CN209211768U - The steel construction of merogenesis lifting - Google Patents

The steel construction of merogenesis lifting Download PDF

Info

Publication number
CN209211768U
CN209211768U CN201821743647.3U CN201821743647U CN209211768U CN 209211768 U CN209211768 U CN 209211768U CN 201821743647 U CN201821743647 U CN 201821743647U CN 209211768 U CN209211768 U CN 209211768U
Authority
CN
China
Prior art keywords
steel pipe
section steel
lower section
telescopic rod
locating piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821743647.3U
Other languages
Chinese (zh)
Inventor
李永文
黄源军
林少鹏
李锋
曾丽琳
卢仕明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Provincial Architectural Members Engineering Co
Original Assignee
Guangdong Provincial Architectural Members Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Provincial Architectural Members Engineering Co filed Critical Guangdong Provincial Architectural Members Engineering Co
Priority to CN201821743647.3U priority Critical patent/CN209211768U/en
Application granted granted Critical
Publication of CN209211768U publication Critical patent/CN209211768U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

A kind of steel construction of merogenesis lifting, it includes constraint steel column and stake well, it is characterized by: the constraint steel column includes upper section steel pipe and lower section steel pipe, the lower section steel pipe bottom is equipped with bottom plate, stake shaft bottom face is equipped with locator, and the lower section penstock installation is equipped with fixing piece on locator between lower section steel pipe on the stake well inner wall, the junction of upper section steel pipe lower end and lower section steel pipe upper end is equipped with attaching means, and the stake well inner wall is equipped with operating platform.The utility model can reduce the load on ground.

Description

The steel construction of merogenesis lifting
Technical field
The utility model relates to the technical fields of construction, more particularly, to a kind of steel construction of merogenesis lifting.
Background technique
At present in construction, be often used reverse construction requirement, basement construction first by negative one layer earth excavation, Then concrete bed course platform is poured in negative one layer and carry out excavation pile construction, carry out basement middlebearing column peace after the completion of pile foundation again Dress.Therefore, first steel member to be unloaded when erection of steel pipe column and transports to the stacking of negative one layer designated position, then big loop wheel machine will descend negative one Layer operation.
Prior art among the above has the following deficiencies: that site environment is narrow, transports the insufficient space of steel construction, greatly Loop wheel machine can not reach subterranean layer.
Utility model content
The purpose of the utility model is to provide a kind of steel constructions of merogenesis lifting for reducing ground load.
The above-mentioned purpose of utility model of the utility model has the technical scheme that
A kind of steel construction of merogenesis lifting, including constraint steel column and stake well, the constraint steel column include upper section steel pipe under Duan Gangguan, the lower section steel pipe bottom are equipped with bottom plate, and stake shaft bottom face is equipped with locator, and the lower section penstock installation is positioning On device, fixing piece, the company of upper section steel pipe lower end and lower section steel pipe upper end are equipped on the stake well inner wall between lower section steel pipe It meets place and is equipped with attaching means, the stake well inner wall is equipped with operating platform.
By using above-mentioned technical proposal, segmenting steel column, convenient transportation and lifting will be constrained, only passes through trolley during installation It can carry, be not necessarily to large-scale crane field operation, reduce the load-bearing on ground.Locator can be such that steel pipe is accurately positioned, in stake well The verticality that support has fixing piece to keep steel pipe between wall and steel pipe, the attaching means of junction prevent in subsequent backfill stake well construction The dislocation of lower section steel pipe, stake well inner wall are arranged operating platform, are capable of providing reasonable space and give construction personnel's operation.
The utility model is further arranged to: the locator includes nut, locating piece and anchor bolt, and the anchor bolt bottom end is solid Due to stake bottom, the end of the anchor bolt and nut are connected through a screw thread, and the end of the anchor bolt passes through locating piece, the spiral shell Female lower surface with locating piece contradicts.
By using above-mentioned technical proposal, anchor bolt lower end is embedded to stake bottom, and anchor bolt upper end is connect with nut and locating piece, Whole locating piece is formed, by the position of turn nut, adjusts locator.
The utility model is further arranged to: the locating piece includes centrally located lug boss and connect with lug boss Support portion, the bottom plate center is equipped with through-hole with raised portion fits.
By using above-mentioned technical proposal, locating piece can be supported with positioning steel tube column, through-hole and locating piece on bottom plate Raised portion fits, facilitate constructor's operation.
The utility model is further arranged to: the lug boss is formed by the fixation of several locating rod circumferential arrangements, the branch Support part includes several connecting rod fixed with locating rod.
By using above-mentioned technical proposal, several locating rods circumferentially arrange fixation, keep locator structure more firm, if The dry connecting rod fixed with locating rod one end provides a support base for steel column, and locating rod and connecting rod are along the circumferential direction solid Fixed, stress is more evenly.
The utility model is further arranged to: the connecting rod includes external extension bar, interior telescopic rod and positioning pin, it is described in Telescopic rod one end is inside outer telescopic rod, and the top of the external extension bar is equipped with location hole, and the interior telescopic rod top is uniformly divided Cloth is several and location hole connecting hole of the same size, the positioning pin pass through location hole and connecting hole.
By using above-mentioned technical proposal, connecting hole and location hole match, at the same positioning pin pass through two holes make it is interior overhanging Contracting bar is fixedly connected, and by the elongation and shortening of connecting rod, can position the steel pipe of different-diameter.
The utility model is further arranged to: the attaching means includes upper ring plate and lower ring plate, and the upper ring plate bottom end is set There is stiffening plate, the bottom end of the stiffening plate is connected to lower ring plate top, and the stiffening plate is distributed uniformly and circumferentially.
By using above-mentioned technical proposal, attaching means can ensure that upper section steel pipe and lower section steel pipe accurately connect always, keep away Exempt to misplace when backfilling stake well.
In conclusion the advantageous effects of the utility model are as follows: by the merogenesis to steel construction, do not need big loop wheel machine and make Industry can reduce the load on ground.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model.
Fig. 2 is the top view of the utility model.
Fig. 3 is the locating element structure view of the utility model.
In figure, 1, upper section steel pipe;2, upper ring plate;3, lower ring plate;4, stiffening plate;5, lower section steel pipe;6, locating rod;7, anchor Bolt;8, nut;9, through-hole;10, interior telescopic rod;11, external extension bar;12, bottom plate;13, steel column is constrained;14, attaching means;15, fixed Position pin;16, stake well;17, fixing piece;18, operating platform;19, locating piece;20, locator, 21, connecting rod, 22, connecting hole; 23, location hole;24, lug boss.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
It referring to FIG. 1, FIG. 2 and FIG. 3, is a kind of steel construction of merogenesis lifting disclosed by the utility model, including constraint steel column 13 and stake well 16.Stake 16 bottom of well is equipped with locator 20, and locator 20 includes nut 8, locating piece 19 and anchor bolt 7.7 lower end of anchor bolt It is fixed on the bottom of a well 16,7 upper end of anchor bolt sequentially passes through nut 8 and locating piece 19, by rotating nuts 8, adjusts locating piece 19 height guarantees that locating piece 19 is in a horizontal state.Locating piece 19 include centrally located lug boss 24 and with lug boss 24 The support portion of connection, lug boss 24 are formed by the fixation of several 6 circumferential arrangements of locating rod, and support portion includes several solid with locating rod 6 Fixed connecting rod 21, several locating rods 6 circumferentially arrange fixation, keep 19 structure of locating piece more firm, several and locating rod 6 one Fixed connecting rod 21 is held, provides a support base for steel column, locating rod 6 and connecting rod 21 are along the circumferential direction fixed, stress More evenly.Connecting rod 21 includes external extension bar 11, interior telescopic rod 10 and positioning pin 15.The top of external extension bar 11 is equipped with location hole 23, interior 10 top of telescopic rod is uniformly distributed several and connecting hole 22 of the same size of location hole 23, and positioning pin 15, which passes through two holes, to be made Interior telescopic rod 10 is connected with external extension bar 11, and inside outer telescopic rod 11, connecting rod 21 passes through stretching for interior 10 one end of telescopic rod The constraint steel column 13 of different-diameter can be positioned.
Constraining steel column 13 includes upper section steel pipe 1 and lower section steel pipe 5, and 5 bottom of lower section steel pipe is fixed with bottom plate 12, bottom plate 12 Center is equipped with the through-hole 9 cooperated with lug boss 24, and lower section steel pipe 5 is hung in a well 16, and lower section steel pipe 5 is placed on the top of locator 20 Portion is arranged in the through-hole 9 on bottom plate 12 by connecting rod 6, carries out precise positioning to steel pipe.It is supportted in time with fixing piece 17 in stake well Between 16 inner walls and lower section steel pipe 5, the accurate location of lower section steel pipe 5 is kept.Confirm it is errorless after, lift preceding elder generation in upper section steel pipe 1 5 casting concrete of lower section steel pipe and backfill stake well 16.
Operating platform 18 is equipped on 16 inner wall of stake well, operating platform 18 is located at the upper end of lower section steel pipe 5.Carry out upper section steel The lifting of pipe 1, construction personnel buttress the lower end of upper section steel pipe 1 on operating platform 18, are slowly directed at lower section steel pipe 5, finally lead to It crosses and is welded and fixed.The junction of upper section steel pipe 1 and lower section steel pipe 5 be equipped with attaching means 14, attaching means 14 include upper ring plate 2, under Ring flat-plate 3 and stiffening plate 4, attaching means 14 are fixedly welded on junction, guarantee that upper end steel pipe and lower section steel pipe 5 are quasi- in the construction process Really engagement, avoids misplacing during backfilling stake well 16.
The implementation principle of the present embodiment are as follows: by constraint 13 merogenesis of steel column lifting, 5 bottom of lower section steel pipe is fixed with bottom plate 12, The center of bottom plate 12 is equipped with the through-hole 9 cooperated with lug boss 24, is first put into locator 20 in 16 bottom of stake well, locator 20 includes Nut 8, locating piece 19 and anchor bolt 7.16 bottom of a well is fixed in 7 bottom end of anchor bolt, and the end of anchor bolt 7 and nut 8 are connected by screw thread It connects, the end of anchor bolt 7 passes through locating piece 19, the lower surface conflict of nut 8 and locating piece 19.Pass through rotating nuts 8, adjustment positioning The height of part 19.The locating piece 19 includes centrally located lug boss 24 and the support portion connecting with lug boss 24, described Lug boss 24 is formed by the fixation of several 6 circumferential arrangements of locating rod, and the support portion includes several connecting rod fixed with locating rod 6 21.Connecting rod 21 includes external extension bar 11, interior telescopic rod 10 and positioning pin 15.The top of external extension bar 11 is equipped with location hole 23, Interior 10 top of telescopic rod is uniformly distributed several and the connecting hole 22 of the same size of location hole 23, interior telescopic rod 10 and external extension bar 11 It is connected by positioning pin 15.Lower section steel pipe 5 is hung in a well 16,20 top of locator is placed on, makes 12 company of being connected to of bottom plate 21 upper surface of extension bar makes lug boss 24 pass through through-hole 9, is protected between stake diameter inner wall and lower section steel pipe 5 with the support of fixing piece 17 in time Hold accurate position.It needs to backfill stake well 16 at this time again to lift upper section steel pipe 1, construction personnel needs on operating platform 18 Upper-lower section steel pipe 5 is accurately docked, is welded and fixed by cooperation, finally welds attaching means 14 in joining place, attaching means 14 includes upper ring Plate 2, lower ring plate 3 and stiffening plate 4, attaching means 14 are fixedly welded on junction, guarantee that upper end steel pipe and lower section steel pipe 5 were being constructed It is accurately engaged in journey, avoids misplacing during backfilling stake well 16.
The embodiment of present embodiment is the preferred embodiment of the utility model, and not limitation is originally practical new according to this The protection scope of type, therefore: the equivalence changes that all structures, shape, principle according to the utility model are done should all be covered by practical Within novel protection scope.

