.
In attached drawing, 1- outdoor terminal, 11- outlet fitting, 2- fastening clip for cable, 3-L type end, 4- hydraulic controller,
5- test bracket, 51- fixed frame, 52- sliding block, 53- hydraulic cylinder, 54- guide rail, 55- oil tray, 56- oil dripping mouth, 57- tentative module,
58- rear joint to be checked, 59-A plug stop connector, 8- universal caster wheel, 6- test platform, 7- connect-disconnect plug, 532-B hydraulic cylinder, 512-B
Fixed frame, 522-B sliding block, 523-C sliding block, 514-D fixed frame, 513-C fixed frame, 533-C hydraulic cylinder, 41- hydraulic control are opened
It closes, 521-A sliding block, 531-A hydraulic cylinder, 511-A fixed frame, 542- front and rear guide rails, 541- left and right rail, 571-B plug only connects
Head, 572- diameter progressive screw, the first front connector of 573-, 574- bilateral head, the second front connector of 575-, 576- cored screw, 577-
One insulation plug, the insulation plug of 578- second, 57- tentative module, the first inserts of 591-, 592- insulating plug stop head, and 593- is without a head
Screw, the second inserts of 594-, 595- spring, 596- tightening screw rod, 597- contact bar fitting.
Specific embodiment
The utility model in order to better understand is made utility model further detailed with reference to the accompanying drawing and embodiment
Describe in detail bright, but the embodiments of the present invention is not limited only to this, and the protection scope of the utility model is also related to art technology
Personnel according to the utility model design it is conceivable that equivalent technologies mean.
As shown in Figure 1-3, a kind of separable connector rear joint delivery test tooling, being used for will be in separable connector
Rear joint and testing equipment carry out fast and reliable connection.Including outdoor terminal 1, fastening clip for cable 2, L-type end 3, hydraulic
Controller 4, test bracket 5, test platform 6, connect-disconnect plug 7, universal caster wheel 8.The outlet of the conductor and outdoor terminal 1 of testing equipment
Fitting 11 is electrically connected, by the vertical plane interface of the tail portion insertion L-type end 3 of outdoor terminal 1, connect-disconnect plug 7 and L-type end
Conductor crimping at 3 horizontal interface is fixed, in order to which the compression aspect of testing equipment is directed to level side by vertical direction
To the more electrical attachment requirements of adequacy test tooling.Test platform 6 is weldingly fixed on 5 top of test bracket.
The test bracket 5 includes fixed frame 51, sliding block 52, hydraulic cylinder 53, guide rail 54, oil tray 55, oil dripping mouth 56, test
Module 57, A plug stop connector 59.Fixed frame 51 includes A fixed frame 511, B fixed frame 512, C fixed frame 513, D fixed frame 514.
Sliding block 52 includes A sliding block 521, B sliding block 522, C sliding block 523.Hydraulic cylinder 53 is hydraulic including A hydraulic cylinder 531, B hydraulic cylinder 532, C
Cylinder 533.Guide rail 54 includes left and right rail 541, front and rear guide rails 542.
By A fixed frame 511 and bolt fastening, B hydraulic cylinder 532 and test bracket 5 are logical for A hydraulic cylinder 531 and test bracket 5
B fixed frame 512 and bolt fastening are crossed, C hydraulic cylinder 533 and test bracket 5 pass through C fixed frame 513 and bolt fastening, A hydraulic cylinder
531 are arranged in the left side of bracket 5, and B hydraulic cylinder 532 and C hydraulic cylinder 533 are separately positioned on 5 front and back side of bracket, and three passes through hydraulic
Power pushes all kinds of tentative modules on institute's connection sliding block 52 connect with product lock sealing to be checked, with reach it is quick detect to
Examine the effect that performance is electrically connected between product and corresponding tentative module, the hydraulic coupling inside hydraulic cylinder, both from same
The active force that a hydraulic pump is transmitted, when ensuring to test, the contact surface of each interface of product to be checked keeps relative constant, impartial
Pressure is locked, the balance of applied external force is maintained.
The tentative module 57 include B plug stop connector 571, diameter progressive screw 572, the first front connector 573, bilateral head 574,
Second front connector 575, cored screw 576, the first front connector 573 and one end of bilateral head 574 are tight by 572 screw thread of diameter progressive screw
Gu the second front connector 575 passes through 576 screw threads for fastening of cored screw with 574 other end of bilateral head.It is sliding that tentative module 57 is placed on B
In block 522,523 card slot of C sliding block, then rear joint 58 to be checked is placed in 514 card slot of D fixed frame, with B hydraulic cylinder 532
After piston rod thread fastening, the delivery test for rear joint.
By B sliding block 522, C sliding block 523, D fixed frame 514 card slot in different tentative modules is installed, it can be achieved that right
The various components of separable connector carry out delivery test, the test tool it is versatile.
The universal caster wheel 8 is mounted on 5 bottom of test bracket, in order to fast move test according to practice examining demand
Tooling.
The oil tray 55 is placed on the lower section of test platform 6, collects test in the process by the drop at 5 top of test bracket
Hydraulic fluid port 56, the insulating oil squeezed out due to locking from separable connector contact surface.
521 lower end surface of A sliding block, is mounted on the top of the left and right rail 541 of test bracket 5, and with A hydraulic cylinder 531
Piston rod be fastened by bolts.A hydraulic cylinder 531 and test bracket 5 pass through A fixed frame 511 and bolt fastening.On A sliding block 521
End face and L-type end 3 pass through fastening clip for cable 2 and bolt fastening.Under the action of the hydraulic coupling that hydraulic controller 4 transmits,
A sliding block 521, L-type end 3, outdoor terminal 1, connect-disconnect plug 7 is pushed to move on the left and right rail 541 of test bracket 5.
522 lower end surface of B sliding block, is mounted on the top of 5 front and rear guide rails 542 of test bracket.B sliding block 522 and test mould
The bottom of block is embedded in by card slot and is connected, and by B fixed frame 512 and bolt fastening, B is hydraulic for B hydraulic cylinder 532 and test bracket 5
The piston rod of cylinder 532 is connected through a screw thread with tentative module tail portion, the hydraulic coupling of the hydraulic controller transmitting on experiment porch 6
Under the action of, B hydraulic cylinder 532 then drives B sliding block 522 in the front and rear guide rails of test bracket 5 by pushing tentative module mobile
It is moved on 542.
The lower end surface of the C sliding block 523 is mounted on the middle part of the front and rear guide rails 542 of test bracket 5.C sliding block 523 and examination
The bottom for testing module is embedded in by card slot to be connected, and B hydraulic cylinder 532 then drives C sliding block 523 by pushing tentative module mobile
It is moved in front and rear guide rails 542.
The A plug stops connector 59 and stops first 592, headless screw 593, the second inserts including the first inserts 591, insulating plug
594, spring 595, tightening screw rod 596, contact bar fitting 597, the second inserts 594 are threadably secured with tightening screw rod 596, connect
Feeler lever fitting 597 is by spring 595 and 593 elastic compression of headless screw in the end face of 596 inner hole seam allowance of tightening screw rod.Insulating plug
Only head 592 and the first inserts 591, the second inserts 594 use integrated poured molding.
With test bracket 5 by C fixed frame 513 and bolt fastening, C hydraulic cylinder 533 and A plug only connects the C hydraulic cylinder 533
Connector 59 is by 591 screw threads for fastening of the first inserts, under the action of the hydraulic coupling that hydraulic controller 6 transmits, pushes contact bar gold
Tool 597 is moved forward and backward on test bracket 5.
514 bottom of D fixed frame is welded and fixed with test bracket 5, to prevent during frequent test, because hydraulic
The multiple promotion of cylinder 53, D fixed frame 514 generate minor shifts, and cause the interface of each tentative module and product to be checked cannot essence
True butt-joint locking sealing, influences test result.
When test, 532 head piston bar of B hydraulic cylinder is stopped into connector 571 with B plug and is connected through a screw thread, the first front connector
573 bottoms are embedded in the card slot of B sliding block 522, and 575 bottom of the second front connector is embedded in the card slot of C sliding block 523, are followed by be checked
In the card slot of first 58 insertion D fixed frame 514.
Before test, by manipulating hydraulic control switch 41, control A hydraulic cylinder 531 pushes L-type end 3 to be followed by with to be checked
First 58 first interface butt-joint locking, central axis and the A plug of 7 head bore of connect-disconnect plug stop the central axis of connector 59.Control B
Hydraulic cylinder 532 pushes the second interface butt-joint locking of the second front connector 575 with rear joint 58 to be checked, the insertion of cored screw 576 to
It examines in 58 inner hole of rear joint.Control C hydraulic cylinder 533 pushes A plug to stop connector 59 and docks with the third interface of rear joint 58 to be checked
Locking, tightening screw rod 596 are contacted with connect-disconnect plug 7, and contact bar fitting 597 connects under spring compression force effect with cored screw 576
Touching, and experimental facilities PD meter is connect with the terminal of the first front connector (573) and the second front connector (575) outside, so that
Electrical connection is formed between experimental facilities and tentative module 57, rear joint to be checked 58.
