CN209217533U - Power distribution cabinet cool-down dehumidification device - Google Patents

Power distribution cabinet cool-down dehumidification device Download PDF

Info

Publication number
CN209217533U
CN209217533U CN201920174077.9U CN201920174077U CN209217533U CN 209217533 U CN209217533 U CN 209217533U CN 201920174077 U CN201920174077 U CN 201920174077U CN 209217533 U CN209217533 U CN 209217533U
Authority
CN
China
Prior art keywords
cooling
cabinet body
air
dust filtering
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920174077.9U
Other languages
Chinese (zh)
Inventor
李洪涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Power Positive Control (beijing) Electric Co Ltd
Original Assignee
China Power Positive Control (beijing) Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Power Positive Control (beijing) Electric Co Ltd filed Critical China Power Positive Control (beijing) Electric Co Ltd
Priority to CN201920174077.9U priority Critical patent/CN209217533U/en
Application granted granted Critical
Publication of CN209217533U publication Critical patent/CN209217533U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Drying Of Gases (AREA)

Abstract

The utility model discloses power distribution cabinet cool-down dehumidification devices, including cabinet body and cooling cavities, the top of the cabinet body is equipped with rain-proof overhead guard, and equipment cavity is formed in cabinet body, the cooling cavities is arranged in the cabinet body above equipment cavity, and the first heat emission fan is set in the lower end surface of cooling cavities, the utility model structure is simple, upper thermovent is dusted using dust filtering mechanism, the dust in outside air is avoided to enter in equipment cavity, dust filtering cavity is cooperatively formed by the first air intake plate and dust filtering case, extraneous dust is completely cut off by dirt filtrating screen, and be easily installed disassembly;Cooperated using cooling body with refrigerator and the sucking intracorporal air of cabinet is cooled down, pass through conduction cooling web plate simultaneously for the condensate moisture in air, reduce air humidity, and it is dehumidified by dehumidifying strainer further progress, to which the air after dehumidification cooling be blasted in equipment cavity by the first heat emission fan, comprehensive cooling down is carried out to power equipment, cooling efficiency is higher.

Description

Power distribution cabinet cool-down dehumidification device
Technical field
The utility model relates to a kind of power distribution cabinet equipment technical fields, specifically power distribution cabinet cool-down dehumidification device.
Background technique
Existing power distribution cabinet mostly uses greatly heat derives cabinet body of the heat emission fan by power equipment, and this mode cools down efficiency It is low, and cabinet body self-radiating ability is poor, works under the condition of high temperature and high humidity, be easy to cause the damage of power equipment.
Utility model content
The purpose of this utility model is to provide power distribution cabinet cool-down dehumidification devices, to solve to propose in above-mentioned background technique The problem of.
To achieve the above object, the utility model provides the following technical solutions:
Power distribution cabinet cool-down dehumidification device, including cabinet body, cooling cavities, dust filtering mechanism and cooling body, the cabinet body Top is equipped with rain-proof overhead guard, and equipment cavity is formed in cabinet body, and the cabinet body on the outside of equipment cavity is equipped with cabinet door, and in equipment cavity Two sides of the bottom cabinet body processes lower thermovent, while the second heat emission fan being arranged in cabinet body, and the second heat emission fan and lower thermovent It is corresponding, control panel is separately set in cabinet door, and the cooling cavities is arranged in the cabinet body above equipment cavity, and in cooling cavities The first heat emission fan is arranged in lower end surface, and the lower end surface of the first heat emission fan and cooling cavities is connected by screw to, while in cooling Upper thermovent is processed on the cabinet body of cavity two sides, and upper thermovent is connected to the first heat emission fan, the setting of the dust filtration mechanism exists In the cooling cavities of first heat emission fan two sides, and dust filtering mechanism includes the first air intake plate, dust filtering case and dirt filtrating screen, in dust filtering case Dirt filtrating screen is set, and the first air intake plate is set in the side of dust filtering case, the inner wall of the first air intake plate and cabinet body is connected by screw to, And the notch with upper thermovent corresponding matching is processed on the first air intake plate, the cooling body is arranged in cold on the inside of dust filtering case But in cavity, and cooling body includes cooler bin, conduction cooling web plate, cooling tube, dehumidify strainer, air outlet plate and the second air intake plate, Cooler bin is connected by screw to cooling cavities and rain-proof overhead guard, and the side of cooler bin be arranged the second air intake plate, second into Aerofoil is bonded with dust filtering case, and the round air port of corresponding matching is processed on the second air intake plate and dust filtering case, cooler bin it is another Air outlet plate is arranged in side, processes air outlet in air outlet plate, and conduction cooling web plate is arranged in cooler bin, and cooling is arranged on conduction cooling web plate Pipe, while the setting dehumidifying strainer in air outlet plate.
As a further solution of the present invention: the cooling cavities rear end be arranged baffle, the both ends of baffle with go out Aerofoil connection, and refrigerator and water circulating pump are set in the cooling cavities between baffle and cabinet body, water circulating pump connection cooling Pipe, and cooling tube connect cooperation with refrigerator, is freezed by refrigerator to cooling tube, and driven in cooling tube by water circulating pump Cooling water is circulated, and cooling effect is improved.
As a further solution of the present invention: second heat emission fan totally four, it is dissipated respectively with the lower of bottom of cabinet bulk Hot mouth is corresponding, and is connected by screw to cabinet body
As a further solution of the present invention: processing three corresponding circles on second air intake plate and dust filtering case Shape air port, and it is corresponding with the upper thermovent at the top of cabinet body.
As a further solution of the present invention: processing two round air outlets in the air outlet plate, and about first The central symmetry of heat emission fan.
As a further solution of the present invention: outlet pipe, outlet pipe are arranged on the cabinet body of the rear end of the cooler bin It is connected to cooler bin, convenient for the export of condensed water in cooler bin.
As a further solution of the present invention: the dehumidifying strainer is manufactured using active carbon.
Compared with prior art, the utility model has the beneficial effects that the utility model structure is simple, using dust filtering mechanism Upper thermovent is dusted, the dust in outside air is avoided to enter in equipment cavity, with the first air intake plate and dust filtering case Dust filtering cavity is formed, extraneous dust is completely cut off by dirt filtrating screen, and be easily installed disassembly;Cooperated using cooling body and refrigerator The sucking intracorporal air of cabinet is cooled down, while the condensate moisture in air is reduced by air humidity by conduction cooling web plate, and It is dehumidified by dehumidifying strainer further progress, thus blasted the air after dehumidification cooling in equipment cavity by the first heat emission fan, it is right Power equipment carries out comprehensive cooling down, and cooling efficiency is higher, improves the service life of power equipment.
Detailed description of the invention
Fig. 1 is the schematic view of the front view of power distribution cabinet cool-down dehumidification device.
Fig. 2 is the schematic cross-sectional view of power distribution cabinet cool-down dehumidification device.
Fig. 3 is the structural schematic diagram of power distribution cabinet cool-down dehumidification device side view.
Fig. 4 is the partial enlargement structural representation of power distribution cabinet cool-down dehumidification device.
In figure: cabinet body 1, control panel 3, rain-proof overhead guard 4, cooling cavities 5, the first heat emission fan 6, upper thermovent 7, is set cabinet door 2 It is standby chamber 8, lower thermovent 9, the second heat emission fan 10, dust filtering mechanism 11, the first air intake plate 111, dust filtering case 112, dirt filtrating screen 113, cold But mechanism 12, cooler bin 121, conduction cooling web plate 122, cooling tube 123, dehumidifying strainer 124, air outlet plate 125, the second air intake plate 126, Baffle 13, refrigerator 14, circulating pump 15 and outlet pipe 16.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Please refer to Fig. 1~4, in the utility model embodiment, power distribution cabinet cool-down dehumidification device, including cabinet body 1, cooling chamber The top of body 5, dust filtering mechanism 11 and cooling body 12, the cabinet body 1 is equipped with rain-proof overhead guard 4, and is formed with equipment in cabinet body 1 Chamber 8, the cabinet body 1 in 8 outside of equipment cavity are equipped with cabinet door 2, and the thermovent 9 under the processing of 8 two sides of the bottom cabinet body 1 of equipment cavity, simultaneously Second heat emission fan 10 is set, and the second heat emission fan 10 is corresponding with lower thermovent 9 in cabinet body 1, control is separately set in cabinet door 2 Heat in cabinet body 1 is bloated cabinet body 1 by plate 3, such second heat emission fan 10, guarantees that the power equipment in equipment cavity 8 works normally, The cooling cavities 5 is arranged in the cabinet body 1 of 8 top of equipment cavity, and the first heat emission fan 6 is arranged in the lower end surface of cooling cavities 5, And the lower end surface of the first heat emission fan 6 and cooling cavities 5 is connected by screw to, while being added on the cabinet body 1 of 5 two sides of cooling cavities Thermovent 7 in work, and upper thermovent 7 is connected to the first heat emission fan 6, so passes through cooling cavities 5 for upper thermovent 7 and equipment Chamber 8 is isolated, and can effectively guarantee the steady operation of power equipment in equipment cavity 8, and the setting of the dust filtration mechanism 11 is dissipated first In the cooling cavities 5 of 6 two sides of heat fan, and dust filtering mechanism 11 includes the first air intake plate 111, dust filtering case 112 and dirt filtrating screen 113, Dirt filtrating screen 113 is set in dust filtering case 112, and first air intake plate 111 is set in the side of dust filtering case 112, the first air intake plate 111 with The inner wall of cabinet body 1 is connected by screw to, and the notch with upper 7 corresponding matching of thermovent is processed on the first air intake plate 111, so Cooperatively form dust filtering cavity by dust filtering case 112 and the first air intake plate 111, and by dirt filtrating screen 113 filter off dust in air and Impurity, while being collected by dust filtering case 112, it avoids dust from entering in cabinet body 1, causes the damage of power equipment, the cooling body 12 are arranged in the cooling cavities 5 of the inside of dust filtering case 112, and cooling body 12 include cooler bin 121, it is conduction cooling web plate 122, cold But pipe 123, dehumidifying strainer 124, air outlet plate 125 and the second air intake plate 126, cooler bin 121 and cooling cavities 5 and rain-proof overhead guard 4 It is connected by screw to, and second air intake plate 126 is set in the side of cooler bin 121, the second air intake plate 126 is pasted with dust filtering case 112 It closes, and processes the round air port of corresponding matching on the second air intake plate 126 and dust filtering case 112, the other side of cooler bin 121 is set Air outlet plate 125 is set, air outlet is processed in air outlet plate 125, and conduction cooling web plate 122, conduction cooling web plate 122 are set in cooler bin 121 Upper setting cooling tube 123, while the setting dehumidifying strainer 124 in air outlet plate 125 so pass through cooling web plate 122 for cooling tube 123 cooling capacity radiation, increases the film-cooled heat of air, improves cooling effect, and then the air sucked in cabinet body 1 is cooled down It is cooling, and remaining moisture in air is removed by dehumidifying strainer 124, improve cooling effect
Baffle 13 is arranged in the rear end of the cooling cavities 5, and the both ends of baffle 13 are connect with air outlet plate 125, and in baffle 13 Refrigerator 14 and water circulating pump 15 are set in the cooling cavities 5 between cabinet body 1, water circulating pump 15 connects cooling tube 123, and Cooling tube 123 connect cooperation with refrigerator 14, is freezed by refrigerator 14 to cooling tube 123, and is driven and cooled down by water circulating pump 15 Cooling water in pipe 123 is circulated, and cooling effect is improved.
It is second heat emission fan 10 totally four, corresponding with the lower thermovent 9 of 1 bottom of cabinet body respectively, and pass through spiral shell with cabinet body 1 Nail connection.
Process three corresponding round air ports on second air intake plate 126 and dust filtering case 112, and with 1 top of cabinet body Upper thermovent 7 it is corresponding.
Two round air outlets, and the central symmetry about the first heat emission fan 6 are processed in the air outlet plate 125.
Outlet pipe 16 is set on the cabinet body 1 of the rear end of the cooler bin 121, and outlet pipe 16 is connected to cooler bin 121, is convenient for The export of condensed water in cooler bin 121.
The dehumidifying strainer is manufactured using active carbon.
The working principle of the utility model is: temperature sensor and humidity sensor are set in equipment cavity in use, passing through, And connect with control panel 3, by the temperature and humidity in 3 care testing device of control panel, when temperature or humidity is excessively high, the first radiator fan 6 and second radiator fan 10 work, by the second radiator fan 10 by equipment cavity 8 hot-air and moisture be discharged cabinet body 1, simultaneously First radiator fan 6 blasts dry air after cooling into equipment cavity 8, accelerates the cooling down of power equipment.
Although the utility model is described in detail with reference to the foregoing embodiments, come for those skilled in the art Say, it is still possible to modify the technical solutions described in the foregoing embodiments, or to part of technical characteristic into Row equivalent replacement, within the spirit and principle of the utility model, any modification, equivalent replacement, improvement and so on should all It is included within the scope of protection of this utility model.

Claims (7)

1. power distribution cabinet cool-down dehumidification device, including cabinet body, cooling cavities, dust filtering mechanism and cooling body, which is characterized in that institute The top for stating cabinet body is equipped with rain-proof overhead guard, and equipment cavity is formed in cabinet body, and the cabinet body on the outside of equipment cavity is equipped with cabinet door, and The thermovent under the processing of equipment cavity two sides of the bottom cabinet body, while being arranged the second heat emission fan in cabinet body, and the second heat emission fan with Lower thermovent is corresponding, control panel is separately arranged in cabinet door, the cooling cavities is arranged in the cabinet body above equipment cavity, and cold But the first heat emission fan is arranged in the lower end surface of cavity, and the lower end surface of the first heat emission fan and cooling cavities is connected by screw to, together When upper thermovent is processed on the cabinet body of cooling cavities two sides, and upper thermovent is connected to the first heat emission fan, the dust filtration machine Structure is arranged in the cooling cavities of the first heat emission fan two sides, and dust filtering mechanism includes the first air intake plate, dust filtering case and dirt filtrating screen, Dirt filtrating screen is set in dust filtering case, and the first air intake plate is set in the side of dust filtering case, the inner wall of the first air intake plate and cabinet body passes through Screw connection, and the notch with upper thermovent corresponding matching is processed on the first air intake plate, the cooling body is arranged in dust filtering In cooling cavities on the inside of case, and cooling body includes cooler bin, conduction cooling web plate, cooling tube, dehumidifying strainer, air outlet plate and the Two air intake plates, cooler bin are connected by screw to cooling cavities and rain-proof overhead guard, and in the second air inlet of the side of cooler bin setting Plate, the second air intake plate are bonded with dust filtering case, and the round air port of corresponding matching is processed on the second air intake plate and dust filtering case, cold But air outlet plate is arranged in the other side of case, processes air outlet in air outlet plate, and conduction cooling web plate is arranged in cooler bin, on conduction cooling web plate Cooling tube is set, while the setting dehumidifying strainer in air outlet plate.
2. power distribution cabinet according to claim 1 cool-down dehumidification device, which is characterized in that the rear end of the cooling cavities is set Baffle is set, the both ends of baffle are connect with air outlet plate, and refrigerator and circulation are arranged in the cooling cavities between baffle and cabinet body Water pump, water circulating pump connects cooling tube, and cooling tube connect cooperation with refrigerator, is freezed by refrigerator to cooling tube, and by Water circulating pump drives the cooling water in cooling tube to be circulated, and improves cooling effect.
3. power distribution cabinet according to claim 1 cool-down dehumidification device, which is characterized in that second heat emission fan totally four It is a, it is corresponding with the lower thermovent of bottom of cabinet bulk respectively, and be connected by screw to cabinet body.
4. power distribution cabinet according to claim 1 cool-down dehumidification device, which is characterized in that second air intake plate and dust filtering Three corresponding round air ports are processed on case, and corresponding with the upper thermovent at the top of cabinet body.
5. power distribution cabinet according to claim 1 cool-down dehumidification device, which is characterized in that process two in the air outlet plate Round air outlet, and the central symmetry about the first heat emission fan.
6. power distribution cabinet according to claim 1 cool-down dehumidification device, which is characterized in that the cabinet of the rear end of the cooler bin Outlet pipe is set on body, and outlet pipe is connected to cooler bin, convenient for the export of condensed water in cooler bin.
7. power distribution cabinet according to claim 1 cool-down dehumidification device, which is characterized in that the dehumidifying strainer is using activity Charcoal manufacture.
CN201920174077.9U 2019-01-31 2019-01-31 Power distribution cabinet cool-down dehumidification device Expired - Fee Related CN209217533U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920174077.9U CN209217533U (en) 2019-01-31 2019-01-31 Power distribution cabinet cool-down dehumidification device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920174077.9U CN209217533U (en) 2019-01-31 2019-01-31 Power distribution cabinet cool-down dehumidification device

Publications (1)

Publication Number Publication Date
CN209217533U true CN209217533U (en) 2019-08-06

Family

ID=67467802

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920174077.9U Expired - Fee Related CN209217533U (en) 2019-01-31 2019-01-31 Power distribution cabinet cool-down dehumidification device

Country Status (1)

Country Link
CN (1) CN209217533U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110568887A (en) * 2019-09-20 2019-12-13 江苏华强新能源科技有限公司 temperature and humidity control device for indoor environment purification regulation
CN111725708A (en) * 2020-06-16 2020-09-29 刘泽楷 Dustproof intelligent regulator cubicle of constant temperature and humidity
CN111918516A (en) * 2020-07-22 2020-11-10 青岛永贵科技有限公司 Grounding resistance device
CN112490912A (en) * 2020-12-14 2021-03-12 孔祥富 Energy-saving heat dissipation type low-voltage cabinet
CN112704325A (en) * 2021-01-04 2021-04-27 张丽 Automatic dust-proof ash-removing cabinet for history teaching computer
CN115102062A (en) * 2022-06-22 2022-09-23 安徽富煌电力装备科技有限公司 Anti salt fog type photovoltaic grid-connected cabinet
CN115394031A (en) * 2022-09-07 2022-11-25 江苏丰东信息科技有限公司 Fire detection early warning device for electrical equipment box
CN115421528A (en) * 2022-08-09 2022-12-02 河南众智天诚电力科技有限公司 Reactive compensation control cabinet with normal temperature dehumidification function

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110568887A (en) * 2019-09-20 2019-12-13 江苏华强新能源科技有限公司 temperature and humidity control device for indoor environment purification regulation
CN111725708A (en) * 2020-06-16 2020-09-29 刘泽楷 Dustproof intelligent regulator cubicle of constant temperature and humidity
CN111918516A (en) * 2020-07-22 2020-11-10 青岛永贵科技有限公司 Grounding resistance device
CN112490912A (en) * 2020-12-14 2021-03-12 孔祥富 Energy-saving heat dissipation type low-voltage cabinet
CN112490912B (en) * 2020-12-14 2022-07-01 孔祥富 Energy-saving heat dissipation type low-voltage cabinet
CN112704325A (en) * 2021-01-04 2021-04-27 张丽 Automatic dust-proof ash-removing cabinet for history teaching computer
CN112704325B (en) * 2021-01-04 2021-11-19 张丽 Automatic dust-proof ash-removing cabinet for history teaching computer
CN115102062A (en) * 2022-06-22 2022-09-23 安徽富煌电力装备科技有限公司 Anti salt fog type photovoltaic grid-connected cabinet
CN115421528A (en) * 2022-08-09 2022-12-02 河南众智天诚电力科技有限公司 Reactive compensation control cabinet with normal temperature dehumidification function
CN115421528B (en) * 2022-08-09 2024-03-08 河南众智天诚电力科技有限公司 Reactive compensation control cabinet with normal temperature dehumidification function
CN115394031A (en) * 2022-09-07 2022-11-25 江苏丰东信息科技有限公司 Fire detection early warning device for electrical equipment box

Similar Documents

Publication Publication Date Title
CN209217533U (en) Power distribution cabinet cool-down dehumidification device
CN205825602U (en) The tablet dedusting drying unit improved
CN207766776U (en) The removable heat dissipation dehumidifying electrical cabinet of one kind
CN208108435U (en) A kind of band dehumidification function central air-conditioning air outlet grate
CN206687052U (en) A kind of batch circulates grain drying tower
CN208765510U (en) A kind of Valve Steel cooling device
CN207279848U (en) A kind of radiator of dehumidifier
CN208572691U (en) A kind of dehumidifier cabinet
CN209362925U (en) A kind of stand alone type version coated baking case apparatus
CN209313217U (en) A kind of novel low-voltage draw-out type switch cabinet
CN215311351U (en) Intelligent dehumidifying device based on novel semiconductor
CN216925055U (en) Positive pressure type temperature and humidity control drying system
CN211936282U (en) Top air-out industrial explosion-proof dehumidifier
CN211709286U (en) Rack is used in electronic tags production
CN206790870U (en) A kind of redrying workshop electrical control cubicles cooling heat radiation system
CN210900116U (en) Evaporative cooling air treatment device for base station
CN209068908U (en) A kind of pharmacy station-service dehumidifier
CN207163108U (en) A kind of drying tower energy-saving circulating layer assembly
CN208238191U (en) Housing unit and dehumidifier
CN109028307A (en) A kind of air cleaning screen with heat and wet treatment function
CN209730465U (en) A kind of automation equipment control device
CN109433558A (en) A kind of stand alone type version coated baking case apparatus
CN220292458U (en) Network security monitoring terminal of power monitoring system
CN216694256U (en) Drying machine with dust and impurity removal function
CN221130986U (en) Spray-dried chicken plasma active protein powder filtering device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190806