CN209227598U - The connection cabin structure of Underground Urban Complex - Google Patents
The connection cabin structure of Underground Urban Complex Download PDFInfo
- Publication number
- CN209227598U CN209227598U CN201822002760.2U CN201822002760U CN209227598U CN 209227598 U CN209227598 U CN 209227598U CN 201822002760 U CN201822002760 U CN 201822002760U CN 209227598 U CN209227598 U CN 209227598U
- Authority
- CN
- China
- Prior art keywords
- cabin
- bottom plate
- load
- pipeline
- connection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
The utility model discloses the connection cabin structure of Underground Urban Complex, it mainly include pipeline connecting cabin, kart sea cabin, load-bearing short column, bottom plate, load-bearing pillar, emergency escape cabin, pipeline passway, kart channel, connecting cabin entrance and maintenance channel, Tipple Bottom plate is connect with the load-bearing pillar of connecting cabin, connecting cabin is divided into the cabin of multiple and different functions by Tipple Bottom plate and load-bearing pillar, it is interconnected between the cabin of upper and lower level different function by maintenance channel, pipeline connecting cabin is connected to emergency escape cabin by maintenance channel, emergency escape cabin is connected to connecting cabin entrance;The utility model can plan as a whole all kinds of municipal pipeline planning, construction and management, the problems such as solving excavated pavement, the connectivity problem of pipeline, the burst accident act of rescue repeatedly, be conducive to ensure urban safety, improve city function, beautifying city landscape, promote the intensive efficient and Transformation Development in city, may advantageously facilitate the development of Urban Underground Complex.
Description
Technical field
The utility model relates to hypogee technical fields, more particularly to a kind of connection cabin structure of Underground Urban Complex.
Background technique
Urban transportation construction at present is like a raging fire, as country is pushed further into pipe gallery, sponge Urban strategy, China
Big and medium-sized cities will start the new round climax of underground engineering construction, and due to the scarcity of the underground space, to collection, " Urban Underground is comprehensive
The demand of the Urban Underground Complex of conjunction piping lane, Urban Underground expressway, urban underground construction space " is huge.
The exploitation and construction of Japan and the American-European underground space maintain the leading position, and advocate at first and propose underground city and city
The synthesization of city's underground space and three-dimensional utility strategies, nineteen ninety propose Tokyo Declaration: the Devoting Major Efforts To Developing underground space, start people
Class new cave period, International Tunnelling Association in 2010 expand to tunnel and underground space association and declare: 21 century is underground
The century in space.To mark international metropolis, become extensive style, booth large flat bread urban development pattern as intensive, solid mode, Xiang Di
Under want space;Break through that urban land, air, water source, greenery patches, the resource environments such as city space, the energy, environment total amount is about per capita
Beam;Sea, greening are insufficient, real estate finance makes the transition, old is seen to traffic congestion, air dirt, noise pollution, visual pollution, city
The urban disease that the tricks such as city vigor decline incur life carries out comprehensive improvement;Change made in China is cultivated leading in the world into Created in China
High-end industry cluster.
Cities of Foreign Countries underground space development is with a long history, mostly combines commercial facility with Large Underground transport hub and stops
Parking lot holds a variety of traffic forms in the underground space synthesis type presentation of one.In the world, Japan and America and Europe are in underground sky
Between exploitation and construction maintain the leading position, advocate and propose the synthesization and solid of underground city and urban underground space at first
Change utility strategies.Totally see have out when including many countries of underground space synthesis of multiple transportation modes or multiple functions
It is existing, there is not yet collection " Urban Underground pipe gallery, Urban Underground expressway, urban underground construction space " Urban Underground is comprehensive
Body type.Therefore, there is an urgent need to develop underground space synthesises, adapt to national green building and the strategy of sustainable development.
Utility model content
The purpose of this utility model is to provide a kind of connection cabin structures of Underground Urban Complex, mainly solve to excavate road repeatedly
The problems such as face, the connectivity problem of pipeline, burst accident act of rescue, is conducive to ensure urban safety, improves city function, beautification
Urban landscape promotes the intensive efficient and Transformation Development in city, may advantageously facilitate the development of Urban Underground Complex.