After the test, by manipulating hydraulic control switch 41, it is hydraulic that A hydraulic cylinder 531, B hydraulic cylinder 532, C are controlled respectively
Cylinder 533 extracts the component respectively connected out from the interface of rear joint 58 to be checked, i.e., another interchangeable product to be checked is tried
It tests.
In addition, it should be noted that, this patent is not limited to above embodiment, as long as its part does not specify specific size
Or shape, then the part can be any size or shape adaptable with its structure, no matter and making in its material composition
Any variation, it is all to be designed using structure provided by the utility model, all it is a kind of deformation of the utility model, is considered as
Within scope of protection of the utility model.
Claims (6)
1. a kind of separable connector rear joint delivery test tooling, including test bracket (5), it is characterised in that: the examination
Bracket (5) are tested equipped with the left and right rail (541) laid along X axis and the front and rear guide rails (542) laid along Y-axis, the left side
It is fixed with L-type end (3) on right guide rail (541) by A sliding block (521), the L-type end (3) will be vertically inserted in it
In outdoor terminal (1) and level be inserted into connect-disconnect plug therein (7) connection, the outdoor terminal (1) be equipped with set with test
The outlet fitting (11) of standby conductor electrical connection, the connecting pin of the connect-disconnect plug (7) is mounted on left and right rail along the x axis
(541) on, the A sliding block (521) is driven by the A hydraulic cylinder (531) being mounted on test bracket (5) in left and right rail
(541) it is moved on,
It is fixed with D fixed frame (514) on the test bracket (5) in the end of front and rear guide rails (542), and the D fixed frame
(514) it is placed in the expanded range of left and right rail (541), is fixed with rear joint to be checked (58), institute on the D fixed frame (514)
Stating rear joint to be checked (58) is T connector, the central axis of the connect-disconnect plug (7) and rear joint (58) first interface to be checked
Central axis setting, the central axis of second, third interface of the rear joint (58) to be checked it is conllinear and with front and rear guide rails (542)
Installation direction is consistent, and B sliding block (522) and C sliding block for fixing tentative module (57) are provided on the front and rear guide rails (542)
(523),
The tentative module (57) includes detecting qualified B plug to stop connector (571), the first front connector (573), bilateral head
(574), the second front connector (575) and cored screw (576), first front connector (573) are fixed on B sliding block (522), institute
It states the second front connector (575) to be fixed on C sliding block (523), first front connector (573) and the second front connector (575) are T
Respectively inserted with the first insulation plug on the first interface of type joint, first front connector (573) and the second front connector (575)
(577) it insulate plug (578) with second, and is all provided with useful and examination outside the first front connector (573) and the second front connector (575)
The terminal of the ground wire connection of equipment PD meter is tested, one end of the bilateral head (574) is fixed on the third of the first front connector (573)
In interface, the other end is fixed in the second interface of the second front connector (575), and the bilateral head (574) is by the first front connector
(573) it is connect with the second front connector (575), the cored screw (576) is arranged in the third interface of the second front connector (575)
And the central axis of cored screw (576) is conllinear with the central axis of second interface of rear joint to be checked (58), connects before described first
It is fixed with B plug in the second interface of head (573) and stops connector (571), the B plug stops connector (571) and B hydraulic cylinder (532)
Connection, the B hydraulic cylinder (532) are arranged in the second interface side of rear joint to be checked (58), and the third of rear joint (58) to be checked connects
Mouth side is equipped with the C hydraulic cylinder (533) moved toward one another with B hydraulic cylinder (532), is equipped on the movable end of the C hydraulic cylinder (533)
A plug stops connector (59), and the A plug, which stops, is respectively equipped with elastic be connected on connector (59) and the opposite face of cored screw (576)
Part and the connector conllinear with elastic connectedness central axis, when connect-disconnect plug (7), the second front connector (575) and A plug stop connector
(59) rear joint to be checked (58) is pressed on by A hydraulic cylinder (531), B hydraulic cylinder (532) and C hydraulic cylinder (533) promotion respectively
When in first interface, second interface and third interface, the connect-disconnect plug (7) passes through elastic connectedness and the second front connector (575)
Cored screw (576) connection.
2. separable connector according to claim 1 rear joint delivery test tooling, it is characterised in that: the elasticity
Connectedness is arranged to be stopped on connector (59) in A plug, and the A plug stops connector (59) and stops head including the first inserts (591), insulating plug
(592), headless screw (593) and the second inserts (594), the elasticity connectedness includes spring (595), tightening screw rod (596)
With contact bar fitting (597), first inserts (591) connect with C hydraulic cylinder (533), and second inserts (594) passes through exhausted
Edge plug stops head (592) and is fixedly connected with the first inserts (591), is fixed with tightening screw rod (596) in second inserts (594),
The tightening screw rod (596) is equipped with inner hole, be successively arranged in the inner hole from the inside to surface headless screw (593), spring (595) and
It contacts bar fitting (597), the contact bar fitting (597) is by spring (595) and headless screw (593) elastic compression in tightening
The end face of screw rod (596) inner hole seam allowance.
