CN209211290U - A kind of bridge civil construction load-bearing hanger - Google Patents
A kind of bridge civil construction load-bearing hanger Download PDFInfo
- Publication number
- CN209211290U CN209211290U CN201822130528.7U CN201822130528U CN209211290U CN 209211290 U CN209211290 U CN 209211290U CN 201822130528 U CN201822130528 U CN 201822130528U CN 209211290 U CN209211290 U CN 209211290U
- Authority
- CN
- China
- Prior art keywords
- supporting table
- fixedly connected
- groove
- rod
- sliding block
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a kind of bridge civil construction load-bearing hangers, including mounting plate, the first supporting table is fixedly connected on the right side of mounting plate, the outer wall of first supporting table slidably connects the second supporting table, the first groove corresponding with the first supporting table is offered on the left of second supporting table, the two sides up and down of first supporting table are fixedly connected to the first sliding block, the two sides up and down of first groove offer the first sliding groove that connection is matched with the first sliding block, first supporting table right side opening is equipped with the second groove, rotating electric machine is fixedly connected at the top of first supporting table, the output end of rotating electric machine is fixedly connected with shaft by shaft coupling, the outer wall of shaft is rotatablely connected by the top of the first rolling bearing and the second groove.The utility model conveniently can preferably adjust the length of load-bearing hanger, construct convenient for staff, improve construction efficiency, while the safety for capableing of preferable staff is protected.
Description
Technical field
The utility model relates to load-bearing hanger technical field more particularly to a kind of bridge civil construction load-bearing hangers.
Background technique
Load-bearing hanger be in order to guarantee each work progress is gone on smoothly and is set up workbench, most of load-bearing hanger by
The stronger material of some weight-bearing functions such as some reinforcing bars, steel pipe and steel plate splices and is made, durable, in construction site or applies
Number used in the ground of workshop is more, and workpeople can be facilitated to carry out construction operation.In bridge civil construction, when encountering needs
Construction height is higher, when concrete is the bridge of shear wall, in order to guarantee quality, bridge can not one-off construction complete, need
It is performed in multiple times and pours, carrying out when pouring of next stage, when by height limitation, generally requiring pouring completion
One load-bearing hanger is set on bridge, provides an interim workbench with this, bridge bearing hanger can give construction work
People brings the convenience in work, substantially increases the working efficiency of construction worker.
Existing bridge civil construction with load-bearing hanger when in use, because its function is excessively single, in the length of load-bearing hanger
When degree is insufficient, the position that can not effectively construct to needs is constructed, and a distance, mistake need to be also added on the basis of original
In cumbersome and inconvenient, and influence the construction efficiency to bridge civil engineering.
Utility model content
Purpose of the utility model is to solve the civil constructions of prior art Bridge with load-bearing hanger when in use, because
Its function is excessively single, and in the curtailment of load-bearing hanger, the position that can not effectively construct to needs is constructed, and also needs
A distance is added on the basis of original, it is excessively cumbersome and inconvenient, and the problem of influence to the construction efficiency of bridge civil engineering, and mention
A kind of bridge civil construction load-bearing hanger out.
To achieve the goals above, the utility model adopts the technical scheme that
A kind of bridge civil construction load-bearing hanger, including mounting plate are fixedly connected with first on the right side of the mounting plate
Supporting table, the outer wall of first supporting table slidably connect the second supporting table, offered on the left of second supporting table with
Corresponding first groove of first supporting table, the two sides up and down of first supporting table are fixedly connected to the first sliding block, described
The two sides up and down of first groove offer the first sliding groove that connection is matched with the first sliding block, open up on the right side of first supporting table
There is the second groove, rotating electric machine is fixedly connected at the top of first supporting table, the output end of the rotating electric machine passes through connection
Axis device is fixedly connected with shaft, and the outer wall of the shaft is rotatablely connected by the top of the first rolling bearing and the second groove, institute
It states shaft and is fixedly connected with first bevel gear far from one end of rotating electric machine, be embedded with the second rolling on the left of second groove
Bearing, and the inner wall of the second rolling bearing is fixedly connected with threaded rod, the outer wall of the threaded rod is fixedly connected with the second cone tooth
Wheel, the second bevel gear are meshed with first bevel gear, and the right end of the threaded rod is threaded with thread barrel, the screw thread
Cylinder passes through the opening of the second groove far from one end of threaded rod and is fixedly connected with the side wall of the first groove, first support
The top of platform and the second supporting table is fixedly connected with protection mechanism jointly.
Preferably, the bottom of first supporting table is fixedly connected with the first reinforcing rod, first reinforcing rod and installation
Second reinforcing rod arranged in a crossed manner there are two being fixedly connected between plate, two second reinforcing rods are far from the first reinforcing rod and peace
One end of loading board is fixedly connected with the bottom of the first supporting table, and two the second reinforcing rod infalls are fixedly connected with third
The top of reinforcing rod, the third reinforcing rod is fixedly connected with the bottom of the first supporting table.
Preferably, the lower rotation of second supporting table is connected with the 4th reinforcing rod, the bottom of the 4th reinforcing rod
It is rotatably connected to the second sliding block, the right side opening of first reinforcing rod is equipped with the second sliding slot that connection is matched with the second sliding block.
Preferably, the protection mechanism includes the protection being fixedly connected with the first supporting table and the second supporting table top
Column, two opposite sides of the protective fence be respectively fixedly connected with there are two the first symmetrical fender rod and second protection
Bar, second fender rod offer third groove far from the side of protective fence, slidably connect connection in the third groove
Bar, the one end of the connecting rod far from third groove are fixedly connected with one end of the first fender rod.
Preferably, the two sides up and down of the connecting rod are fixedly connected to third sliding block, and up and down the two of the third groove
Side offers the third sliding slot that connection is matched with third sliding block.
Preferably, the outer wall of the protective fence, the first fender rod, the second fender rod and connecting rod is fixedly connected to rubber
Pad.
Compared with prior art, the utility model provides a kind of bridge civil construction load-bearing hanger, and having following has
Beneficial effect:
1, the bridge civil construction load-bearing hanger, by be provided with the first supporting table, the second supporting table, rotating electric machine,
Threaded rod and thread barrel start rotating electric machine when needing the length to load-bearing hanger to be adjusted, and rotating electric machine drives shaft
It being rotated in the first rolling bearing, shaft drives first bevel gear rotation, and first bevel gear drives second bevel gear to rotate, and second
Bevel gear drives threaded rod to rotate in the second rolling bearing, and threaded rod pushes thread barrel, thread barrel by screw telescopic principle
The second supporting table is pushed, the second supporting table is slided in first sliding groove by the first sliding block, conveniently can preferably adjust load-bearing
The length of hanger, constructs convenient for staff, improves construction efficiency.
2, bridge civil construction load-bearing hanger, by being provided with protective fence, the first fender rod, the second fender rod and company
Extension bar, when adjusting the length of load-bearing hanger, the protective fence in the second supporting table pulls the second fender rod, and the second fender rod passes through
Third sliding block slides in third sliding slot, can be preferable by protective fence, the first fender rod, the second fender rod and connecting rod
The safety of staff is protected.
It is not directed to part in the device to be the same as those in the prior art or can be realized by using the prior art, the utility model
The length that conveniently can preferably adjust load-bearing hanger, constructs convenient for staff, improves construction efficiency, while can
The safety of preferable staff is protected.
Detailed description of the invention
Fig. 1 be the utility model proposes a kind of bridge civil construction load-bearing hanger structural schematic diagram;
Fig. 2 be the utility model proposes a kind of bridge civil construction load-bearing hanger part A structural schematic diagram;
Fig. 3 be the utility model proposes a kind of bridge civil construction load-bearing hanger part B structural schematic diagram.
In figure: 1 mounting plate, 2 first supporting tables, 3 second supporting tables, 4 first grooves, 5 second grooves, 6 rotating electric machines, 7
Shaft, 8 first bevel gears, 9 threaded rods, 10 second bevel gears, 11 thread barrels, 12 first reinforcing rods, 13 second reinforcing rods, 14
Three reinforcing rods, 15 the 4th reinforcing rods, 16 protective fences, 17 first fender rods, 18 second fender rods, 19 third grooves, 20 connecting rods.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.
In the description of the present invention, it should be understood that term " on ", "lower", "front", "rear", "left", "right",
The orientation or positional relationship of the instructions such as "top", "bottom", "inner", "outside" is to be based on the orientation or positional relationship shown in the drawings, and is only
For ease of description the utility model and simplify description, rather than the device or element of indication or suggestion meaning must have it is specific
Orientation, be constructed and operated in a specific orientation, therefore should not be understood as limiting the present invention.
Referring to Fig.1-3, a kind of bridge civil construction load-bearing hanger, including mounting plate 1, the right side of mounting plate 1 is fixed to be connected
It is connected to the first supporting table 2, the outer wall of the first supporting table 2 slidably connects the second supporting table 3, and the left side of the second supporting table 3 opens up
There is first groove 4 corresponding with the first supporting table 2, the two sides up and down of the first supporting table 2 are fixedly connected to the first sliding block, the
The two sides up and down of one groove 4 offer the first sliding groove that connection is matched with the first sliding block, and 2 right side opening of the first supporting table is equipped with the
Two grooves 5, the top of the first supporting table 2 are fixedly connected with rotating electric machine 6, and the output end of rotating electric machine 6 is fixed by shaft coupling
It is connected with shaft 7, the outer wall of shaft 7 is rotatablely connected by the top of the first rolling bearing and the second groove 5, and shaft 7 is far from rotation
One end of rotating motor 6 is fixedly connected with first bevel gear 8, and the left side of the second groove 5 is embedded with the second rolling bearing, and the second rolling
The inner wall of dynamic bearing is fixedly connected with threaded rod 9, and the outer wall of threaded rod 9 is fixedly connected with second bevel gear 10, second bevel gear
10 are meshed with first bevel gear 8, and the right end of threaded rod 9 is threaded with thread barrel 11, thread barrel 11 far from threaded rod 9 one
It holds the opening across the second groove 5 and is fixedly connected with the side wall of the first groove 4, the first supporting table 2 and the second supporting table 3
Top is fixedly connected with protection mechanism jointly, and rotating electric machine 6 is electrically connected by control switch and external power supply, can be guaranteed
The support of power supply volume is obtained when work, it is the prior art that this, which is electrically connected, and belongs to those skilled in the art's conventional techniques, therefore
It will not be repeated here.
The bottom of first supporting table 2 is fixedly connected with the first reinforcing rod 12, fixed between the first reinforcing rod 12 and mounting plate 1
Connection is there are two the second reinforcing rod 13 arranged in a crossed manner, and two the second reinforcing rods 13 are far from the first reinforcing rod 12 and mounting plate 1
One end is fixedly connected with the bottom of the first supporting table 2, and two 13 infalls of the second reinforcing rod are fixedly connected with third reinforcing rod
14, the top of third reinforcing rod 14 is fixedly connected with the bottom of the first supporting table 2, can be facilitated and be propped up the first supporting table 2
Support, strengthens its ability to bear.
The lower rotation of second supporting table 3 is connected with the 4th reinforcing rod 15, and the lower rotation of the 4th reinforcing rod 15 is connected with
Second sliding block, the right side opening of the first reinforcing rod 12 are equipped with the second sliding slot for matching connection with the second sliding block, can facilitate to second
Supporting table 3 is supported.
Protection mechanism include with the protective fence 16 that is fixedly connected at the top of the first supporting table 2 and the second supporting table 3, two are anti-
The opposite side of guardrail 16 is respectively fixedly connected with there are two symmetrical the first fender rod 17 and the second fender rod 18, and second is anti-
Guard bar 18 offers third groove 19 far from the side of protective fence 16, and connecting rod 20 is slidably connected in third groove 19, connection
The one end of bar 20 far from third groove 19 is fixedly connected with one end of the first fender rod 17, is capable of the safety of preferable staff
It is protected.
The two sides up and down of connecting rod 20 are fixedly connected to third sliding block, the two sides up and down of third groove 19 offer with
The third sliding slot of third sliding block matching connection, can facilitate and limit to connecting rod 20.
Protective fence 16, the first fender rod 17, the second fender rod 18 and connecting rod 20 outer wall be fixedly connected to rubber pad,
The frictional force that protective fence 16, the first fender rod 17, the second fender rod 18 and connecting rod 20 can be increased makes one grasp protective fence
When 16, it is not easy to slide.
In the utility model, when needing the length to load-bearing hanger to be adjusted, start rotating electric machine 6, rotating electric machine 6
Shaft 7 is driven to rotate in the first rolling bearing, shaft 7 drives first bevel gear 8 to rotate, and first bevel gear 8 drives the second cone
Gear 10 rotates, and second bevel gear 10 drives threaded rod 9 to rotate in the second rolling bearing, and threaded rod 9 passes through screw telescopic original
Reason pushes thread barrel 11, and thread barrel 11 pushes the second supporting table 3, and the second supporting table 3 is sliding in first sliding groove by the first sliding block
It is dynamic, the length of load-bearing hanger conveniently can be preferably adjusted, constructs convenient for staff, improves construction efficiency, adjusting
When the length of whole load-bearing hanger, protective fence 16 in the second supporting table 3 pulls the second fender rod 18, and the second fender rod 18 passes through the
Three sliding blocks slide in third sliding slot, can by protective fence 16, the first fender rod 17, the second fender rod 18 and connecting rod 20
The safety of preferable staff is protected.
The preferable specific embodiment of the above, only the utility model, but the protection scope of the utility model is not
It is confined to this, anyone skilled in the art is within the technical scope disclosed by the utility model, practical according to this
Novel technical solution and its utility model design are subject to equivalent substitution or change, should all cover the protection model in the utility model
Within enclosing.
Claims (6)
1. a kind of bridge civil construction load-bearing hanger, including mounting plate (1), which is characterized in that the right side of the mounting plate (1)
It being fixedly connected with the first supporting table (2), the outer wall of first supporting table (2) slidably connects the second supporting table (3), and described
The first groove (4) corresponding with the first supporting table (2) is offered on the left of two supporting tables (3), first supporting table (2)
Upper and lower two sides are fixedly connected to the first sliding block, and the two sides up and down of first groove (4) are offered to be matched with the first sliding block
The first sliding groove of connection, the first supporting table (2) right side opening are equipped with the second groove (5), the top of first supporting table (2)
It is fixedly connected with rotating electric machine (6), the output end of the rotating electric machine (6) is fixedly connected with shaft (7) by shaft coupling, described
The outer wall of shaft (7) is rotatablely connected by the top of the first rolling bearing and the second groove (5), and the shaft (7) is far from rotation
One end of motor (6) is fixedly connected with first bevel gear (8), is embedded with the second rolling bearing on the left of second groove (5),
And second the inner wall of rolling bearing be fixedly connected with threaded rod (9), the outer wall of the threaded rod (9) is fixedly connected with the second cone tooth
It takes turns (10), the second bevel gear (10) is meshed with first bevel gear (8), and the right end of the threaded rod (9) is threaded with
Thread barrel (11), the thread barrel (11) far from the one end of threaded rod (9) pass through the second groove (5) opening and with it is first recessed
The side wall of slot (4) is fixedly connected, and the top of first supporting table (2) and the second supporting table (3) is fixedly connected with protection jointly
Mechanism.
2. a kind of bridge civil construction load-bearing hanger according to claim 1, which is characterized in that first supporting table
(2) bottom is fixedly connected with the first reinforcing rod (12), is fixedly connected between first reinforcing rod (12) and mounting plate (1)
Two the second reinforcing rods (13) arranged in a crossed manner, two second reinforcing rods (13) are far from the first reinforcing rod (12) and mounting plate
(1) one end is fixedly connected with the bottom of the first supporting table (2), and two the second reinforcing rod (13) infalls are fixedly connected
Have third reinforcing rod (14), the top of the third reinforcing rod (14) is fixedly connected with the bottom of the first supporting table (2).
3. a kind of bridge civil construction load-bearing hanger according to claim 2, which is characterized in that second supporting table
(3) lower rotation is connected with the 4th reinforcing rod (15), and the lower rotation of the 4th reinforcing rod (15) is connected with the second sliding block,
The right side opening of first reinforcing rod (12) is equipped with the second sliding slot that connection is matched with the second sliding block.
4. a kind of bridge civil construction load-bearing hanger according to claim 1, which is characterized in that the protection mechanism packet
The protective fence (16) for including and being fixedly connected at the top of the first supporting table (2) and the second supporting table (3), two protective fences (16)
Opposite side is respectively fixedly connected with there are two symmetrical the first fender rod (17) and the second fender rod (18), and described second
Fender rod (18) offers third groove (19) far from the side of protective fence (16), slidably connects in the third groove (19)
Connecting rod (20), one end of the connecting rod (20) one end and the first fender rod (17) far from third groove (19) is fixed to be connected
It connects.
5. a kind of bridge civil construction load-bearing hanger according to claim 4, which is characterized in that the connecting rod (20)
Two sides up and down be fixedly connected to third sliding block, the two sides up and down of the third groove (19) offer and third sliding block
Third sliding slot with connection.
6. a kind of bridge civil construction load-bearing hanger according to claim 4, which is characterized in that the protective fence
(16), the outer wall of the first fender rod (17), the second fender rod (18) and connecting rod (20) is fixedly connected to rubber pad.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822130528.7U CN209211290U (en) | 2018-12-18 | 2018-12-18 | A kind of bridge civil construction load-bearing hanger |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822130528.7U CN209211290U (en) | 2018-12-18 | 2018-12-18 | A kind of bridge civil construction load-bearing hanger |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209211290U true CN209211290U (en) | 2019-08-06 |
Family
ID=67465152
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822130528.7U Expired - Fee Related CN209211290U (en) | 2018-12-18 | 2018-12-18 | A kind of bridge civil construction load-bearing hanger |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209211290U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115324423A (en) * | 2022-09-02 | 2022-11-11 | 中铁十四局集团大盾构工程有限公司 | Automatic telescopic protector |
-
2018
- 2018-12-18 CN CN201822130528.7U patent/CN209211290U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115324423A (en) * | 2022-09-02 | 2022-11-11 | 中铁十四局集团大盾构工程有限公司 | Automatic telescopic protector |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209190870U (en) | A kind of structural lumber cutter device | |
CN207829513U (en) | A kind of building template, which pours, uses fixing support rack | |
CN208002533U (en) | A kind of computer software research and development displaying device | |
CN209211290U (en) | A kind of bridge civil construction load-bearing hanger | |
CN111300089A (en) | Clamping table convenient for clamping mechanical parts | |
CN205588298U (en) | Gripper -like multi freedom robot manipulator mechanism | |
CN207727947U (en) | A kind of scaffold of architectural engineering | |
CN204434189U (en) | A kind of plastering wall auxiliary device | |
CN209509443U (en) | A kind of easy-to-dismount scaffold of civil engineering | |
CN110340786A (en) | A kind of burnishing device for office furniture processing | |
CN208276274U (en) | A kind of square pile end plate production clamping device of plate shearing machine | |
CN207736312U (en) | A kind of folding mechanical arm | |
CN209550428U (en) | Multistation hydraulic stamping press | |
CN208430762U (en) | A kind of modified scaffold for building | |
CN207863513U (en) | A kind of building structure strengthening attachment device | |
CN214621113U (en) | Portable house area measurement mapping device | |
CN209363499U (en) | A kind of angle-bender of the building site with limit function | |
CN208441440U (en) | A kind of construction operation platform for building with defencive function | |
CN108608447A (en) | A kind of bindiny mechanism for feeding manipulator | |
CN208485519U (en) | A kind of subway work handling device | |
CN211164707U (en) | Thin-wall drill bit for concrete processing | |
CN208845037U (en) | A kind of energy conservation and environmental protection exempts from the assembled architecture enclosing of preset concrete ground foundation | |
CN110153337B (en) | Steel reinforcement cage owner muscle positioner that municipal works were used | |
CN208183590U (en) | A kind of urban construction roadblock | |
CN209533884U (en) | A kind of solar panel cutter device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190806 Termination date: 20201218 |