Of the existing technology in order to solve the problems, such as, the technical solution adopted in the utility model is as follows:
The connection cabin structure of Underground Urban Complex mainly includes pipeline connecting cabin, kart sea cabin, load-bearing short column, bottom
Plate, load-bearing pillar, emergency escape cabin, pipeline passway, kart channel, connecting cabin entrance and maintenance channel, the bottom plate include
First layer bottom plate, second layer bottom plate and third layer bottom plate, the pipeline connecting cabin are connected to pipeline passway, kart sea cabin
It is connected to kart channel, the top plate connection of first layer bottom plate and pipeline passway, second layer bottom plate and kart channel are pushed up
Plate connection, third layer bottom plate connect with kart channel base plate, between first layer bottom plate and second layer bottom plate and the second layer
Load-bearing short column is added between bottom plate and third layer bottom plate, Tipple Bottom plate is connect with the load-bearing pillar of connecting cabin, Tipple Bottom plate with hold
Connecting cabin is divided into the cabin of multiple and different functions by weight column, and it is mutual to pass through maintenance channel between the cabin of upper and lower level different function
Connection, pipeline connecting cabin are connected to emergency escape cabin by maintenance channel, and emergency escape cabin is connected to connecting cabin entrance;It is described to hold
Weight column is connect with Vierendeel girder, and Vierendeel girder is connect with bottom plate, and load-bearing pillar is vertically equipped with load-bearing pillar vertical reinforcement, and Vierendeel girder is equipped with frame
Beam transverse steel.
Further, two adjacent Underground Urban Complexes are connected to the company for carrying out pipeline by pipeline connecting cabin with pipeline passway
It connects.
Further, kart sea cabin is connected to pipeline connecting cabin by maintenance channel.
Further, maintenance storehouse is set in connecting cabin to be used to park piping lane maintenance car, maintenance car enters ground by maintenance channel
It is constructed and is repaired in lower synthesis.
A kind of improvement of the utility model, the load-bearing pillar are connect with Vierendeel girder cross.
The another of the utility model improves, the load-bearing pillar and the T-shaped connection of Vierendeel girder.
Advantage and beneficial effect possessed by the utility model are:
The connection cabin structure of the utility model Underground Urban Complex, including pipeline connecting cabin, kart sea cabin, load-bearing
Entrance, maintenance channel, institute are repaired in column, bottom plate, load-bearing short column, maintenance lock, emergency escape cabin, pipeline passway, kart channel
It states pipeline connecting cabin to connect with pipeline passway, pipeline connecting cabin is mainly used for the connection of the pipeline between Underground Urban Complex and pipeline dimension
It repairs;Kart sea cabin is connect with kart channel, if the kart burst in kart channel traveling is urgent
Accident, which can drive into vehicle in kart sea cabin, to be repaired processing or waits for rescue;Maintenance lock is added at the top of connecting cabin
With emergency escape cabin for the maintenance of connecting cabin cabin in-vivo device and the emergency escape of personnel after burst accident;Between different cabins
Prevent connection Ceiling from failure by shear occurs by adding load-bearing short column, the shear-carrying capacity of enhancing connection Ceiling is to guarantee
The overall stability of connecting cabin.The utility model can plan as a whole all kinds of municipal pipeline planning, construction and management, solution and excavate repeatedly
The problems such as road surface, the connectivity problem of pipeline, burst accident act of rescue, is conducive to ensure urban safety, improves city function, beauty
Change urban landscape, promote the intensive efficient and Transformation Development in city, may advantageously facilitate the development of Urban Underground Complex.
Detailed description of the invention
The utility model is described in detail with reference to the accompanying drawings and examples:
Fig. 1 is the connecting cabin structure front view of the utility model Underground Urban Complex;
Fig. 2 is Section A-A sectional view in Fig. 1;
Fig. 3 is section B-B sectional view in Fig. 1;
Fig. 4 is load-bearing pillar shown in embodiment 1 and Vierendeel girder connection schematic diagram;
Fig. 5 is load-bearing pillar shown in embodiment 2 and Vierendeel girder connection schematic diagram;
Fig. 6 is load-bearing short column connection schematic diagram.
In figure, 1 is pipeline connecting cabin;2 be kart sea cabin;3 be load-bearing short column;4 be bottom plate;4-1 is first layer
Bottom plate;4-2 is second layer bottom plate;4-3 is third layer bottom plate;5 be load-bearing pillar;5-1 is Vierendeel girder transverse steel;5-2 is load-bearing
Column vertical reinforcement;5-3 is Vierendeel girder;6 be maintenance lock;7 be emergency escape cabin;8 be pipeline passway;9 be kart channel;10
For connecting cabin entrance;11 be maintenance channel.
Specific embodiment
In order to further illustrate the utility model, the utility model is retouched in detail with reference to the accompanying drawings and embodiments
It states, but they cannot be interpreted as to the restriction to scope of protection of the utility model.
Embodiment 1:
As shown in Fig. 1,2,3,4,6, the connection cabin structure of the present embodiment Underground Urban Complex, mainly include pipeline connecting cabin 1,
Kart sea cabin 2, load-bearing short column 3, bottom plate 4, load-bearing pillar 5, maintenance lock 6, emergency escape cabin 7, pipeline passway 8, small size gasoline
Vehicle passage 9, connecting cabin entrance 10 and maintenance channel 11, the bottom plate include first layer bottom plate 4-1, second layer bottom plate 4-2 and
Tipple Bottom plate 4-3, the pipeline connecting cabin 1 are connected to pipeline passway 8, and kart sea cabin 2 and kart channel 9 connect
Logical, the vehicle burst accident that kart channel 9 travels can drive into kart sea cabin 2;First layer bottom plate 4-1 and pipeline
The top plate in channel 8 connects, and second layer bottom plate 4-2 is connect with 9 top plate of kart channel, third layer bottom plate 4-3 and kart
9 bottom plate of channel connection, between first layer bottom plate 4-1 and second layer bottom plate 4-2 and second layer bottom plate 4-2 and third layer bottom plate 4-
Load-bearing short column 3 is added between 3, prevents connection Ceiling from failure by shear, enhancing connection Ceiling occurs by adding load-bearing short column
Shear-carrying capacity to guarantee the overall stability of connecting cabin.Tipple Bottom plate is connect with the load-bearing pillar of connecting cabin 5, Tipple Bottom
Connecting cabin is divided into the cabin of multiple and different functions by plate and load-bearing pillar 5, passes through maintenance between the cabin of upper and lower level different function
Channel 11 is interconnected, and maintenance work personnel are entered in different cabins by maintenance channel 11 to be repaired;Pipeline connecting cabin 1
It is connected to emergency escape cabin 7 by maintenance channel 11, emergency escape cabin 7 is connected to connecting cabin entrance 10, personnel after burst accident
It can be from 10 emergency escape of connecting cabin entrance;The load-bearing pillar 5 is connect with Vierendeel girder 5-3, and Vierendeel girder 5-3 is connect with bottom plate 4, is held
Weight column 5 is vertically equipped with load-bearing pillar vertical reinforcement 5-2, and Vierendeel girder 5-3 is equipped with Vierendeel girder transverse steel 5-1.
Two adjacent Underground Urban Complexes are connected to the connection for carrying out pipeline by pipeline connecting cabin 1 with pipeline passway 8.
Kart sea cabin 2 is connected to pipeline connecting cabin 1 by maintenance channel 11.
Maintenance storehouse 6 is set in connecting cabin and is used to park piping lane maintenance car, and maintenance car enters underground synthesis by maintenance channel 11
It is constructed and is repaired in vivo.
The load-bearing pillar 5 is connect with Vierendeel girder 5-3 cross.
Embodiment 2:
The present embodiment is only that with the difference of embodiment 1: the load-bearing pillar 5 is connect with Vierendeel girder 5-3T font, remaining is same
Embodiment 1.
The above is only the preferred embodiment of the utility model, it is noted that for the common skill of the art
For art personnel, without departing from the principle of this utility model, several improvements and modifications can also be made, these improve and
Retouching also should be regarded as the protection scope of the utility model.
Claims (6)
1. the connection cabin structure of Underground Urban Complex, it is characterised in that: mainly include pipeline connecting cabin (1), kart sea cabin
(2), load-bearing short column (3), bottom plate (4), load-bearing pillar (5), emergency escape cabin (7), pipeline passway (8), kart channel (9),
Connecting cabin entrance (10) and maintenance channel (11), the bottom plate include first layer bottom plate (4-1), second layer bottom plate (4-2) and
Tipple Bottom plate (4-3), the pipeline connecting cabin (1) are connected to pipeline passway (8), kart sea cabin (2) and kart
Channel (9) connection, first layer bottom plate (4-1) are connect with the top plate of pipeline passway (8), second layer bottom plate (4-2) and kart
The connection of channel (9) top plate, third layer bottom plate (4-3) connect with kart channel (9) bottom plate, first layer bottom plate (4-1) and the
It is added load-bearing short column (3) between two layers of bottom plate (4-2) and between second layer bottom plate (4-2) and third layer bottom plate (4-3), three layers
Bottom plate is connect with the load-bearing pillar of connecting cabin (5), and connecting cabin is divided into multiple and different functions with load-bearing pillar (5) by Tipple Bottom plate
Cabin is interconnected between the cabin of upper and lower level different function by maintenance channel (11), pipeline connecting cabin (1) and emergency escape
Cabin (7) is connected to by maintenance channel (11), and emergency escape cabin (7) are connected to connecting cabin entrance (10);The load-bearing pillar (5) and frame
It sets a roof beam in place (5-3) connection, Vierendeel girder (5-3) connect with bottom plate (4), vertical outfit load-bearing pillar vertical reinforcement (5-2) of load-bearing pillar (5),
Vierendeel girder (5-3) is equipped with Vierendeel girder transverse steel (5-1).
2. the connection cabin structure of Underground Urban Complex according to claim 1, it is characterised in that: two adjacent Underground Urban Complexes
The connection for carrying out pipeline is connected to pipeline passway (8) by pipeline connecting cabin (1).
3. the connection cabin structure of a kind of Underground Urban Complex according to claim 1, it is characterised in that: kart sea cabin
(2) it is connected to pipeline connecting cabin (1) by maintenance channel (11).
4. the connection cabin structure of a kind of Underground Urban Complex according to claim 1, it is characterised in that: set maintenance storehouse in connecting cabin
(6) it is used to park piping lane maintenance car, maintenance car is entered in Underground Urban Complex by maintenance channel (11) to be constructed and repaired.
5. the connection cabin structure of a kind of Underground Urban Complex according to claim 1, it is characterised in that: the load-bearing pillar (5)
It is connect with Vierendeel girder (5-3) cross.
6. the connection cabin structure of a kind of Underground Urban Complex according to claim 1, it is characterised in that: the load-bearing pillar (5)
With Vierendeel girder (5-3) T-shaped connection.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822002760.2U CN209227598U (en) | 2018-11-30 | 2018-11-30 | The connection cabin structure of Underground Urban Complex |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822002760.2U CN209227598U (en) | 2018-11-30 | 2018-11-30 | The connection cabin structure of Underground Urban Complex |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209227598U true CN209227598U (en) | 2019-08-09 |
Family
ID=67505636
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822002760.2U Expired - Fee Related CN209227598U (en) | 2018-11-30 | 2018-11-30 | The connection cabin structure of Underground Urban Complex |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209227598U (en) |
-
2018
- 2018-11-30 CN CN201822002760.2U patent/CN209227598U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106013221B (en) | Four layers of class rectangle Urban Underground Complex | |
CN106013225B (en) | Six layers of circular traffic, pipe gallery and sponge Urban Underground Complex | |
CN106013223B (en) | Elliptical section Urban Underground Complex | |
CN106013215B (en) | Three layers of class rectangle Urban Underground Complex | |
CN105971009B (en) | Five layers of circular Urban Underground Complex | |
CN101634126A (en) | Ground-road combined comprehensive tunnel for underground pipeline and trolley bus | |
CN106192640A (en) | A kind of urban planning method utilizing open type sinking road | |
CN101311413A (en) | Process for using underground passage combined with roads on ground as passage of trolley bus | |
CN106013222B (en) | Three circular cross section Urban Underground Complexes | |
CN206189448U (en) | Elliptical section city underground complex | |
CN209227598U (en) | The connection cabin structure of Underground Urban Complex | |
CN106638682A (en) | Efficient-seismic-reduction quasi-rectangular city underground architecture complex | |
CN106013938B (en) | Above and below ground urban transportation and pipeline coordination body | |
CN106013226B (en) | Double Circle section Urban Underground Complex | |
CN109296002A (en) | The connection cabin structure of Underground Urban Complex | |
WO2021253925A1 (en) | Space layout method suitable for urban updating construction | |
CN206128816U (en) | Secret urban traffic in ground and pipe network complex | |
CN206110171U (en) | Double circle section city underground complex | |
CN107059918A (en) | Get down the highway to Double Multi-Arch, pipe gallery and sponge City complex | |
CN207079623U (en) | A kind of class rectangle Urban Underground Complex of efficiently damping | |
CN206110168U (en) | Three -layer quasi -rectangular city underground complex | |
CN209145605U (en) | The round more cabin pipe galleries of shield-tunneling construction | |
CN206408643U (en) | A kind of three circular cross section Urban Underground Complexes | |
CN101372825A (en) | Method for using underground passage combined with ground road as trolley bus passage | |
CN101736931A (en) | Spatial multi-floor car park |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190809 Termination date: 20211130 |
|
CF01 | Termination of patent right due to non-payment of annual fee |