3. separable connector according to claim 1 rear joint delivery test tooling, it is characterised in that: the test
The bottom of bracket (5) is equipped with the universal caster wheel (8) for facilitating test bracket (5) mobile.
4. separable connector according to claim 1 rear joint delivery test tooling, it is characterised in that: the test
Bracket (5) is equipped with test platform (6), and the front and rear guide rails (542) and D fixed frame (514) are installed in test platform (6)
On, the test platform (6) is equipped with oil groove, is provided with oil tray (55) below the oil dripping mouth (56) of the flume outlet.
5. separable connector according to claim 1 rear joint delivery test tooling, it is characterised in that: the D is solid
Determine frame (514) bottom to be welded and fixed with test bracket (5).
6. separable connector according to one of claims 1 to 5 rear joint delivery test tooling, it is characterised in that:
The B sliding block (522), C sliding block (523) and D fixed frame (514) are equipped with card slot, before first front connector (573), second
Connector (575) and rear joint to be checked (58) are respectively embedded in the B sliding block (522), C sliding block (523) and D fixed frame (514)
In card slot.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822087461.3U CN209247937U (en) | 2018-12-12 | 2018-12-12 | A kind of separable connector rear joint delivery test tooling |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822087461.3U CN209247937U (en) | 2018-12-12 | 2018-12-12 | A kind of separable connector rear joint delivery test tooling |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209247937U true CN209247937U (en) | 2019-08-13 |
Family
ID=67532653
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822087461.3U Withdrawn - After Issue CN209247937U (en) | 2018-12-12 | 2018-12-12 | A kind of separable connector rear joint delivery test tooling |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209247937U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109358265A (en) * | 2018-12-12 | 2019-02-19 | 长缆电工科技股份有限公司 | A kind of separable connector rear joint delivery test tooling |
-
2018
- 2018-12-12 CN CN201822087461.3U patent/CN209247937U/en not_active Withdrawn - After Issue
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109358265A (en) * | 2018-12-12 | 2019-02-19 | 长缆电工科技股份有限公司 | A kind of separable connector rear joint delivery test tooling |
CN109358265B (en) * | 2018-12-12 | 2023-10-24 | 长缆电工科技股份有限公司 | Post-joint delivery test tool for separable connector |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101650413B (en) | Automatic positioning rapid wiring device for power meter | |
CN103777120B (en) | A kind of on-line automatic insulation pressure-resistant test system | |
CN209247937U (en) | A kind of separable connector rear joint delivery test tooling | |
CN109093053A (en) | Riveting device with detection function | |
CN209327491U (en) | A kind of separable connector front connector delivery test tooling | |
CN209327490U (en) | A kind of separable connector bilateral head delivery test tooling | |
CN107356789B (en) | Solar module test fixture | |
CN201170753Y (en) | On-line detection bench for automobile door and lock | |
CN109375045A (en) | A kind of separable connector front connector delivery test tooling | |
CN209247938U (en) | A kind of separable connector delivery test tooling | |
CN204347066U (en) | The general switching device of a kind of cable pass plug | |
CN109358265A (en) | A kind of separable connector rear joint delivery test tooling | |
CN205880103U (en) | Cable subassembly comprehensive testing device | |
CN202916363U (en) | Photovoltaic conjunction box test equipment matching testboard | |
CN220154478U (en) | Automobile wire harness detection clamp | |
CN108776243A (en) | The electric energy meter mounting base of electric energy meter calibrating apparatus | |
CN109613385A (en) | A kind of separable connector bilateral head delivery test tooling | |
CN208860876U (en) | A kind of middle conversion adapter device of USB port detection device | |
CN206009266U (en) | Temperature sensor plug is into set detecting device | |
CN103486950A (en) | Die for inspecting screw holecoaxiality of crimping semi-finished hardware fittings | |
CN101358944B (en) | Detection device for inlay pieces | |
CN216177422U (en) | Round head aviation plug welding tool capable of returning quickly | |
CN104569695A (en) | Rotating disc type extension socket testing device | |
CN210893632U (en) | Auxiliary joint device of switch mechanical characteristic tester | |
CN203433002U (en) | Replaceable conduction test connecting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20190813 Effective date of abandoning: 20231024 |
|
AV01 | Patent right actively abandoned |
Granted publication date: 20190813 Effective date of abandoning: 20231024 |
|
AV01 | Patent right actively abandoned | ||
AV01 | Patent right actively abandoned |