Claims (6)

1. a kind of steel construction of merogenesis lifting, including constraint steel column (13) and stake well (16), it is characterised in that: the constraint steel column It (13) include upper section steel pipe (1) and lower section steel pipe (5), lower section steel pipe (5) bottom is equipped with bottom plate (12), the stake well (16) Bottom surface is equipped with locator (20), and the lower section steel pipe (5) is mounted on locator (20), on stake well (16) inner wall with lower section Fixing piece (17) are equipped between steel pipe (5), the junction of upper section steel pipe (1) lower end and lower section steel pipe (5) upper end is equipped with constraint Part (14), stake well (16) inner wall are equipped with operating platform (18).
2. the steel construction of merogenesis lifting according to claim 1, it is characterised in that: the locator (20) includes nut (8), a well (16) bottom is fixed in locating piece (19) and anchor bolt (7), anchor bolt (7) bottom end, the end of the anchor bolt (7) and Nut (8) is connected through a screw thread, and the end of the anchor bolt (7) passes through locating piece (19), the nut (8) and locating piece (19) Lower surface contradicts.
3. the steel construction of merogenesis lifting according to claim 2, it is characterised in that: the locating piece (19) includes in being located at The lug boss (24) of the heart and the support portion connecting with lug boss (24), bottom plate (12) center is equipped with matches with lug boss (24) The through-hole (9) of conjunction.
4. the steel construction of merogenesis lifting according to claim 3, it is characterised in that: the lug boss (24) is by several positioning The fixation of bar (6) circumferential arrangement forms, and the support portion includes several connecting rod (21) fixed with locating rod (6).
5. the steel construction of merogenesis lifting according to claim 4, it is characterised in that: the connecting rod (21) includes external extension Bar (11), interior telescopic rod (10) and positioning pin (15), described interior telescopic rod (10) one end is internal in outer telescopic rod (11), described outer The top of telescopic rod (11) is equipped with location hole (23), and interior telescopic rod (10) top is uniformly distributed several big with location hole (23) Small consistent connecting hole (22), the positioning pin (15) pass through location hole (23) and connecting hole (22).
6. the steel construction of merogenesis lifting according to claim 1, it is characterised in that: the attaching means (14) includes upper ring plate (2) and lower ring plate (3), upper ring plate (2) bottom end are equipped with stiffening plate (4), and the bottom end of the stiffening plate (4) is connected to lower ring plate (3) top, the stiffening plate (4) are uniformly distributed along attaching means (14) circumferencial direction.
CN201821743647.3U 2018-10-25 2018-10-25 The steel construction of merogenesis lifting Active CN209211768U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821743647.3U CN209211768U (en) 2018-10-25 2018-10-25 The steel construction of merogenesis lifting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821743647.3U CN209211768U (en) 2018-10-25 2018-10-25 The steel construction of merogenesis lifting

Publications (1)

Publication Number Publication Date
CN209211768U true CN209211768U (en) 2019-08-06

Family

ID=67456890

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821743647.3U Active CN209211768U (en) 2018-10-25 2018-10-25 The steel construction of merogenesis lifting

Country Status (1)

Country Link
CN (1) CN209211768U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111088879A (en) * 2019-12-13 2020-05-01 中铁广州工程局集团深圳工程有限公司 Prefabricated decorative blank mold for steel pipe column and steel pipe column decoration construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111088879A (en) * 2019-12-13 2020-05-01 中铁广州工程局集团深圳工程有限公司 Prefabricated decorative blank mold for steel pipe column and steel pipe column decoration construction method

Similar Documents

Publication Publication Date Title
WO2019128155A1 (en) Open caisson construction structure and method
CN101812842B (en) Tensionless filling pile structure
CN103243961B (en) Titanium plate steel inner tank reversed construction device for chimney of thermal power station
CN108571425B (en) Pile foundation cap foundation of offshore wind turbine generator set and construction method thereof
CN111254920B (en) Reverse-operation-process concrete-filled steel tube column installation construction method and reverse-operation-process concrete-filled steel tube column construction structure
CN203891009U (en) Structure for installing reverse steel pipe column in rotary excavating pile hole
CN104264902A (en) Steel pipe column disc positioning device and structure for connecting concrete filled steel tubular column with pile foundation
CN107806205A (en) A kind of mounting structure and installation method of unlined steel dome
CN105544587A (en) Combined tower crane foundation and construction method thereof
CN115262865B (en) Steel reinforcement cage butt joint placing device and positioning method
CN103510541A (en) Device and method for installing steel pipe column to interior of lifting frame hole
CN209211768U (en) The steel construction of merogenesis lifting
CN208415258U (en) A kind of piling positioning mould bases of offshore wind turbine foundation
CN104674839B (en) Foundation structure for wind-driven generator
CN202139255U (en) Tooling platform for assembling converter body equipment
CN201649071U (en) Unstressing cast-in-place pile
CN111962506A (en) Collimating pile structure and construction method
CN209368877U (en) Contrary sequence method steel pipe column and the movable attachment device of steel reinforcement cage
CN201495556U (en) Structure for quickly hoisting and centering base of large steel frame
CN111827648A (en) Construction device and method for down-supporting type overhanging scaffold
CN207160721U (en) A kind of super-huge iron tower of power transmission line supervisor
CN108455465B (en) A kind of tower crane support base and its installation method
CN109372015A (en) Contrary sequence method steel pipe column and the movable attachment device of steel reinforcement cage
CN208416809U (en) A kind of offshore wind turbine pile foundation support table basis
CN212270916U (en) Collimating pile structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant