CN209228538U - Cable Lifting Kit - Google Patents
Cable Lifting Kit Download PDFInfo
- Publication number
- CN209228538U CN209228538U CN201822123668.1U CN201822123668U CN209228538U CN 209228538 U CN209228538 U CN 209228538U CN 201822123668 U CN201822123668 U CN 201822123668U CN 209228538 U CN209228538 U CN 209228538U
- Authority
- CN
- China
- Prior art keywords
- cable
- tower
- traction device
- hoisting component
- saddle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
Landscapes
- Types And Forms Of Lifts (AREA)
Abstract
本实用新型涉及一种电缆吊装组件,用于风力发电机组,该电缆吊装组件包括:牵引装置,靠近风力发电机组的机舱设置,牵引装置连接电缆的一端;放线装置,位于风力发电机组的塔筒底部,电缆的另一端缠绕于放线装置上;滚动件,靠近塔筒的马鞍平台设置,滚动件与牵引装置之间的连线与水平面呈预定角度设置;以及,导向组件,包括多个导向轮,多个导向轮至少位于塔筒底部、马鞍平台下方的爬梯处。本实用新型通过滚动件调整电缆在爬梯侧至机舱之间的吊装摩擦阻力,提高了电缆的吊装效率和使用寿命。
The utility model relates to a cable hoisting assembly for a wind turbine generator set, the cable hoisting assembly comprising: a traction device, arranged near the cabin of the wind turbine generator set, the traction device connected to one end of the cable; a pay-off device, located at the bottom of the tower of the wind turbine generator set, the other end of the cable wound on the pay-off device; a rolling element, arranged near the saddle platform of the tower, the connecting line between the rolling element and the traction device being arranged at a predetermined angle to the horizontal plane; and a guide assembly, comprising a plurality of guide wheels, the plurality of guide wheels being at least located at the ladder at the bottom of the tower and below the saddle platform. The utility model adjusts the lifting friction resistance of the cable between the ladder side and the cabin through the rolling element, thereby improving the lifting efficiency and service life of the cable.
Description
技术领域technical field
本实用新型涉及风力发电技术领域,特别是涉及一种电缆吊装组件。The utility model relates to the technical field of wind power generation, in particular to a cable hoisting assembly.
背景技术Background technique
目前,风力发电机组的动力电缆多为分段预敷设在多个塔筒段内的低压电缆,然后在现场组装塔筒段时再将低压电缆对接,以减小现场的电气工作量。随着风力发电机组容量的增大,采用整根高压电缆代替分段敷设的多根低压电缆已逐渐成为趋势,由于省去了原来塔筒底部的环控设备,仅需一套机舱的环控设备即可,降低了设备成本。At present, the power cables of wind turbines are mostly low-voltage cables pre-laid in multiple tower sections, and then the low-voltage cables are connected when the tower sections are assembled on site to reduce the electrical workload on site. With the increase of the capacity of wind turbines, it has gradually become a trend to use a whole high-voltage cable instead of multiple low-voltage cables laid in sections. Since the original environmental control equipment at the bottom of the tower is omitted, only one set of environmental control equipment for the engine room is required. The equipment is sufficient, and the equipment cost is reduced.
由于高压电缆由塔筒外整体吊装至机舱的路径比较长,在吊装过程中高压电缆容易因摩擦阻力被磨损,影响电缆的使用寿命。Due to the relatively long path for the high-voltage cables to be hoisted from the outside of the tower to the engine room, the high-voltage cables are easily worn due to frictional resistance during the hoisting process, which affects the service life of the cables.
实用新型内容Utility model content
本实用新型的目的是提供一种电缆吊装组件,其可以减小电缆在吊装过程中的磨擦阻力。The purpose of the utility model is to provide a cable hoisting assembly, which can reduce the frictional resistance of the cable during hoisting.
本实用新型提供了一种电缆吊装组件,用于风力发电机组,该电缆吊装组件包括:牵引装置,靠近风力发电机组的机舱设置,牵引装置连接电缆的一端;放线装置,位于风力发电机组的塔筒底部,电缆的另一端缠绕于放线装置上;滚动件,靠近塔筒的马鞍平台设置,滚动件与牵引装置之间的连线与水平面呈预定角度设置;以及,导向组件,包括多个导向轮,多个导向轮至少位于塔筒底部、马鞍平台下方的爬梯处。The utility model provides a cable hoisting assembly, which is used for a wind power generating set. The cable hoisting assembly includes: a traction device, which is arranged close to the engine room of the wind power generating set, and one end of the cable connected to the traction device; At the bottom of the tower, the other end of the cable is wound on the pay-off device; the rolling element is set close to the saddle platform of the tower, and the connection line between the rolling element and the traction device is set at a predetermined angle with the horizontal plane; and the guide assembly includes multiple A plurality of guide wheels are located at least at the bottom of the tower and at the climbing ladder below the saddle platform.
根据本实用新型实施例的一个方面,滚动件为滚筒,塔筒的壁部靠近马鞍平台的位置设置有第一转接架,滚筒的转轴与第一转接架连接。According to an aspect of the embodiment of the present invention, the rolling member is a roller, and a first adapter frame is provided on the wall of the tower close to the saddle platform, and the rotating shaft of the roller is connected to the first adapter frame.
根据本实用新型实施例的一个方面,滚筒上设置有可拆卸的定位销,定位销用于将滚筒固定于第一转接架上。According to an aspect of the embodiment of the present invention, a detachable positioning pin is provided on the drum, and the positioning pin is used to fix the drum to the first adapter frame.
根据本实用新型实施例的一个方面,滚筒的外周面上设置有多个固定孔,电缆通过穿过固定孔的束紧件固定于滚筒上。According to one aspect of the embodiment of the present invention, a plurality of fixing holes are provided on the outer peripheral surface of the drum, and the cables are fixed on the drum through the tightening parts passing through the fixing holes.
根据本实用新型实施例的一个方面,滚动件为滑轮组,滑轮组包括至少两个滑轮,其中一个滑轮设置于马鞍平台上且靠近爬梯,另一个滑轮设置于马鞍平台上且位于牵引装置的下方。According to an aspect of the embodiment of the present invention, the rolling member is a pulley block, and the pulley block includes at least two pulleys, one of which is arranged on the saddle platform and close to the climbing ladder, and the other pulley is arranged on the saddle platform and below the traction device.
根据本实用新型实施例的一个方面,电缆吊装组件进一步包括马鞍桥架,马鞍桥架为具有弧形面的薄板,马鞍桥架的一端朝向牵引装置,马鞍桥架的另一端朝向爬梯。According to an aspect of the embodiment of the present invention, the cable hoisting assembly further includes a saddle bridge, the saddle bridge is a thin plate with a curved surface, one end of the saddle bridge faces the traction device, and the other end of the saddle bridge faces the ladder.
根据本实用新型实施例的一个方面,塔筒的壁部对应马鞍桥架设置有第二转接架,马鞍桥架与第二转接架连接。According to an aspect of the embodiment of the present invention, the wall of the tower is provided with a second adapter frame corresponding to the saddle bridge, and the saddle bridge is connected to the second adapter frame.
根据本实用新型实施例的一个方面,导向组件还包括放线支架,放线支架设置于放线装置与塔筒底部的导向轮之间。According to an aspect of the embodiment of the present invention, the guide assembly further includes a wire-releasing bracket, and the wire-releasing bracket is arranged between the wire-releasing device and the guide wheel at the bottom of the tower.
根据本实用新型实施例的一个方面,导向组件还包括位于牵引装置与滚动件之间的多个导向轮。According to an aspect of the embodiment of the present utility model, the guide assembly further includes a plurality of guide wheels located between the traction device and the rolling member.
根据本实用新型实施例的一个方面,牵引装置为电动葫芦或者手动葫芦。According to an aspect of the embodiment of the present utility model, the traction device is an electric hoist or a manual hoist.
本实用新型提供的电缆吊装组件,通过滚动件调整电缆在爬梯侧至机舱之间的吊装摩擦阻力,提高了电缆的吊装效率和使用寿命。The cable hoisting assembly provided by the utility model adjusts the hoisting friction resistance of the cable between the side of the ladder and the engine room through rolling parts, thereby improving the hoisting efficiency and service life of the cable.
附图说明Description of drawings
下面将参考附图来描述本实用新型示例性实施例的特征、优点和技术效果。The features, advantages and technical effects of the exemplary embodiments of the present invention will be described below with reference to the accompanying drawings.
图1是本实用新型提供的一种电缆吊装组件的结构示意图;Fig. 1 is a schematic structural view of a cable hoisting assembly provided by the utility model;
图2是图1所示的电缆吊装组件中的滚筒的结构示意图;Fig. 2 is a schematic structural view of the drum in the cable hoisting assembly shown in Fig. 1;
图3是本实用新型提供的另一种电缆吊装组件的结构示意图。Fig. 3 is a structural schematic diagram of another cable hoisting assembly provided by the utility model.
其中:in:
10-牵引装置;20-放线装置;30-滚动件;31-第一转接架;32-定位销;33-固定孔;35-滑轮;40-导向组件;41-导向轮;42-放线支架;51-第二转接架;50-马鞍桥架;10-traction device; 20-pay-off device; 30-rolling parts; 31-first adapter frame; 32-locating pin; 33-fixing hole; 35-pulley; 40-guide assembly; Pay-off bracket; 51-second adapter frame; 50-saddle bridge;
C-机舱;T-塔筒;S-马鞍平台;E-进入门;L-电缆。C-nacelle; T-tower; S-saddle platform; E-access door; L-cable.
在附图中,相同的部件使用相同的附图标记。附图并未按照实际的比例绘制。In the figures, the same parts are given the same reference numerals. The drawings are not drawn to scale.
具体实施方式Detailed ways
下面将详细描述本实用新型的各个方面的特征和示例性实施例。在下面的详细描述中,提出了许多具体细节,以便提供对本实用新型的全面理解。但是,对于本领域技术人员来说很明显的是,本实用新型可以在不需要这些具体细节中的一些细节的情况下实施。下面对实施例的描述仅仅是为了通过示出本实用新型的示例来提供对本实用新型的更好的理解。在附图和下面的描述中,至少部分的公知结构和技术没有被示出,以便避免对本实用新型造成不必要的模糊;并且,为了清晰,可能夸大了部分结构的尺寸。此外,下文中所描述的特征、结构或特性可以以任何合适的方式结合在一个或更多实施例中。Features and exemplary embodiments of various aspects of the present invention will be described in detail below. In the following detailed description, numerous specific details are set forth in order to provide a thorough understanding of the present invention. It will be apparent, however, to one skilled in the art that the present invention may be practiced without some of these specific details. The following description of the embodiments is only to provide a better understanding of the present invention by showing examples of the present invention. In the drawings and the following description, at least some of the well-known structures and techniques are not shown in order to avoid unnecessary obscurity of the present invention; and, for clarity, the size of some structures may be exaggerated. Furthermore, the features, structures, or characteristics described hereinafter may be combined in any suitable manner in one or more embodiments.
下述描述中出现的方位词均为图中示出的方向,并不是对本实用新型的具体结构进行限定。在本实用新型的描述中,还需要说明的是,除非另有明确的规定和限定,术语“安装”、“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸式连接,或一体地连接;可以是直接相连,也可以间接相连。对于本领域的普通技术人员而言,可视具体情况理解上述术语在本实用新型中的具体含义。The orientation words appearing in the following description are the directions shown in the figure, and are not intended to limit the specific structure of the present invention. In the description of the present utility model, it should also be noted that unless otherwise specified and limited, the terms "installation" and "connection" should be understood in a broad sense, for example, it can be a fixed connection or a detachable connection , or integrally connected; it can be directly connected or indirectly connected. Those of ordinary skill in the art can understand the specific meanings of the above terms in the present utility model according to specific situations.
为了更好地理解本实用新型,下面结合图1至图3对本实用新型实施例提供的电缆吊装组件进行详细描述。In order to better understand the utility model, the cable hoisting assembly provided by the embodiment of the utility model will be described in detail below with reference to FIG. 1 to FIG. 3 .
参阅图1,本实用新型提供了一种电缆吊装组件,用于风力发电机组。该电缆吊装组件包括:牵引装置10、放线装置20、滚动件30和导向组件40。Referring to Fig. 1, the utility model provides a cable hoisting assembly for a wind power generating set. The cable hoisting assembly includes: a traction device 10 , a pay-off device 20 , a rolling element 30 and a guide assembly 40 .
牵引装置10靠近风力发电机组的机舱C设置,可以位于机舱C的内部,也可以位于机舱C的下方,牵引装置10连接电缆L的一端。牵引装置10可以为电动葫芦或者手动葫芦,用于提供吊装电缆的动力。The traction device 10 is set close to the nacelle C of the wind power generating set, and can be located inside the nacelle C or below the nacelle C. The traction device 10 is connected to one end of the cable L. The traction device 10 can be an electric hoist or a manual hoist, and is used to provide power for hoisting cables.
放线装置20位于风力发电机组的塔筒T底部,可以放置于塔筒T内部的地面上,也可以放置于塔筒T外的地面上,对于海上风力发电机组,放线装置20位于塔筒T外的船的甲板上,电缆L的另一端缠绕于放线装置20上,电缆L优选为高压电缆。放线装置20可以实现自动放线,便于操作人员灵活放线。The pay-off device 20 is located at the bottom of the tower T of the wind power generating set, and can be placed on the ground inside the tower T or on the ground outside the tower T. For offshore wind power generating sets, the pay-off device 20 is located On the deck of the ship outside T, the other end of the cable L is wound on the pay-off device 20, and the cable L is preferably a high-voltage cable. The pay-off device 20 can realize automatic pay-off, which is convenient for the operator to pay-off flexibly.
滚动件30靠近塔筒T的马鞍平台S设置,滚动件30与牵引装置10之间的连线与水平面呈预定角度设置。该预定角度例如可以为小于或者等于45°。The rolling element 30 is arranged close to the saddle platform S of the tower T, and the line between the rolling element 30 and the traction device 10 is set at a predetermined angle to the horizontal plane. The predetermined angle may be, for example, less than or equal to 45°.
导向组件40包括多个导向轮41,多个导向轮41至少位于塔筒T底部、马鞍平台S下方的爬梯处,例如放线装置20放置于塔筒T外的地面上时,塔筒T的进入门E处也放置有导向轮41,避免电缆L在放线过程中由于自重与塔筒T的底部地面发生摩擦。导向轮41的转轴可以通过紧固件固定至地面或者爬梯上,也可以通过焊接的方式紧固,优选为紧固件固定的方式,以便于在线缆L吊装完成后拆卸。The guide assembly 40 includes a plurality of guide wheels 41, and the plurality of guide wheels 41 are located at least at the bottom of the tower T and at the ladder below the saddle platform S. For example, when the pay-off device 20 is placed on the ground outside the tower T, the tower T A guide wheel 41 is also placed at the entrance door E to prevent the cable L from rubbing against the ground at the bottom of the tower T due to its own weight during the unwinding process. The rotating shaft of the guide wheel 41 can be fixed to the ground or the ladder by fasteners, or can be fastened by welding, preferably by fasteners, so as to facilitate disassembly after the cable L is hoisted.
以放线装置20放置于塔筒T外为例,在电缆L的吊装过程中,先由操作人员携带电缆L的一端由放线装置20依次经由塔筒T进入门E处的导向轮41、爬梯处的导向轮41、滚动件30挂接至牵引装置10,或者乘坐塔筒T内的电梯或者爬梯到达牵引装置10处,将电缆L的一端挂接到牵引装置10上,同时在返回过程中将电缆L依次放置于滚动件30、塔筒T进入门E处的导向轮41、爬梯处的导向轮41等多个导向轮41。放线装置20在牵引装置10的作用下自动放线,最终完成整根电缆的吊装工作。Taking the pay-off device 20 placed outside the tower T as an example, during the hoisting process of the cable L, the operator first carries one end of the cable L, and the pay-off device 20 enters the guide wheel 41 at the door E via the tower T, The guide wheels 41 and rolling elements 30 at the ladder are hooked to the traction device 10, or take the elevator or ladder in the tower T to reach the traction device 10, and hook one end of the cable L to the traction device 10, and at the same time, during the return process Place the cable L on the rolling member 30, the guide wheel 41 at the entrance door E of the tower T, the guide wheel 41 at the ladder, and other guide wheels 41 in sequence. The pay-off device 20 automatically pays out the wire under the action of the traction device 10, and finally completes the hoisting work of the whole cable.
由于爬梯靠近塔筒T的壁部设置,牵引装置10位于机舱下方,从爬梯处的导向轮41到牵引装置10处的电缆被斜向拉伸,经由滚动件30可以调整电缆的倾斜程度,以减小电缆吊装过程中的摩擦阻力。Since the ladder is arranged near the wall of the tower T, the traction device 10 is located below the nacelle, and the cable from the guide wheel 41 at the ladder to the traction device 10 is obliquely stretched, and the inclination of the cable can be adjusted via the rolling member 30 to Reduce frictional resistance during cable hoisting.
本实用新型提供的电缆吊装组件,通过滚动件30调整电缆L在爬梯侧至机舱C之间的吊装摩擦阻力,提高了电缆L的吊装效率和使用寿命。The cable hoisting assembly provided by the utility model adjusts the hoisting friction resistance of the cable L between the side of the ladder and the cabin C through the rolling member 30, thereby improving the hoisting efficiency and service life of the cable L.
参阅图2,滚动件30可以为滚筒,塔筒T的壁部靠近马鞍平台S的位置设置有第一转接架31,滚筒的转轴与第一转接架31连接。滚筒绕转轴转动,从而由爬梯处的导向轮41到牵引装置10被斜向拉伸的电缆经由滚筒的滚动可以改变电缆的倾斜程度,提高了电缆的吊装效率。Referring to FIG. 2 , the rolling member 30 can be a roller, and a first adapter frame 31 is provided on the wall of the tower T close to the saddle platform S, and the rotating shaft of the roller is connected to the first adapter frame 31 . The drum rotates around the axis of rotation, so that the cables stretched obliquely from the guide wheels 41 at the ladder to the traction device 10 can change the inclination of the cables through the rolling of the drums, improving the hoisting efficiency of the cables.
另外,滚筒上设置有可拆卸的定位销32,定位销32用于将滚筒固定于第一转接架31上。吊装电缆L时,将定位销32从滚筒内拔出,利用滚筒的滚动使电缆L易于吊装。吊装完毕后,通过定位销32将滚筒固定于第一转接架31上。In addition, a detachable positioning pin 32 is provided on the drum, and the positioning pin 32 is used to fix the drum on the first adapter frame 31 . When hoisting the cable L, the positioning pin 32 is pulled out from the drum, and the rolling of the drum is used to facilitate the hoisting of the cable L. After the hoisting is completed, the drum is fixed on the first adapter frame 31 through the positioning pin 32 .
另外,由于电缆L随机舱C的偏航系统的转动而转动,因此需预留出足够的转动余量,另外,后续维护电缆时也需要用预留的电缆压接电缆头,预留的线缆可以缠绕于滚筒上,而不必放置于机舱C内,可以减小机舱C的整体尺寸。In addition, since the cable L rotates with the rotation of the yaw system of the cabin C, sufficient rotation margin must be reserved. In addition, the reserved cable also needs to be used to crimp the cable head during subsequent maintenance of the cable. The cable can be wound on the drum instead of being placed in the nacelle C, and the overall size of the nacelle C can be reduced.
进一步地,为了防止预留的电缆在滚筒上脱落,滚筒的外周面上设置有多个固定孔33,用于压接电缆头的电缆通过穿过固定孔33的束紧件固定于滚筒的外周面上。束紧件可以为电缆管夹或者扎带,可以将预留电缆整齐地缠绕于滚筒上。Further, in order to prevent the reserved cables from falling off on the drum, a plurality of fixing holes 33 are provided on the outer peripheral surface of the drum, and the cables used for crimping the cable heads are fixed to the outer circumference of the drum through the tightening parts passing through the fixing holes 33 face. The tightening parts can be cable pipe clips or cable ties, which can neatly wind the reserved cables on the drum.
电缆维护时,解开束紧件,拔出定位销32,利用牵引装置向上提升电缆,压接电缆头的电缆可以用于机舱C处的二次电缆使用。如果需要更换整根电缆,通过滚筒的滚动也可以灵活地更换电缆。During cable maintenance, untie the tightening member, pull out the positioning pin 32, utilize the traction device to lift the cable upwards, and the cable of the crimped cable head can be used for the secondary cable at the engine room C place. If the entire cable needs to be replaced, the rolling of the drum can also flexibly replace the cable.
放线装置20放置于塔筒T外时,由于放线装置20与塔筒进入门E处之间一般相隔一定距离,为了防止电缆L在自身重力的作用下下垂而与地面、船的甲板或其它建筑物发生摩擦,导向组件40还包括放线支架42,放线支架42设置于放线装置20与塔筒底部的进入门E处的导向轮41之间。放线支架42包括固定架和支撑固定架的导向轮。When the pay-off device 20 is placed outside the tower T, since the pay-off device 20 and the entrance door E of the tower are generally separated by a certain distance, in order to prevent the cable L from sagging under the action of its own gravity, it will not contact the ground, the deck of the ship or If friction occurs in other buildings, the guide assembly 40 also includes a pay-off bracket 42, which is arranged between the pay-off device 20 and the guide wheel 41 at the entrance door E at the bottom of the tower. The pay-off support 42 includes a fixed frame and guide wheels supporting the fixed frame.
另外,导向组件40还包括位于牵引装置10与滚动件30之间的多个导向轮41,例如,可以在塔筒T的顶平台和电梯到达平台上分别设置导向轮41,以进一步降低爬梯处的导向轮41到牵引装置10被斜向拉伸的电缆的倾斜程度,避免电缆在吊装过程中被顶平台和电梯到达平台磨损,提高电缆L的吊装效率。In addition, the guide assembly 40 also includes a plurality of guide wheels 41 located between the traction device 10 and the rolling member 30. For example, the guide wheels 41 can be respectively set on the top platform of the tower T and the elevator arrival platform to further reduce the height of the ladder. The inclination of the guide wheel 41 to the obliquely stretched cable of the traction device 10 can avoid the cable from being worn by the top platform and the elevator arrival platform during the hoisting process, and improve the hoisting efficiency of the cable L.
由此,本实用新型提供的电缆吊装组件在电缆L吊装完成后,可以将放线装置20和导向组件40移除,滚筒用于挂接预留的电缆。Thus, the cable hoisting assembly provided by the present invention can remove the pay-off device 20 and the guide assembly 40 after the hoisting of the cable L is completed, and the roller is used to hook the reserved cables.
参阅图3,本实用新型还提供了一种电缆吊装组件,其与图1中的电缆吊装组件结构类似,不同之处在于,滚动件30为滑轮组。Referring to FIG. 3 , the utility model also provides a cable hoisting assembly, which is similar in structure to the cable hoisting assembly in FIG. 1 , except that the rolling member 30 is a pulley block.
滑轮组包括至少两个滑轮35,其中一个滑轮35设置于马鞍平台S上且靠近爬梯,另一个滑轮35设置于马鞍平台S上且位于牵引装置10的下方。滑轮组可以改变电缆L的提升方向,将从爬梯处的导向轮41到牵引装置10的电缆由斜向拉伸改为竖直向上拉伸,相对于图1中的滚筒,进一步减小了电缆L吊装过程中受到的摩擦阻力,简化了电缆L的吊装路径。The pulley block includes at least two pulleys 35 , one pulley 35 is arranged on the saddle platform S and close to the climbing ladder, and the other pulley 35 is arranged on the saddle platform S and below the traction device 10 . The pulley block can change the lifting direction of the cable L, and the cable from the guide wheel 41 at the ladder to the traction device 10 is changed from oblique stretching to vertical upward stretching. Compared with the drum in Figure 1, the cable L is further reduced. The friction resistance encountered during the hoisting process simplifies the hoisting path of the cable L.
另外,电缆吊装组件还包括马鞍桥架50,马鞍桥架50具有弧形面,马鞍桥架50的一端朝向牵引装置10,马鞍桥架50的另一端朝向爬梯。塔筒T的壁部对应马鞍桥架50设置有第二转接架51,马鞍桥架50与第二转接架51连接。马鞍桥架50用于放置预留的线缆,而不必将预留的线缆放置于机舱C内,从而减小机舱C的整体尺寸。In addition, the cable hoisting assembly further includes a saddle bridge frame 50 having an arc-shaped surface, one end of the saddle bridge frame 50 faces the traction device 10 , and the other end of the saddle bridge frame 50 faces the climbing ladder. The wall of the tower T is provided with a second adapter frame 51 corresponding to the saddle bridge frame 50 , and the saddle bridge frame 50 is connected to the second adapter frame 51 . The saddle bridge frame 50 is used to place reserved cables without placing the reserved cables in the nacelle C, thereby reducing the overall size of the nacelle C.
可以理解的是,马鞍桥架50也可以用前述的滚筒代替,主要用于承载预留的电缆,以节省电缆的占用空间。It can be understood that the saddle bridge frame 50 can also be replaced by the aforementioned roller, which is mainly used to carry the reserved cables, so as to save the occupied space of the cables.
虽然已经参考优选实施例对本实用新型进行了描述,但在不脱离本实用新型的范围的情况下,可以对其进行各种改进并且可以用等效物替换其中的部件。尤其是,只要不存在结构冲突,各个实施例中所提到的各项技术特征均可以任意方式组合起来。本实用新型并不局限于文中公开的特定实施例,而是包括落入权利要求的范围内的所有技术方案。While the invention has been described with reference to a preferred embodiment, various modifications may be made and equivalents may be substituted for parts thereof without departing from the scope of the invention. In particular, as long as there is no structural conflict, the technical features mentioned in the various embodiments can be combined in any manner. The utility model is not limited to the specific embodiments disclosed herein, but includes all technical solutions falling within the scope of the claims.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201822123668.1U CN209228538U (en) | 2018-12-18 | 2018-12-18 | Cable Lifting Kit |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201822123668.1U CN209228538U (en) | 2018-12-18 | 2018-12-18 | Cable Lifting Kit |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN209228538U true CN209228538U (en) | 2019-08-09 |
Family
ID=67508082
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201822123668.1U Active CN209228538U (en) | 2018-12-18 | 2018-12-18 | Cable Lifting Kit |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN209228538U (en) |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112707231A (en) * | 2021-03-26 | 2021-04-27 | 国网山东省电力公司潍坊市寒亭区供电公司 | Lifting device for cable installation and use method |
| CN113586368A (en) * | 2020-04-30 | 2021-11-02 | 西门子歌美飒可再生能源公司 | Platform for a wind turbine, wind turbine with a platform and method for assembling the same |
| CN113700621A (en) * | 2021-08-23 | 2021-11-26 | 浙江运达风电股份有限公司 | Cable support used inside wind power tower |
| CN114068073A (en) * | 2020-07-31 | 2022-02-18 | 北京金风科创风电设备有限公司 | Cable, wind generating set and cable laying method |
| CN114204484A (en) * | 2021-11-16 | 2022-03-18 | 重庆海装风电工程技术有限公司 | Power cable laying method for wind generating set |
| CN114696262A (en) * | 2020-12-30 | 2022-07-01 | 新疆金风科技股份有限公司 | Cable hoisting and laying device and method, wind turbine |
-
2018
- 2018-12-18 CN CN201822123668.1U patent/CN209228538U/en active Active
Cited By (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113586368A (en) * | 2020-04-30 | 2021-11-02 | 西门子歌美飒可再生能源公司 | Platform for a wind turbine, wind turbine with a platform and method for assembling the same |
| CN114068073A (en) * | 2020-07-31 | 2022-02-18 | 北京金风科创风电设备有限公司 | Cable, wind generating set and cable laying method |
| CN114068073B (en) * | 2020-07-31 | 2024-06-07 | 北京金风科创风电设备有限公司 | Cable, wind generating set and cable laying method |
| CN114696262A (en) * | 2020-12-30 | 2022-07-01 | 新疆金风科技股份有限公司 | Cable hoisting and laying device and method, wind turbine |
| CN112707231A (en) * | 2021-03-26 | 2021-04-27 | 国网山东省电力公司潍坊市寒亭区供电公司 | Lifting device for cable installation and use method |
| CN113700621A (en) * | 2021-08-23 | 2021-11-26 | 浙江运达风电股份有限公司 | Cable support used inside wind power tower |
| CN114204484A (en) * | 2021-11-16 | 2022-03-18 | 重庆海装风电工程技术有限公司 | Power cable laying method for wind generating set |
| CN114204484B (en) * | 2021-11-16 | 2024-01-05 | 重庆海装风电工程技术有限公司 | Power cable laying method for wind generating set |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN209228538U (en) | Cable Lifting Kit | |
| JP5148708B2 (en) | Wind power generator and cable support structure used therefor | |
| US9494133B2 (en) | Method for lowering and raising a wind turbine blade | |
| CN101548099B (en) | Wind power generation device rotating body installation method and wind power generation device construction method | |
| JP4210540B2 (en) | Windmill and wind power generator with easy blade maintenance | |
| CN102734056B (en) | Repair platform is attached to the method for wind turbine | |
| CN101939538A (en) | Development of new tower cabling | |
| US20150284218A1 (en) | Crane with double wire guide and anchoring bracket arranged in the nacelle of a wind turbine | |
| CN203813314U (en) | Elevating device | |
| CN113498400B (en) | Automatic marking line control system and method of handling wind turbine components using the automatic marking line control system | |
| CN107035623A (en) | Vortex-induced vibration inhibiting method in superelevation blower fan tower barrel hoisting process | |
| CN106865422A (en) | A kind of folded truss arm hanging device for installing maintenance of wind powered generator group | |
| TW202102773A (en) | Inspection device of wind power generator and inspection method thereof which can inhibit increase of operation costs and enhance reliability | |
| CN204441087U (en) | Transformer high-voltage bushing lead-in wire mounting bracket | |
| CN110100090A (en) | A method and assembly for handling wind turbine blades | |
| CN111997842B (en) | A kind of installation method of tower and main engine of floating double-wind turbine wind turbine | |
| CN110356959B (en) | Wind wheel hoisting tool | |
| CN205681012U (en) | Live working platform for overhead transmission line | |
| CN103738861B (en) | A kind of ultra-high voltage transformer station type column of steel pipe integral hoisting method | |
| CN106760891A (en) | A kind of steel tube tower cross-arm installs equipment | |
| CN207194592U (en) | A kind of adjustable for height tower bar of cross-arm | |
| CN207417077U (en) | A kind of sea gangway for wind power platform | |
| CN201985472U (en) | Pay-off mechanism and lead laying auxiliary mechanism for guide rope release of helicopter | |
| CN207108176U (en) | Wind-driven generator and its instrument conveying device | |
| CN206143631U (en) | A leading wheel device for installation of cable -stay bridge cable |