CN109628135A - A kind of green coke device and application method - Google Patents

A kind of green coke device and application method Download PDF

Info

Publication number
CN109628135A
CN109628135A CN201811504261.1A CN201811504261A CN109628135A CN 109628135 A CN109628135 A CN 109628135A CN 201811504261 A CN201811504261 A CN 201811504261A CN 109628135 A CN109628135 A CN 109628135A
Authority
CN
China
Prior art keywords
tower
coke
green coke
tower body
green
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811504261.1A
Other languages
Chinese (zh)
Other versions
CN109628135B (en
Inventor
孙鸣
孔祥玺
马明明
沙帅
么秋香
陈汇勇
马晓迅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Northwest University
Original Assignee
Northwest University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Northwest University filed Critical Northwest University
Priority to CN201811504261.1A priority Critical patent/CN109628135B/en
Publication of CN109628135A publication Critical patent/CN109628135A/en
Application granted granted Critical
Publication of CN109628135B publication Critical patent/CN109628135B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10GCRACKING HYDROCARBON OILS; PRODUCTION OF LIQUID HYDROCARBON MIXTURES, e.g. BY DESTRUCTIVE HYDROGENATION, OLIGOMERISATION, POLYMERISATION; RECOVERY OF HYDROCARBON OILS FROM OIL-SHALE, OIL-SAND, OR GASES; REFINING MIXTURES MAINLY CONSISTING OF HYDROCARBONS; REFORMING OF NAPHTHA; MINERAL WAXES
    • C10G11/00Catalytic cracking, in the absence of hydrogen, of hydrocarbon oils
    • C10G11/10Catalytic cracking, in the absence of hydrogen, of hydrocarbon oils with stationary catalyst bed

Abstract

A kind of green coke device and application method, including green coke tower, green coke tower include tower body, and decoking mouth is offered at the top of tower body, devoke and are provided with hydraulic decoking device at mouth;Tower body bottom is provided with feed inlet and coke outlet, and automatic bottom cover machine is provided at coke outlet;Coke plate layer of the gas phase plate layer passed through for oil gas for dividing the foam sheet of oily phase foam and gas phase foam and for generating coke is provided with inside tower body from top to bottom;Catalyst grid reactor is provided with above gas phase plate layer.Apparatus of the present invention are intermittent operation, small investment, simple process, technology maturation.Under green coke Ta Tanei suitable temperature, pressure condition, cracking, condensation reaction can occur for heavy oil residue or decompression residuum, obtain coke and oil gas, wherein pass through the oil gas of catalyst grid reactor, the yield of the oil discovery BTXN obtained after characterization is cooling has apparent increase, solves the problems, such as existing heavy oil residue or decompression residuum surplus and has no way of handling.

Description

A kind of green coke device and application method
Technical field
The invention belongs to technical field of coal chemical industry, it is related to a kind of green coke device and application method.
Background technique
Coal tar is coal liquid by-product obtained in pyrolytic process, can be divided into high temperature coal tar by the difference of pyrolysis temperature Oil and coalite tar, wherein coalite tar has very high utility value.Coalite tar mainly contains arene Close object, aliphatic compound, phenolic compound etc..It is wherein contour additional containing naphthalene, anthracene, phenanthrene, pyrene in compound fragrant hydrocarbon It is worth fine chemicals;Aliphatic compound is the important component of the fuel oil such as gasoline, diesel oil, is plus hydrogen produces Gao Shiliu The good raw material of alkane value diesel oil;Phenolic compound is in synthetic fibers, engineering plastics, pesticide, medicine, preservative, plasticizer, fragrance And dyestuff intermediate etc. has extensive purposes.Therefore how separation coal tar efficiently, economic, environmentally friendly has seemed currently It is particularly significant.
Compared to light oil, heavy coal tar is increasingly complex, and most of heavy oil is dropped, this not only causes the big of resource Amount waste, while also polluted environment.How efficiently to handle heavy coal tar is necessarily becoming for current Developing Coal Chemical Industry Gesture.Heavy coal tar can generate the more inferior residue oil of a large amount of quality during processing, traditional coking process and plus Hydrogen process has been difficult to be carried out effectively processing and utilization.
A kind of green coke tower preheating device is described in Chinese patent CN108148613A, by being equipped with wheel carrier, air pressure tank, electricity Magnetic heater box, pulsometer, heater wire, lifting pump rod, the lifting for realizing equipment uniformly preheat, and equipment by being equipped with air pressure tank Pulsometer pressure supply control lifting pump rod is that electromagnetic heater box is gone up and down, and enables electromagnetic heater box in different height switch operating, It is that green coke tower is uniformly preheated, and equipment also keeps equipment mobile more by being equipped with wheel carrier that electromagnetic heater box, which is equipped with electromagnetic heating line, It is convenient, the problem of facilitating the uniform preheating of green coke tower.But this plant energy consumption is big, installation is inconvenient.In addition, due to this Device is continuity operation, and large-scale inspection operation can be faced during driving, production capacity increase can be reduced in this way and be produced into This.
A kind of green coke tower, including green coke tower tower body, electric heating are described in Chinese utility model patent CN106190226A Device, coke removing appts, lifting device.Electric heater unit is used to heat green coke tower tower body and feedstock oil;Coke removing appts include setting It is placed in the driving device on green coke tower top face top and is set to for scraping the decoking end of coke inside green coke tower, driving device is also Including for driving decoking end to make the driving shaft rotated horizontally;Lifting device includes the lifting deceleration for being set to driving device bottom Machine and the guide rail mounting base being socketed on driving shaft outer wall, the outer wallflow of guide rail mounting base are equipped with guide rail.The green coke tower is with existing skill Art is compared, and has pollution-free, decoking thoroughly and the higher advantage of the degree of automation.But the device does not have Insulation, tower body Suddenly cold and hot can make deformation of the body of coke drum.
A kind of coke drum preheating device, including two green coke towers are described in Chinese patent application 201320370168.2. The utility model steady material balance and heat balance of apparatus system while realizing that green coke device is energy-saving, reduces The cyclic swing of device, shortens green coke tower preheating time, improves the liquid yield of device, the energy for saving pump disappears Consumption, the technique drawback of green coke device batch production have obtained breakthrough optimization.But there is no specific heating in device Mode is heated simply by fixed heating device is equipped in tower body, this is easy to appear the non-uniform problem of heating, installation Disassembly is also inconvenient.
Summary of the invention
To overcome the problems of the prior art, the object of the present invention is to provide a kind of green coke device and application methods.This dress It is set to intermittent operation, small investment, simple process, technology maturation.Under green coke Ta Tanei suitable temperature, pressure condition, weight Matter residual oil or decompression residuum (petroleum, plastic oil blend, bio-oil blend, coal tar, kerosene blend, kerosene slurry etc.) Cracking, condensation reaction can occur, coke and oil gas (coker gasoline, coker gas oil, wax tailings etc.) are obtained, wherein passing through catalysis The yield of the oil gas of agent grid reactor, the oil discovery BTXN obtained after characterization is cooling has apparent increase.It is this novel Green coke device economic benefit is fairly obvious, is the new type ideal device for processing heavy oil residue or decompression residuum, it will solve existing Heavy oil residue or decompression residuum are superfluous and the problem of have no way of handling.
To achieve the above object, The technical solution adopted by the invention is as follows:
A kind of green coke device, including green coke tower, green coke tower include tower body, and decoking mouth is offered at the top of tower body, is devoked at mouth It is provided with hydraulic decoking device;Tower body bottom is provided with feed inlet and coke outlet, and automatic bottom cover machine is provided at coke outlet; The gas phase plate layer passed through for oil gas is provided with inside tower body from top to bottom for a point cystosepiment for oily phase foam and gas phase foam Layer and the coke plate layer for generating coke;Catalyst grid reactor is provided with above gas phase plate layer.
A further improvement of the present invention lies in that catalyst grid reactor includes shell, it is provided with catalyst layer in shell, Snap ring is provided on housing exterior walls.
A further improvement of the present invention lies in that being provided with sprinkling mouth and oil gas vent at the top of tower body;And it sprays mouth to be located at Hydraulic decoking device side, oil gas vent are located at the hydraulic decoking device other side.
A further improvement of the present invention lies in that being provided with high-temperature fuel gas muff on tower body outer surface.
A further improvement of the present invention lies in that high-temperature fuel gas muff and tower body are mounted on tower body outer surface by flange On, high-temperature fuel gas muff uses corrugated plating.
A further improvement of the present invention lies in that being provided with the skirt for being used to support tower body on tower body.
A further improvement of the present invention lies in that the cylindrical pressure vessel that tower body is vertically arranged, a height of 25m of tower body, tower Body width is 7m.
A further improvement of the present invention lies in that coke plate layer includes cylindrical plate body, seven are offered on cylindrical plate body The identical circular hole of size, wherein cylindrical plate body center offers a circular hole, and six circular holes in addition, which are evenly distributed on, to be located at Around the circular hole at center, the outer wall and tower body inner wall of 6 circular holes are tangent, Circularhole diameter 1m;
Foam sheet includes cylindrical plate body, offers the identical circular hole of 14 sizes on cylindrical plate body, circular hole is straight Diameter is 0.5m, wherein cylindrical plate body center is opened up there are four circular hole, and two-by-two side by side, ten circular holes in addition are evenly distributed on Around centrally located four circular holes, the outer wall and tower body inner wall of ten circular holes are tangent;
Gas phase plate layer includes cylindrical plate body, offers several circular holes on cylindrical plate body, and the diameter of circular hole is less than 0.5m。
A further improvement of the present invention lies in that each plate layer is pacified in coke plate layer, foam sheet and gas phase plate layer Equipped with level-sensing device.
A kind of application method of green coke device is shared, two using two green coke towers of the first green coke tower and the second green coke tower Green coke tower is connected by four-way valve with inlet valve;The dust of electrostatic can be generated before progress coking reaction in tower top sprinkling mouth sprinkling Little particle;550 DEG C -650 DEG C of heavy oil residue or decompression residuum will be preheated, green coke tower is entered by feed inlet, and in Ta Neifa Raw cracking and condensation reaction, the coke that condensation reaction generates rests in tower, and from tower wall to Center Extender, is centrally formed charging Channel, the oil gas above gas phase plate layer pass through the catalyst layer of catalyst grid reactor, reach the active site of catalyst into Row reaction, the oil gas across catalyst layer duct is discharged from oil gas vent to be collected;It is devoked using high-pressure hydraulic decoking method;The For one green coke tower when reacting green coke, another second green coke tower is then in the decoking stage;First green coke tower is another at the stage of decoking Second green coke tower is then in reaction green coke.
Compared with prior art, the invention has the benefit that apparatus of the present invention are before progress coking reaction in tower Top spray spills the dust little particle (granular size is about 5 μm) that mouth sprinkling generates electrostatic, and this short grained effect of dust is raw Burnt tower inner plies surface tension increases, in order to which bigizationner avoids the coke generated in green coke tower from sticking together on green coke tower wall face, The coke generated is set to remove and collect well.
Apparatus of the present invention are in coking reaction that the oil gas above gas phase plate layer passes through the catalysis of catalyst grid reactor Oxidant layer, the active site for reaching catalyst are reacted, and the tower top oil gas across catalyst duct is discharged from oil gas vent to be collected. The yield of the oil discovery BTXN obtained after characterization is cooling has apparent increase.
Apparatus of the present invention are intermittent operation, small investment, simple process, technology maturation.In the temperature that green coke Ta Tanei is suitable for Under degree, pressure condition, heavy oil residue or decompression residuum (petroleum, plastic oil blend, bio-oil blend, coal tar, kerosene Blend, kerosene slurry etc.) cracking, condensation reaction can occur, obtain coke and oil gas (coker gasoline, coker gas oil, wax tailings Deng), wherein passing through the oil gas of catalyst grid reactor, the yield of the oil discovery BTXN obtained after characterization is cooling has obviously Increase.This novel green coke device economic benefit is fairly obvious, is the new type ideal dress for processing heavy oil residue or decompression residuum It sets, it will solve the problems, such as existing heavy oil residue or decompression residuum surplus and has no way of handling.
Detailed description of the invention
Fig. 1 is green coke tower structure schematic diagram;
Fig. 2 is green coke tower parallel-connection structure schematic diagram;
Fig. 3 is coke removing appts structural schematic diagram;
Fig. 4 is green coke tower internal component structural schematic diagram;
Fig. 5 is catalyst grid reactor schematic diagram;
Fig. 6 is that 1 phase combined gas chromatography mass spectrometry of embodiment analyzes result;
Fig. 7 is 1 each component content results of embodiment;
The content distribution that Fig. 8 is BTXN under the conditions of different catalysts in embodiment 1;
Fig. 9 is that 2 phase combined gas chromatography mass spectrometry of embodiment analyzes result;
Figure 10 is 2 each component content results of embodiment;
The content distribution that Figure 11 is BTXN under the conditions of different catalysts in embodiment 2.
In figure, 1, sprinkling mouth;2, flange;3, high-temperature fuel gas muff;4, hydraulic decoking device;5, mouth is devoked;6, oil gas Outlet;7, catalyst grid reactor;8, level-sensing device;9, skirt;10, automatic bottom cover machine;11, feed inlet;12, the first green coke Tower;13, the second green coke tower;14, four-way valve;15, inlet valve;16, high-pressure hydraulic pump;17, giant;18, drilling cramp;19, drilling rod; 20, hydraulic coke-cutting device;21, chute;22, coke;23, coke plate layer;24, foam sheet;25, gas phase plate layer;26, snap ring;27, Catalyst layer.
Specific embodiment
The present invention is described in detail with reference to the accompanying drawing.
Referring to Fig. 1, a kind of novel green coke device of the invention, including green coke tower tower body, on green coke tower tower body from top to bottom It is disposed with sprinkling mouth 1, flange 2, high-temperature fuel gas muff 3, hydraulic decoking device 4, decoking mouth 5, oil gas vent 6, catalysis Agent grid reactor 7, level-sensing device 8, skirt 9, automatic bottom cover machine 10 and feed inlet 11.
The green coke tower tower body is a right circular cylinder shell pressure vessel, and top opens up spherical or ellipse decoking mouth 5, under Portion is tower made of cone thickness boiler plate.Since the operation temperature of green coke tower is higher, and it is in suddenly cold and hot, high pressure water impact Deng under more harsh operating condition, therefore easily there are the bulge of tower body burn into, deformation or even weld cracking and the inclined feelings of tower body Condition, so the material of green coke tower tower body uses 1m thickness boiler plate.Tower body high setting is 25m or so, and tower body width is set as the left side 7m The right side generally requires two towers for the considerations of operating and shares, a tower green coke, a tower coke discharging.One tower when reacting green coke, Another is then in the decoking stage.That is (generally 2/3 or so the height of tower height when a Tai Tanei coke accumulation is to certain altitude Degree) it switches over.
Fig. 4 is that green coke tower tower body internal component structural schematic diagram is led inside green coke tower main body tower from top to bottom referring to fig. 4 It to include 25 3 coke plate layer 23, foam sheet 24 and gas phase plate layer plate layer.Wherein coke plate layer 23 includes cylindrical plate Body offers the identical circular hole of seven sizes on cylindrical plate body, and plate body center offers a circular hole, 6 circular holes in addition It is evenly distributed on around centrally located circular hole, the outer wall and green coke tower tower body inner wall of 6 circular holes are tangent.(Circularhole diameter is 1m or so) it constitutes, it is the main place that coke generates.
Foam sheet 24 includes cylindrical plate body, offers the identical circular hole of 14 sizes on plate body, and (Circularhole diameter is 0.5m or so), wherein cylindrical plate body center is opened up there are four circular hole (square side by side two-by-two), 10 circular holes in addition It is evenly distributed on around centrally located four circular holes, the outer wall and green coke tower tower body inner wall of 10 circular holes are tangent.Condensation is anti- The coke that should be generated rests in tower, and from tower wall to Center Extender, is centrally formed to spout and expects channel, coke plate layer 23 the above are Key reaction area, as 24th area of foam sheet, foam sheet 24 divide oily phase foam and gas phase foam.
Gas phase plate layer 25 includes cylindrical plate body, several circular holes is offered on plate body, and the diameter of circular hole is less than 0.5m, With the progress of cracking reaction, highly viscous coal tar constantly forms foam by bubbling, and established bubbling is constantly broken again Split evolution oil gas.
Sprinkling mouth 1 on the green coke tower tower body is mounted on the left of green coke tower tower body top, is to carry out coking reaction Preceding to spray a kind of dust little particle (granular size is about 5 μm) for generating electrostatic, this short grained effect of dust is to make to give birth to Burnt tower tower body inner plies surface tension increases, and avoids the coke generated in green coke tower from sticking together on green coke tower wall face, makes to generate Coke can remove and collect well.
High-temperature fuel gas muff 3 and green coke tower are mounted on green coke tower tower body two sides by green coke tower flange, thus by high temperature Combustion gas muff 3 and green coke tower connect;Before connecting flange, whether the specification of control flange, bolt and gasket meets the requirements, Sealing surface will keep smooth clean and tidy, and the screw thread of bolt is complete, and gasket quality wants flexible, and surface is without breakage, fold, scratch etc. Defect before assembly flange, cleans up flange, degreases, sundries, the seal line such as dust, rusty stain are rejected clean.
The high-temperature fuel gas muff 3 of the green coke tower is mounted on green coke tower tower body outer surface, this is a kind of by combustion gas combustion Burn a kind of muff that heat release keeps the temperature tower body.High-temperature fuel gas muff 3 uses corrugated plating, has both increased the rigid of external protection Degree, and solve the problems, such as the thermal expansion difference of tower body circumferential direction.This high-temperature fuel gas muff adiabatic heat insulating effect is good, high temperature resistant and Low temperature, resistance to various chemical attacks, fire protection flame retarding, Water-proof and oil-proof have good hydrophobicity performance.
Referring to Fig. 3, the hydraulic decoking device 4 of the green coke tower is mounted on green coke tower tower body tower top, and hydraulic decoking device 4 is Existing apparatus, hydraulic decoking device 4 include be followed successively by from top to bottom high-pressure hydraulic pump 16, giant 17, drilling cramp 18, drilling rod 19, Hydraulic coke-cutting device 20, chute 21 and coke 22.
Decoking devokes method with high-pressure hydraulic, and the green coke tower for coalescing coke is first cooling with steam, then carries out hydraulic decoking.By The high pressure water that high-pressure hydraulic pump 16 conveys arrives the nozzle of hydraulic coke-cutting device 20 by giant 17, drilling cramp 18, drilling rod 19, from water The high pressure water that power coke cutter nozzle sprays forms high-pressure jet, cuts down coke by means of the strong impact power of high-pressure jet, makes Flowed out together with water by tower bottom chute 21, drilling rod 19 constantly goes up and down and rotates, and coke 22 all removes in green coke tower Until net.
Referring to Fig. 5, the catalyst grid reactor 7 is located above gas phase plate layer, is connected with green coke tower flange.Catalyst Grid reactor 7 includes shell, is provided with catalyst layer 27 in shell, snap ring 26, catalyst layer 27 are provided on housing exterior walls Positioned at 7 bosom position of catalyst grid reactor, in order to keep the oil gas of 25 top of gas phase plate layer anti-by catalyst grid The catalyst layer 27 of device 7 is answered, the active site for reaching catalyst is reacted, and the tower top oil gas across catalyst duct is from oil gas Outlet discharge is collected;Snap ring 26 is located on 7 outer wall of catalyst grid reactor, is to stablize catalyst grid reactor 7 It is fixed in green coke tower.The catalyst that catalyst layer 27 is placed is ZSM-5, Al2O3, USY, HY etc..
The green coke tower decoking mouth 5 is located at green coke top of tower, is provided with hydraulic decoking device 4 at green coke tower decoking mouth 5, and And green coke tower decoking mouth 5 is connected with hydraulic decoking device 4.
The green coke tower oil gas vent 6 is located on the right side of tower top, and the medium in tower top oil gas outlet conduit is generally gas phase, manages Diameter is larger, and pipeline is as short as possible, and has certain flexibility.
The green coke tower level-sensing device 8 is mounted on the side of green coke tower tower body, coke plate layer 23, foam sheet 24 and gas phase Each plate layer installs a level-sensing device 8 in 25 3 plate layer of plate layer, focus carbon slab layer 23, foam sheet 24, gas phase plate layer 25 Height is monitored, and is observed the present position of foam sheet 24 and coke plate layer 25 in green coke tower, is helped to determine coke in time Position, stop process charging instruct coking process operation, energy saving highly beneficial the utilization rate for improving coke drum.
The green coke tower skirt 9 is located at the welded seam area of connection tower body with taper position at tower body from top to bottom 2/3, is used to Support tower body.
The green coke tower automatic bottom cover machine 10 is located at tower bottom coke outlet, and automatic bottom cover machine 10 is automatic open-close sealing knot Structure, structural strength is reliable, favorable sealing property, and safety is guaranteed by operator, and labor intensity reduces significantly, can improve dress Set working efficiency.
The green coke tower feed inlet 11 is located at below green coke tower bottom taper position, the heavy oil residue of 550 DEG C -650 DEG C of preheating Or decompression residuum petroleum, plastic oil blend, bio-oil blend, coal tar, kerosene blend, kerosene slurry etc., by into Material mouth 11 enters green coke tower and carries out coking reaction, and the coke for reacting generation stays in tower.
It referring to fig. 2, is green coke tower parallel-connection structure schematic diagram, including the first green coke tower 12, the second green coke tower 13, four-way valve 14 With inlet valve 15.It generally requires two towers to share, such as 12 green coke of the first green coke tower, 13 coke discharging of the second green coke tower.First green coke tower 12 when reacting green coke, and another second green coke tower 13 is then in the decoking stage.I.e. when a Tai Tanei coke accumulation to certain altitude When (generally 2/3 or so height of tower height) switch over.
Fig. 5 is the schematic diagram of catalyst grid reactor 7,, will by snap ring 26 above gas phase plate layer 25 referring to Fig. 5 Catalyst grid reactor 7 is fixed on the position of 2 lower section of flange.It can be ZSM-5, Al in catalyst layer 272O3, USY, HY etc. Catalyst.
Referring to fig. 2, a kind of application method of novel green coke device, carry out coking reaction before tower top sprinkling mouth spray one kind The dust little particle (granular size is about 5 μm) for generating electrostatic is shared using two towers, with 15 phase of four-way valve 14 and inlet valve Even, for a tower when reacting green coke, another is then in the decoking stage.First green coke tower 12 is when reacting green coke, and another second Green coke tower 13 is then in the decoking stage.By the heavy oil residue or decompression residuum that preheat 550 DEG C -650 DEG C, (petroleum, plastic oil are blended Object, bio-oil blend, coal tar, kerosene blend, kerosene slurry etc.), green coke tower is entered by feed inlet 11, in green coke tower Tower body outer surface, to water heat supply, is generated vapor and is kept the temperature by high-temperature fuel gas muff 3 to tower body by combustion gas, and is fitted in tower Suitable pressure and cracking and condensation reaction occur under conditions of the residence time, be cracked into the endothermic reaction, is condensed as exothermic reaction, splits The heat of solution is provided in addition to from outer some of feed residue itself by condensation reaction, the coke stop that condensation reaction generates In tower, and from tower wall to Center Extender, it is centrally formed feeding-passage, in coke plate floor 23 the above are key reaction area, that is, is steeped Foam plate layer 24 is gas phase plate layer 25 on 24 top of foam sheet, and the oily phase foam of foam sheet point and gas phase foam, gas phase foam exist Top, oily phase foam is more than focus layer, and pyrogenetic reaction temperature is froth bed temperature, generally 460-480 DEG C, and coking yield Higher, the reaction temperature is higher.Coke layer is there is also pyrogenetic reaction, and the gas that cracking generates is overflowed from coke layer, coke layer Voidage is about are as follows: 30%~50%.Hot coke layer height is set to be higher than the coke height of cold conditions.With raw material it is continuous into Enter, the amount of coke of generation increases, and coke layer height increases, and froth bed is also continuous therewith to be increased.And 25 top of gas phase plate layer Oil gas passes through the catalyst layer 27 of catalyst grid reactor 7, and the active site for reaching catalyst is reacted, and passes through catalyst The tower top oil gas in duct is discharged from oil gas vent 6 and collects.So that the yield of benzene-toluene-naphthalene (BTXN) increases.
The yield of the oil discovery BTXN obtained after characterization is cooling has apparent increase.Decoking is devoked with high-pressure hydraulic Method, the coke drum for coalescing coke 22 is first cooling with steam, then carries out hydraulic decoking.The high pressure water conveyed by high-pressure hydraulic pump 16, The nozzle that hydraulic coke-cutting device 20 is arrived by giant 17, drilling cramp 18, drilling rod 19, the high pressure sprayed from 20 nozzle of hydraulic coke-cutting device Water forms high-pressure jet, cuts down coke 22 by means of the strong impact power of high-pressure jet, is allowed to together with water by tower is arranged in The chute 21 at bottom flows out, and drilling rod 19 constantly goes up and down and rotates, until coke is all cleared in green coke tower.
The Industrial Analysis and elemental analysis of coal sample used are shown in Table 1 in Examples 1 and 2.
The Industrial Analysis and elemental analysis of 1 coal sample of table
* minusing
Embodiment 1
Using northern Shensi chemical plant low-order coal as raw material, Industrial Analysis and elemental analysis are shown in Table 1, by a certain amount of kerosene The heavy oil residue of slurry is preheated to 550 DEG C -650 DEG C, enters green coke tower by feed inlet and carries out pyrolysis green coke, green coke pressure tower maintains In 0.1-0.15MPa, oil gas is escaped and is collected from top of tower, and coke remains in tower.Measure and calculate coke, pyrolysis water and heat The yield for venting one's spleen and being pyrolyzed air cooling tar is shown in Table 2.Test obtains the tar that pyrolysis air cooling obtains and carries out gaschromatographic mass spectrometry Combination analysis, and BTXN constituent content is analyzed, as a result see Fig. 6, Fig. 7 and Fig. 8, as can be seen from Figures 6 and 7, test obtains The tar that pyrolysis air cooling obtains is mainly by aromatic hydrocarbon, aliphatic hydrocarbon, acid compound, oxygenatedchemicals, nitrogenous compound, sulfur-bearing Compound and unknown compound composition, content is respectively 42.02%, 20.94%, 32.01%, 4.79%, 0%, 0.12% and 0.12%.Wherein aromatic hydrocarbon mainly contains retene, anthracene, phenanthrene, substituted arene etc., wherein the content highest of retene, is 6.72%, acid Compound is mainly phenolic compound, content 32.01%.From figure 8, it is seen that by using different catalyst, discovery The content of BTXN increases, best using ZSM-5 catalyst effect, reaches rich production.
2 embodiment 1 of table is pyrolyzed the yield of air cooling tar, pyrolysis char, pyrolysis gas
Embodiment 2
Using northern Shensi chemical plant low-order coal as raw material, Industrial Analysis and elemental analysis are shown in Table 1, before green coke, A kind of dust for generating electrostatic is added in green coke tower, the heavy oil residue of a certain amount of kerosene slurry is preheated to 550 DEG C -650 DEG C, leads to It crosses feed inlet 11 and carries out pyrolysis green coke into green coke tower, shared using two towers, be connected with four-way valve with inlet valve, a green coke When tower green coke, another green coke tower coke discharging.Increase a catalyst grid reactor in green coke tower, in green coke tower tower body appearance Face one kind to water heat supply, is generated vapor high-temperature fuel gas muff and kept the temperature to tower body by combustion gas, and be suitable in tower pressure, With generation cracking and condensation reaction under conditions of the residence time, there are also one other than from feed residue itself for the heat of cracking Divide and provided by condensation reaction, the coke that condensation reaction generates rests in tower.Measure and calculate coke, pyrolysis water and pyrolysis gas and The yield of pyrolysis air cooling tar is shown in Table 3.Economic benefit is fairly obvious, overcomes residual oil superfluous and has no way of handling.Test obtains heat The tar that solution air cooling obtains carries out gas chromatography combined with mass spectrometry analysis, and analyzes BTXN constituent content, as a result sees Fig. 9, figure 10 and Figure 11, from Fig. 9 and Figure 10 can be seen that test obtain the obtained tar of pyrolysis air cooling mainly by arene compound, Aliphatic hydrocarbon compound, acid compound, oxygenatedchemicals, nitrogenous compound, sulfur-containing compound and unknown compound composition, contain Amount is respectively 42.91%, 20.01%, 31.67%, 4.35%, 0%, 0.98% and 0.08%.Arene compound content is most Height, predominantly retene, naphthalene, pyrene, phenanthrene, fluoranthene, alkyl-substituted naphthaline etc..Acid compound is mainly phenols, mainly phenol and its Alkyl substituted phenol.Dibenzofuran, furans, alcohol etc. in oxygenatedchemicals.A small amount of butylated hydroxytoluene is also found, content is 0.12%.From figure 8, it is seen that finding that the content of BTXN increases by using different catalyst, using ZSM-5 catalyst Effect is best, reaches rich production.
3 embodiment 2 of table is pyrolyzed the yield of air cooling tar, pyrolysis char, pyrolysis gas

Claims (10)

1. a kind of green coke device, which is characterized in that including green coke tower, green coke tower includes tower body, offers decoking mouth at the top of tower body (5), it devokes at mouth (5) and is provided with hydraulic decoking device (4);Tower body bottom is provided with feed inlet (11) and coke outlet, and goes out Automatic bottom cover machine (10) are provided at Jiao Kou;The gas phase plate layer (25) passed through for oil gas is provided with inside tower body from top to bottom to use In the foam sheet (24) of point oily phase foam and gas phase foam and coke plate layer (23) for generating coke;Gas phase plate layer (25) top is provided with catalyst grid reactor (7).
2. a kind of green coke device according to claim 1, which is characterized in that catalyst grid reactor (7) includes shell, It is provided in shell catalyst layer (27), snap ring (26) is provided on housing exterior walls.
3. a kind of green coke device according to claim 1, which is characterized in that be provided with sprinkling mouth (1) and oil at the top of tower body Gas exports (6);And it sprays mouth (1) and is located at hydraulic decoking device (4) side, oil gas vent (6) is located at hydraulic decoking device (4) The other side.
4. a kind of green coke device according to claim 1, which is characterized in that be provided with high-temperature fuel gas guarantor on tower body outer surface Temperature set (3).
5. a kind of green coke device according to claim 4, which is characterized in that high-temperature fuel gas muff (3) and tower body pass through Flange (2) is mounted on tower body outer surface, and high-temperature fuel gas muff (3) uses corrugated plating.
6. a kind of green coke device according to claim 1, which is characterized in that be provided with the skirt for being used to support tower body on tower body Seat (9).
7. a kind of green coke device according to claim 1, which is characterized in that the cylindrical pressure that tower body is vertically arranged holds Device, a height of 25m of tower body, tower body width are 7m.
8. a kind of green coke device according to claim 1, which is characterized in that coke plate layer (23) includes cylindrical plate body, The identical circular hole of seven sizes is offered on cylindrical plate body, wherein cylindrical plate body center offers a circular hole, in addition Six circular holes are evenly distributed on around centrally located circular hole, and the outer wall and tower body inner wall of 6 circular holes are tangent, and Circularhole diameter is 1m;
Foam sheet (24) includes cylindrical plate body, offers the identical circular hole of 14 sizes on cylindrical plate body, circular hole is straight Diameter is 0.5m, wherein cylindrical plate body center is opened up there are four circular hole, and two-by-two side by side, ten circular holes in addition are evenly distributed on Around centrally located four circular holes, the outer wall and tower body inner wall of ten circular holes are tangent;
Gas phase plate layer (25) includes cylindrical plate body, offers several circular holes on cylindrical plate body, and the diameter of circular hole is less than 0.5m。
9. a kind of green coke device according to claim 1, which is characterized in that coke plate layer (23), foam sheet (24) with And each plate layer is mounted on level-sensing device (8) in gas phase plate layer (25).
10. a kind of application method of green coke device as claimed in claim 3, which is characterized in that using the first green coke tower and the Two two, green coke tower green coke towers share, and two green coke towers are connected by four-way valve (14) with inlet valve (15);Carry out coking reaction The preceding dust little particle that electrostatic can be generated in tower top sprinkling mouth (1) sprinkling;550 DEG C -650 DEG C of heavy oil residue will be preheated or subtracted Residual oil is pressed, enters green coke tower by feed inlet (11), and cracking and condensation reaction occur in tower, the coke that condensation reaction generates It rests in tower, and from tower wall to Center Extender, is centrally formed feeding-passage, the oil gas above gas phase plate layer (25) passes through catalysis The catalyst layer (27) of agent grid reactor (7), the active site for reaching catalyst are reacted, and catalyst layer (27) hole is passed through The oil gas in road is discharged from oil gas vent (6) and collects;It is devoked using high-pressure hydraulic decoking method;First green coke tower is in reaction green coke When, another second green coke tower is then in the decoking stage;At the stage of decoking, another second green coke tower is then reacting first green coke tower Green coke.
CN201811504261.1A 2018-12-10 2018-12-10 Coke producing device and using method Active CN109628135B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811504261.1A CN109628135B (en) 2018-12-10 2018-12-10 Coke producing device and using method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811504261.1A CN109628135B (en) 2018-12-10 2018-12-10 Coke producing device and using method

Publications (2)

Publication Number Publication Date
CN109628135A true CN109628135A (en) 2019-04-16
CN109628135B CN109628135B (en) 2024-01-30

Family

ID=66072407

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811504261.1A Active CN109628135B (en) 2018-12-10 2018-12-10 Coke producing device and using method

Country Status (1)

Country Link
CN (1) CN109628135B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4385980A (en) * 1981-02-26 1983-05-31 Conoco Inc. Coal treating process
US20030192810A1 (en) * 2002-04-11 2003-10-16 Annesley Sharon A. Separation process and apparatus for removal of particulate material from flash zone gas oil
CN102899079A (en) * 2011-07-27 2013-01-30 中国石油化工股份有限公司 Delayed coking method
CN103087769A (en) * 2011-11-02 2013-05-08 中国石油化工股份有限公司 Delayed coking method
US20140082999A1 (en) * 2012-09-21 2014-03-27 Lummus Technology Inc. Coke drum additive injection
CN209210725U (en) * 2018-12-10 2019-08-06 西北大学 A kind of green coke device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4385980A (en) * 1981-02-26 1983-05-31 Conoco Inc. Coal treating process
US20030192810A1 (en) * 2002-04-11 2003-10-16 Annesley Sharon A. Separation process and apparatus for removal of particulate material from flash zone gas oil
CN102899079A (en) * 2011-07-27 2013-01-30 中国石油化工股份有限公司 Delayed coking method
CN103087769A (en) * 2011-11-02 2013-05-08 中国石油化工股份有限公司 Delayed coking method
US20140082999A1 (en) * 2012-09-21 2014-03-27 Lummus Technology Inc. Coke drum additive injection
CN209210725U (en) * 2018-12-10 2019-08-06 西北大学 A kind of green coke device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
范京薇;: "浅谈焦炭塔设计要点", 化工管理, no. 29, pages 237 - 239 *

Also Published As

Publication number Publication date
CN109628135B (en) 2024-01-30

Similar Documents

Publication Publication Date Title
CN108587674B (en) Millisecond pyrolysis-gasification coupling process for heavy oil double-reaction tube semicoke circulating bed
WO2016176948A1 (en) Multi-optimised slurry bed hydrogenation reactor, and design method therefor and use thereof
CN105586077B (en) Heavy oil coking equipment
CN108424785A (en) Inferior heavy oil double-reaction tube alkalinity millisecond catalytic pyrolysis and gasification coupling technique
CN106590751A (en) Biomass gasification method for achieving tar self-digestion
CN209210725U (en) A kind of green coke device
CN204981160U (en) System for oxygen / coal jetting preparation carbide and ethylene
WO2014198180A1 (en) Organic material dry distillation pyrolysis gasifier, treatment system and method
CN202912908U (en) Heavy oil thermal cracking and gasification coupled double reaction tube circulating bed device
CN102268286A (en) C4 hydrocarbon catalytic splitting and heavy oil catalytic cracking combined technology and device
CN102965139A (en) Heavy oil pyrolysis and gasification device coupling combined type lifting pipe and downstream reactor
CN109628135A (en) A kind of green coke device and application method
CN103045276A (en) Pyrolyzing furnace for powdered coal
CN102527448A (en) Catalyst de-oiling method and device
CN105505423B (en) Down-flow fluidized bed using ECT quick catalysis pyrolysis reactor
CN104342196A (en) Catalytic cracking method and device thereof
CN104419458A (en) Catalytic cracking method and device
CN211141964U (en) Cracking refining system of oil product lava furnace
CN101993735B (en) Biomass dry gasification centralized air supply system
CN210261683U (en) Vacuum negative pressure pyrolysis modification device for extracting biological liquid clean fuel from waste oil
CN105586078B (en) A kind of heavy oil coking method
CN202936381U (en) Heavy oil pyrolysis and gasification device with coupled combined type lifting pipe and downer reactor
CN104342197A (en) Double lift pipe catalytic cracking method and device
CN105586066B (en) A kind of processing method of regeneration fume from catalytic cracking
CN207507489U (en) A kind of full back-mixed reactors of coal tar hydrogenating

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant