CN209227401U - A kind of Hanging Basket bottom basket system hanger - Google Patents

A kind of Hanging Basket bottom basket system hanger Download PDF

Info

Publication number
CN209227401U
CN209227401U CN201821975948.9U CN201821975948U CN209227401U CN 209227401 U CN209227401 U CN 209227401U CN 201821975948 U CN201821975948 U CN 201821975948U CN 209227401 U CN209227401 U CN 209227401U
Authority
CN
China
Prior art keywords
hanger
plate
pull rod
basket
crossbeam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821975948.9U
Other languages
Chinese (zh)
Inventor
张敏
李纲平
张德
徐彪彪
彭博
石峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Wuxin Intelligent Technology Co ltd
Original Assignee
China Railway Wuxin Steel Formwork Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Wuxin Steel Formwork Co Ltd filed Critical China Railway Wuxin Steel Formwork Co Ltd
Priority to CN201821975948.9U priority Critical patent/CN209227401U/en
Application granted granted Critical
Publication of CN209227401U publication Critical patent/CN209227401U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model discloses a kind of Hanging Basket bottom basket system hangers, including sunpender connection frame and crossbeam hanger, crossbeam hanger is articulated with the bottom of sunpender connection frame, and crossbeam hanger includes pull rod and bearing beam, bearing beam is detachably articulated with the lower end of pull rod, and bearing beam holds the bottom surface of bottom basket crossbeam.It is connected between bearing beam and bottom basket crossbeam for support formula, in the case where being deviated on concrete beam body for anchoring the reserved hole site of bottom basket system sunpender, it can be deflected between sunpender connection frame and crossbeam hanger, so the correction of upper and lower crossbeam hanger erection position can be realized, it is not required to again that aperture or Reconstruction in field bottom basket bottom basket crossbeam hoisting point position, the installation site of hanging basket system are easy to adjust on preceding upper beam.It is that rotatably hingedly can ensure that for sunpender still in vertical tension state, hanger bearing capacity is good under work progress indsole basket system tilt state between pull rod and sunpender connection frame and bearing beam.

Description

A kind of Hanging Basket bottom basket system hanger
Technical field
The utility model relates to a kind of Hanging Basket hangers, more particularly, to a kind of Hanging Basket bottom basket system hanger.
Background technique
At this stage, Bridges in Our Country development is very fast, bridge structure form be also it is varied, due to by geographical ring Border and execution conditions limitation, in most cases bridge is all made of hanging basket cantilever construction.Its indsole basket system is as Hanging Basket in bridge The bearing carrier of beam lower part, plays the role of receiving and transfer beams body concrete load, and bottom basket system includes crossbeam and stringer, Middle cross beam is divided into front beam and rear cross beam.It needs to be arranged multiple fixed suspension centres according to carrying on the basket crossbeam of bottom and passes through sunpender for lotus Load is passed up on the Hanging Basket bearing carrier of bridge top.Different bridge type suspension centre arrangement spacing is different, under normal conditions It must be transformed adjustment rear to hoisting point position after Hanging Basket completion one bridge block construction and adapt to the construction of other bridge types.Meanwhile Inevitable operating error in work progress often results on concrete beam body for anchoring the reserved hole location of bottom basket system sunpender It sets and deviates, aperture or Reconstruction in field bottom basket crossbeam hoisting point position on concrete beam body again can only be passed through under normal circumstances Mode handled, to cause certain economic loss and biggish security risk.
Utility model content
The purpose of this utility model is to provide a kind of Hanging Basket bottom basket system hangers that hoisting point position is easy to adjust.
This Hanging Basket bottom basket system hanger provided by the utility model, including sunpender connection frame and crossbeam hanger, crossbeam are hung Frame is articulated with the bottom of sunpender connection frame, and crossbeam hanger includes pull rod and bearing beam, and bearing beam is detachably articulated with the lower end of pull rod, pad Corbel lives the bottom surface of bottom basket crossbeam.
The sunpender connection frame includes side plate and hanger erection plate, and the lower part of side plate is provided with the hinge hole through its plate thickness, The center position of hanger erection plate has mounting hole, both side plate parallel arrangement, and hanger erection plate is vertically connected between both side plate Top.
The two sides that hanger erection plate upper installing hole is corresponded between the both side plate are provided with stiffening plate.
The pull rod includes rectangular slab and connecting plate, there is hinge hole, the parallel cloth of two rectangular slabs at the top and bottom of rectangular slab It sets, connecting plate is arranged vertically between two rectangular slabs, and the width between two rectangular slab outer walls is less than the width between both side plate inner wall Degree.
The bearing beam is hollow box beam, and the length direction middle position of top plate and bottom plate has the pull rod along vertical plane The length direction middle position of mounting hole, side plate has bearing pin mounting hole.
The middle position of the bearing beam length direction side plate is provided with rectangular slab, and the length of rectangular slab is greater than the pull rod The length of mounting hole, center position have corresponding bearing pin mounting hole.
The lower end of the pull rod passes through the pull rod mounting hole on bearing beam top plate and bottom plate, by passing through the bearing pin mounting hole Pin shaft and bearing beam it is hinged, between the upper end of pull rod and the side plate by pin shaft it is hinged.
The limit plate with pull rod arranged crosswise is connected at the top of the pull rod outer wall, the both ends of limit plate stretch out in pull rod Outside.
It is connected between the hanger bearing beam and bottom basket crossbeam of the utility model for support formula, for anchoring bottom on concrete beam body In the case that the reserved hole site of basket system sunpender deviates, holding position can be adjusted flexibly in hanger on crossbeam, so can The correction for realizing crossbeam hanger erection position, is not required to aperture or Reconstruction in field bottom basket crossbeam suspension centre position on concrete beam body again It sets, the installation site of hanging basket system is easy to adjust.Being between pull rod and sunpender connection frame and bearing beam rotatably hingedly can be true Protecting sunpender under work progress indsole basket system tilt state, still in vertical tension state, hanger bearing capacity is good.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model one embodiment.
Fig. 2 is the right view of Fig. 1.
Fig. 3 is the front view of Fig. 1.
Fig. 4 is the use state diagram of the utility model embodiment.
Fig. 5 is that embodiment installs status diagram after preceding and disassembly in Fig. 4.
Specific embodiment
This Hanging Basket bottom basket system hanger disclosed in the present embodiment, including sunpender connection frame 1 and crossbeam hanger 2.
As depicted in figs. 1 and 2, sunpender connection frame 1 includes side plate 11, hanger erection plate 12 and stiffening plate 13.
The lower part of side plate is provided with the circular hole through its thickness, and the center position of hanger erection plate has mounting hole, both side plate Parallel arrangement, hanger erection plate are vertically connected at the top between both side plate.It corresponds between both side plate and is installed on hanger erection plate The two sides in hole are arranged symmetrically two pieces of stiffening plates.
Crossbeam hanger 2 includes pull rod 21 and bearing beam 22.
Pull rod 21 includes rectangular slab 211, upper junction plate 212, lower connecting plate 213 and limit plate 214.
The top and bottom of rectangular slab 211 are provided with the circular hole through its plate thickness.Limit plate 214 is convex slab, top There is circular hole at portion center, and bottom width is greater than the width of 1 side plate 11 of sunpender connection frame.212 level of upper junction plate is fixed on two rectangles The lower section of circular hole, 213 level of lower connecting plate are fixed on the lower section of circular hole between two rectangular slab bottoms between at the top of plate.Limit plate 214 are welded in the top outer of rectangular slab, the circular hole and square of the bottom of limit plate perpendicular to rectangular slab length direction, on limit plate Circular hole at the top of shape plate is corresponding.
Bearing beam 22 is hollow box beam, including top plate 221, bottom plate 222, support side plate 223 and rectangular slab stiffening plate 224.
The middle position of 222 length direction of top plate 221 and bottom plate has the pull rod mounting hole along vertical plane.Side wall 223 Center position is provided with the hinge hole through its thickness.The length of rectangle stiffening plate is greater than the length of pull rod mounting hole, and rectangle adds The center position of strong plate has bearing pin mounting hole corresponding with side wall.Rectangle stiffening plate 224 is fixed in side wall length direction Between at position, for increasing the intensity of bearing beam 22.
Two support side plates are fixed between top plate and bottom plate in parallel, the outer wall of support side plate corresponds to fixed rectangular slab at hinge hole For increasing the intensity of bearing beam.
It is hinged by pin shaft between the upper end insertion both side plate of pull rod 21.The lower end of pull rod passes through 22 top plate of bearing beam and bottom plate On pull rod mounting hole, cooperate between pull rod and pull rod mounting hole for small―gap suture, it is hinged with bearing beam by pin shaft, make bearing beam can be around Pin shaft low-angle horizontal hunting.After pull rod and bearing beam assembly, T-type structure is formed between pull rod and bearing beam.
As shown in Figure 3 and Figure 4, when the bottom basket system of assembled Hanging Basket, first by the padded certain altitude of bottom basket crossbeam 3, by pull rod 21 are inserted into the design hoisting point position of bottom basket crossbeam from top to bottom, and pull rod is hung on the top surface of bottom basket crossbeam by limit plate 214, will padded Beam 22 is placed on pull rod and hinged with pin shaft XZ from bottom basket crossbeam bottom, is finally articulated with sunpender connection frame 1 by pin shaft XZ Pull rod upper end.After the completion of bottom basket system is assembled, sunpender 4 is anchored on lifting lug, basket system in bottom passes through hanger support at this time It is hung on the Hanging Basket bearing carrier of bridge top.
When hoisting point position need to be adjusted in work progress, first pine removes sunpender 4, and hanger is made to pass through the limit plate on pull rod 21 214 are hung on bottom basket crossbeam 3, further according to needing travelling bridge position.
When the suspension centre of bottom basket crossbeam 3 need to use steel suspender belt by bearing requirements, it is only necessary to remove sunpender connection frame 1, then will It is hinged that upper pin XZ is refilled between 21 two rectangular slabs of top of steel suspender belt insertion pull rod.
This hanger has the characteristics that be convenient to mount and dismount, bearing capacity is good, versatile, highly-safe, is particularly suitable for using On the bottom basket crossbeam of profile Two bors d's oeuveres structure.

Claims (8)

1. a kind of Hanging Basket bottom basket system hanger, it is characterised in that: it includes sunpender connection frame and crossbeam hanger, and crossbeam hanger is hinged In the bottom of sunpender connection frame, crossbeam hanger includes pull rod and bearing beam, and bearing beam is detachably articulated with the lower end of pull rod, and bearing beam is held The bottom surface of bottom basket crossbeam.
2. basket system hanger in Hanging Basket bottom according to claim 1, it is characterised in that: the sunpender connection frame include side plate and Hanger erection plate, the lower part of side plate are provided with the hinge hole through its plate thickness, and the center position of hanger erection plate has a mounting hole, and two Side plate parallel arrangement, hanger erection plate are vertically connected at the top between both side plate.
3. basket system hanger in Hanging Basket bottom according to claim 2, it is characterised in that: correspond to sunpender peace between the both side plate The two sides of loading board upper installing hole are provided with stiffening plate.
4. basket system hanger in Hanging Basket bottom according to claim 2, it is characterised in that: the pull rod includes rectangular slab and connection Plate has hinge hole, two rectangular slabs parallel arrangement at the top and bottom of rectangular slab, and connecting plate is arranged vertically between two rectangular slabs, Width between two rectangular slab outer walls is less than the width between both side plate inner wall.
5. basket system hanger in Hanging Basket bottom according to claim 1, it is characterised in that: the bearing beam is hollow box beam, The length direction middle position of top plate and bottom plate has the pull rod mounting hole along vertical plane, the length direction middle position of side plate There is bearing pin mounting hole at place.
6. basket system hanger in Hanging Basket bottom according to claim 5, it is characterised in that: in the bearing beam length direction side plate Between rectangular slab is provided at position, the length of rectangular slab is greater than the length of the pull rod mounting hole, and center position has accordingly Bearing pin mounting hole.
7. basket system hanger in Hanging Basket bottom according to claim 6, it is characterised in that: the lower end of the pull rod passes through bearing beam top Pull rod mounting hole on plate and bottom plate, the upper end of pull rod and institute hinged by the pin shaft and bearing beam that pass through the bearing pin mounting hole It states hinged by pin shaft between side plate.
8. basket system hanger in Hanging Basket bottom according to claim 4, it is characterised in that: be connected at the top of the pull rod outer wall with The both ends of the limit plate of pull rod arranged crosswise, limit plate stretch out in outside pull rod.
CN201821975948.9U 2018-11-28 2018-11-28 A kind of Hanging Basket bottom basket system hanger Active CN209227401U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821975948.9U CN209227401U (en) 2018-11-28 2018-11-28 A kind of Hanging Basket bottom basket system hanger

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821975948.9U CN209227401U (en) 2018-11-28 2018-11-28 A kind of Hanging Basket bottom basket system hanger

Publications (1)

Publication Number Publication Date
CN209227401U true CN209227401U (en) 2019-08-09

Family

ID=67505063

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821975948.9U Active CN209227401U (en) 2018-11-28 2018-11-28 A kind of Hanging Basket bottom basket system hanger

Country Status (1)

Country Link
CN (1) CN209227401U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114892543A (en) * 2022-06-01 2022-08-12 中国十九冶集团有限公司 Construction method of bridge closure device
WO2023160724A1 (en) * 2022-04-29 2023-08-31 中铁七局集团郑州工程有限公司 Integral hoisting device for beam transportation vehicle

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023160724A1 (en) * 2022-04-29 2023-08-31 中铁七局集团郑州工程有限公司 Integral hoisting device for beam transportation vehicle
CN114892543A (en) * 2022-06-01 2022-08-12 中国十九冶集团有限公司 Construction method of bridge closure device

Similar Documents

Publication Publication Date Title
CN209227401U (en) A kind of Hanging Basket bottom basket system hanger
CN107416685B (en) Installation of gas pipeline construction method and its supporting structure on the downside of a kind of bridge
CN102795553B (en) Locomotive pre-wiring frame lifting system
CN109958819A (en) A kind of gas pipeline laying method and its supporting structure
CN108797380B (en) Suspension construction device and construction method for suspension irrigation continuous beam bracket
CN207827648U (en) A kind of counterweight of tracking-driven elevator
CN214402353U (en) Three-hinge type steel structure curtain wall assembling and hoisting structure
JP4787381B1 (en) Girder bridge suspension method using girder bridge suspension jig
CN213505869U (en) Rack with rotating arm system and good stability
CN108025897B (en) Tower crane
CN208668292U (en) A kind of cantilever pouring device of single box single chamber Arch Bridge Ribs
CN218950806U (en) Balance bracket for hanging curtain wall glass ribs at overhanging part
CN112061952A (en) Carrying pole beam for hoisting rolling mill frame
CN209581547U (en) A kind of transport device of urea for vehicle case
CN114673093B (en) Temporary fixing device and method for hoisting construction rear end of reinforced concrete combined section
CN218595886U (en) Hanging basket lower cross beam lifting appliance capable of being transversely adjusted
CN210764012U (en) Hoisting accessory is used in power supply facility construction in district
CN214456346U (en) Prefabricated case roof beam hoist
CN221440092U (en) Adjustable prefabricated component hanger
CN110469721A (en) A kind of assembled anti-knock suspension and support
CN212639671U (en) Carrying pole beam for hoisting rolling mill frame
CN216586195U (en) Bridge bracket
CN219950209U (en) Casting sand box horizontal hoisting mechanism
CN214989730U (en) Auxiliary sling for replacing chain belt of pig casting machine
CN214832103U (en) Suspension device of guide board

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: Hunan business culture and Technology Industrial Park, Zhongfang County, Huaihua City, Hunan Province

Patentee after: Hunan Wuxin Intelligent Technology Co.,Ltd.

Address before: Hunan business culture and Technology Industrial Park, Zhongfang County, Huaihua City, Hunan Province

Patentee before: Hunan China Railway Wuxin Steel Mould Co.,Ltd.

CP01 Change in the name or title of a patent holder