CN209243763U - A kind of precast assembly piping lane joint waterproofing construction - Google Patents
A kind of precast assembly piping lane joint waterproofing construction Download PDFInfo
- Publication number
- CN209243763U CN209243763U CN201821631867.7U CN201821631867U CN209243763U CN 209243763 U CN209243763 U CN 209243763U CN 201821631867 U CN201821631867 U CN 201821631867U CN 209243763 U CN209243763 U CN 209243763U
- Authority
- CN
- China
- Prior art keywords
- piping lane
- concatenation unit
- socket
- precast assembly
- splice
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Building Environments (AREA)
Abstract
The utility model relates to city integrated piping lane fields, and disclose a kind of precast assembly piping lane joint waterproofing construction, including multiple piping lane concatenation units, the piping lane concatenation unit is made of upper splice and lower splice, the upper splice and the lower splice are spliced using straight cut, the piping lane concatenation unit is provided with faucet part and socket, the bellmouth face of the faucet part and the socket face of the socket are all provided with and are set to step type, adjacent piping lane concatenation unit mutually splices, the piping lane concatenation unit wall body is internally provided with hybrid rubber tape, the hybrid rubber tape includes series composite rubber strip and lateral hybrid rubber tape, the series composite rubber strip and the lateral hybrid rubber tape, the wall body of the piping lane concatenation unit is separated into left and right and lower regions respectively.Each region cannot mutually seep water, so forming multilayer flashing effect.
Description
Technical field
The utility model relates to city integrated pipelines to be laid with field, especially a kind of precast assembly piping lane joint waterproofing structure
It makes.
Background technique
Rice, underground pipe gallery are to be built in Urban Underground for laying the public utility of city planting ductwork, will be given
The municipal pipelines such as water, draining, heating power, communication, electric power, combustion gas are included, and the facilities such as hoisting port, line outlet are arranged, and plan as a whole
All kinds of municipal pipeline planning, construction and management solve repeatedly excavated pavement, make somebody a mere figurehead the problems such as intensive gauze, pipeline Frequent Accidents,
Be conducive to ensure urban safety, improve city function, beautifying city landscape, promote the intensive efficient and Transformation Development in city, favorably
In improving city integrated bearing capacity and urbanization quality, is conducive to increase public product effective investment, pulls social data
It puts into, make the new power of economic development.
Currently, the pipe gallery engineering in general in China uses excavation and cast-in-place reinforced concrete construction technique, the construction technology
Period is long, labour force request is more, efficiency is lower, is affected by weather, field condition, will also generate larger dirt to surrounding enviroment
Dye, and the disadvantages of construction quality is difficult to ensure.For this purpose, more cabin big cross section pipe galleries are divided into the production of multi-segmental, lumpy
Product, to realize the light, quick, safe of assembly construction.However, the piping lane of multi-segmental has higher requirement to waterproof again.
Such as Chinese patent, application number: 2017201680158, a kind of prefabricated piping lane is disclosed, is only used only on Mosaic face
Waterproof adhesive tape is sealed, although this mode is simple, there was only one layer using waterproof, once water into later can directly into
Enter to inside piping lane, and so that waterproof adhesive tape is easy to appear displacement for a long time, so waterproof effect is bad, is easy leakage.
Summary of the invention
This hair is bad in view of the piping lane waterproof effect of stitching portion in the prior art, and the utility model provides a kind of precast assembly
Piping lane joint waterproofing construction, provides multiple waterproof effect.
The technical solution adopted in the utility model is spelled for a kind of precast assembly piping lane joint waterproofing construction, including multiple piping lanes
Order member, the piping lane concatenation unit are made of upper splice and lower splice, and the upper splice and the lower splice are adopted
Spliced with straight cut, the piping lane concatenation unit is provided with faucet part and socket, the bellmouth face of the faucet part and described inserts
The socket face of oral area, which is all provided with, is set to step type, and the adjacent piping lane concatenation unit mutually splices, outside the piping lane concatenation unit
Layer is provided with waterproof filleting layer, spells interface and is provided with waterproof filleting interface layer, setting inside the piping lane concatenation unit wall body
There is hybrid rubber tape, the hybrid rubber tape includes series composite rubber strip and lateral hybrid rubber tape, the series composite rubber
Adhesive tape and the lateral hybrid rubber tape, are separated into left and right and lower regions for the wall body of the piping lane concatenation unit respectively.
Further, the bellmouth face of the faucet part and lower splice or upper splice joint surface, it is convex to be provided with water proof.
Further, the outside of the piping lane concatenation unit isolation is provided with waterproof roll layer.
Further, the waterproof filleting interface layer bottom is provided with seal strip, and the seal strip is made of foam.
Further, the socket is provided with injected hole, and the injected hole setting open at one end is spliced in the piping lane
The inside of cell isolation, another end opening are arranged on the socket face of the socket.
Further, the waterproof filleting layer and the waterproof filleting interface layer are all made of high resiliency sealant and are made.
Further, the hybrid rubber tape is formed using elastic rubber and hydro-expansive rubber.
Further, the elastic rubber is ethylene propylene diene rubber or neoprene.
The utility model has the beneficial effects that
1. piping lane concatenation unit outer layer, which is provided with waterproof filleting layer and spells interface, is provided with waterproof filleting interface layer, form
One group of complete closure mechanism all fills up the seam of stitching portion, so cannot seep water, there are also in the piping lane concatenation unit
Portion is provided with hybrid rubber tape, and hybrid rubber tape is provided with vertical and horizontal, so by the inner part of piping lane concatenation unit wall body
Being divided into left and right and lower regions, each region cannot mutually seep water, so forming multilayer flashing effect.
2. being additionally provided in spelling interface, water proof is convex, and water proof is convex is made of hydro-expansive rubber, is realized faucet part and is inserted
The engagement of oral area and upper splice and lower splice, water encounter the convex rear convex swelling water of water proof of water proof and are blocked, forms water proof and make
With.
Detailed description of the invention
Fig. 1 Fig. 1 is the splicing construction schematic diagram of the utility model;
Fig. 2 is the injected hole setting position view of the utility model;
Fig. 3 is the upper splice of the utility model and the splicing schematic diagram of lower splice;
Fig. 4 is the upper splice of the utility model and the splicing schematic internal view of lower splice.
It is made the following instructions in conjunction with attached drawing:
10, faucet part;20, socket;11, waterproof roll layer;12, waterproof filleting layer;121, waterproof filleting interface layer;
13, hole for injecting glue;14, series composite rubber strip;15, lateral hybrid rubber tape;16, water proof is convex;17, seal strip.
Specific embodiment
The embodiments of the present invention are described below in detail, examples of the embodiments are shown in the accompanying drawings, wherein from beginning
Same or similar element or element with the same or similar functions are indicated to same or similar label eventually.Below by ginseng
The embodiment for examining attached drawing description is exemplary, it is intended to for explaining the utility model, and should not be understood as to the utility model
Limitation.
In the present invention unless specifically defined or limited otherwise, term " installation ", " connected ", " connection ", " Gu
It is fixed " etc. terms shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can
To be to be connected directly, the connection inside two elements can also be can be indirectly connected through an intermediary.For this field
For those of ordinary skill, the concrete meaning of above-mentioned term in the present invention can be understood as the case may be.
As shown in Figure 1, a kind of precast assembly piping lane joint waterproofing construction, including multiple piping lane concatenation units, the piping lane
Concatenation unit is made of upper splice and lower splice, and the upper splice and the lower splice are spliced using straight cut, institute
It states piping lane concatenation unit and is provided with faucet part 10 and socket 20, the bellmouth face of the faucet part 10 and inserting for the socket 20
Mouth face, which is all provided with, is set to step type, and the adjacent piping lane concatenation unit mutually splices, and the piping lane concatenation unit outer layer is provided with
Waterproof filleting layer 12 spells interface and is provided with waterproof filleting interface layer 121, and the piping lane concatenation unit wall body is internally provided with multiple
Rubber strip is closed, the hybrid rubber tape includes series composite rubber strip 14 and lateral hybrid rubber tape 15, the series composite rubber
Adhesive tape 14 and the lateral hybrid rubber tape 15, are separated into left and right and upper and lower region for the wall body of the piping lane concatenation unit respectively
Domain.
Wherein, water can effectively be obstructed by being provided with waterproof filleting interface layer after splicing between upper splice and lower splice
Gap penetration between upper splice and lower splice, the waterproof filleting layer 12 and the waterproof filleting interface layer 121 are equal
It is made of high resiliency sealant.Spliced faucet part 10 and the splicing of socket 20 it is good after, between form gap, utilize at this time
Waterproof filleting interface layer 121 end opening will fill thereon, and person uses identical material, and adhesive property is identical, all to be easier
Realize seamless stickup, material itself has high resiliency, a little gap can be crowded with completely, at the same high resiliency sealant can with it is mixed
Solidifying soil is pasted, and has the function of absorbing seismic force, moreover it is possible to play the role of protecting piping lane concatenation unit.
It, can be in addition, piping lane concatenation unit wall body is separated into the left and right and lower regions being mutually isolated by hybrid rubber tape
Part infiltration situation is completely cut off in the region individually separated completely, is not in large-scale infiltration, increases one and prevent again
Water effect.In addition, the hybrid rubber tape is formed using elastic rubber and hydro-expansive rubber, the elastic rubber can be used
Multiple material is made, and ethylene propylene diene rubber or neoprene are wherein used in the present embodiment.
Wherein the bellmouth face of the faucet part 10 shown in FIG. 1 and lower splice or upper splice joint surface, are provided with
Water proof convex 16.When water flow to water proof it is convex 16 when, water-swellable, so that water proof convex 16 compresses the joint surface of socket 20
On, play the role of stopping water.
More specifically, the outside of the piping lane concatenation unit isolation, i.e. piping lane upstream face are provided with waterproof roll layer 11, first
Upper waterproof filleting interface layer 121 is set after piping lane concatenation unit mutually being spliced well, finally pastes upper waterproof roll layer 11,
To reinforcement waterproof action.
In order to which upper waterproof gap interface layer 121 is preferably arranged, 121 bottom of waterproof filleting interface layer is provided with sealing
Item 17, the seal strip 17 are made of foam, and waterproof gap interface layer 121 effectively can be limited in splicing mouth by seal strip 17
Periphery.
As shown in Fig. 2, the socket 20 is provided with injected hole 13, the injected hole 13 is open at one end to be arranged in the pipe
The inside of corridor concatenation unit isolation, another end opening are arranged on the socket face of the socket 20.It is single to install piping lane splicing
By 13 pairs of spelling interfaces of injected hole detect whether closed after member, elastic water-proofing material can also be filled after detection
Barrier water by injected hole 13 leak into come.
The present embodiment has the advantages that
1. piping lane concatenation unit outer layer, which is provided with waterproof filleting layer and spells interface, is provided with waterproof filleting interface layer, form
One group of complete closure mechanism all fills up the seam of stitching portion, so cannot seep water, there are also in the piping lane concatenation unit
Portion is provided with hybrid rubber tape, and hybrid rubber tape is provided with vertical and horizontal, so by the inner part of piping lane concatenation unit wall body
Being divided into left and right and lower regions, each region cannot mutually seep water, so forming multilayer flashing effect.
2. being additionally provided in spelling interface, water proof is convex, realizes the engagement of faucet part and socket, and water proof is convex swollen using water is met
Swollen rubber is made, and water encounters the convex rear convex swelling water of water proof of water proof and is blocked, and forms impermeable role.
The preferred embodiments of the present invention have been described in detail above.It should be appreciated that the ordinary skill people of this field
Member according to the present invention can conceive without creative work makes many modifications and variations.Therefore, it is all in the art
Technical staff passes through logical analysis, reasoning, or a limited experiment according to the design of the utility model on the basis of existing technology can
It, all should be within the scope of protection determined by the claims with obtained technical solution.
Claims (8)
1. a kind of precast assembly piping lane joint waterproofing construction, including multiple piping lane concatenation units, which is characterized in that the piping lane is spelled
Order member is made of upper splice and lower splice, and the upper splice and the lower splice are spliced using straight cut, described
Piping lane concatenation unit is provided with faucet part (10) and socket (20), the bellmouth face of the faucet part (10) and the socket
(20) socket face, which is all provided with, is set to step type, and the adjacent piping lane concatenation unit mutually splices, outside the piping lane concatenation unit
Layer is provided with waterproof filleting layer (12), spells interface and is provided with waterproof filleting interface layer (121), the piping lane concatenation unit wall body
It is internally provided with hybrid rubber tape, the hybrid rubber tape includes series composite rubber strip (14) and lateral hybrid rubber tape
(15), the series composite rubber strip (14) and the lateral hybrid rubber tape (15), respectively by the piping lane concatenation unit
Wall body is separated into left and right and lower regions.
2. precast assembly piping lane joint waterproofing construction according to claim 1, which is characterized in that the faucet part (10)
Bellmouth face and lower splice (B) or the joint surface upper splice (A), it is convex (16) to be provided with water proof.
3. precast assembly piping lane joint waterproofing construction according to claim 2, which is characterized in that the piping lane concatenation unit
Waterproof roll layer (11) are provided on the outside of isolation.
4. precast assembly piping lane joint waterproofing construction according to claim 1-3, which is characterized in that the waterproof
Filleting interface layer (121) bottom is provided with seal strip (17), and the seal strip (17) is made of foam.
5. precast assembly piping lane joint waterproofing construction according to claim 1-3, which is characterized in that the socket
Portion (20) is provided with injected hole (13), and the injected hole (13) is open at one end to be arranged in the piping lane concatenation unit isolation
Side, another end opening are arranged on the socket face of the socket (20).
6. precast assembly piping lane joint waterproofing construction according to claim 1, which is characterized in that the waterproof filleting layer
(12) it is all made of high resiliency sealant with the waterproof filleting interface layer (121) and is made.
7. precast assembly piping lane joint waterproofing construction according to claim 1, which is characterized in that the hybrid rubber tape is adopted
It is formed with elastic rubber and hydro-expansive rubber.
8. precast assembly piping lane joint waterproofing construction according to claim 7, which is characterized in that the elastic rubber is three
First EP rubbers or neoprene.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821631867.7U CN209243763U (en) | 2018-10-09 | 2018-10-09 | A kind of precast assembly piping lane joint waterproofing construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821631867.7U CN209243763U (en) | 2018-10-09 | 2018-10-09 | A kind of precast assembly piping lane joint waterproofing construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209243763U true CN209243763U (en) | 2019-08-13 |
Family
ID=67524626
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821631867.7U Active CN209243763U (en) | 2018-10-09 | 2018-10-09 | A kind of precast assembly piping lane joint waterproofing construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209243763U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113715423A (en) * | 2021-07-26 | 2021-11-30 | 安徽大禹防水科技发展有限公司 | Self-adhesion type waterproofing membrane structure |
CN118166831A (en) * | 2024-05-14 | 2024-06-11 | 广州一建建设集团有限公司 | Modularized assembled comprehensive pipe rack and construction method |
-
2018
- 2018-10-09 CN CN201821631867.7U patent/CN209243763U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113715423A (en) * | 2021-07-26 | 2021-11-30 | 安徽大禹防水科技发展有限公司 | Self-adhesion type waterproofing membrane structure |
CN118166831A (en) * | 2024-05-14 | 2024-06-11 | 广州一建建设集团有限公司 | Modularized assembled comprehensive pipe rack and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106013225B (en) | Six layers of circular traffic, pipe gallery and sponge Urban Underground Complex | |
CN209243763U (en) | A kind of precast assembly piping lane joint waterproofing construction | |
CN106013215B (en) | Three layers of class rectangle Urban Underground Complex | |
CN106013221B (en) | Four layers of class rectangle Urban Underground Complex | |
CN106013223B (en) | Elliptical section Urban Underground Complex | |
CN207760872U (en) | The double-deck pipe gallery | |
CN207597428U (en) | Prefabricated piping lane is connected waterproof construction with cast-in-place piping lane | |
CN206143804U (en) | Prefabricated socket joint formula waterproof construction of assembling utility tunnel tube coupling | |
CN205617426U (en) | Cast -in -place bottom plate of utility tunnel and prefabricated outer panel connection structure | |
CN108193707A (en) | A kind of comprehensive pipe gallery structure | |
CN106885093A (en) | A kind of two-way plugging device of pipeline with strong sealing and its application method | |
CN206298906U (en) | Precast splice type underground pipe gallery | |
CN206693265U (en) | A kind of installation node of piping lane | |
CN106351675B (en) | The complete deep curtain of the buried Station of rich water sand-pebble layer freezes water-stopping system | |
CN106013222B (en) | Three circular cross section Urban Underground Complexes | |
CN106638682A (en) | Efficient-seismic-reduction quasi-rectangular city underground architecture complex | |
CN207069539U (en) | A kind of novel cable pipe plugging device | |
CN207513619U (en) | Tunnel rich water section partitioning waterproofing system | |
CN205407204U (en) | Cable pipeline plugging device | |
CN206189968U (en) | Prefabricated assembled underground granary of inside lining plastics echelonment | |
CN216077128U (en) | Subway double-layer full-section freezing underground excavation transfer station structure | |
CN106013226B (en) | Double Circle section Urban Underground Complex | |
CN111779503A (en) | Triple baffling type partition waterproof structure of underground excavation tunnel | |
CN212272202U (en) | Grouting water stop and stratum reinforcing structure around pipeline in soft soil stratum | |
CN207685861U (en) | Concrete pipe gallery side wall or roof deformation stitch waterproof construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |