Prior art keywords
supporting
diagonal brace
support
jack
bracket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920362187.8U
Other languages
Chinese (zh)
Inventor
付中华
景晨曦
张建丽
霍俞江
崔国宏
张贵文
程志红
申建伟
李斌胜
胡俊峰
李江文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changzhi Shanxi Province Is Through Mill Coal Industry Co Ltd
Original Assignee
Changzhi Shanxi Province Is Through Mill Coal Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changzhi Shanxi Province Is Through Mill Coal Industry Co Ltd filed Critical Changzhi Shanxi Province Is Through Mill Coal Industry Co Ltd
Priority to CN201920362187.8U priority Critical patent/CN209244592U/en
Application granted granted Critical
Publication of CN209244592U publication Critical patent/CN209244592U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model provides a kind of active advanced temporary shoring bracket of underworkings, connecting rod and crossbeam including two supporting units disposed in parallel and the connection supporting unit;Wherein, each supporting unit includes: supporting leg, support jack, mandril, cone, stringer, diagonal brace jack, handlebar stem, control valve, hydraulic tube, castor and diagonal brace.The support system of the utility model is made of supporting beam, supporting leg and diagonal brace, and supporting beam is divided into longitudinal and cross beam;Diagonal brace is to further increase support stability;Castor is set below supporting leg, and convenient for the carrying of bracket, castor is fixed using bolt, when bracket carries out supporting, is removed bolt, can be folded up castor.

Description

A kind of active advanced temporary shoring bracket of underworkings
Technical field
The utility model belongs to a kind of temporary shoring bracket, and in particular to a kind of active advanced gib of underworkings Bracket.
Background technique
The gib of coal mine underground tunneling roadway advance support mostly uses greatly hanging-ring type front canopy support or point pillar to face When supporting, both gibs are all difficult to provide active support power to back, and supporting effect is bad.And exists and carry The problems such as inconvenience, working efficiency is low.
Summary of the invention
It is simple and convenient to operate to solve the above problems, the utility model provides a kind of structure, practical safety and work can be provided Make the active advanced temporary shoring bracket of underworkings of efficiency.
In order to achieve the above objectives, the technical solution adopted in the utility model:
A kind of active advanced temporary shoring bracket of underworkings, including two supporting units disposed in parallel and connection The connecting rod and crossbeam of the supporting unit;
Wherein, each supporting unit includes: that supporting leg, support jack, mandril, cone, stringer, diagonal brace are very heavy Top, handlebar stem, control valve, hydraulic tube, castor and diagonal brace;
In the supporting unit: the bottom claw of the fixed support jack in the upper end of the supporting leg, the support The top bracket of jack is connect with the lower end of the mandril, the fixed cone in the upper end of the mandril, on the mandril The mandril is connect by stringer described in vertical articulation, the diagonal brace jack with the lower part of the stringer;
The support midleg vertically fixes the handlebar stem, and the handlebar stem direction and stringer direction phase Instead, the control valve is fixed on the handlebar stem, the control valve passes through the hydraulic tube and the support jack or described The connection of diagonal brace jack gas circuit;
The fixed castor in the lower end of the supporting leg, the diagonal brace hingedly with the lower end of supporting leg, and are located at described Castor side.
Further, two connecting rod connections that the supporting leg of two supporting units passes through right-angled intersection.
Further, the stringer of described two supporting units passes through two crossbeam connections.
Further, inclined connecting rod is equipped between the supporting leg and the handlebar stem, the connecting rod is located at institute State the lower section of handlebar stem.
Further, the supporting leg is hollow pipe, and the castor includes the wheel carrier of wheel and the fixed wheel, the wheel Frame is fixed in the lower end of the hollow pipe by bolt.
Compared with prior art the utility model has the beneficial effects that:
1, the utility model structure is simple and convenient to operate;
2, the utility model provides power using external poured hydraulic pipeline feed flow, and bracket is mainly by dynamical system and support System is constituted, and dynamical system is mainly made of four hydraulic jacks, and two one group is controlled by a control valve;Diagonal brace jack control The lifting of supporting beam processed, makes supporting beam be close to back, and support jack controls the lifting of supporting leg, makes supporting leg upper and lower side Cone be tightly inserted into the roof and floor of tunnel, anti-sliding stop;
3, the support system of the utility model is made of supporting beam, supporting leg and diagonal brace, and supporting beam is divided into stringer and cross Beam;Diagonal brace is to further increase support stability;Castor is set below supporting leg, and convenient for the carrying of bracket, castor is adopted It is fixed with bolt, when bracket carries out supporting, removes bolt, castor can be folded up.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model.
Specific embodiment
As shown in Figure 1, a kind of active advanced temporary shoring bracket of underworkings, including two supporting lists disposed in parallel The connecting rod 2 and crossbeam 3 of member 1 and the connection supporting unit 1.
The supporting unit 1 includes the first supporting unit and the second supporting unit.
Wherein, each supporting unit 1 include: supporting leg 4, support jack 5, mandril 6, cone 7, stringer 8, tiltedly Support jack 9, handlebar stem 10, control valve 11, hydraulic tube 12, castor 13, diagonal brace 14 and connecting rod 15.
Handle 10 includes handle 101 and handle 102, and control valve 11 includes control valve 111 and control valve 112, hydraulic tube 12 Including hydraulic tube 121 and hydraulic tube 122.
Jack, which refers to, uses rigid top lift part as equipment, by the small stroke of top bracket or bottom claw Open the light and small lifting equipment of weight.
In the supporting unit 1: the bottom claw of the fixed support jack 5 in the upper end of the supporting leg 4, the branch The top bracket of support jack 5 is connect with the lower end of the mandril 6, the fixed cone 7 in the upper end of the mandril 6, described The mandril 6 is connect by stringer 8 described in vertical articulation on mandril 6, the diagonal brace jack 9 with the lower part of the stringer 8.
The handlebar stem 10, and 10 direction of the handlebar stem and 8 side of stringer are vertically fixed in the middle part of the supporting leg 4 To on the contrary, fixing the control valve 11 on the handlebar stem 10, the control valve 11 passes through the hydraulic tube 12 and the support Jack 5 or 9 gas circuit of diagonal brace jack connection.
It is very heavy by hydraulic tube 121 and the support that the control valve 111 is fixed on the handlebar stem 101 of first supporting unit Push up the connection of 5 gas circuits;The control valve 112 is fixed on the handlebar stem 102 of second supporting unit passes through hydraulic tube 122 and the diagonal brace The connection of 9 gas circuit of jack controls the flexible of 9 jack of support jack 5 and diagonal brace jack by different control valves, tiltedly The support rise of jack 9 keeps stringer 8 parallel with back, and support jack 5 rises, and mandril 6 rises with it cone 7 and tightly inserts Enter in the roof and floor of tunnel.
The fixed castor 13 in the lower end of the supporting leg 4, the hingedly lower end with supporting leg 4, and position of diagonal brace 14 In 13 side of castor.
The supporting leg 4 of two supporting units 1 is connected by two connecting rods 2 of right-angled intersection.
The stringer 8 of described two supporting units 1 is connected by two crossbeams 3.
Inclined connecting rod 15 is equipped between the supporting leg 4 and the handlebar stem 10, the connecting rod is located at described The lower section of hand lever 10.
The supporting leg 4 is hollow pipe, and the castor 13 includes the wheel carrier of wheel and the fixed wheel, and the wheel carrier passes through Bolt is fixed in the lower end of the hollow pipe, and the lower end of the wheel carrier is equipped with U-type groove, and the wheel passes through the rotatable fixation of wheel shaft In in U-type groove, the upper end of wheel carrier offers pin hole, and the lower end of hollow pipe also offers pin hole, and bolt will across pin hole The upper end of wheel carrier is fixed in hollow pipe.
In use, 1, after the completion of tunnelling, girder steel and metal mesh are placed in bracket according to bolt interval in advance and indulged On beam and crossbeam, and it is fixed temporarily using thin wire, the external feed liquid pipeline of bracket;
2, it places a stent into below the sky top of tunnel, personnel stand below permanent support, remove bolt, castor is folded Come;
3, control valve is opened, the rise of diagonal brace jack keeps stringer parallel with back;
4, control valve is opened, support jack rises, and cone is tightly inserted into the roof and floor of tunnel, diagonal brace is put down, By bracket fixation;
5, carry out setting for anchor pole and anchor cable, after the completion of anchor shaft anchor cable is set, close control valve, remove bracket carry out it is next Circulation.

Claims (5)

1. a kind of active advanced temporary shoring bracket of underworkings, which is characterized in that including two supporting lists disposed in parallel The connecting rod and crossbeam of member and the connection supporting unit;
Wherein, each supporting unit include: supporting leg, support jack, mandril, cone, stringer, diagonal brace jack, Handlebar stem, control valve, hydraulic tube, castor and diagonal brace;
In the supporting unit: the bottom claw of the fixed support jack in the upper end of the supporting leg, the support are very heavy The top bracket on top is connect with the lower end of the mandril, the fixed cone in the upper end of the mandril, vertical on the mandril The mandril is connect by the hinged stringer, the diagonal brace jack with the lower part of the stringer;
The support midleg vertically fixes the handlebar stem, and the handlebar stem direction is contrary with the stringer, institute It states and fixes the control valve on handlebar stem, the control valve passes through the hydraulic tube and the support jack or the diagonal brace thousand The connection of jin top gas road;
The fixed castor in the lower end of the supporting leg, the diagonal brace hingedly with the lower end of supporting leg, and are located at the activity Take turns side.
2. the active advanced temporary shoring bracket of a kind of underworkings according to claim 1, which is characterized in that two branch The supporting leg for protecting unit passes through two connecting rod connections of right-angled intersection.
3. the active advanced temporary shoring bracket of a kind of underworkings according to claim 2, which is characterized in that described two The stringer of a supporting unit passes through two crossbeam connections.
4. the active advanced temporary shoring bracket of a kind of underworkings according to claim 1, which is characterized in that the branch Inclined connecting rod is equipped between support leg and the handlebar stem, the connecting rod is located at the lower section of the handlebar stem.
5. the active advanced temporary shoring bracket of a kind of underworkings according to claim 1, which is characterized in that the branch Support leg is hollow pipe, and the castor includes the wheel carrier of wheel and the fixed wheel, and the wheel carrier is fixed on the sky by bolt In the lower end of heart pipe.
CN201920362187.8U 2019-03-20 2019-03-20 A kind of active advanced temporary shoring bracket of underworkings Expired - Fee Related CN209244592U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920362187.8U CN209244592U (en) 2019-03-20 2019-03-20 A kind of active advanced temporary shoring bracket of underworkings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920362187.8U CN209244592U (en) 2019-03-20 2019-03-20 A kind of active advanced temporary shoring bracket of underworkings

Publications (1)

Publication Number Publication Date
CN209244592U true CN209244592U (en) 2019-08-13

Family

ID=67537454

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920362187.8U Expired - Fee Related CN209244592U (en) 2019-03-20 2019-03-20 A kind of active advanced temporary shoring bracket of underworkings

Country Status (1)

Country Link
CN (1) CN209244592U (en)

Similar Documents

Publication Publication Date Title
KR102038877B1 (en) Pile frame and its installation method
CN110552709A (en) self-propelled integral station-crossing method and device suitable for large-diameter shield machine
CN101550832A (en) A safety protecting work trolley for chamber
CN104674674A (en) One-way full cantilever steel arch bridge installation construction method
CN203373664U (en) Foldable rear supporting leg of tunnel-through bridge girder erection machine
CN202544854U (en) Lining trolley for subway station
CN202441387U (en) Multifunctional tunnel working rack
CN105908635A (en) Intelligent synchronous moving forward system for multiple main truss hanging baskets and construction method
CN103321156A (en) Foldable through-tunnel bridge girder erection machine rear support leg and application thereof
CN106968687B (en) Closed type circular ring yielding support device and method for mining roadway of steep coal seam
CN201428461Y (en) Safety protection working bogie for cavern
CN209244592U (en) A kind of active advanced temporary shoring bracket of underworkings
CN206986644U (en) A kind of tunnel track simply removes device
CN209039992U (en) Bracket is packed in high-speed rail Bridge Erector transition
CN105672136B (en) Erecting construction process for large-span steel-concrete combination beam
CN201826320U (en) Assembling and sinking device for double wall steel cofferdam
CN102330413B (en) Construction method for enabling bridge girder erection machine to independently go up and down girder carrier
CN203905988U (en) Slip type temporary supporting bracket
CN216008539U (en) Be used for subway tunnel steel truss to support multi-functional platform truck
CN213684191U (en) Quick erection bracing frame is used in colliery relief of disaster
CN201943350U (en) Supporting steel frame for die holder of high-altitude large span overhanging structure
CN214061617U (en) Installation fixing and verticality adjusting integrated device for overlong pile foundation reinforcement cage
CN209838445U (en) Tunnel preliminary bracing rapid construction trolley
CN210263847U (en) Stride and establish portable construction platform on subway U type groove
CN107237639B (en) Tunnel lining trolley adopting split type double-side-wall pilot tunnel method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190813

Termination date: 20200320

CF01 Termination of patent right due to non-payment of annual fee