CN209227839U - A kind of equipment for building keel partition wall - Google Patents

A kind of equipment for building keel partition wall Download PDF

Info

Publication number
CN209227839U
CN209227839U CN201821528387.8U CN201821528387U CN209227839U CN 209227839 U CN209227839 U CN 209227839U CN 201821528387 U CN201821528387 U CN 201821528387U CN 209227839 U CN209227839 U CN 209227839U
Authority
CN
China
Prior art keywords
control system
equipment
power source
screw
automatic screw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821528387.8U
Other languages
Chinese (zh)
Inventor
樊则森
孙晖
雷俊
苏世龙
马拴鹏
丁沛然
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China State Construction Technology Xuzhou Co Ltd
Original Assignee
China Construction Science and Technology Co Ltd Shenzhen Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Science and Technology Co Ltd Shenzhen Branch filed Critical China Construction Science and Technology Co Ltd Shenzhen Branch
Priority to CN201821528387.8U priority Critical patent/CN209227839U/en
Application granted granted Critical
Publication of CN209227839U publication Critical patent/CN209227839U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a kind of equipment for building keel partition wall, the equipment includes control system, construction robot and composite tool, clamp device and adsorbent equipment are integrated on the composite tool, construction robot, which is controlled, by control system executes corresponding order, so that construction robot cooperation clamp device clamps lightgage steel joist jointly, and lightgage steel joist is placed into specified station;Meanwhile the construction robot can also cooperate the adsorbent equipment adsorb jointly crawl plasterboard, so that lightgage steel joist and plasterboard are mutually aligned, secured the two together later so that plasterboard is placed on specified station.The equipment realizes the automatic installation of light steel keel partition by matched composite tool based on construction robot under control of the control system, compared with artificial, improves construction efficiency, while construction quality is more unified;In addition, requirement of the equipment to environment is lower, can continue to construct under high temperature or low temperature environment.

Description

A kind of equipment for building keel partition wall
Technical field
The utility model belongs to the realm of building construction more particularly to a kind of equipment for building keel partition wall.
Background technique
With the cumulative year after year of value of construction output, while it is consistent to be faced with Frequent Accidents, lack of labor, construction reference again Poor, the ever-increasing pressure of labor cost of property.At the same time, robot technology has significant progress, with robot technology It is more and more for the various equipments of core, in the new direction that various industries lead technology to develop.
Robot technology is introduced into construction industry, forms the construction robot with professional building function, is to solve building One of the effective way of industry problems.Although the industrial application of robot is in manufacturing industry, relative maturity, building are set Meter, production, the industrial grade robotic people of construction stage application are still in blank stage.Currently, domestic light steel keel partition is mainly answered Used in places such as hotel, terminal, passenger station, station, old building remodelings, building course is all by being accomplished manually.Lightgage steel joist Partition wall have it is light-weight, intensity is high, fire resistance is good, versatile and simple to install characteristic, have shockproof, dust-proof, sound insulation, suction Sound, constant temperature and other effects.However, installation procedure is complex, the part category being related to is more, moreover, not applying still at present The precedent of robot construction light steel keel partition.
Construction robot in the world includes Robot, wall-building robot, prefabricated board robot, Work machine at present People, girder steel welding robot, concrete ejection machine people, cleaning robot, tunnelling machine people, robot for disassembling work etc., very More construction robots are the pre-stage test stage, and the construction robot type of large-scale application is few.
Currently, the construction of light steel keel partition is primarily present following shortcoming: the first, installing mainly by being accomplished manually The cost of labor of personnel is higher;The second, process flow is complicated, and it is longer to expend the time;Exist between third, the technology of installation personnel Difference leads to the construction quality disunity of partition wall;4th, installation personnel is higher to environmental requirement, leads to high-temperature temperature or other It is not suitable for not can be carried out continuous construction in the environment of operation.
Utility model content
The technical problem to be solved by the utility model is to provide a kind of equipment for building keel partition wall, it is intended to solve existing Some light steel keel partition construction efficiency are lower, and construction quality is irregular, to the higher problem of environmental requirement.
In order to solve the above technical problems, the utility model is realized in this way, a kind of equipment for building keel partition wall, packet It includes:
Control system;
Construction robot, the construction robot are electrically connected with the control system, and the control system is to the building Robot sends control instruction, and the construction robot receives the control instruction and executes corresponding movement;
Composite tool, the composite tool are removably mounted on the mechanical arm of the construction robot, described compound Tool includes main frame, is equipped with clamp device and adsorbent equipment on the main frame;The clamp device and adsorbent equipment are equal It is electrically connected with the control system, the control system controls the mechanical arm of the construction robot and the clamp device is total to With clamping lightgage steel joist, and it is placed on specified station;The control system controls mechanical arm and the institute of the construction robot It states adsorbent equipment and adsorbs crawl plasterboard jointly, and be placed on the specified station, and by the stone in the specified station Cream plate is connected on the lightgage steel joist.
Further, the composite tool further includes automatic screw-driving device, and the automatic screw-driving device is mounted on institute It states on main frame, and the automatic screw-driving device is electrically connected with the control system, the control system controls the building The mechanical arm of robot drives the automatic screw-driving device to be successively moved to each the turn of the screw station, when the automatically stubborn spiral shell After silk device is moved to the turn of the screw station, the control system controls the automatic screw-driving device automatic screw-driving, with The plasterboard is fixed on the lightgage steel joist.
Further, the main frame includes bottom plate, vertically extends several mounting plates, institute towards the same side on the bottom plate It states adsorbent equipment and clamp device is detachably mounted on the mounting plate, and the absorption end edge of the adsorbent equipment and peace The parallel direction reciprocable of the extending direction of loading board, to adjust between the absorption end of the adsorbent equipment and the bottom plate Distance;The clamping end edge of the clamp device direction perpendicular with the extending direction of mounting plate is retractable to be moved, to clamp Or unclamp the lightgage steel joist.
Further, the clamp device includes at least two gripper assemblies, each gripper assembly includes that guide rail is sliding The parallel finger cylinder of platform and two clamping plates, the parallel finger cylinder of the guide rail slide unit has the first guide rail and two sliding blocks, described Two sliding blocks are mounted on first guide rail in which can be movable relatively, and the two clamping plates are removably mounted on described two respectively On a sliding block;The parallel finger cylinder of the guide rail slide unit is electrically connected with the control system, is led described in the control system control The parallel finger cylinder of rail slide unit drives two sliding blocks close to each other or is located remotely from each other, the two clamping plates it is correspondingly close to each other or It is located remotely from each other, with lightgage steel joist described in clamp or release.
Further, the adsorbent equipment includes at least two Suction cup assemblies, each Suction cup assembly includes sucker, takes out Vacuum plant and the first flexible power source;The first flexible power source is mounted on the mounting plate, the sucker installation In the power output end of the described first flexible power source, the vacuum evacuation device is connect with the sucker by pipeline, and described Vacuum evacuation device and the first flexible power source are electrically connected with the control system, and the control system control described first is flexible Power source drives the sucker to move back and forth along the direction parallel with the extending direction of mounting plate, and the control system controls The vacuum evacuation device is vacuumized, and plasterboard crawl is adsorbed on the sucker.
Further, the automatic screw-driving device is stretched including the first fixed plate, the second fixed plate, the second guide rail, second The flexible power source of contracting power source, third, automatic screw-driving rifle and nails introducer;
First fixed plate is mounted on the bottom plate, and second guide rail is mounted in first fixed plate, and Second guide rail is parallel with the extending direction of the mounting plate, and second fixed plate is mounted on described with being reciprocally moveable On second guide rail, the second flexible power source is mounted in first fixed plate, and the second flexible power source is dynamic Power output end is connect with second fixed plate;
The flexible power source of the third and automatic screw-driving rifle are installed in second fixed plate, and the nails introducer It is connect with the automatic screw-driving rifle, screw is sent into automatic screw-driving rifle;The power output of the flexible power source of the third End is protruded into inside the automatic screw-driving rifle, and is moved back and forth along the direction parallel with the extending direction of mounting plate, when described After screw is sent into automatic screw-driving rifle by nails introducer, the power output end of the flexible power source of the third is along the extension side of mounting plate To stretching, to support the screw that the nails introducer is sent into automatic screw-driving rifle, after the screw is tightened, the third is stretched The power output end of contracting power source retracts to original position;
The second flexible power source, third stretch power source, automatic screw-driving rifle and nails introducer with the control System electrical connection.
Further, the equipment further includes mobile chassis, and the mobile chassis includes platform and driving device, described flat Platform is placed on above the driving device, and the control system, construction robot are both placed on the platform.
Further, the mobile chassis further includes several support foots, and one end of the support foot is fixed on the platform, institute The other end for stating support foot is scalable along the vertical direction, and is respectively supported on ground or mutually separates with ground.
Compared with prior art, beneficial effect is the utility model: a kind of construction keel partition wall of the utility model Equipment comprising control system, construction robot and composite tool are integrated with clamp device and absorption on the composite tool Device controls construction robot by control system and executes corresponding order, so that construction robot cooperation clamp device is common Lightgage steel joist is clamped, and lightgage steel joist is placed into specified station;Meanwhile the construction robot can also cooperate the absorption to fill Common absorption crawl plasterboard is set, so that plasterboard is placed on specified station, so that lightgage steel joist and plasterboard are mutually aligned, It secures the two together later.The equipment is based on construction robot, by matched composite tool in control system The automatic installation that light steel keel partition is realized under the control of system improves construction efficiency, while construction quality compared with artificial It is more unified;In addition, requirement of the equipment to environment is lower, can continue to construct under high temperature or low temperature environment.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of the equipment of construction keel partition wall of the utility model first embodiment;
Fig. 2 is the structural schematic diagram of composite tool in Fig. 1;
Fig. 3 is the decomposition texture schematic diagram of Fig. 2;
Fig. 4 is the decomposition texture schematic diagram of gripper assembly in Fig. 3;
Fig. 5 is the decomposition texture schematic diagram of absorbent module in Fig. 3;
Fig. 6 is the structural schematic diagram of automatic screw-driving device in Fig. 3;
Fig. 7 is a kind of structural schematic diagram of the equipment of construction keel partition wall of the utility model second embodiment;
Fig. 8 is a kind of flow chart of method for building keel partition wall provided by the embodiment of the utility model.
In the accompanying drawings, each appended drawing reference indicates:
100, the equipment of keel partition wall is built;10, control system;20, construction robot;30, composite tool;21, mechanical Arm;31, main frame;32, clamp device;33, adsorbent equipment;34, automatic screw-driving device;311, bottom plate;312, mounting plate; 321, the parallel finger cylinder of guide rail slide unit;322, clamping plate;3211, the first guide rail;3212, sliding block;331, sucker;332, first stretches Contracting power source;341, the first fixed plate;342, the second fixed plate;343, the second guide rail;344, the second flexible power source;345, Three flexible power sources;346, automatic screw-driving rifle;40, mobile chassis;41, platform;42, driving device;43, support foot.
Specific embodiment
In order to make the purpose of the utility model, technical solutions and advantages more clearly understood, below in conjunction with attached drawing and implementation Example, the present invention will be further described in detail.It should be appreciated that specific embodiment described herein is only used to explain The utility model is not used to limit the utility model.
It should be noted that it can be directly another when element is referred to as " being fixed on " or " being set to " another element On one element or indirectly on another element.When an element is known as " being connected to " another element, it can To be directly to another element or be indirectly connected on another element.
It is to be appreciated that term " length ", " width ", "upper", "lower", "front", "rear", "left", "right", "vertical", The orientation or positional relationship of the instructions such as "horizontal", "top", "bottom", "inner", "outside" is that orientation based on the figure or position are closed System is merely for convenience of description the application and simplifies description, rather than the device or element of indication or suggestion meaning must have Specific orientation is constructed and operated in a specific orientation, therefore should not be understood as the limitation to the application.
In addition, term " first ", " second " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance Or implicitly indicate the quantity of indicated technical characteristic.Define " first " as a result, the feature of " second " can be expressed or Implicitly include one or more of the features.In the description of the present application, the meaning of " plurality " is two or more, Unless otherwise specifically defined.
Embodiment one:
Fig. 1 is please referred to, for a kind of equipment 100 for building keel partition wall provided by the embodiment of the utility model comprising control System 10, construction robot 20 and composite tool 30 processed.Control system 10 in the present embodiment is PLC (Programmable Logic Controller, programmable logic controller (PLC)), for sending control to the construction robot 20 and composite tool 30 System instruction carries out cooperative motion to control the construction robot 20 and composite tool 30, but is not limited to the control system The type of system 10.
Specifically, the construction robot 20 is electrically connected with the control system 10, the control system 10 is built to described It builds robot 20 and sends control instruction, the construction robot 20 receives the control instruction and executes corresponding movement.At this In embodiment, the construction robot 20 is existing industrial robot-ABB IRB2600-1.65/20, when the building machine Device people 20 transports to after construction site, writes program according to the construction process of light steel keel partition in advance, then carries out scene Operation, the personnel for being responsible for the operation of robot are not only responsible for operation robot, and are also responsible for the place of robot in special circumstances Science and engineering is made.
Referring to Fig. 2 and Fig. 3, the composite tool 30 is removably mounted on the mechanical arm 21 of the construction robot 20 On, the composite tool 30 includes main frame 31, is equipped with clamp device 32 and adsorbent equipment 33 on the main frame 31.Specifically , the main frame 31 includes bottom plate 311, vertically extends several mounting plates 312 towards the same side on the bottom plate 311, described Clamp device 32 and adsorbent equipment 33 are detachably mounted on the mounting plate 312.The clamping end of the clamp device 32 The edge direction perpendicular with the extending direction of mounting plate 312 is retractable to be moved, with clamp or release lightgage steel joist;Meanwhile it is described The absorption end of adsorbent equipment 33 is along the direction reciprocable parallel with the extending direction of mounting plate 312, to adjust the suction The distance between the absorption end of adsorption device 33 and the bottom plate 311, so that it is dry to avoid adsorbent equipment 33 and clamp device 32 from generating It relates to.
The clamp device 32 and adsorbent equipment 33 are electrically connected with the control system 10, and the control system 10 controls Clamping lightgage steel joist (not shown) jointly of the mechanical arm 21 and the clamp device 32 of the construction robot 20, and be placed on Specified station.Meanwhile the control system controls the mechanical arm 21 of the construction robot 20 and the adsorbent equipment 33 is total to With absorption crawl plasterboard (not shown), and it is placed on specified station, so that the plasterboard and the lightgage steel joist are mutually right Together, it is then secured the two together by screw.
To further increase the construction efficiency of light steel keel partition and realizing the diversification of 20 function of construction robot, In the present embodiment, the equipment 100 for building keel partition wall also has some auxiliary equipment, such as: in the construction robot A tool rack (not shown) is arranged in 20 side, is placed with several Quick Release tools, on the tool rack so that robot is fast Speed installs other tools and carries out other operations.Meanwhile the other side of the construction robot 20 is equipped with a tooling platform and (does not scheme Show), the accessory of several lightgage steel joists is placed on the tooling platform, before construction, by the construction robot 20 described The accessory of several lightgage steel joists is assembled on tooling platform, forms the lightgage steel joist of completion, so as to subsequent processing use.
In the above-described embodiments, the clamp device 32 includes at least two gripper assemblies, referring to Fig. 4, each clamping Component includes the parallel finger cylinder 321 of guide rail slide unit and two clamping plates 322, and the parallel finger cylinder 321 of the guide rail slide unit has There are the first guide rail 3211 and two sliding blocks 3212, described two sliding blocks 3212 are mounted on first guide rail in which can be movable relatively On 3211, the two clamping plates 322 are removably mounted on respectively on described two sliding blocks 3212, and the guide rail slide unit is parallel Finger cylinder 321 is electrically connected with the control system 10.In the present embodiment, the parallel finger cylinder 321 of the guide rail slide unit passes through In the market directly obtained by purchase.
When specifically used, the construction robot 20 is controlled by the control system 10 and is moved, so that construction robot 20 mechanical arm 21 drives the clamp device 32 to be moved at assembled lightgage steel joist;Then, the control system 10 is controlled Making the parallel finger cylinder 321 of the guide rail slide unit drives two sliding blocks 3212 close to each other, and then drives the two clamping plates 322 It is correspondingly close to each other, so that lightgage steel joist be clamped;Subsequently, the control system 10 controls the construction robot 20 Mechanical arm drives clamping to have the clamp device 32 of lightgage steel joist to be moved to specified station;Finally, the control system 10 controls institute Stating the parallel finger cylinder 321 of guide rail slide unit drives two sliding blocks 3212 to be located remotely from each other, and then drives the two clamping plates 322 corresponding Ground is located remotely from each other, so that lightgage steel joist is placed on specified station.
It should be noted that the structure type of the gripper assembly is only a kind of preferable embodiment in the present embodiment, but It is not limited to such structure.Such as: one piece of clamping plate mobile with output shaft is connected on the output shaft of common cylinder, is then existed One piece of fixed clamping plate is set on cylinder, the function of clamp or release lightgage steel joist also may be implemented;Alternatively, being cooperated by motor Screw rod, nut form realize stretching motion, and clamping plate is set in place, enables two clamping plates open and close movements ?.
The adsorbent equipment 33 includes at least two Suction cup assemblies, and referring to Fig. 5, each Suction cup assembly includes sucker 331, vacuum evacuation device (not shown) and the first flexible power source 332.The first flexible power source 332 is mounted on the peace In loading board 312, the sucker 331 is mounted on the power output end of the described first flexible power source 332, the vacuum evacuation device with The sucker 331 by pipeline connect, and the vacuum evacuation device and the first flexible power source 332 with the control system 10 Electrical connection.
When specifically used, construction robot 20 is controlled by the control system 10 and is moved, so that construction robot 20 Mechanical arm 21 drives the adsorbent equipment 33 to be moved at plasterboard;Then, it is flexible to control described first for the control system 10 Power source 332 drives the sucker 331 to stretch out preset distance along the direction parallel with the extending direction of mounting plate 312, and makes It obtains the sucker 331 to be in contact with plasterboard, to avoid adsorbent equipment 33 when absorption grabs plasterboard, be filled with the clamping Set 32 generations interference;Subsequently, the control system 10 controls the vacuum evacuation device and carries out vacuum pumping, so that the suction The absorption of disk 331 grabs the plasterboard;Finally, the mechanical arm 21 that the control system 10 controls the construction robot 20 drives The adsorbent equipment 33 is moved to specified station, and controls the vacuum evacuation device stopping and vacuumize, so that the plasterboard pastes It closes in the side of the lightgage steel joist, and the plasterboard is mutually aligned with the lightgage steel joist.
For the fixed efficiency for improving plasterboard and lightgage steel joist, in the present embodiment, the composite tool 30 further includes certainly Dynamic screwing device 34, the automatic screw-driving device 34 is mounted on the main frame 31, and the automatic screw-driving device 34 are electrically connected with the control system 10, and the mechanical arm 21 that the control system 10 controls the construction robot 20 drives described Automatic screw-driving device 34 is successively moved to each the turn of the screw station, when the automatic screw-driving device 34 is moved to described twist After screw station, the control system 10 controls 34 automatic screw-driving of automatic screw-driving device, and the plasterboard is consolidated It is scheduled on the lightgage steel joist, to improve the efficiency of the turn of the screw, has saved cost of labor.
Specifically, referring to Fig. 6, the automatic screw-driving device 34 includes the first fixed plate 341, the second fixed plate 342, the The flexible power source 345 of two guide rails 343, the second flexible power source 344, third, automatic screw-driving rifle 346 and nails introducer (are not schemed Show).
First fixed plate 341 is mounted on the bottom plate 311, and it is solid that second guide rail 343 is mounted on described first On fixed board 341, and second guide rail 343 is parallel with the extending direction of the mounting plate 312.Second fixed plate 342 It is mounted on being reciprocally moveable on second guide rail 343, the second flexible power source 344 is mounted on first fixed plate On 341, and the power output end of the second flexible power source 344 is connect with second fixed plate 342, so that described Second flexible power source 344 is able to drive second fixed plate 342 and moves back and forth on second guide rail 343.
The flexible power source 345 of the third and automatic screw-driving rifle 346 are installed in second fixed plate 342, and The nails introducer is connect with the automatic screw-driving rifle 346, by screw feeding automatic screw-driving rifle 346 (not shown);At this In embodiment, the nails introducer is directly to buy gained on the market.The power output end of the flexible power source 345 of the third protrudes into It inside the automatic screw-driving rifle 346, and is moved back and forth along the direction parallel with the extending direction of mounting plate 312, when described After screw is sent into automatic screw-driving rifle 346 by nails introducer, the power output end of the flexible power source 345 of the third is along mounting plate 312 extending direction stretches out, to support the screw that the nails introducer is sent into automatic screw-driving rifle 346;When the screw is screwed Next, the power output end of the flexible power source 345 of the third retracts to original position, prepares to support screw next time.
The second flexible power source 344, third stretch power source 345, automatic screw-driving rifle 346 and nails introducer with The control system 10 is electrically connected.When specific works, moved firstly, the control system 10 controls the construction robot 20, So that the mechanical arm 21 of construction robot 20 drives the automatic screw-driving device 34 to be moved at corresponding the turn of the screw station;So Afterwards, the power output end that the control system 10 controls the described second flexible power source 344 stretches out preset distance, to drive institute It states the second fixed plate 342 and stretches out preset distance on second guide rail 343, it is described automatic to avoid during oncomelania silk Screwing device 34 and clamp device 32 or adsorbent equipment 33 generate interference;Subsequently, the control system 10 controls described send It follows closely device screw is sent into automatic screw-driving rifle 346;Subsequently, the control system 10 controls the flexible power source of the third 345 power output end stretches out, to support the screw that the nails introducer is sent into automatic screw-driving rifle 346, by described automatic Screw is screwed into corresponding position by the turn of the screw rifle 346;Finally, each component return to primitive age station, is moved in circles with this, until by institute Until thering is the turn of the screw station to screw on screw.
It should be noted that the equipment 100 of the construction keel partition wall in the present embodiment is mainly used in construction lightgage steel joist Partition wall, but be used not only for building light steel keel partition.Since the composite tool 30 is detachable, when the construction robot 20 Mechanical arm 21 on change the outfit different front end tools when, which can also be applied to other fields of construction, such as lay bricks, wall The installation etc. of face ceramic tile.
The equipment 100 of the construction keel partition wall of the utility model embodiment, based on construction robot 20, by matching The composite tool 30 of set realizes the automatic installation of light steel keel partition under the control of control system 10, compared with artificial, mentions High construction efficiency, while construction quality is more unified;In addition, requirement of the equipment to environment is lower, it can be in high temperature or low temperature Continue to construct under environment.
Embodiment two:
Fig. 7 is please referred to, for another equipment 100 for building keel partition wall provided by the embodiment of the utility model comprising Control system 10, construction robot 20 and composite tool 30.The present embodiment and embodiment one the difference is that, this implementation The equipment 100 of the construction keel partition wall of example further includes mobile chassis 40, and the entirety of equipment can be realized by the mobile chassis 40 It is mobile.
Specifically, the mobile chassis 40 includes platform 41 and driving device 42, the platform 41 is placed on the driving 42 top of device, the control system 10, construction robot 20 are both placed on the platform 41.Pass through the driving device 42 Control system 10 and construction robot 20 on the platform 41 can be driven to be moved to any position, to improve construction just Benefit.
Meanwhile the mobile chassis 40 further includes several support foots 43, one end of the support foot 43 is fixed on the platform 41 On, the other end of the support foot 43 is scalable along the vertical direction, and is respectively supported on ground or mutually separates with ground.It utilizes Several support foots 43 can fix the relative position of the mobile chassis 40, to improve the stability of equipment entirety.
In addition to the foregoing structure, remaining structure and embodiment one are all the same, and details are not described herein for the present embodiment.
Referring to Fig. 8, for a kind of equipment construction using the construction keel partition wall provided by the embodiment of the utility model The method of keel partition wall, specifically includes the following steps:
Clamping is light jointly for S10, the mechanical arm 21 that construction robot 20 is controlled by control system 10 and clamp device 32 Then the lightgage steel joist is placed into specified station by steel joist;
Absorption is grabbed jointly for S20, the mechanical arm 21 that construction robot 20 is controlled by control system 10 and adsorbent equipment 33 Plasterboard is taken, then the plasterboard is placed on to the side of the lightgage steel joist, so that the plasterboard and the light steel dragon The side of bone is bonded to each other and is mutually aligned;
S30, the plasterboard and the lightgage steel joist are fixed together by screw, form the light steel of hollow semi-finished product Keel partition wall;
S40, sound control glass cotton (not shown) is placed on inside the semi-finished product light steel keel partition;
S50, it adsorbs grab again by the mechanical arm 21 and adsorbent equipment 33 of the control construction robot 20 of control system 10 Plasterboard is taken, then the plasterboard is placed on to the other side of the lightgage steel joist, so that the plasterboard and the light steel The other side of keel is bonded to each other and is mutually aligned;
S60, the plasterboard and the lightgage steel joist are fixed together by screw, complete one piece of lightgage steel joist every Wall;
S70, step S10-S60 is repeated, is completed until all keel partition walls are built.
In above-mentioned work progress, in the step S30 or step S60, it can also pass through machine by artificial the turn of the screw Device the turn of the screw.In the present embodiment, automatic screw-driving device 34 is controlled by control system 10 and is started, so that the plasterboard be consolidated It is scheduled on the lightgage steel joist, to improve the efficiency of the turn of the screw.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this Made any modifications, equivalent replacements, and improvements etc., should be included in the utility model within the spirit and principle of utility model Protection scope within.

Claims (8)

1. a kind of equipment for building keel partition wall characterized by comprising
Control system;
Construction robot, the construction robot are electrically connected with the control system, and the control system is to the construction machine Human hair send control instruction, and the construction robot receives the control instruction and executes corresponding movement;
Composite tool, the composite tool are removably mounted on the mechanical arm of the construction robot, the composite tool Including main frame, clamp device and adsorbent equipment are installed on the main frame;The clamp device and adsorbent equipment are and institute Control system electrical connection is stated, the control system controls the mechanical arm of the construction robot and the clamp device presss from both sides jointly Lightgage steel joist is taken, and is placed on specified station;The control system control the construction robot mechanical arm and the suction Adsorption device adsorbs crawl plasterboard jointly, and is placed on the specified station, and by the plasterboard in the specified station It is connected on the lightgage steel joist.
2. building the equipment of keel partition wall as described in claim 1, which is characterized in that the composite tool further includes automatic twists Screw device, the automatic screw-driving device are mounted on the main frame, and the automatic screw-driving device and the control System electrical connection, the mechanical arm that the control system controls the construction robot drive the automatic screw-driving device successively to move It moves to each the turn of the screw station, after the automatic screw-driving device is moved to the turn of the screw station, the control system The automatic screw-driving device automatic screw-driving is controlled, the plasterboard is fixed on the lightgage steel joist.
3. building the equipment of keel partition wall as claimed in claim 2, which is characterized in that the main frame includes bottom plate, described Several mounting plates are vertically extended towards the same side on bottom plate, the adsorbent equipment and clamp device are detachably mounted on described On mounting plate, and the absorption end edge direction reciprocable parallel with the extending direction of mounting plate of the adsorbent equipment, with Adjust absorption end and the distance between the bottom plate of the adsorbent equipment;Clamping end edge and the mounting plate of the clamp device The retractable movement in the perpendicular direction of extending direction, with lightgage steel joist described in clamp or release.
4. building the equipment of keel partition wall as claimed any one in claims 1 to 3, which is characterized in that the clamp device Including at least two gripper assemblies, each gripper assembly includes the parallel finger cylinder of guide rail slide unit and two clamping plates, described The parallel finger cylinder of guide rail slide unit has the first guide rail and two sliding blocks, and described two sliding blocks are mounted on described in which can be movable relatively On first guide rail, the two clamping plates are removably mounted on respectively on described two sliding blocks;The parallel finger of the guide rail slide unit Cylinder is electrically connected with the control system, and the control system controls the parallel finger cylinder of the guide rail slide unit and drives two sliding blocks Close to each other or be located remotely from each other, the two clamping plates are correspondingly close to each other or are located remotely from each other, with light steel described in clamp or release Keel.
5. building the equipment of keel partition wall as claimed in claim 3, which is characterized in that the adsorbent equipment includes at least two Suction cup assembly, each Suction cup assembly include sucker, vacuum evacuation device and the first flexible power source;Described first is flexible dynamic Power source is mounted on the mounting plate, and the sucker is mounted on the power output end of the described first flexible power source, described to take out very Empty device is connect with the sucker by pipeline, and the vacuum evacuation device and the first flexible power source with the control system Electrical connection, the control system control the described first flexible power source and drive the sucker along equal with the extending direction of mounting plate Capable direction moves back and forth, and the control system controls the vacuum evacuation device and vacuumized, and the plasterboard is grabbed It takes and is adsorbed on the sucker.
6. building the equipment of keel partition wall as claimed in claim 3, which is characterized in that the automatic screw-driving device includes the One fixed plate, the second fixed plate, the second guide rail, the second flexible power source, third, which are stretched, power source, automatic screw-driving rifle and to be sent Follow closely device;
First fixed plate is mounted on the bottom plate, and second guide rail is mounted in first fixed plate, and described Second guide rail is parallel with the extending direction of the mounting plate, and second fixed plate is mounted on described second with being reciprocally moveable On guide rail, the second flexible power source is mounted in first fixed plate, and the power of the second flexible power source is defeated Outlet is connect with second fixed plate;
The flexible power source of the third and automatic screw-driving rifle are installed in second fixed plate, and the nails introducer and institute The connection of automatic screw-driving rifle is stated, screw is sent into automatic screw-driving rifle;The power output end of the flexible power source of the third is stretched Enter inside the automatic screw-driving rifle, and moved back and forth along the direction parallel with the extending direction of mounting plate, send nail when described After screw is sent into automatic screw-driving rifle by device, the power output end of the flexible power source of the third is stretched along the extending direction of mounting plate Out, to support the screw that the nails introducer is sent into automatic screw-driving rifle, after the screw is tightened, the third is flexible dynamic The power output end in power source retracts to original position;
The second flexible power source, third stretch power source, automatic screw-driving rifle and nails introducer with the control system Electrical connection.
7. building the equipment of keel partition wall as described in claim 1, which is characterized in that the equipment further includes mobile chassis, The mobile chassis includes platform and driving device, and the platform is placed on above the driving device, and the control system is built Robot is built to be both placed on the platform.
8. building the equipment of keel partition wall as claimed in claim 7, which is characterized in that the mobile chassis further includes several supports Foot, one end of the support foot is fixed on the platform, and the other end of the support foot is scalable along the vertical direction, and corresponding twelve Earthly Branches Support mutually separates on the ground or with ground.
CN201821528387.8U 2018-09-18 2018-09-18 A kind of equipment for building keel partition wall Expired - Fee Related CN209227839U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821528387.8U CN209227839U (en) 2018-09-18 2018-09-18 A kind of equipment for building keel partition wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821528387.8U CN209227839U (en) 2018-09-18 2018-09-18 A kind of equipment for building keel partition wall

Publications (1)

Publication Number Publication Date
CN209227839U true CN209227839U (en) 2019-08-09

Family

ID=67498856

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821528387.8U Expired - Fee Related CN209227839U (en) 2018-09-18 2018-09-18 A kind of equipment for building keel partition wall

Country Status (1)

Country Link
CN (1) CN209227839U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109162384A (en) * 2018-09-18 2019-01-08 中建科技有限公司深圳分公司 A kind of equipment and method of construction for building keel partition wall
CN110594836A (en) * 2019-09-18 2019-12-20 浙江发恩集成房屋有限公司 Prefabricated plate material injection and nail insertion integrated equipment

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109162384A (en) * 2018-09-18 2019-01-08 中建科技有限公司深圳分公司 A kind of equipment and method of construction for building keel partition wall
CN109162384B (en) * 2018-09-18 2024-01-09 中建科技有限公司深圳分公司 Equipment and method for building keel partition wall
CN110594836A (en) * 2019-09-18 2019-12-20 浙江发恩集成房屋有限公司 Prefabricated plate material injection and nail insertion integrated equipment

Similar Documents

Publication Publication Date Title
CN103978361B (en) Double-workbench multifunctional efficient rate automatic locking screw machine
CN209227839U (en) A kind of equipment for building keel partition wall
CN102107783A (en) Loading and unloading handling mechanical arm for solar cell module
CN206509187U (en) Reinforcement machine
CN108247873B (en) A kind of construction site ceramic tile cutting device
CN109162384A (en) A kind of equipment and method of construction for building keel partition wall
CN102969534B (en) Device used for pressing and fixing battery by using locking clamp
CN202021898U (en) Adhesive dispensing overturning laminating machine for large-size touch screen
CN107378143A (en) A kind of Gear Processing fixing tool
CN208592567U (en) Rubber shell automatic locking screw machine
CN210549146U (en) Automatic positioning welding device for aluminum template
CN202507049U (en) Multifunctional adsorption type four-shaft screw locking machine
CN209577157U (en) A kind of inner barrel electrostatic plastic spraying equipment
CN209289302U (en) A kind of equipment and its composite tool for building keel partition wall
CN207997320U (en) A kind of automatic material-fetching mechanical hand
CN106826803A (en) A kind of multiple degrees of freedom link-type light-duty mechanical arm
CN106394099A (en) Automatic picture stretching machine
CN103817725B (en) The processing unit (plant) of processing guitar handle
CN207309943U (en) A kind of electric automatization fixture
CN203526916U (en) Automatic motormeter hand pressing device
CN109604108A (en) A kind of electronic component automation dispensing equipment
CN210935676U (en) Reconfigurable intelligent multi-axis linkage dispensing device
CN107584486A (en) A kind of electric automatization fixture
CN203356971U (en) Device for assembling pressing slice to connector
CN206588559U (en) A kind of efficiently automatic dress card taking needle device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200602

Address after: 221000 west side of West jingsan Road, Xuzhou Industrial Park, Xuzhou City, Jiangsu Province

Patentee after: China Construction Technology Xuzhou Co.,Ltd.

Address before: 518000 Huatai Road Training Building, Nanshan District, Shenzhen City, Guangdong Province, 3rd Floor

Patentee before: CHINA CONSTRUCTION SCIENCE & TECHNOLOGY GROUPCO Ltd. SHENZHEN BRANCH

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190809