CN209243549U - A kind of Long Span Steel Bridge device - Google Patents

A kind of Long Span Steel Bridge device Download PDF

Info

Publication number
CN209243549U
CN209243549U CN201821955564.0U CN201821955564U CN209243549U CN 209243549 U CN209243549 U CN 209243549U CN 201821955564 U CN201821955564 U CN 201821955564U CN 209243549 U CN209243549 U CN 209243549U
Authority
CN
China
Prior art keywords
harbour
fixedly installed
floating
main gantry
end support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821955564.0U
Other languages
Chinese (zh)
Inventor
肖建国
王新华
曾少华
龙文坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Hehai Heavy Industry Co ltd
Original Assignee
Huizhou Hehai Heavy Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huizhou Hehai Heavy Industry Co Ltd filed Critical Huizhou Hehai Heavy Industry Co Ltd
Priority to CN201821955564.0U priority Critical patent/CN209243549U/en
Application granted granted Critical
Publication of CN209243549U publication Critical patent/CN209243549U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to bridge technology fields, and disclose a kind of Long Span Steel Bridge device, including the first floating harbour, second floating harbour and cushion cap, the quantity of the second floating harbour is two, river end support is fixedly installed at the top of the first floating harbour, bank end support is fixedly installed at the top of the cushion cap, main gantry is fixedly installed between the top of river end support and the top of bank end support, described first side for floating the adjacent cushion cap of harbour is fixedly installed with draw bar and connecting rod, the quantity of the connecting rod is two, two connecting rods are located at the two sides of main gantry.First floating harbour is gone up and down according to the height of water level, the tilt angle of main gantry is changed, main gantry passes through anchor system with lower boom and is fixedly connected, when needing to overhaul main gantry, the elastic of main gantry can be changed by anchor system, facilitate maintenance and maintenance to main gantry.

Description

A kind of Long Span Steel Bridge device
Technical field
The utility model relates to bridge technology field, specially a kind of Long Span Steel Bridge device.
Background technique
Access bridge refers to being located at main bridge both ends, the bridge span instead of high embankment.The bridge-type for connecting harbour and land-based area is built Object.Access bridge:, must there are enough headroom in order to allow under bridge the large vessel that can smoothly pass through, under bridge opening when building on-water bridge Highly, thus bridge must be made higher.Bridge makes height, and bridge just will increase with the intercoastal gradient, this will seriously shadow Ring the traffic of bridge floor up and down.Access bridge is exactly " transition " between the road Qiao He, and road surface is gradually raised or gradually decreased, is enabled the vehicle to Bridge floor above and below gently.
Utility model content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the utility model provides a kind of Long Span Steel Bridge device, has X and facilitates maintenance The advantages that maintenance, solves the problems in above-mentioned background.
(2) technical solution
In order to achieve the above object, the utility model provides the following technical solutions: a kind of Long Span Steel Bridge device, including The quantity of first floating harbour, the second floating harbour and cushion cap, the second floating harbour is two, the first floating harbour Top be fixedly installed with river end support, bank end support, the top of river end support are fixedly installed at the top of the cushion cap Main gantry is fixedly installed between the top of bank end support, the described first side for floating the adjacent cushion cap of harbour is fixedly installed with Draw bar and connecting rod, the quantity of the connecting rod are two, and two connecting rods are located at the two sides of main gantry, described The quantity of draw bar is two, and two draw bars are located at the two sides of two connecting rods, and two draw bars are adjacent Lower boom is fixedly installed between two second floating harbours, the both ends of the lower boom pass through anchor system and the first floating respectively The surface of harbour and the second floating harbour is fixedly connected, and the surface of host bridge frame is fixedly installed with Men Shi and bridge floor.
Preferably, the both ends of host bridge frame pass through anchor system and are fixedly connected with the surface of the first floating harbour and cushion cap.
Preferably, the inside of host bridge frame is fixedly installed with vertical lateral and lower vertical lateral, and upper vertical lateral is indulged with lower Lateral interconnection.
Preferably, the two sides of host bridge frame are fixedly installed with cable testing bridge.
Preferably, support plate, and the bottom of river end support and support are fixedly installed at the top of the first floating harbour It is fixedly connected at the top of plate.
(3) beneficial effect
Compared with prior art, the utility model provides a kind of Long Span Steel Bridge device, have it is following the utility model has the advantages that
The Long Span Steel Bridge device, the first floating harbour are gone up and down according to the height of water level, change main gantry Tilt angle, main gantry passes through anchor system with lower boom and is fixedly connected, and when needing to overhaul main gantry, can pass through anchor System changes the elastic of main gantry, facilitates maintenance and maintenance to main gantry.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the utility model structure top view;
Fig. 3 is the utility model partial structural diagram.
In figure: 1, main gantry;2, Men Shi;3, bridge floor;4, upper vertical lateral;5, lower vertical lateral;6, bank end support;7, Jiang Duanzhi Seat;8, anchor system;9, cable testing bridge;10, the first floating harbour;11, lower boom;12, the second floating harbour;13, cushion cap;14, it leads Draw bar;15, connecting rod;16, support plate.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
It please refers to Fig. 1-3, a kind of Long Span Steel Bridge device, including the first floating harbour 10, second and floats 12 and of harbour Cushion cap 13, the quantity of the second floating harbour 12 are two, and the top of the first floating harbour 10 is fixedly installed with river end support 7, holds The top of platform 13 is fixedly installed with bank end support 6, is fixedly installed between the top of river end support 7 and the top of bank end support 6 The side of main gantry 1, the first floating adjacent cushion cap 13 of harbour 10 is fixedly installed with draw bar 14 and connecting rod 15, connecting rod 15 Quantity is two, and two connecting rods 15 are located at the two sides of main gantry 1, and the quantity of draw bar 14 is two, two draw bars 14 are located at the two sides of two connecting rods 15, and two draw bars 14 two neighboring second float to be fixedly mounted between harbour 12 There is lower boom 11, the both ends of lower boom 11 pass through the surface of anchor system 8 and the first floating harbour 10 and the second floating harbour 12 respectively It is fixedly connected, the surface of main gantry 1 is fixedly installed with Men Shi 2 and bridge floor 3.
During this is practical, the both ends of main gantry 1 pass through the fixed company in surface of anchor system 8 and the first floating harbour 10 and cushion cap 13 It connects, the inside of main gantry 1 is fixedly installed with vertical lateral 4 and lower vertical lateral 5, and upper vertical lateral 4 intersects company with lower vertical lateral 5 It connecing, the two sides of main gantry 1 are fixedly installed with cable testing bridge 9, and the top of the first floating harbour 10 is fixedly installed with support plate 16, And the bottom of river end support 7 is fixedly connected with the top of support plate 16.
When work, the both ends of main gantry 1 are individually placed to the top of the first floating harbour 10 and cushion cap 13, respectively with anchor system 8 are fixedly connected at the both ends of main gantry 1 with the first floating harbour 10 and cushion cap 13, then by anchor system 8 by the both ends of lower boom 11 It is fixedly connected respectively with the surface of the first floating harbour 10 and the second floating harbour 13, when needs carry out maintenance inspection to main gantry 1 When repairing, anchor system 8 is loosened, easy to operate, stability is good.
In conclusion the Long Span Steel Bridge device, the first floating harbour 10 is gone up and down according to the height of water level, is changed Become the tilt angle of main gantry 1, main gantry 1 is fixedly connected by anchor system 8 with lower boom 11, when need to main gantry 1 into When row maintenance, maintenance and maintenance to main gantry can be facilitated by the elastic of the main gantry 1 of 8 change of anchor system.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (5)

1. a kind of Long Span Steel Bridge device, including the first floating harbour (10), the second floating harbour (12) and cushion cap (13), Be characterized in that: the quantity of second floating harbour (12) is two, and the top of first floating harbour (10) is fixedly mounted Have river end support (7), be fixedly installed with bank end support (6) at the top of the cushion cap (13), the top of river end support (7) with It is fixedly installed between the top of bank end support (6) main gantry (1), described first floats the one of harbour (10) adjacent cushion cap (13) Side is fixedly installed with draw bar (14) and connecting rod (15), and the quantity of the connecting rod (15) is two, two connecting rods (15) two sides of main gantry (1) are located at, the quantity of the draw bar (14) is two, and two draw bars (14) are respectively It is fixed between two two neighboring second floatings harbour (12) of draw bar (14) positioned at the two sides of two connecting rods (15) It is equipped with lower boom (11), the both ends of the lower boom (11) pass through anchor system (8) and the first floating harbour (10) and second respectively The surface of floating harbour (12) is fixedly connected, and the surface of host bridge frame (1) is fixedly installed with Men Shi (2) and bridge floor (3).
2. a kind of Long Span Steel Bridge device according to claim 1, it is characterised in that: the both ends of host bridge frame (1) It is fixedly connected by anchor system (8) with the surface of the first floating harbour (10) and cushion cap (13).
3. a kind of Long Span Steel Bridge device according to claim 1, it is characterised in that: the inside of host bridge frame (1) It is fixedly installed with vertical lateral (4) and lower vertical lateral (5), and upper vertical lateral (4) and lower vertical lateral (5) interconnection.
4. a kind of Long Span Steel Bridge device according to claim 1, it is characterised in that: the two sides of host bridge frame (1) It is fixedly installed with cable testing bridge (9).
5. a kind of Long Span Steel Bridge device according to claim 1, it is characterised in that: first floating harbour (10) Top be fixedly installed with support plate (16), and be fixedly connected at the top of the bottom of river end support (7) and support plate (16).
CN201821955564.0U 2018-11-26 2018-11-26 A kind of Long Span Steel Bridge device Active CN209243549U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821955564.0U CN209243549U (en) 2018-11-26 2018-11-26 A kind of Long Span Steel Bridge device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821955564.0U CN209243549U (en) 2018-11-26 2018-11-26 A kind of Long Span Steel Bridge device

Publications (1)

Publication Number Publication Date
CN209243549U true CN209243549U (en) 2019-08-13

Family

ID=67529451

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821955564.0U Active CN209243549U (en) 2018-11-26 2018-11-26 A kind of Long Span Steel Bridge device

Country Status (1)

Country Link
CN (1) CN209243549U (en)

Similar Documents

Publication Publication Date Title
CN208105019U (en) A kind of bridge deformation monitoring safety pre-warning system
CN104594201B (en) A kind of method utilizing one-sided pier-side bracket to set up pier top girder steel
CN209243549U (en) A kind of Long Span Steel Bridge device
CN104060585B (en) Floating-plug bulkhead gate
CN212176015U (en) Town road drainage device
CN104002936B (en) A kind of shoal, strand drilling platform
CN109268251B (en) A kind of Anti-inclining buoyancy tank halogen-extracting pump station
CN206956752U (en) The assembly of steel cofferdam coxopodite and suspension system
CN206828959U (en) A kind of municipal bridge guardrail
CN203819481U (en) Bottomless buoy for offshore floating platform
CN217328772U (en) Simple three-leg jacket suitable for hundred-meter water depth
CN205688420U (en) A kind of steel structure device of power station maintenance construction in operation
CN214219400U (en) High pier stud concrete curing means of bridge
CN202828999U (en) Complete machine high-rail unshipping jacking rail entering device
CN209353310U (en) A kind of novel float-type garbage barrier net
CN205168832U (en) Pier of perpendicular keg float formula heaving pile ware
CN213114577U (en) Boat passing device for fish culture through block net
CN108930260A (en) The installation method of jack-up unit spud leg
CN211285682U (en) Deepwater cantilever type tower crane foundation structure
CN208219547U (en) A kind of suspension mounting structure of harbour lower section shore protection block
CN208235574U (en) Base-supporting pedestal for the storage of bridge prefabrication column
CN207958998U (en) A kind of not contour steel suspended box cofferdam floor structure
CN105672135A (en) Simulation pre-pressing method for concrete box girder construction supporting frame
CN206385459U (en) A kind of portable bridge cleaning device
CN207159946U (en) Channel intake floats impurity separator

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 516100 No. 9, Gongye Avenue, Dakeng office, BOLUO Yangqiao Town, Huizhou City, Guangdong Province

Patentee after: Guangdong Hehai Heavy Industry Co.,Ltd.

Address before: No. ck11, community 68, Jinlong Avenue, Jiangbei, Huizhou, Guangdong 516000

Patentee before: Huizhou Hehai Heavy Industry Co.,Ltd.