CN209210725U - A kind of green coke device - Google Patents

A kind of green coke device Download PDF

Info

Publication number
CN209210725U
CN209210725U CN201822067690.9U CN201822067690U CN209210725U CN 209210725 U CN209210725 U CN 209210725U CN 201822067690 U CN201822067690 U CN 201822067690U CN 209210725 U CN209210725 U CN 209210725U
Authority
CN
China
Prior art keywords
coke
tower
green coke
tower body
green
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201822067690.9U
Other languages
Chinese (zh)
Inventor
孙鸣
孔祥玺
马明明
沙帅
么秋香
陈汇勇
马晓迅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Northwest University
Original Assignee
Northwest University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Northwest University filed Critical Northwest University
Priority to CN201822067690.9U priority Critical patent/CN209210725U/en
Application granted granted Critical
Publication of CN209210725U publication Critical patent/CN209210725U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Coke Industry (AREA)

Abstract

A kind of green coke device, including green coke tower, green coke tower include tower body, and decoking mouth is offered at the top of tower body, devoke and are provided with hydraulic decoking device at mouth;Tower body bottom is provided with feed inlet and coke outlet, and automatic bottom cover machine is provided at coke outlet;Coke plate layer of the gas phase plate layer passed through for oil gas for dividing the foam sheet of oily phase foam and gas phase foam and for generating coke is provided with inside tower body from top to bottom;Catalyst grid reactor is provided with above gas phase plate layer.Utility model device is to generate the dust little particle of electrostatic in tower top sprinkling mouth sprinkling before progress coking reaction, this short grained effect of dust is that green coke tower inner plies surface tension increases, in order to which bigizationner avoids the coke generated in green coke tower from sticking together on green coke tower wall face, the coke generated is allow to remove and collect well.The yield of the oil discovery BTXN obtained after characterization is cooling has apparent increase.

Description

A kind of green coke device
Technical field
The utility model belongs to technical field of coal chemical industry, is related to a kind of green coke device.
Background technique
Coal tar is coal liquid by-product obtained in pyrolytic process, can be divided into high temperature coal tar by the difference of pyrolysis temperature Oil and coalite tar, wherein coalite tar has very high utility value.Coalite tar mainly contains arene Close object, aliphatic compound, phenolic compound etc..It is wherein contour additional containing naphthalene, anthracene, phenanthrene, pyrene in compound fragrant hydrocarbon It is worth fine chemicals;Aliphatic compound is the important component of the fuel oil such as gasoline, diesel oil, is plus hydrogen produces Gao Shiliu The good raw material of alkane value diesel oil;Phenolic compound is in synthetic fibers, engineering plastics, pesticide, medicine, preservative, plasticizer, fragrance And dyestuff intermediate etc. has extensive purposes.Therefore how separation coal tar efficiently, economic, environmentally friendly has seemed currently It is particularly significant.
Compared to light oil, heavy coal tar is increasingly complex, and most of heavy oil is dropped, this not only causes the big of resource Amount waste, while also polluted environment.How efficiently to handle heavy coal tar is necessarily becoming for current Developing Coal Chemical Industry Gesture.Heavy coal tar can generate the more inferior residue oil of a large amount of quality during processing, traditional coking process and plus Hydrogen process has been difficult to be carried out effectively processing and utilization.
A kind of green coke tower preheating device is described in Chinese patent CN108148613A, by being equipped with wheel carrier, air pressure tank, electricity Magnetic heater box, pulsometer, heater wire, lifting pump rod, the lifting for realizing equipment uniformly preheat, and equipment by being equipped with air pressure tank Pulsometer pressure supply control lifting pump rod is that electromagnetic heater box is gone up and down, and enables electromagnetic heater box in different height switch operating, It is that green coke tower is uniformly preheated, and equipment also keeps equipment mobile more by being equipped with wheel carrier that electromagnetic heater box, which is equipped with electromagnetic heating line, It is convenient, the problem of facilitating the uniform preheating of green coke tower.But this plant energy consumption is big, installation is inconvenient.In addition, due to this Device is continuity operation, and large-scale inspection operation can be faced during driving, production capacity increase can be reduced in this way and be produced into This.
A kind of green coke tower, including green coke tower tower body, electric heating are described in Chinese utility model patent CN106190226A Device, coke removing appts, lifting device.Electric heater unit is used to heat green coke tower tower body and feedstock oil;Coke removing appts include setting It is placed in the driving device on green coke tower top face top and is set to for scraping the decoking end of coke inside green coke tower, driving device is also Including for driving decoking end to make the driving shaft rotated horizontally;Lifting device includes the lifting deceleration for being set to driving device bottom Machine and the guide rail mounting base being socketed on driving shaft outer wall, the outer wallflow of guide rail mounting base are equipped with guide rail.The green coke tower is with existing skill Art is compared, and has pollution-free, decoking thoroughly and the higher advantage of the degree of automation.But the device does not have Insulation, tower body Suddenly cold and hot can make deformation of the body of coke drum.
A kind of coke drum preheating device, including two green coke towers are described in Chinese patent application 201320370168.2. The utility model steady material balance and heat balance of apparatus system while realizing that green coke device is energy-saving, reduces The cyclic swing of device, shortens green coke tower preheating time, improves the liquid yield of device, the energy for saving pump disappears Consumption, the technique drawback of green coke device batch production have obtained breakthrough optimization.But there is no specific heating in device Mode is heated simply by fixed heating device is equipped in tower body, this is easy to appear the non-uniform problem of heating, installation Disassembly is also inconvenient.
Utility model content
To overcome the problems of the prior art, the purpose of the utility model is to provide a kind of green coke devices.Between this device is The operation of having a rest property, small investment, simple process, technology maturation.Under green coke Ta Tanei suitable temperature, pressure condition, heavy oil residue Or decompression residuum (petroleum, plastic oil blend, bio-oil blend, coal tar, kerosene blend, kerosene slurry etc.) can occur Cracking, condensation reaction, obtain coke and oil gas (coker gasoline, coker gas oil, wax tailings etc.), wherein passing through catalyst grid The yield of the oil gas of reactor, the oil discovery BTXN obtained after characterization is cooling has apparent increase.This novel green coke dress It sets that economic benefit is fairly obvious, is the new type ideal device for processing heavy oil residue or decompression residuum, it will solve existing heavy slag Oil or decompression residuum it is superfluous and the problem of have no way of handling.
To achieve the above object, the technical solution adopted in the utility model is as follows:
A kind of green coke device, including green coke tower, green coke tower include tower body, and decoking mouth is offered at the top of tower body, is devoked at mouth It is provided with hydraulic decoking device;Tower body bottom is provided with feed inlet and coke outlet, and automatic bottom cover machine is provided at coke outlet; The gas phase plate layer passed through for oil gas is provided with inside tower body from top to bottom for a point cystosepiment for oily phase foam and gas phase foam Layer and the coke plate layer for generating coke;Catalyst grid reactor is provided with above gas phase plate layer.
The utility model, which further improves, to be, catalyst grid reactor includes shell, and catalysis is provided in shell Oxidant layer is provided with snap ring on housing exterior walls.
The utility model, which further improves, to be, sprinkling mouth and oil gas vent are provided at the top of tower body;And spray mouth Positioned at hydraulic decoking device side, oil gas vent is located at the hydraulic decoking device other side.
The utility model, which further improves, to be, high-temperature fuel gas muff is provided on tower body outer surface.
The utility model, which further improves, to be, high-temperature fuel gas muff and tower body are mounted on tower body appearance by flange On face, high-temperature fuel gas muff uses corrugated plating.
The utility model, which further improves, to be, the skirt for being used to support tower body is provided on tower body.
The utility model, which further improves, to be, the cylindrical pressure vessel that tower body is vertically arranged, and tower body is a height of 25m, tower body width are 7m.
The utility model, which further improves, to be, coke plate layer includes cylindrical plate body, is offered on cylindrical plate body The identical circular hole of seven sizes, wherein cylindrical plate body center offers a circular hole, and six circular holes in addition are evenly distributed on Around centrally located circular hole, the outer wall and tower body inner wall of 6 circular holes are tangent, Circularhole diameter 1m;
Foam sheet includes cylindrical plate body, offers the identical circular hole of 14 sizes on cylindrical plate body, circular hole is straight Diameter is 0.5m, wherein cylindrical plate body center is opened up there are four circular hole, and two-by-two side by side, ten circular holes in addition are evenly distributed on Around centrally located four circular holes, the outer wall and tower body inner wall of ten circular holes are tangent;
Gas phase plate layer includes cylindrical plate body, offers several circular holes on cylindrical plate body, and the diameter of circular hole is less than 0.5m。
The utility model, which further improves, to be, each plate layer in coke plate layer, foam sheet and gas phase plate layer It is mounted on level-sensing device.
Compared with prior art, the utility model has the advantages that utility model device is that progress green coke is anti- The dust little particle (granular size is about 5 μm) of electrostatic is generated before answering in tower top sprinkling mouth sprinkling, this dust is short grained Effect is that green coke tower inner plies surface tension increases, in order to which bigizationner avoids the coke generated in green coke tower from sticking together in green coke tower On wall surface, the coke generated is allow to remove and collect well.
Utility model device is in coking reaction that the oil gas above gas phase plate layer passes through catalyst grid reactor Catalyst layer, the active site for reaching catalyst are reacted, and the tower top oil gas across catalyst duct is discharged from oil gas vent It collects.The yield of the oil discovery BTXN obtained after characterization is cooling has apparent increase.
Utility model device is intermittent operation, small investment, simple process, technology maturation.It is suitable in green coke Ta Tanei Temperature, under pressure condition, heavy oil residue or decompression residuum (petroleum, plastic oil blend, bio-oil blend, coal tar, Kerosene blend, kerosene slurry etc.) cracking, condensation reaction can occur, obtain coke and oil gas (coker gasoline, coker gas oil, coking Wax oil etc.), wherein passing through the oil gas of catalyst grid reactor, the yield of the oil discovery BTXN obtained after characterization is cooling has It is apparent to increase.This novel green coke device economic benefit is fairly obvious, is the novel reason for processing heavy oil residue or decompression residuum Think device, it will solve the problems, such as existing heavy oil residue or decompression residuum surplus and has no way of handling.
Detailed description of the invention
Fig. 1 is green coke tower structure schematic diagram;
Fig. 2 is green coke tower parallel-connection structure schematic diagram;
Fig. 3 is coke removing appts structural schematic diagram;
Fig. 4 is green coke tower internal component structural schematic diagram;
Fig. 5 is catalyst grid reactor schematic diagram;
Fig. 6 is that 1 phase combined gas chromatography mass spectrometry of embodiment analyzes result;
Fig. 7 is 1 each component content results of embodiment;
The content distribution that Fig. 8 is BTXN under the conditions of different catalysts in embodiment 1;
Fig. 9 is that 2 phase combined gas chromatography mass spectrometry of embodiment analyzes result;
Figure 10 is 2 each component content results of embodiment;
The content distribution that Figure 11 is BTXN under the conditions of different catalysts in embodiment 2.
In figure, 1, sprinkling mouth;2, flange;3, high-temperature fuel gas muff;4, hydraulic decoking device;5, mouth is devoked;6, oil gas Outlet;7, catalyst grid reactor;8, level-sensing device;9, skirt;10, automatic bottom cover machine;11, feed inlet;12, the first green coke Tower;13, the second green coke tower;14, four-way valve;15, inlet valve;16, high-pressure hydraulic pump;17, giant;18, drilling cramp;19, drilling rod; 20, hydraulic coke-cutting device;21, chute;22, coke;23, coke plate layer;24, foam sheet;25, gas phase plate layer;26, snap ring;27, Catalyst layer.
Specific embodiment
The utility model is described in detail with reference to the accompanying drawing.
Referring to Fig. 1, a kind of novel green coke device of the utility model, including green coke tower tower body, from upper on green coke tower tower body Be disposed under sprinkling mouth 1, flange 2, high-temperature fuel gas muff 3, hydraulic decoking device 4, decoking mouth 5, oil gas vent 6, Catalyst grid reactor 7, level-sensing device 8, skirt 9, automatic bottom cover machine 10 and feed inlet 11.
The green coke tower tower body is a right circular cylinder shell pressure vessel, and top opens up spherical or ellipse decoking mouth 5, under Portion is tower made of cone thickness boiler plate.Since the operation temperature of green coke tower is higher, and it is in suddenly cold and hot, high pressure water impact Deng under more harsh operating condition, therefore easily there are the bulge of tower body burn into, deformation or even weld cracking and the inclined feelings of tower body Condition, so the material of green coke tower tower body uses 1m thickness boiler plate.Tower body high setting is 25m or so, and tower body width is set as the left side 7m The right side generally requires two towers for the considerations of operating and shares, a tower green coke, a tower coke discharging.One tower when reacting green coke, Another is then in the decoking stage.That is (generally 2/3 or so the height of tower height when a Tai Tanei coke accumulation is to certain altitude Degree) it switches over.
Fig. 4 is that green coke tower tower body internal component structural schematic diagram is led inside green coke tower main body tower from top to bottom referring to fig. 4 It to include 25 3 coke plate layer 23, foam sheet 24 and gas phase plate layer plate layer.Wherein coke plate layer 23 includes cylindrical plate Body offers the identical circular hole of seven sizes on cylindrical plate body, and plate body center offers a circular hole, 6 circular holes in addition It is evenly distributed on around centrally located circular hole, the outer wall and green coke tower tower body inner wall of 6 circular holes are tangent.(Circularhole diameter is 1m or so) it constitutes, it is the main place that coke generates.
Foam sheet 24 includes cylindrical plate body, offers the identical circular hole of 14 sizes on plate body, and (Circularhole diameter is 0.5m or so), wherein cylindrical plate body center is opened up there are four circular hole (square side by side two-by-two), 10 circular holes in addition It is evenly distributed on around centrally located four circular holes, the outer wall and green coke tower tower body inner wall of 10 circular holes are tangent.Condensation is anti- The coke that should be generated rests in tower, and from tower wall to Center Extender, is centrally formed to spout and expects channel, coke plate layer 23 the above are Key reaction area, as 24th area of foam sheet, foam sheet 24 divide oily phase foam and gas phase foam.
Gas phase plate layer 25 includes cylindrical plate body, several circular holes is offered on plate body, and the diameter of circular hole is less than 0.5m, With the progress of cracking reaction, highly viscous coal tar constantly forms foam by bubbling, and established bubbling is constantly broken again Split evolution oil gas.
Sprinkling mouth 1 on the green coke tower tower body is mounted on the left of green coke tower tower body top, is to carry out coking reaction Preceding to spray a kind of dust little particle (granular size is about 5 μm) for generating electrostatic, this short grained effect of dust is to make to give birth to Burnt tower tower body inner plies surface tension increases, and avoids the coke generated in green coke tower from sticking together on green coke tower wall face, makes to generate Coke can remove and collect well.
High-temperature fuel gas muff 3 and green coke tower are mounted on green coke tower tower body two sides by green coke tower flange, thus by high temperature Combustion gas muff 3 and green coke tower connect;Before connecting flange, whether the specification of control flange, bolt and gasket meets the requirements, Sealing surface will keep smooth clean and tidy, and the screw thread of bolt is complete, and gasket quality wants flexible, and surface is without breakage, fold, scratch etc. Defect before assembly flange, cleans up flange, degreases, sundries, the seal line such as dust, rusty stain are rejected clean.
The high-temperature fuel gas muff 3 of the green coke tower is mounted on green coke tower tower body outer surface, this is a kind of by combustion gas combustion Burn a kind of muff that heat release keeps the temperature tower body.High-temperature fuel gas muff 3 uses corrugated plating, has both increased the rigid of external protection Degree, and solve the problems, such as the thermal expansion difference of tower body circumferential direction.This high-temperature fuel gas muff adiabatic heat insulating effect is good, high temperature resistant and Low temperature, resistance to various chemical attacks, fire protection flame retarding, Water-proof and oil-proof have good hydrophobicity performance.
Referring to Fig. 3, the hydraulic decoking device 4 of the green coke tower is mounted on green coke tower tower body tower top, and hydraulic decoking device 4 is Existing apparatus, hydraulic decoking device 4 include be followed successively by from top to bottom high-pressure hydraulic pump 16, giant 17, drilling cramp 18, drilling rod 19, Hydraulic coke-cutting device 20, chute 21 and coke 22.
Decoking devokes method with high-pressure hydraulic, and the green coke tower for coalescing coke is first cooling with steam, then carries out hydraulic decoking.By The high pressure water that high-pressure hydraulic pump 16 conveys arrives the nozzle of hydraulic coke-cutting device 20 by giant 17, drilling cramp 18, drilling rod 19, from water The high pressure water that power coke cutter nozzle sprays forms high-pressure jet, cuts down coke by means of the strong impact power of high-pressure jet, makes Flowed out together with water by tower bottom chute 21, drilling rod 19 constantly goes up and down and rotates, and coke 22 all removes in green coke tower Until net.
Referring to Fig. 5, the catalyst grid reactor 7 is located above gas phase plate layer, is connected with green coke tower flange.Catalyst Grid reactor 7 includes shell, is provided with catalyst layer 27 in shell, snap ring 26, catalyst layer 27 are provided on housing exterior walls Positioned at 7 bosom position of catalyst grid reactor, in order to keep the oil gas of 25 top of gas phase plate layer anti-by catalyst grid The catalyst layer 27 of device 7 is answered, the active site for reaching catalyst is reacted, and the tower top oil gas across catalyst duct is from oil gas Outlet discharge is collected;Snap ring 26 is located on 7 outer wall of catalyst grid reactor, is to stablize catalyst grid reactor 7 It is fixed in green coke tower.The catalyst that catalyst layer 27 is placed is ZSM-5, Al2O3, USY, HY etc..
The green coke tower decoking mouth 5 is located at green coke top of tower, is provided with hydraulic decoking device 4 at green coke tower decoking mouth 5, and And green coke tower decoking mouth 5 is connected with hydraulic decoking device 4.
The green coke tower oil gas vent 6 is located on the right side of tower top, and the medium in tower top oil gas outlet conduit is generally gas phase, manages Diameter is larger, and pipeline is as short as possible, and has certain flexibility.
The green coke tower level-sensing device 8 is mounted on the side of green coke tower tower body, coke plate layer 23, foam sheet 24 and gas phase Each plate layer installs a level-sensing device 8 in 25 3 plate layer of plate layer, focus carbon slab layer 23, foam sheet 24, gas phase plate layer 25 Height is monitored, and is observed the present position of foam sheet 24 and coke plate layer 25 in green coke tower, is helped to determine coke in time Position, stop process charging instruct coking process operation, energy saving highly beneficial the utilization rate for improving coke drum.
The green coke tower skirt 9 is located at the welded seam area of connection tower body with taper position at tower body from top to bottom 2/3, is used to Support tower body.
The green coke tower automatic bottom cover machine 10 is located at tower bottom coke outlet, and automatic bottom cover machine 10 is automatic open-close sealing knot Structure, structural strength is reliable, favorable sealing property, and safety is guaranteed by operator, and labor intensity reduces significantly, can improve dress Set working efficiency.
The green coke tower feed inlet 11 is located at below green coke tower bottom taper position, the heavy oil residue of 550 DEG C -650 DEG C of preheating Or decompression residuum petroleum, plastic oil blend, bio-oil blend, coal tar, kerosene blend, kerosene slurry etc., by into Material mouth 11 enters green coke tower and carries out coking reaction, and the coke for reacting generation stays in tower.
It referring to fig. 2, is green coke tower parallel-connection structure schematic diagram, including the first green coke tower 12, the second green coke tower 13, four-way valve 14 With inlet valve 15.It generally requires two towers to share, such as 12 green coke of the first green coke tower, 13 coke discharging of the second green coke tower.First green coke tower 12 when reacting green coke, and another second green coke tower 13 is then in the decoking stage.I.e. when a Tai Tanei coke accumulation to certain altitude When (generally 2/3 or so height of tower height) switch over.
Fig. 5 is the schematic diagram of catalyst grid reactor 7,, will by snap ring 26 above gas phase plate layer 25 referring to Fig. 5 Catalyst grid reactor 7 is fixed on the position of 2 lower section of flange.It can be ZSM-5, Al in catalyst layer 272O3, USY, HY etc. Catalyst.
Referring to fig. 2, a kind of application method of novel green coke device as described above, sprays before carrying out coking reaction in tower top Mouth sprays a kind of dust little particle (granular size is about 5 μm) for generating electrostatic, is shared using two towers, with 14 He of four-way valve Inlet valve 15 is connected, and for a tower when reacting green coke, another is then in the decoking stage.First green coke tower 12 is in reaction green coke When, another second green coke tower 13 is then in the decoking stage.By preheat 550 DEG C -650 DEG C heavy oil residue or decompression residuum (petroleum, Plastic oil blend, bio-oil blend, coal tar, kerosene blend, kerosene slurry etc.), green coke is entered by feed inlet 11 Tower is generated vapor and is protected by high-temperature fuel gas muff 3 to tower body by combustion gas in green coke tower tower body outer surface to water heat supply Temperature, and cracking and condensation reaction occur under conditions of the pressure for being suitable in tower and residence time, it is cracked into the endothermic reaction, is condensed For exothermic reaction, the heat of cracking other than from feed residue itself some provided by condensation reaction, condensation reaction The coke of generation rests in tower, and from tower wall to Center Extender, is centrally formed feeding-passage, based on 23 or more coke plate layer Reaction zone, i.e. foam sheet 24 are wanted, is gas phase plate layer 25, the oily phase foam of foam sheet point and gas phase bubble on 24 top of foam sheet Foam, gas phase foam is on top, and for oily phase foam more than focus layer, pyrogenetic reaction temperature is froth bed temperature, generally 460-480 DEG C, and coking yield is higher, and the reaction temperature is higher.Coke layer is there is also pyrogenetic reaction, and gas that cracking generates is from coke layer It overflows, the voidage of coke layer is about are as follows: 30%~50%.Hot coke layer height is set to be higher than the coke height of cold conditions.With The amount of coke of the continuous entrance of raw material, generation increases, and coke layer height increases, and froth bed is also continuous therewith to be increased.And gas phase The oil gas of 25 top of plate layer passes through the catalyst layer 27 of catalyst grid reactor 7, and the active site for reaching catalyst carries out instead It answers, the tower top oil gas across catalyst duct is discharged from oil gas vent 6 to be collected.So that benzene-toluene-naphthalene (BTXN) Yield increases.
The yield of the oil discovery BTXN obtained after characterization is cooling has apparent increase.Decoking is devoked with high-pressure hydraulic Method, the coke drum for coalescing coke 22 is first cooling with steam, then carries out hydraulic decoking.The high pressure water conveyed by high-pressure hydraulic pump 16, The nozzle that hydraulic coke-cutting device 20 is arrived by giant 17, drilling cramp 18, drilling rod 19, the high pressure sprayed from 20 nozzle of hydraulic coke-cutting device Water forms high-pressure jet, cuts down coke 22 by means of the strong impact power of high-pressure jet, is allowed to together with water by tower is arranged in The chute 21 at bottom flows out, and drilling rod 19 constantly goes up and down and rotates, until coke is all cleared in green coke tower.
The Industrial Analysis and elemental analysis of coal sample used are shown in Table 1 in Examples 1 and 2.
The Industrial Analysis and elemental analysis of 1 coal sample of table
* minusing
Embodiment 1
Using northern Shensi chemical plant low-order coal as raw material, Industrial Analysis and elemental analysis are shown in Table 1, by a certain amount of kerosene The heavy oil residue of slurry is preheated to 550 DEG C -650 DEG C, enters green coke tower by feed inlet and carries out pyrolysis green coke, green coke pressure tower maintains In 0.1-0.15MPa, oil gas is escaped and is collected from top of tower, and coke remains in tower.Measure and calculate coke, pyrolysis water and heat The yield for venting one's spleen and being pyrolyzed air cooling tar is shown in Table 2.Test obtains the tar that pyrolysis air cooling obtains and carries out gaschromatographic mass spectrometry Combination analysis, and BTXN constituent content is analyzed, as a result see Fig. 6, Fig. 7 and Fig. 8, as can be seen from Figures 6 and 7, test obtains The tar that pyrolysis air cooling obtains is mainly by aromatic hydrocarbon, aliphatic hydrocarbon, acid compound, oxygenatedchemicals, nitrogenous compound, sulfur-bearing Compound and unknown compound composition, content is respectively 42.02%, 20.94%, 32.01%, 4.79%, 0%, 0.12% and 0.12%.Wherein aromatic hydrocarbon mainly contains retene, anthracene, phenanthrene, substituted arene etc., wherein the content highest of retene, is 6.72%, acid Compound is mainly phenolic compound, content 32.01%.From figure 8, it is seen that by using different catalyst, discovery The content of BTXN increases, best using ZSM-5 catalyst effect, reaches rich production.
2 embodiment 1 of table is pyrolyzed the yield of air cooling tar, pyrolysis char, pyrolysis gas
Embodiment 2
Using northern Shensi chemical plant low-order coal as raw material, Industrial Analysis and elemental analysis are shown in Table 1, before green coke, A kind of dust for generating electrostatic is added in green coke tower, the heavy oil residue of a certain amount of kerosene slurry is preheated to 550 DEG C -650 DEG C, leads to It crosses feed inlet 11 and carries out pyrolysis green coke into green coke tower, shared using two towers, be connected with four-way valve with inlet valve, a green coke When tower green coke, another green coke tower coke discharging.Increase a catalyst grid reactor in green coke tower, in green coke tower tower body appearance Face one kind to water heat supply, is generated vapor high-temperature fuel gas muff and kept the temperature to tower body by combustion gas, and be suitable in tower pressure, With generation cracking and condensation reaction under conditions of the residence time, there are also one other than from feed residue itself for the heat of cracking Divide and provided by condensation reaction, the coke that condensation reaction generates rests in tower.Measure and calculate coke, pyrolysis water and pyrolysis gas and The yield of pyrolysis air cooling tar is shown in Table 3.Economic benefit is fairly obvious, overcomes residual oil superfluous and has no way of handling.Test obtains heat The tar that solution air cooling obtains carries out gas chromatography combined with mass spectrometry analysis, and analyzes BTXN constituent content, as a result sees Fig. 9, figure 10 and Figure 11, from Fig. 9 and Figure 10 can be seen that test obtain the obtained tar of pyrolysis air cooling mainly by arene compound, Aliphatic hydrocarbon compound, acid compound, oxygenatedchemicals, nitrogenous compound, sulfur-containing compound and unknown compound composition, contain Amount is respectively 42.91%, 20.01%, 31.67%, 4.35%, 0%, 0.98% and 0.08%.Arene compound content is most Height, predominantly retene, naphthalene, pyrene, phenanthrene, fluoranthene, alkyl-substituted naphthaline etc..Acid compound is mainly phenols, mainly phenol and its Alkyl substituted phenol.Dibenzofuran, furans, alcohol etc. in oxygenatedchemicals.A small amount of butylated hydroxytoluene is also found, content is 0.12%.From figure 8, it is seen that finding that the content of BTXN increases by using different catalyst, using ZSM-5 catalyst Effect is best, reaches rich production.
3 embodiment 2 of table is pyrolyzed the yield of air cooling tar, pyrolysis char, pyrolysis gas

Claims (9)

1. a kind of green coke device, which is characterized in that including green coke tower, green coke tower includes tower body, offers decoking mouth at the top of tower body (5), it devokes at mouth (5) and is provided with hydraulic decoking device (4);Tower body bottom is provided with feed inlet (11) and coke outlet, and goes out Automatic bottom cover machine (10) are provided at Jiao Kou;The gas phase plate layer (25) passed through for oil gas is provided with inside tower body from top to bottom to use In the foam sheet (24) of point oily phase foam and gas phase foam and coke plate layer (23) for generating coke;Gas phase plate layer (25) top is provided with catalyst grid reactor (7).
2. a kind of green coke device according to claim 1, which is characterized in that catalyst grid reactor (7) includes shell, It is provided in shell catalyst layer (27), snap ring (26) is provided on housing exterior walls.
3. a kind of green coke device according to claim 1, which is characterized in that be provided with sprinkling mouth (1) and oil at the top of tower body Gas exports (6);And it sprays mouth (1) and is located at hydraulic decoking device (4) side, oil gas vent (6) is located at hydraulic decoking device (4) The other side.
4. a kind of green coke device according to claim 1, which is characterized in that be provided with high-temperature fuel gas guarantor on tower body outer surface Temperature set (3).
5. a kind of green coke device according to claim 4, which is characterized in that high-temperature fuel gas muff (3) and tower body pass through Flange (2) is mounted on tower body outer surface, and high-temperature fuel gas muff (3) uses corrugated plating.
6. a kind of green coke device according to claim 1, which is characterized in that be provided with the skirt for being used to support tower body on tower body Seat (9).
7. a kind of green coke device according to claim 1, which is characterized in that the cylindrical pressure that tower body is vertically arranged holds Device, a height of 25m of tower body, tower body width are 7m.
8. a kind of green coke device according to claim 1, which is characterized in that coke plate layer (23) includes cylindrical plate body, The identical circular hole of seven sizes is offered on cylindrical plate body, wherein cylindrical plate body center offers a circular hole, in addition Six circular holes are evenly distributed on around centrally located circular hole, and the outer wall and tower body inner wall of 6 circular holes are tangent, and Circularhole diameter is 1m;
Foam sheet (24) includes cylindrical plate body, offers the identical circular hole of 14 sizes on cylindrical plate body, circular hole is straight Diameter is 0.5m, wherein cylindrical plate body center is opened up there are four circular hole, and two-by-two side by side, ten circular holes in addition are evenly distributed on Around centrally located four circular holes, the outer wall and tower body inner wall of ten circular holes are tangent;
Gas phase plate layer (25) includes cylindrical plate body, offers several circular holes on cylindrical plate body, and the diameter of circular hole is less than 0.5m。
9. a kind of green coke device according to claim 1, which is characterized in that coke plate layer (23), foam sheet (24) with And each plate layer is mounted on level-sensing device (8) in gas phase plate layer (25).
CN201822067690.9U 2018-12-10 2018-12-10 A kind of green coke device Withdrawn - After Issue CN209210725U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822067690.9U CN209210725U (en) 2018-12-10 2018-12-10 A kind of green coke device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822067690.9U CN209210725U (en) 2018-12-10 2018-12-10 A kind of green coke device

Publications (1)

Publication Number Publication Date
CN209210725U true CN209210725U (en) 2019-08-06

Family

ID=67463873

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822067690.9U Withdrawn - After Issue CN209210725U (en) 2018-12-10 2018-12-10 A kind of green coke device

Country Status (1)

Country Link
CN (1) CN209210725U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109628135A (en) * 2018-12-10 2019-04-16 西北大学 A kind of green coke device and application method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109628135A (en) * 2018-12-10 2019-04-16 西北大学 A kind of green coke device and application method
CN109628135B (en) * 2018-12-10 2024-01-30 西北大学 Coke producing device and using method

Similar Documents

Publication Publication Date Title
WO2016176948A1 (en) Multi-optimised slurry bed hydrogenation reactor, and design method therefor and use thereof
CN105586077B (en) Heavy oil coking equipment
CN108587674A (en) Heavy oil double-reaction tube semicoke circulation fluidized bed millisecond pyrolysis-gasification coupling technique
CN110787766B (en) Tower type reaction device and process for preparing fatty acid butyl ester
CN106590751A (en) Biomass gasification method for achieving tar self-digestion
CN209210725U (en) A kind of green coke device
CN204981160U (en) System for oxygen / coal jetting preparation carbide and ethylene
CN105154140A (en) Multi-stage entrained-flow coal gasification method and equipment capable of realizing coupling high temperature shift
CN202912908U (en) Heavy oil thermal cracking and gasification coupled double reaction tube circulating bed device
CN202447098U (en) Catalyst oil removing device
CN102268286A (en) C4 hydrocarbon catalytic splitting and heavy oil catalytic cracking combined technology and device
WO2014198075A1 (en) System and method for organic material treatment
CN102965139A (en) Heavy oil pyrolysis and gasification device coupling combined type lifting pipe and downstream reactor
CN109628135A (en) A kind of green coke device and application method
CN103045276A (en) Pyrolyzing furnace for powdered coal
CN110747008A (en) Cracking refining system and method for oil product lava furnace
CN110903864A (en) Ascending pipe device and method for removing organic sulfur in raw coke oven gas
CN104342196A (en) Catalytic cracking method and device thereof
CN104419458A (en) Catalytic cracking method and device
CN211141964U (en) Cracking refining system of oil product lava furnace
CN101993735B (en) Biomass dry gasification centralized air supply system
CN211771111U (en) Ascending pipe device for removing organic sulfur in raw coke oven gas
CN105985804B (en) A kind of mink cell focus processing technology and processing unit (plant)
CN210261683U (en) Vacuum negative pressure pyrolysis modification device for extracting biological liquid clean fuel from waste oil
CN104513670A (en) Catalytic cracking method and device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20190806

Effective date of abandoning: 20240130

AV01 Patent right actively abandoned

Granted publication date: 20190806

Effective date of abandoning: 20240130

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned