CN209243857U - Rubbish clears up pond module - Google Patents
Rubbish clears up pond module Download PDFInfo
- Publication number
- CN209243857U CN209243857U CN201821853009.7U CN201821853009U CN209243857U CN 209243857 U CN209243857 U CN 209243857U CN 201821853009 U CN201821853009 U CN 201821853009U CN 209243857 U CN209243857 U CN 209243857U
- Authority
- CN
- China
- Prior art keywords
- pond
- rubbish
- pool wall
- clears
- discharge outlet
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Processing Of Solid Wastes (AREA)
Abstract
The utility model relates to a kind of rubbish to clear up pond module, be related to the technical field of environmental protection comprising bottom of pond and three pool walls for being vertically fixedly connected on bottom of pond, three pool walls U-shaped arrangement in bottom of pond;Discharge outlet is offered in the bottom of pond, and the sewage pipe for draining the sewage for flowing into the discharge outlet is communicated in the discharge outlet;One end of the sewage pipe is connected to the discharge outlet, and the other end is inserted into sewer.The utility model has the effect of for the sewage in garbage pool being directly discharged into sewer.
Description
Technical field
The utility model relates to the technical fields of environmental protection, clear up pond module more particularly, to a kind of rubbish.
Background technique
Existing house refuse has the characteristics that usually to need before high-moisture, low heat value, rubbish enter incinerator mostly
It is stored 3~5 days in garbage pool, makes rubbish fermentation, curing and dehydration, be conducive to burning disposal.
When existing dumping is in garbage pool, the moisture in rubbish can be deviate from slave rubbish slowly.Rubbish is de-
After water, garbage transporting to destructor plant is carried out burning disposal by staff.
When taking out dewatered rubbish from garbage pool, stayed in garbage pool when general from the water deviate from rubbish,
Continue emitting offensive odor, influences the environment of surrounding.
Utility model content
The purpose of the utility model is to provide a kind of rubbish to clear up pond module, has and directly arranges the sewage in garbage pool
Enter the advantage in sewer.
The above-mentioned purpose of utility model of the utility model has the technical scheme that
A kind of rubbish cleaning pond module, including bottom of pond and vertical three pool walls for being fixedly connected on bottom of pond, three pool walls
The U-shaped arrangement in bottom of pond;
Discharge outlet is offered in the bottom of pond, and the sewage row for that will flow into the discharge outlet is communicated in the discharge outlet
The sewage pipe walked;
One end of the sewage pipe is connected to the discharge outlet, and the other end is inserted into sewer.
By using above-mentioned technical proposal, when staff or resident pour into rubbish when keeping in garbage pool,
Moisture in rubbish is constantly deviate from from rubbish, and garbage dewatering is made, convenient for the burning work of subsequent rubbish.In sewage from rubbish
When abjection, sewage flows into discharge outlet, then flows into sewer via sewage pipe, and the sewage in garbage pool is transported, prevents from accumulating
Sewage again results in pollution to environment to emitting offensive odor is continued.
The utility model is further arranged to: being also equipped in the discharge outlet prevents rubbish by the water drainage hole plug
Sieve.
By using above-mentioned technical proposal, prevent bulk rubbish from entering in sewage pipe, so that sewage is during draining
Blocking is not will receive.
The utility model is further arranged to: the bottom of pond and pool wall are arranged at two side positions of road;And the pond
Bottom is lower than the upper surface of road.
By using above-mentioned technical proposal, so that garbage pool and road is formed difference of height, the sewage in garbage pool is avoided to be discharged to
Road ground causes the pollution of environment.
The utility model is further arranged to: being equipped with screen in the bottom of pond.
By using above-mentioned technical proposal, when pouring into rubbish in garbage pool, dumping is on screen, and screen is by rubbish
Rubbish is separated with bottom of pond, so that rubbish is not contacted with the discharge outlet that bottom of pond opens up, when sewage is deviate from from rubbish, sewage is along grid
Plate is dripped in bottom of pond, is then flowed into discharge outlet from bottom of pond, allows garbage dewatering process to complete more preferable, and garbage dewatering is more
Thoroughly.
The utility model is further arranged to: the face in three pool walls towards the bottom of pond middle position, which protrudes above, is provided with branch
Platform is supportted, the supporting table is fixed together with the bottom of pond;The screen installation is on the supporting table.
By using above-mentioned technical proposal, screen is placed in supporting table, and supporting table is allowed to be supported screen, so that grid
Plate is not contacted with bottom of pond.When rubbish is dehydrated, the sewage of rubbish abjection drops onto bottom of pond, and dumping is on screen,
Allow rubbish will not again with the waste water of abjection, so that rubbish be made to have better dehydrating effect.
The utility model is further arranged to: flow pipe is equipped in the pool wall, one end of the flow pipe is connected to
On water source, the other end is pierced by pool wall, and the flow pipe is pierced by the side of the pool wall and is located at the upside of the screen, described to send
One end that the pool wall is pierced by water pipe is equipped with tap.
By using above-mentioned technical proposal, allow staff flow pipe can be made to be discharged by opening tap, to screen
And dust man's tool is cleared up, and is guaranteed that screen and dust man make clean and tidy, is prevented from being bonded on screen and tool
Rubbish and emitting offensive odor.
The utility model is further arranged to: be also communicated with cleaning pipe on the flow pipe, one end of the cleaning pipe with
Flow pipe connection, the other end are pierced by the pool wall, and the cleaning pipe is pierced by one end of pool wall and is located at the screen and institute
It states between bottom of pond, the electromagnetism for controlling the cleaning pipe opening and closing is installed on one end that the cleaning pipe is pierced by the bottom of pond
Valve.
By using above-mentioned technical proposal, staff can make cleaning pipe water outlet by controlling the opening and closing of solenoid valve simultaneously
Bottom of pond is cleared up, the remaining sewage of bottom of pond can be flowed into discharge outlet together with the water that cleaning pipe is discharged, to allow
Bottom of pond is more clean, is not easy residual sewage.
The utility model is further arranged to: the exhaust fan extracted to foul smell is fixedly connected on the pool wall.
By using above-mentioned technical proposal, exhaust fan is connected to air purifier, and staff can beat exhaust fan
It comes and takes foul smell away, then foul smell is transferred in air purifier by exhaust fan, and foul smell could be discharged after purification
Into air, reduce influence of the rubbish for ambient enviroment.
The utility model is further arranged to: the caulking groove for exhaust fan insertion, the pumping are offered on the pool wall
Blower is embedded in the pool wall.
By using above-mentioned technical proposal, set exhaust fan in insertion pool wall, so that rubbish is not easy and exhaust fan
It is contacted, is prevented when pouring into rubbish in garbage pool, rubbish hits exhaust fan, causes the damage of exhaust fan.
The utility model is further arranged to: a block baffle, and the baffle are fixedly connected at the notch of the caulking groove
On offer exhausting hole.
By using above-mentioned technical proposal, allow baffle rubbish is contacted with exhaust fan stop while, will not also
The pumping foul smell of exhaust fan is caused to interfere, so that the pumping work of exhaust fan is normally carried out.
In conclusion the advantageous effects of the utility model are as follows:
1. clear up pond module by the way that a kind of rubbish is arranged, the sewage deviate from is allowed in rubbish to be easier to drain cleaning;
2. making the dewatering work of rubbish more thorough by setting screen;
3. by setting exhaust fan, the foul smell for allowing rubbish to distribute is cleared up, is not easy to impact the environment of surrounding.
Detailed description of the invention
Fig. 1 is the schematic diagram that rubbish clears up pond module in embodiment 1;
Fig. 2 is the schematic diagram that discharge outlet is arranged in embodiment 1 in bottom of pond;
Fig. 3 is the structural schematic diagram that rubbish clears up pond module in embodiment 1.
In figure, 1, bottom of pond;2, pool wall;3, discharge outlet;4, sewage pipe;5, sieve;6, screen;7, supporting table;8, flow pipe;
9, tap;10, cleaning pipe;11, solenoid valve;12, exhaust fan;13, caulking groove;14, baffle;15, exhausting hole.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
Embodiment 1: as shown in Figure 1 and Figure 2, for a kind of rubbish cleaning pond module disclosed by the utility model, garbage pool is main
It is piled up by concrete and masonry, including bottom of pond 1 and vertical three pool walls 2 for being fixedly connected on bottom of pond 1, three pool walls 2
The U-shaped arrangement in bottom of pond 1.Garbage pool is arranged at two side positions of road, and bottom of pond 1 is lower than the upper surface of road.Wherein,
The side of garbage pool opening allows garbage truck and resident to keep in convenient for pouring into rubbish in garbage pool towards road center.
As shown in Figure 1 and Figure 2, it is also provided with discharge outlet 3 in bottom of pond 1, is communicated in discharge outlet 3 for draining will to be flowed into
The sewage pipe 4 that the sewage of mouth 3 is drained, one end of sewage pipe 4 are connected to discharge outlet 3, and the other end is inserted into sewer.Wherein, exist
Bottom of pond 1 is provided with multiple discharge outlet 3 and sewage pipe 4.
When staff or resident, which pour into rubbish, to keep in garbage pool, the moisture in rubbish is constantly from rubbish
Middle abjection, makes garbage dewatering, convenient for the burning work of subsequent rubbish.When sewage is deviate from from rubbish, sewage flows into discharge outlet
3, then via sewage pipe 4 flow into sewer, the sewage in garbage pool is transported, prevent the sewage accumulated to continue emitting offensive odor,
Pollution is again resulted in environment.
As shown in Figure 1 and Figure 2, it is also equipped with the sieve 5 for preventing rubbish from blocking discharge outlet 3 in discharge outlet 3, prevents big
Block rubbish enters in sewage pipe 4, so that sewage not will receive blocking during draining.
In order to allow the sewage in bottom of pond 1 to more readily flow into discharge outlet 3, as shown in Figure 1 and Figure 2, set discharge outlet 3 to
Lower than 1 face of bottom of pond, flow the sewage in bottom of pond 1 to the lower direction of topography in flowing, and discharge outlet 3 is lower than bottom of pond 1
Face allows the sewage in bottom of pond 1 to more readily flow into discharge outlet 3.
In addition, it is actual in use, in garbage pool rubbish increase, excessive rubbish may will in garbage pool
Discharge outlet 3 covers, so that edge flowing of the waste water deviate from rubbish to rubbish, only least a portion of sewage is drained, so that rubbish
The process of rubbish dehydration is not readily accomplished, in order to which the sewage for allowing rubbish to deviate from can be more convenient to drain, as shown in Figure 1 and Figure 2, in bottom of pond 1
On be equipped with one layer of screen 6, when pouring into rubbish in garbage pool, dumping is on screen 6, and screen 6 is by rubbish and bottom of pond 1
It separates, so that rubbish is not contacted with the discharge outlet 3 that bottom of pond 1 opens up, when sewage is deviate from from rubbish, sewage is dripped along screen 6
It in bottom of pond 1, is then flowed into discharge outlet 3 from bottom of pond 1, allows garbage dewatering process to complete more preferable, and garbage dewatering is more
Thoroughly.
In order to allow the effect of garbage dewatering can be further improved, as shown in Figure 1 and Figure 2, in three pool walls 2 towards in bottom of pond 1
Between the face of position protrude above and be provided with supporting table 7, and supporting table 7 is fixed together with bottom of pond 1, in the present embodiment for
It piles up when garbage pool that supporting table 7 is constructed.Screen 6 is placed in supporting table 7, is allowed supporting table 7 to be supported screen 6, is made
Screen 6 is obtained not contact with bottom of pond 1.
When rubbish is dehydrated, the sewage of rubbish abjection drops onto bottom of pond 1, and dumping is on screen 6, allows rubbish
Will not again with the waste water of abjection, so that rubbish be made to have better dehydrating effect.
As shown in Figure 2 and Figure 3, flow pipe 8 is equipped in pool wall 2, one end of flow pipe 8 is connected on water source, the other end
It is pierced by pool wall 2, and flow pipe 8 is pierced by the side of pool wall 2 and is located at the upside of screen 6, and one end of pool wall 2 is pierced by flow pipe 8
Tap 9 is installed, allows staff flow pipe 8 can be made to be discharged by opening tap 9, screen 6 and rubbish is cleared up
Tool (such as spades, rubbish fork etc.) is cleared up, and guarantees that screen 6 and dust man are made clean and tidy, prevent screen 6 and tool
On be bonded with rubbish and emitting offensive odor.
As shown in Figure 2 and Figure 3, cleaning pipe 10 is also communicated on flow pipe 8, one end of cleaning pipe 10 and flow pipe 8 connect
Logical, the other end is pierced by pool wall 2, and cleaning pipe 10 is pierced by one end of pool wall 2 between screen 6 and bottom of pond 1, wears in cleaning pipe 10
Solenoid valve 11 for controlling the opening and closing of cleaning pipe 10 is installed out, staff can be by controlling electromagnetism on one end of bottom of pond 1
The opening and closing of valve 11 come make cleaning pipe 10 be discharged and bottom of pond 1 is cleared up, allow the remaining sewage of bottom of pond 1 can be with cleaning pipe 10
The water of discharge is flowed into together in discharge outlet 3, to make bottom of pond 1 more clean, is not easy residual sewage.
When dumping is in garbage pool, rubbish can give out one foul smell, influence the environment of surrounding, in order to allow foul smell not
It can be directly discharged in air, as shown in Figure 1 and Figure 2, the exhaust fan 12 extracted to foul smell is fixedly connected on pool wall 2,
Exhaust fan 12 is connected to air purifier (non-table goes out in figure), and staff can open exhaust fan 12 and takes out foul smell
It walks, then foul smell is transferred in air purifier by exhaust fan 12, and foul smell can be just discharged into air after purification, subtracts
Influence of the small rubbish for ambient enviroment.
In order to prevent when pouring into rubbish in garbage pool, rubbish hits exhaust fan 12, causes exhaust fan 12
Damage offers the caulking groove 13 being embedded in for exhaust fan 12 on pool wall 2, exhaust fan 12 is set as being embedded in as shown in Figure 1 and Figure 2
In pool wall 2, so that rubbish is not easy to be contacted with exhaust fan 12.And one piece of gear is fixedly connected at the notch of caulking groove 13
Plate 14, and exhausting hole 15 is offered on baffle 14, allow baffle 14 rubbish is contacted with exhaust fan 12 stop while, also
Will not the pumping foul smell to exhaust fan 12 cause to interfere so that the pumping work of exhaust fan 12 is normally carried out.
The implementation principle of the present embodiment are as follows: by dumping on screen 6, when rubbish is dehydrated, sewage is dropped onto
Bottom of pond 1, then discharge outlet 3 is flowed into, and flow into sewer via sewage pipe 4, the sewage in garbage pool is transported, the dirt accumulated is prevented
Water again results in pollution to environment to emitting offensive odor is continued.And purification is taken away by the foul smell that exhaust fan 12 distributes rubbish,
Rubbish will not be impacted to ambient enviroment.
The embodiment of present embodiment is the preferred embodiment of the utility model, and not limitation is originally practical new according to this
The protection scope of type, therefore: the equivalence changes that all structures, shape, principle according to the utility model are done should all be covered by practical
Within novel protection scope.
Claims (10)
1. a kind of rubbish clears up pond module, it including bottom of pond (1) and is vertically fixedly connected on three pool walls (2) of bottom of pond (1), three
A pool wall (2) U-shaped arrangement on bottom of pond (1);
It is characterized by: being offered discharge outlet (3) on the bottom of pond (1), it is communicated on the discharge outlet (3) for institute will to be flowed into
State the sewage pipe (4) that the sewage of discharge outlet (3) is drained;
One end of the sewage pipe (4) is connected to the discharge outlet (3), and the other end is inserted into sewer.
2. rubbish according to claim 1 clears up pond module, it is characterised in that: be also equipped on the discharge outlet (3) anti-
The only sieve (5) that rubbish blocks the discharge outlet (3).
3. rubbish according to claim 1 clears up pond module, it is characterised in that: the bottom of pond (1) and pool wall (2) are arranged in
At two side positions of road;And the bottom of pond (1) is lower than the upper surface of road.
4. rubbish according to claim 1 clears up pond module, it is characterised in that: be equipped with screen on the bottom of pond (1)
(6).
5. rubbish according to claim 4 clears up pond module, it is characterised in that: three pool walls (2) are towards the bottom of pond (1)
The face in middle position, which protrudes above, to be provided with supporting table (7), and the supporting table (7) is fixed together with the bottom of pond (1);Institute
Screen (6) is stated to be mounted on the supporting table (7).
6. rubbish according to claim 5 clears up pond module, it is characterised in that: be equipped with flow pipe in the pool wall (2)
(8), one end of the flow pipe (8) is connected on water source, and the other end is pierced by pool wall (2), and the flow pipe (8) be pierced by it is described
The side of pool wall (2) is located at the upside of the screen (6), and one end that the pool wall (2) is pierced by the flow pipe (8) is equipped with
Tap (9).
7. rubbish according to claim 6 clears up pond module, it is characterised in that: be also communicated on the flow pipe (8) clear
It washes pipe (10), one end of the cleaning pipe (10) is connected to the flow pipe (8), and the other end is pierced by the pool wall (2), and described
Cleaning pipe (10) is pierced by one end of pool wall (2) between the screen (6) and the bottom of pond (1), in the cleaning pipe (10)
It is pierced by the solenoid valve (11) being equipped on one end of the bottom of pond (1) for controlling the cleaning pipe (10) opening and closing.
8. rubbish according to claim 1 clears up pond module, it is characterised in that: be fixedly connected on the pool wall (2) pair
The exhaust fan (12) that foul smell is extracted.
9. rubbish according to claim 8 clears up pond module, it is characterised in that: offered described in confession on the pool wall (2)
The caulking groove (13) of exhaust fan (12) insertion, the exhaust fan (12) are embedded in the pool wall (2).
10. rubbish according to claim 9 clears up pond module, it is characterised in that: fixed at the notch of the caulking groove (13)
It is connected with a block baffle (14), and offers exhausting hole (15) on the baffle (14).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821853009.7U CN209243857U (en) | 2018-11-10 | 2018-11-10 | Rubbish clears up pond module |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821853009.7U CN209243857U (en) | 2018-11-10 | 2018-11-10 | Rubbish clears up pond module |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209243857U true CN209243857U (en) | 2019-08-13 |
Family
ID=67527882
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821853009.7U Active CN209243857U (en) | 2018-11-10 | 2018-11-10 | Rubbish clears up pond module |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209243857U (en) |
-
2018
- 2018-11-10 CN CN201821853009.7U patent/CN209243857U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109082965A (en) | A kind of environment-friendly type town road and its construction method | |
CN205421504U (en) | Abandon STREAMING inlet for stom water | |
CN207392389U (en) | A kind of LID types overflow-type rainwater port system | |
KR101252242B1 (en) | Gutter for treating early rainwater | |
CN209243857U (en) | Rubbish clears up pond module | |
CN206916920U (en) | It is automatically separated the grid of suspended material | |
CN209636585U (en) | A kind of pavement grass planting ditch | |
CN216195095U (en) | Sponge city rainwater recycling device | |
KR200289100Y1 (en) | The hopper with a gutter for temporary storaging of sludge cake | |
CN207776074U (en) | Collaborate the overflow-type reverse-filling river diversion tee joint well of pipe culvert suitable for city | |
CN109610265B (en) | Bury municipal square rainwater collection system | |
CN218757824U (en) | Sewer seepage and drainage structure | |
KR102448419B1 (en) | Rainwater penetration type storage | |
CN221072913U (en) | Shallow grass ditch based on sponge principle | |
Gray | Proposed Plan for a Sewerage System, and for the Disposal of the Sewage of the City of Providence | |
CN210288645U (en) | Sponge city environment-friendly rainwater well | |
CN209053209U (en) | Concave herbaceous field postpones plastic inlet for stom water with runoff | |
CN210194739U (en) | Rainwater discarding and filtering device | |
CN220538825U (en) | Environment-friendly type rain inlet capable of controlling pollution of initial rain and directly discharging heavy rain | |
CN213268201U (en) | Municipal administration greenbelt drainage structures | |
CN218812972U (en) | Sponge city drainage road surface for town road | |
CN218932862U (en) | Bridge rainwater collecting well device | |
CN211547154U (en) | Road formula of sinking road surface greenbelt that permeates water | |
CN208183909U (en) | Rainwater penetration system | |
CN211735660U (en) | Green high-efficient flood-proof self-supporting structure with solid-liquid separation function |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |