CN209243752U - A kind of inter-tie and the integrally formed falsework structure of pier stud - Google Patents

A kind of inter-tie and the integrally formed falsework structure of pier stud Download PDF

Info

Publication number
CN209243752U
CN209243752U CN201822085820.1U CN201822085820U CN209243752U CN 209243752 U CN209243752 U CN 209243752U CN 201822085820 U CN201822085820 U CN 201822085820U CN 209243752 U CN209243752 U CN 209243752U
Authority
CN
China
Prior art keywords
inter
template
tie
pier stud
fixed block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822085820.1U
Other languages
Chinese (zh)
Inventor
孟计划
翟楠楠
吕闪闪
胡珊
赵志奇
刘瑞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Zhenxing road and Bridge Construction Co., Ltd
Original Assignee
孟计划
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 孟计划 filed Critical 孟计划
Priority to CN201822085820.1U priority Critical patent/CN209243752U/en
Application granted granted Critical
Publication of CN209243752U publication Critical patent/CN209243752U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of inter-ties and the integrally formed falsework structure of pier stud, including pedestal, hydraulic cylinder, support castor, pier stud, hydraulic lifting arm, inclined support bar, inter-tie template, wood glue plate, steel plate, template fixed block and connector, the base bottom installation settings has support castor, there are two hydraulic cylinders for the pedestal upper center installation settings, it is connected with hydraulic lifting arm above the hydraulic cylinder, the inter-tie template is fixed between two pier studs.The utility model is disposably installed by pier stud with inter-tie template and template fixed block;And by inclined support bar come support shuttering fixed block and inter-tie template, wood glue plate and steel plate are set in inter-tie template bottom, and be supported by hydraulic lifting arm by hydraulic cylinder;Integrally formed, the concrete one-piece casting that pier stud and inter-tie can be achieved improves construction speed under the premise of guaranteeing construction quality, reduces engineering cost and appearance looks elegant.

Description

A kind of inter-tie and the integrally formed falsework structure of pier stud
Technical field
The utility model relates to a kind of inter-ties and the integrally formed falsework structure of pier stud.
Background technique
Recently as constantly putting into operation for each standard highway, highway bridge also a large amount of application therewith.At present in public affairs In the design of road and bridge beam, it is column pier that it is most of, which to be less than 30m design, for the lower height of bridge, generally by holding in pile foundation Platform (binder between stake), pillar pier shaft, inter-tie (when pier stud is higher) and bent cap composition.Advantage is to mitigate pier shaft self weight, section About masonry material, relatively beautiful, stiffness and strength are all larger, can be used in the river for having drift and floating ice.Carry out All it was the construction for first carrying out lower pier stud in the past when having the bridge lower part of inter-tie to construct, and completed simultaneously demoulding in the construction of lower pier stud The construction of inter-tie is carried out using Hold Hoop method, Support Method afterwards.
Utility model content
To solve the above problems, the utility model provides a kind of inter-tie and the integrally formed falsework knot of pier stud Structure.
To achieve the above object, the technical solution that the utility model is taken are as follows:
A kind of inter-tie and the integrally formed falsework structure of pier stud operate specific as follows: including pedestal, hydraulic cylinder, Support castor, pier stud, hydraulic lifting arm, inclined support bar, inter-tie template, wood glue plate, steel plate, template fixed block and connection Part, the base bottom installation settings have support castor, and there are two hydraulic cylinder, the liquid for the pedestal upper center installation settings It is connected with hydraulic lifting arm above cylinder pressure, the inter-tie template is fixed between two pier studs;The inter-tie Template both ends are provided with semicircular arc mouth, are provided with semicircular arc mouth, the inter-tie template on the inside of the template fixed block Be provided with the plate that is screwed on both ends and template fixed block end, inter-tie template both ends be threadably secured plate and Turnbuckle and template fixed block, which cooperate, to be connected, and template fixed block bottom installation settings has connector, the template Fixed block is connected with inclined support bar by connector, and the inclined support bar bottom end is fixedly connected with pedestal, the intercolumniation system Beam forms bottom is provided with wood glue plate, and wood glue board bottom portion is provided with steel plate, the steel plate bottom and hydraulic lifting arm top It is connected.
Preferably, the inter-tie template and the mutual cooperation of template fixed block are fixed on pier stud.
Preferably, the inclined support bar uses hydraulic stem.
Preferably, being provided with the control switch box for controlling hydraulic cylinder works on the pedestal.
The utility model structure is simple, easy to operate, and pier stud is disposably installed with inter-tie template and template fixed block It completes;And by inclined support bar come support shuttering fixed block and inter-tie template, wood glue is set in inter-tie template bottom Plate and steel plate, and be supported by hydraulic cylinder by hydraulic lifting arm;Integrally formed, the coagulation of pier stud and inter-tie can be achieved Native one-piece casting improves construction speed under the premise of guaranteeing construction quality, reduces engineering cost and appearance looks elegant;It is complete Integral support is moved easily by support castor at after construction.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only It is some embodiments of the utility model, for those of ordinary skill in the art, in the premise not made the creative labor Under, it is also possible to obtain other drawings based on these drawings;
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the inter-tie template and template fixed block attachment structure schematic diagram of the utility model.
Specific embodiment
The preferred embodiment of the utility model is described in detail with reference to the accompanying drawing, so that the advantages of the utility model It can be easier to be readily appreciated by one skilled in the art with feature, to make the protection scope of the utility model apparent clear Define.
As shown in Figs. 1-2, a kind of inter-tie of the utility model and the integrally formed falsework structure of pier stud include pedestal 1, hydraulic cylinder 2, support castor 3, pier stud 4, hydraulic lifting arm 5, inclined support bar 6, inter-tie template 7, wood glue plate 8, steel plate 9, Template fixed block 10 and connector 11, the 1 bottom installation settings of pedestal have support castor 3,1 upper center of the pedestal installation Setting is connected with hydraulic lifting arm 5 there are two hydraulic cylinder 2 above the hydraulic cylinder 2, the inter-tie template 7 is fixed Between two pier studs 4;7 both ends of inter-tie template are provided with semicircular arc mouth 71,10 inside of template fixed block It is provided with semicircular arc mouth 12, is provided with and is screwed on 7 both ends of inter-tie template and 10 end of template fixed block Plate 13,7 both ends of inter-tie template are threadably secured plate 13 and turnbuckle 14 and template fixed block 10 cooperates Connection, the 10 bottom installation settings of template fixed block have connector 11, and the template fixed block 10 is connected by connector 11 It is provided with inclined support bar 6,6 bottom end of inclined support bar is fixedly connected with pedestal 1, and 7 bottom of inter-tie template is provided with Wood glue plate 8,8 bottom of wood glue plate are provided with steel plate 9, and 9 bottom of steel plate is connected with 5 top of hydraulic lifting arm.
It is worth noting that, the inter-tie template 7 is fixed at pier stud 4 with the mutual cooperation of template fixed block 10 On.
It is worth noting that, the inclined support bar 6 uses hydraulic stem.
It is worth noting that, being provided with the control switch box for controlling the work of hydraulic cylinder 2 on the pedestal 1.
The utility model structure is simple, easy to operate, and pier stud is disposably installed with inter-tie template and template fixed block It completes;And by inclined support bar come support shuttering fixed block and inter-tie template, wood glue is set in inter-tie template bottom Plate and steel plate, and be supported by hydraulic cylinder by hydraulic lifting arm;Integrally formed, the coagulation of pier stud and inter-tie can be achieved Native one-piece casting improves construction speed under the premise of guaranteeing construction quality, reduces engineering cost and appearance looks elegant;It is complete Integral support is moved easily by support castor at after construction.
The standardized element that the utility model uses can commercially, shaped piece according to specification and attached drawing Record can carry out customized, the specific connection type of each part is all made of in the prior art mature bolt, rivet, weldering Equal conventional means are connect, mechanical, part and equipment are all made of in the prior art, conventional model, in addition circuit connection is using existing Conventional connection type in technology, this will not be detailed here.
The basic principles and main features of the present invention and the advantages of the present invention have been shown and described above.Current row The technical staff of industry is described in above embodiments and description it should be appreciated that the present utility model is not limited to the above embodiments Only illustrate the principles of the present invention, on the premise of not departing from the spirit and scope of the utility model, the utility model is also It will have various changes and improvements, these various changes and improvements fall within the scope of the claimed invention.The utility model Claimed range is defined by the appending claims and its equivalent thereof.

Claims (4)

1. a kind of inter-tie and the integrally formed falsework structure of pier stud, it is characterised in that: including pedestal (1), hydraulic cylinder (2), support castor (3), pier stud (4), hydraulic lifting arm (5), inclined support bar (6), inter-tie template (7), wood glue plate (8), Steel plate (9), template fixed block (10) and connector (11), pedestal (1) bottom installation settings has support castor (3), described There are two hydraulic cylinder (2), hydraulic cylinder (2) tops to be connected with hydraulic lifting arm for pedestal (1) upper center installation settings (5), the inter-tie template (7) is fixed between two pier studs (4);Inter-tie template (7) both ends are provided with half Arc-shaped mouth (71), template fixed block (10) inside are provided with semicircular arc mouth (12), the inter-tie template (7) two It is provided with the plate that is screwed (13) on end and template fixed block (10) end, inter-tie template (7) both ends pass through spiral shell Line fixed plate (13) and turnbuckle (14) and template fixed block (10), which cooperate, to be connected, template fixed block (10) bottom Installation settings has connector (11), and the template fixed block (10) is connected with inclined support bar (6), institute by connector (11) It states inclined support bar (6) bottom end to be fixedly connected with pedestal (1), inter-tie template (7) bottom is provided with wood glue plate (8), institute It states wood glue plate (8) bottom to be provided with steel plate (9), steel plate (9) bottom is connected with hydraulic lifting arm (5) top.
2. a kind of inter-tie as described in claim 1 and the integrally formed falsework structure of pier stud, it is characterised in that: described Inter-tie template (7) and template fixed block (10), which cooperate, to be fixed on pier stud (4).
3. a kind of inter-tie as described in claim 1 and the integrally formed falsework structure of pier stud, it is characterised in that: described Inclined support bar (6) uses hydraulic stem.
4. a kind of inter-tie as described in claim 1 and the integrally formed falsework structure of pier stud, it is characterised in that: described The control switch box for controlling hydraulic cylinder (2) work is provided on pedestal (1).
CN201822085820.1U 2018-12-12 2018-12-12 A kind of inter-tie and the integrally formed falsework structure of pier stud Active CN209243752U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822085820.1U CN209243752U (en) 2018-12-12 2018-12-12 A kind of inter-tie and the integrally formed falsework structure of pier stud

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822085820.1U CN209243752U (en) 2018-12-12 2018-12-12 A kind of inter-tie and the integrally formed falsework structure of pier stud

Publications (1)

Publication Number Publication Date
CN209243752U true CN209243752U (en) 2019-08-13

Family

ID=67532659

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822085820.1U Active CN209243752U (en) 2018-12-12 2018-12-12 A kind of inter-tie and the integrally formed falsework structure of pier stud

Country Status (1)

Country Link
CN (1) CN209243752U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111455858A (en) * 2020-04-23 2020-07-28 安徽省路港工程有限责任公司 Integral pouring construction method for column pier

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111455858A (en) * 2020-04-23 2020-07-28 安徽省路港工程有限责任公司 Integral pouring construction method for column pier

Similar Documents

Publication Publication Date Title
CN105625186B (en) A kind of heavy in section concrete Y shape pillar construction method
CN103938546B (en) Simply supported non-uniform construction method
CN103938533B (en) The construction method of Simply supported non-uniform structure
CN205501791U (en) Two recessed arch integrated configurations of steel binder - entity jib -
CN104727227B (en) A kind of whole segmental erection method of uncovered lattice girder steel of half-through steel box tied arch bridge
CN201873937U (en) Combined bridge with self resistance to crack
CN108360678A (en) A kind of assembled beam-column node tenon connection structure
CN103290784A (en) Arched beam combination bridge lifting construction method
CN208701729U (en) A kind of offshore wind farm High-Rise Pile Cap Foundation using prefabricated cushion cap
CN109505222A (en) A kind of netted sunpender bowstring arch bridge of assembled
CN209243752U (en) A kind of inter-tie and the integrally formed falsework structure of pier stud
CN106012851A (en) Synchronous construction method of steel box girder and concrete pier studs
CN207032062U (en) Tower with suspended cable available for Large-span Steel Box Beam construction
CN106284097B (en) The installation method that pier K is supportted on a kind of tubular arch bridge arch
CN211006318U (en) Assembled pier
CN208830464U (en) A kind of girder steel and concrete small column rigid joint
CN208379439U (en) A kind of inter-tie and the integrally formed falsework structure of pier stud
CN104746434B (en) Closure segment formwork system without dismantling outer formwork
CN203530864U (en) Large-span concrete continuous beam bridge side span folding device
CN209099080U (en) A kind of suspension type rail traffic two-wire concrete pier girder system system
CN208121617U (en) A kind of bridge nameplate installation robust structure
CN204000503U (en) The convenient long and short adjustable universal type roadbed base template of non-fragment orbit
CN209482165U (en) A kind of novel rhombus Hanging Basket
CN208934257U (en) A kind of Super High rod iron group is connected and fixed device
CN207314179U (en) A kind of sound barrier monoblock type rim of a cup mounting structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200409

Address after: 417715 in Wulipai bus west station, Yongfeng Town, Shuangfeng County, Loudi City, Hunan Province

Patentee after: Hunan Zhenxing road and Bridge Construction Co., Ltd

Address before: 476000 No. 46, Houbai Layuan Village, Maogudui Township, Suiyang District, Shangqiu City, Henan Province

Patentee before: Meng Jihua